Loading...
HomeMy WebLinkAboutNCS000348_Closure Plan_20220405Stormwater Permit Closure Plan Capital Power Southport, NC Facility NPDES Permit No. NCS000348 Introduction: Capital Power (CPI) is authorized under the NPDES Permit No. NCS000348 to discharge Stormwater associated with industrial activity via Outfall 01C. Outfall 01C is a combined outfall that is comprised of stormwater drainage areas associated with internal Outfalls 001 through 007. Effective at midnight on March 31, 2021, the facility ceased operations and CPI began the process of closing the facility. The facility closure is scheduled to be completed during the second quarter of 2022. CPI is also in the process of closure of the wastewater treatment system based on the requirements of the NPDES Permit No. NC0065099. CPI notified NCDEQ on November 9, 2021 of the planned wastewater closure activities, and a copy of this closure plan is included as an attachment. CPI's demolition contractor, DH Griffin, has submitted an Erosion and Sedimentation Control (ESC) Plan to NCDEQ and is awaiting receipt of a permit to perform land disturbance work at the facility. A copy of the Certificate of Coverage (COC) can be provided upon receipt. CPI has assumed that stormwater runoff that occurs as a result of the land disturbance work and discharges in accordance with the ESC Plan is allowable in accordance with Part I, Section B (Permitted Activities) of NPDES Permit No. NCS000348. Furthermore, CPI has assumed that NPDES Permit No. NCS000348 can be rescinded independent of the land disturbance work. CPI continues to maintain compliance under NPDES Permit No. NCS000348 and the Stormwater Pollution Prevention Plan (SWPPP), and the following sections provide a closure plan that will be implemented in order to rescind the subject permit. Closure Methodology: The following closure steps will be completed for closure of CPI's stormwater permit. 1. Submit a Stormwater Closure Plan to NCDEQ for review and approval. 2. Officially notify NCDEQ at least 90 days prior to closure. 3. CPI and its contractors will remove potential pollutant sources associated with areas that drain to the stormwater conveyances and ultimately to Outfall 01C. The areas of potential pollutant sources are delineated on the attached SWPPP map and a summary of these areas is presented below: o Drainage Area #1: ■ Condensate Tank ■ Ash Handling and Storage Silos ■ Limestone Silo ■ Fuel Conveyors ■ Bucket Elevator Towers o Drainage Area #2: ■ Equipment and facilities that currently drain to the wastewater basins and discharge under NPDES Permit No. NC0065099. See attached Wastewater Closure Plan for further details. Page 1 of 3 o Drainage Area #3: ■ Cooling Towers ■ Cooling Tower Chemical Storage Areas ■ Rail Car Unloading Area ■ Coal Conveyors ■ Truck Dumper and Wood Conveyors ■ Railroad Spur ■ Railroad Tie Chippers and Storage Piles o Drainage Area #4: ■ Cooling Towers o Drainage Area #5: ■ Demineralizer Building ■ Neutralization Tank ■ Reverse Osmosis Building ■ Drum Storage Area ■ Water Tanks ■ Pump House o Drainage Area #6: ■ Laydown Yard Area o Drainage Area #7: ■ Ash Handling and Storage Silo ■ Limestone Silo ■ Electric Fire Pump (EFP) Transformer ■ Unloading Bay ■ Gasoline and Drum Storage Area 4. A sand filter was constructed in Drainage Area #3 and permitted under State Stormwater Management Permit No. SW8 090511 (effective until July 2029). This stormwater control measure was installed to address runoff from impervious areas in the vicinity of the truck dumper and wood conveyor area. CPI also plans to rescind this permit as part of the closure work and the land disturbing activities mentioned above which includes removal of the associated impervious surfaces. 5. Complete closure work required under the Wastewater Closure Plan and rescind NPDES Permit No. NC0065099. Once NPDES Permit No. NC0065099 has been rescinded, runoff from Drainage Area #2 will discharge from the site as "stormwater". These discharges will be managed in accordance with NPDES Permit NO. NCS000348 or the permit issued for land disturbance activities. 6. Notify NCDEQ of completion of the subject closure work, offer opportunity for site visit, and request that the NPDES Permit NO. NCS000348 is rescinded. 7. Prepare a written report documenting the closure work for record keeping purposes to include photographs and a log of closure work. Receive NPDES permit recission letter from NCDEQ. Attachments: 1. SWPPP Map 2. Wastewater Treatment System Closure Plan Page 2of3 Attachments: Page 3 of 3 No Industrial Activity it �. � -� • � � o No Water Industrinl Tnnk Activity Utal@SK ' Punp Water House Tank OUTFALL }}} ooc �z • / No 'Industrinl Activity / V U Haller DRA1IMff Building AREA 7 19 Turbine Building Switch Yard Area 11 No Industrinl Activity ] TF LL 001 'V' 6 7StA Truck Dunper 1 atAnwf ..I AA'E114 .O i FALL OO I Cooling 00 No Industrial O ° Activity I Snnd� OFll0000 0 No Industrial Activity (FIGURE 2: BULK "OIL" FACILITIES &SITE DRAINAGE MAP CPI - USA North Carolina 1281 Powerhouse Drive Southport, Brunswick County, NC coal Starnge Area No Industrinl Activity 0 125 250 FT No