HomeMy WebLinkAbout20060711 Ver 1_More Info Letter_20060505O~QF W AT~RQG Michael F. Easley, Governor
y, William G. Ross Jr., Secretary
r- North Carolina Department of Environment and Natural Resources
~_ .~
d '~ Alan W. Klimek, P.E. Director
Division of Water Quality
May 5, 2006
DWQ Project # 06-0711
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Lance Williams
Holly Pointe, LLC
10612 Winding Wood Trail
Raleigh, NC 27613
Subject Property: Holly Pointe - Phase I and II
Harris Lake [030607, 18-7-(3), WSV]
REQUEST FOR MORE INFORMATION
Dear Mr. Williams:
On Apri125, 2006, the Division of Water. Quality (DWQ) received your application on Apri125, 2006, to
impact 1441inear feet of stream to construct the proposed residential subdivision. The DWQ has
determined that your application was incomplete and/or provided inaccurate information as discussed
below. The DWQ. will require additional information in order to process your application to impact
protected wetlands and/or streams on the subject property.. Therefore, unless we receive the additional
information requested below, we will have to move toward denial of your application as required by 15A
NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional
information. Please provide the following information so that we may continue to review your project.
Additional Information Requested:
1. Please indicate which 404 Permit the USACE would use to authorize. this project. Your plans show
seven road crossing of streams near lots Nos. 158 and 117, 111 and 97, 129 and 31, 90 and 52, 145
and 123, 138 and 124, and 1 and 42. You have indicated this application is a "Courtesy Copy" and
that you are applying under an "Isolated Wetland" permit, yet neither your application nor
supporting materials reference any isolated waters. Instead, your application lists seven
"temporary" stream impacts associated with a sewerline, but not the road crossings. Please contact
the USACE to determine which permit you should be applying under, and resubmit your complete
application using the most current attached Pre-Construction Notification application. Please be
sure to include all impacts and associated nationwide permits so that this application can be
reviewed comprehensively. Please note that all impact sites listed in your PCN form must be
clearly labeled and identifiable on the site plans.
2. Please contact DWQ staff to arrange apre-application meeting to make stream determinations on
the on-site surface waters and to discuss measures necessary to complete this application.
3. Please show all stream impacts including all fill slopes, dissipaters and bank stabilization on the
site plan. You will also need to demonstrate that these crossings have been designed to provide
for aquatic life passage.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: htirr ~h?a_enr_state,~icus ncwetlands
N""on~~ennCarolina
~va~ura!!r~
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Holly Pointe, LLC
Page 2 of 2
May 5, 2006
4. Please place building envelopes on all lots containing streams or wetlands. This is particularly
important in order to demonstrate that the lots have been designed to be buildable without
incurring additional future wetlands and stream impacts (i.e. see lots 145, 157, 118, 137, and
other lots containing streams which might be encroached upon to build houses).
Please see item XI of the PCN form, which requests a specific description of proposed
impervious area based on build-out conditions. You have stated that it will be "<30%" but have
not provided a breakdown of impervious areas. Please provide a specific project breakdown of
all impervious areas such as houses, road, sidewalks, outbuildings, and driveways.. It will be
necessary to quantify these impacts in order for us to concur that you do not need a stormwater
management plan.
6. Please indicate the stormwater outfalls on the site plan.
7. It would be helpful if you could provide your electronic CAD files for this project specifically
showing the stream impacts. Please forward this data via CD and. email them, size permitting, to
ian.mcmillan@ncmail.net
Please respond within three weeks of the date of this letter by sending this information to me in writing
and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks,. we
will assume that you no longer want to pursue this project and we will consider the project as withdrawn..
This letter only addresses the application review and does not authorize any impacts to wetlands, waters.
or protected buffers: Please be aware that any impacts requested within your application are not
authorized (at this time). by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to discuss this matter.
Sincerely,
1 `~
Cyndi Karoly, Supervisor
401 Oversight/Express Review Permitting Unit
CBK/ijm
Enclosures: March 2005 Pre-Construction Notification Application
cc: Eric Kulz, DWQ Raleigh Regional Office.
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Randy Miller, Thompson & Associates, 153 Holly Springs Road, Holly Springs, NC 27540
Filename: 060711 HollyPointePhIand2(Wake)On_Hold