HomeMy WebLinkAboutSW1210901_Supplement-EZ Form_20220405DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Dry Pond
5
Total BUA in project (sq ft
18774 sf
6
New BUA on subdivided lots (subject to
permitting) (sq ft)
sf
7permitting)
New BUA outside of subdivided lots (subject to
sf
18774 sf
8
Offsite - total area (sq ft)
sf
9
Offsite BUA (sq ft
sf
10
Breakdown of new BUA outside subdivided lots:
-Parking s ft
18774 sf
Sidewalk (sq ft
sf
Roof (sq ft
sf
Roadway s ft
sf
Future (sq ft
sf
Other, please specify in the comment box
below (sq ft
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
sf
14
Existing BUA that is already permitted (sq ft
sf
15
Existina BUA that will be removed (sq ft
sf
16
Percent BUA
67%
17
1 Design storm inches
3 in
18
1 Design volume of SCM cu ft
3684 cf
19
ICalculation method for design volume
SCS method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
20 drainage area(s):
According to Appendix E-4 of the NCDEQ Stormwater Design Manual, the
dry pond was designed to drawn down in 40 hours rather than 48 hours
because this is an airport project and permanent pooling must be avoided.
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Dry Pond
5
Total BUA from project (sq ft
18774 sf
6
1995 rules
SL 2006-246
2008 rules
2017 rules
New BUA on subdivided lots (subject to
ermittin ) (sq ft)
1995 rules
SL 2006-246
7
sf
2008 rules
2017 rules
8
New BUA outside of subdivided lots (subject
to rmittin sf
18774 sf
1995 rules
SL 2006-246
2008 rules
2017 rules
9
Offsite -total area (sq ft
sf
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA s ft
sf
1995 rules
SL 2006-246
2008 rules
2017 rules
11
Design storm inches
1 in
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
Parking (sq ft
18774 sf
Sidewalk (sq ft
Roof (sq ft
Roadway s ft
Future (sq ft)
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
14
New infiltrating permeable pavement outside of
Isubdivided lots (sq ft
sf
15permitting)
Exisitng BUA that will remain (not subject to
s ft
sf
16
Existing BUA that is already permitted (sq ft
sf
17
Existing BUA that will be removed (sq ft
sf
18
Percent BUA
67%
19
Design volume of SCM cu ft
3684 cf
20
lCalculation method for design volume
Simple Method
ADDITIONAL INFORMATION
21
Please use this space to provide any additional
information about the drainage area(s):
DRY POND
1
1Drainage area number
1
2
IDesign volume of SCM (cu ft)
c
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at
build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or
other engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream
protected from erosion (10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in
excess of the design volume?
Yes
9
What is the method for dewatering the SCM for
maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after
construction?
Yes
11
Does the maintenance access comply with General
MDC (8)?
Yes
12
Does the drainage easement comply with General
MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the
plat comply with General MDC (10)?
No
14
Is there an O&M Agreement that complies with
General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General
MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCIVI designedy an NC licensed
professional?
Yes
DRY POND
MDC FROM 02H .1062
18
SHWT elevation (fmsl)
unknown
19
Elevation of the bottom of the dry pond (fmsl)
2154
20
Distance from bottom to SHWT (feet)
>3ft
21
Elevation of the temporary pool during the design
storm (feet)
2155 ft
22
Ponding depth of the design storm (feet)
1 ft
23
Will the dry pond be uniformly graded to flow toward
the outlet?
Yes
24
Is a low flow channel being provided?
No
25
Are the inlet(s) and outlet located in a manner that
avoids short-circuiting?
Yes
26
Will berms or baffles be provided to increase the
flow path?
No
27
What method of pretreatment will be provided?
Gravel and grass
strip
28
Diameter of drawdown orifice (in)
.8 in
29
Drawdown time for the temporary pool (hours)
40
30
Does the pond minimize impacts to the receiving
channel from the 1-yr, 24-hr storm?
Yes
31
Is there a small permantent pool near the orifice to
prevent clogging?
No
32
Will the outlet be designed to prevent clogging?
Yes
33
Are the dam and embankment planted in non-
clumping turf grass?
Yes
34
Species of turf that will be used on the dam and
embankment
Fescue
35
Will trees and shrubs e prevented from growing on
the dam and embankment?
Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional
36 linformation about the infiltration system(s):
There is no permanent pool proposed in the SCM, this is
Dry Pond 4 3:10 PM 4/1/2022