Sndusirinl Activity Wastewnter Hnsln Coot �� I � I � rsl R Car L(q 1 Unloading Are 14 Tru k nun 2 No Industrial. Activity LEAF ENVIRONMENTAL & ENGINEERING, P.C. 1426 E. NC HWY 54, STE C DURHAM, NC 27713 480 RCP [HITFALL UNDER RR �005 TRACK / TO DUKE ENERGY OUTF — DISCHARGE r13 DIC CANAL auTFAL , LEGEND: 002 , Tx1 PROJECT NO.: 257019 DATE: December, 2019 DRAWN BY: KJK APPROVED BY: TWM FILE: CPI/Southport/SPPP 0 1) It Trap Pit (12,160-gal capacity) 2) Dlesel Fuel AST (265-gal) 3) Unloading Bay; Gasoline (30-gal) & Drum Storage area 4) Neutrallzation Tank 5) Condensate Tank 6) Ash Silo 7) Limestone Silo 8) Trash Dumpsters 9) Miscellaneous Materlals 10) E.F.P Transformer (125-gal) 11) Two Diesel Fuel AST (1000-gal & 265-gal) 12) Wood, Ash, & Soil Piles 13) Indoor Chemical Storage (Caustics & Flocculants) 14) Railroad Tie Crane/Chippers (200-gal) - By Others 15) Truck Dumper Hydraulic Oil Reservoirs (700-gal & 320-gal) 16) Chipper Transformer (662-gal) - By others 17) Turbine Bldg, - Lubrication system & Reservoirs (2 x 2000 gal) EHC Controllers (2 x 80-gal) 18) Step-up Transformers (2 x 9750-gal) Auxiliary Transformers (2 x 1090-gal) 19) Power transformers (2 x 77-gal) 20) it Storage Room (55-gal drums) (12 x GO -gat) (1 x 150-gal) 21) Chipper Diesel Fuel AST (1750-gal) - By Others ----------- Underground Pipe/Structure Gravel Surface — — — Dralnage Area Boundary H+HH+Hi+R+R+R+ Railroad Tracks Belt Conveyor Fenceline 8 Storm Drain ♦ Outfall Pipe v Overland Flow SK Spill Response Supplies SCALE: AS SHOWN Wastewater Treatment System Closure Plan Capital Power Southport, NC Facility NPDES Permit No. NC0065099 Introduction: CPI USA North Carolina, LLC - Southport (CPI) is authorized under the NPDES Permit No. NC0065099 to discharge treated coal pile runoff, fuel pile runoff from wood and tire derived fuel (TDF), low volume wastewater, cooling tower blowdown, and reverse osmosis filter reject water via Outfall 003 (combined flows from internal Outfalls 001, 002 and 004). Effective at midnight on March 31, 2021, the facility ceased operations and CPI began the process of closing the facility. The facility closure is scheduled to be completed during the third quarter of 2022. The wastewater treatment system closure methodology outlined herein was developed based on the requirements of NPDES Permit No. NC0065099. A summary of the permit requirements is provided below. NPDES Permit No. NC0065099, Part III Section D Facility Closure Requirements: "The Permittee must notify the Division at least 90 days prior to the closure of any wastewater treatment system covered by this permit. The Division may require specific measures during deactivation of the system to prevent adverse impacts to water of the State. This permit cannot be seconded while any activities requiring this permit continue at the permitted facility." Closure Methodology: The following closure steps will be completed for closure of CPI's wastewater treatment system. 1. Submit a Wastewater Treatment System (WWTS) Closure Plan to NCDEQ for review and approval. 2. Officially notify NCDEQ at least 90 days prior to closure. 3. CPI and its contractors will eliminate all potential sources of wastewater from the areas that drain to the wastewater basins that are delineated on the attached map. A summary of these areas is presented below: o Switch Yard ■ Owned/operated by Duke Energy -Progress and connected to the Oil Trap Pit. ■ Cut and cap the drain line from the Duke Power Switch Yard to the Oil Trap Pit. o Rail Car Unloading ■ Confirm that no additional unloading events are scheduled. o Wood Storage Area ■ Remove any residual wood. o Coal Storage Pile ■ Remove any residual coal. ■ Backfill, rough -grade and seed, to minimize erosion caused by stormwater run- off. o Coal Stockout and Reclaim Conveyors ■ Remove any residual coal from the conveyor equipment. o Active Coal Storage Page 1 of 2 ■ Remove any residual coal. o Laydown Area ■ Confirm no potential pollutant sources exposed. o Woodchip Pile ■ Remove any residual wood chips. o Tire -Derived Fuel (TDF) Storage Area ■ Remove any residual TDF o Oil Trap Pit ■ Remove oil from equipment in containment areas that discharge to the Oil Trap Pit. ■ Remove any residual solids and oily wastewater from the Oil Trap Pit. 4. Clean the v-ditches leading to the WWTS. 5. Remove or cap pipelines leading to the WWTS. 6. Clean the WWTS basins. o Remove residual solids and clean the basins. 7. Perform a visual inspection of the cleaned basins for significant cracks. If significant cracks are found, investigate potential impact to soil in the area of the crack(s). 8. Disconnect the discharge pipe between the WWTS and Outfall 003 discharge point. 9. Notify NCDEQ of closure status and offer opportunity for site visit and confirmation inspection. 10. Break up the basins, backfill, and grade the site. 11. Notify NCDEQ of completion of the closure work, and request that the NPDES permit be rescinded. 12. Prepare a written report documenting the closure work for record keeping purposes to include photographs and a log of closure work. 13. Receive NPDES permit recission letter from NCDEQ. Page 2 of 2