Loading...
HomeMy WebLinkAbout20170239_ Post-Construction Stormwater BMP opportunity at U-3109 Carpenter,Kristi From:McDaniel, Andrew H. Sent:Tuesday, April 05, 2022 3:59 PM To:Wanucha, Dave; Conchilla, Ryan Cc:Parker, Jerry A; Moore, Della R; Patterson, Robert D; Lipscomb, Brian S Subject:RE: Post-Construction Stormwater BMP opportunity at U-3109 Dave, Jerry is going to provide me with more information about the specific location and I’ll send an engineer out to assess the site. Most likely it will be Brian Lipscomb. Brian is overseeing our update of the BMP Toolbox so he is very familiar with a wide range of stormwater management options. We’ll coordinate through Jerry so you have a consistent chain of communication. Best, Andy _____________________________________________ From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Tuesday, April 5, 2022 2:45 PM To: McDaniel, Andrew H. <ahmcdaniel@ncdot.gov>; Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Cc: Parker, Jerry A <japarker3@ncdot.gov>; Moore, Della R <drmoore2@ncdot.gov>; Patterson, Robert D <robert.patterson@ncdenr.gov> Subject: Post-Construction Stormwater BMP opportunity at U-3109 Hey Andy, Ryan and I met with Div 7 DEOs (Jerry Parker and Della Moore) this morning on U-3109 (Mebane Bypass) to discuss a stormwater drainage issue at a permit site, of which we believe may be an excellent candidate for a stormwater BMP (stormwater wetland perhaps). The area in question is used as an erosion control sedimentation basin (a converted old farm pond) at the toe of a fill slope (picture attached). The original plan was to fill the pond and construct a rip rap lined ditch below the existing dam to transport stormwater to a downstream JS. Jerry is concerned that this will not work because of the volume/intensity of stormwater discharge and existing wetland conditions at the toe of slope. Ryan and I suggested that a more formalized stormwater BMP would be more appropriate provided better treatment. The downstream receiving stream is WS-II; HQW; NSW-Jordan Lake Buffers. So, please assess and let us know if a stormwater BMP would be feasible at this location and if you would like to meet out there to take a closer look or if you need more info. 1 Thanks. Dave W. << File: Potential SW BMP.jpg >> Dave Wanucha Division of Water Resources 401 & Buffer Transportation Permitting NCDOT Divisions 9 and 11 NC Department of Environmental Quality 336-403-5655 Mobile 336-776-9703 Office Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2