HomeMy WebLinkAbout20220301 Ver 1_More Info Received_202203101
Anderson, Mitchell L
From:Carissa Parker <carissa@bennickgrading.com>
Sent:Thursday, March 10, 2022 2:20 PM
To:Anderson, Mitchell L
Subject:Re: [External] Re: DWR 22-0301_ Nitard, Shoreline Stabilization, 2523 West Paradise Harbor Dr_
Request for Additional Information
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Item 7 yes that is correct, impacts are to open waters, not wetlands
Item 8 Impacts to zone 1 only, no impact to zone 2
The invoice has been paid online. Let me know if you need anything further.
Thanks
Carissa Parker
Office Manager
Bennick Enterprises, LLC.
P.O Box 1059
Nebo, NC 28761
Phone- (828) 659-1000
Email- carissa@bennickgrading.com
www.bennickgrading.com
On Thu, Mar 10, 2022 at 2:03 PM Anderson, Mitchell L <mitchell.anderson@ncdenr.gov> wrote:
Hello Ms. Parker,
Thank you for providing this information.
These documents satisfy requested items 1,3,4,5,6. Please confirm or provide corrected impact calculations as detailed
in requested items 7 and 8.
7. Indicated in section D.2. of your PCN are impacts of 0.100 acres to wetlands. Impacts typically associated with
shoreline stabilization projects along Lake Rhodhiss would be considered impacts to Open Waters. Please
confirm the type of impacts proposed for this project.
2
8. Indicated in section D.6. of your PCN are impacts to both Zone 1 and Zone 2 of the Catawba Buffer. Impacts to
Zone 2 of the Catawba Buffer are atypical when work is performed from barge. Please confirm the type of
impacts proposed for this project.
The 50‐foot buffer is split into two zones.
‐Zone 1 extends from full pond level landward a distance of 30 feet, measured horizontally on a line
perpendicular to the lake.
‐Zone 2 begins at the outer edge of Zone 1 and extends landward 20 feet as measured horizontally on a
line perpendicular to the lake
Attached is the fee request email sent on February 24, 2022
Please email mitchell.anderson@ncdenr.gov if you have any questions.
Mitchell Anderson
Environmental Specialist – Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ – Division of Water Resources
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
828-296-4662 office
mitchell.anderson@ncdenr.gov
3
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Carissa Parker <carissa@bennickgrading.com>
Sent: Thursday, March 10, 2022 9:55 AM
To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>
Subject: [External] Re: DWR 22‐0301_ Nitard, Shoreline Stabilization, 2523 West Paradise Harbor Dr_ Request for
Additional Information
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hey Mitchell
Could you send me the link to pay the fee online? I never got this one. The other items are attached. If you
need anything else, let me know.
Thanks
Carissa Parker
Office Manager
Bennick Enterprises, LLC.
P.O Box 1059
Nebo, NC 28761
Phone- (828) 659-1000
Email- carissa@bennickgrading.com
www.bennickgrading.com
On Thu, Mar 10, 2022 at 9:34 AM Stefan Wilson <stefan@bennickgrading.com> wrote:
4
‐‐‐‐‐‐‐‐‐‐ Forwarded message ‐‐‐‐‐‐‐‐‐
From: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>
Date: Wed, Mar 9, 2022 at 3:51 PM
Subject: DWR 22‐0301_ Nitard, Shoreline Stabilization, 2523 West Paradise Harbor Dr_ Request for Additional
Information
To: Stefan Wilson <Stefan@bennickgrading.com>
CC: Brandee.C.Boggs@usace.army.mil <brandee.c.boggs@usace.army.mil>
Hello Mr. Wilson,
On February 22, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water
Quality Certification from the Division for the subject project. An email containing instructions to submit the required
application review fee was sent on February 23, 2022. The Division has determined that your application is incomplete
and cannot be processed. The application is on‐hold until all of the following information is received:
1. A signed and dated copy of the Agent Authorization letter must be submitted if the Agent has signed this
application form. (A form can be downloaded here:
http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE_AGENT_AUTHORIZATION_F
ORM.pdf)
2. The Division has not received the application review fee. The application is not complete until the fee is
received. Please ensure the application review fee is paid. [15A NCAC 02H .0502(a)(10)]
3. Please provide a site plan showing the property boundaries, structures (buildings, docks, impervious surfaces,
etc.), location of the shoreline, location of the impacts to the shoreline and/or lake bottom (excavation,
dredging, rip rap, retaining walls, etc.), and the location and area (sqft) of any vegetated areas that will be
impacted within Zone 1 and Zone 2 of the Catawba Riparian Buffer Rule. [15A NCAC 02H .0502(a)(9)]
4. Please locate all protected riparian buffers as overlays on the site plan, clearly showing Zone 1 and Zone 2. [15A
NCAC 02B .0611(b)(1)(f)]
5. Please provide an elevation plan showing the approximate location of rip rap or fill to be placed above and
below the Full Pond/ Normal Water Level elevation. The template located on pages 4‐5 of the help document
linked below may be used to assist with this requirement. [15A NCAC 02H .0502(a)(9)]
5
https://files.nc.gov/ncdeq/Water%20Quality/Surface%20Water%20Protection/401/Certs%20and%20Permits/
SSGP09‐2020_ShorelineForm_09112020Final.docx
6. Please provide a photograph of the shoreline/ buffer proposed to be stabilized.
7. Indicated in section D.2. of your PCN are impacts of 0.100 acres to wetlands. Impacts typically associated with
shoreline stabilization projects along Lake Rhodhiss would be considered impacts to Open Waters. Please
confirm the type of impacts proposed for this project.
8. Indicated in section D.6. of your PCN are impacts to both Zone 1 and Zone 2 of the Catawba Buffer. Impacts to
Zone 2 of the Catawba Buffer are atypical when work is performed from barge. Please confirm the type of
impacts proposed for this project.
The 50‐foot buffer is split into two zones.
‐Zone 1 extends from full pond level landward a distance of 30 feet, measured horizontally on a line
perpendicular to the lake.
‐Zone 2 begins at the outer edge of Zone 1 and extends landward 20 feet as measured horizontally on
a line perpendicular to the lake
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the
proper consideration of the application. Please respond in writing within 30 calendar days. If all of the requested
information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the
application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division
for approval, including a complete application package and the appropriate fee.
Thank you,
Mitchell Anderson
Environmental Specialist – Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ – Division of Water Resources
6
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
828-296-4662 office
mitchell.anderson@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
‐‐
Stefan Wilson‐ Shoreline Project Manager
828‐334‐9094
stefan@bennickgrading.com
Bennick Grading
7836 Hwy 70 E Nebo,
NC 28761
828‐659‐1000