April 4, 2022
.LETTER OF APPROVAL WITH MODIFICATIONS
topers, LLC
;tacy Johnson, Managing Member
NC 27569
RE: Project Name: Fynloch Chase Subdivision
Project ID: Wayne-2022-029
County: Wayne
Cit : Nahunta
Address: Governor Aycock Road
River Basin: Neuse
Date Received by LQS: March 7, 2022
Sub itted By: Bryan K. Jones Consulting Engineers, PA
Plar Type: New
Dear Mada
Acres Approved: 54.0
This office as reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modificatia s. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing ctiviLy has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010006 Construction General Permit. After the form is reviewed and found to be
complete, y u i,vJll receive a link with payment instructions for the $100 annual permit
fee. After t e fee is processed, you will receive the COC via email. As the Financially
Responsible Par y shown on the PRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed
atdeq.nc.gov/NCG01. Please direct questions about the eNOI Form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title ISA NCIAC -,,B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
North Carolina Department of Environmental Quality I Division of Energy, ivl6neral and land Resources
Washington Rteglonai office 1 943 Washington Square Mall I Washington, North Carolina 27889
252,946,0481
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection ro insure compliance with the approved plan.
North Car lina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencernent of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (Mort Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan nd implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules m y also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbanc , as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and ad Jitional application fee. You are requested to file an amended form if there is any
change in t e information included on the form. In addition, it would be helpful if you notify
this office o the proposed starting date for this project.
Please be ai
the Neuse I
Protection
directly adj
and estuari,
please cont,
in our reRio
Sincerely,
/0�l
Samir Duml
Regional Er
Land Qualit
cc w/o enc:
vised that a rule to protect and maintain existing buffers along watercourses in
iver Basin became effective on July 22, 1997. The Neuse River Riparian Area
nd Maintenance Rule (15A NCAC 2B.0233) applies to the 50-foot wide zone
cent to surface waters (intermittent streams, perennial streams, lakes, ponds,
s) in the Neuse River Basin. For more information about this riparian area rule,
ct the Division of Water Resources Wetland/401 Unit at 919-807-6300, or DWR
ial office at 252-946-6481.
45 5 4V_
or, PE
,ineer
Section
Stacy Johnson, J & N Developers. LLC (email)
Bryan Jones, PE, Bryan K. Jones Consulting Engineers, PA (email)
WaRO Division of Water Resources (email)
54.
All
developer is responsible for the control of sediment on -site. If the approved erosion
sedimentation control measures prove insufficient, the developer must take those
tional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
i sediment storage device must be inspected after each storm event (NCGS 113A-
(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity.
pediment storage measures will remain on site and functional until all grading and final
scaping of the project is complete (I 5A NCAC 04B _0113).
2, The developer is responsible for obtaining all permits and approvals necessary for the
dev lopment of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
ties urces' enforcement requirements within Section 401 of the Clean Water Act, the U.S.
Ar y Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
_Viu icipalities' ordinances, or others that maybe required. This approval cannot supersede
any then permit or approval.
3
Ade hate and appropriate measures must be ,properly installed downstream, within the
lim-1 s of uisturbance, of any land disturbing activity to prevent sediment from leaving the
lima s of disturbance, entering existing drainage systems, impacting an on -site natural
Nvatc rcoisr:;e or adjoining property. (NCGS 113A-57)
PROJECT INFORMATION SHEET
APPROVAL DATE: April 4. 2022
RESPONS]
BLE PARTY
PROJECT NAME:
COUNTY:
& N Developers, LLC
loch Chase Subdivision
Wavne
NO.: Wavne-2022-029
OFF-SITEORROW
AND/OR ISPOSAL SITE: NO.:
START-UP DATE: (;
CONTRACTOR: Rew ,.r- Qt A.t, C ` - o j• .�
h ` '
ON -SITE C NTACT:
ON -SITE PHONE NO.:
OFFICE PRONE NO.:
4 i q --- 9,21 Y i.
lq_ raw-&Dt
COMPLETE & RETURN THIS FORM
PRIOR -TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: James Edwards
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889