Loading...
HomeMy WebLinkAbout20210023 Ver 3_Site Walk Request Memo_20220404Mitigation Project Information Upload ID#* 20210023 Version* 3 Select Reviewer: * Katie Merritt Initial Review Completed Date 04/05/2022 Mitigation Project Submittal - 4/4/2022 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Jason Lorch Project Information ID#:* 20210023 Existing ID# Project Type: Project Name: County: Email Address: * jlorch@wildlandseng.com Version:* 3 DMS • Mitigation Bank Anderson Farm Phase II Mitigation Site Wayne Document Information Mitigation Document Type: * Mitigation As -Built Plans File Upload: Signature ............................................ Print Name: * Signature:* Existing Version Anderson Farm II Site Walk Request Memo.pdf 5.49MB Please upload only one PDF of the complete file that needs to be submitted... Jason Lorch Anderson Farm II Mitigation Bank Parcel – Memo    Wildlands Engineering, Inc.    page 1  April 4, 2022  MEMORANDUM TO:    Katie Merritt, Nutrient Offset & Buffer Banking Coordinator  FROM:    Andrea Eckardt, Project Manager        Jason Lorch, Monitoring Coordinator     DATE:    April 4, 2022  RE:    Request for Site Visit        MBI Task 2 Site Walk        ANDERSON FARM II MITIGATION BANK PARCEL‐ Mount Olive, NC       The Anderson Farm II Mitigation Bank Parcel (Parcel) is in Wayne County approximately 6 miles  northeast of the town of Mount Olive. The Parcel is directly adjacent to the North Carolina Division of  Mitigation Services (NCDMS) Anderson Farm Mitigation Site and was restored to provide ecological and  water quality enhancements to the Neuse River Basin by restoring the riparian buffer along three  unnamed tributaries (UT1, UT2, and UT3), and one ditch (Ditch A). Buffer widths within the NCDMS  project extend up to 100 feet from the tops of banks of UT1, UT2, and most of UT3. The Parcel extends  these buffer widths another 100 feet, creating a total of 200 feet of functional riparian corridor along  UT1, UT2, and UT3. Additionally, Ditch A is buffered from the top of bank to 200 feet. Prior to mitigation  activities the Parcel was used to produce row crops. Tables 1 and 2 contain project overview and credit  applicability information.   Table 1. Project Overview  Project Name Anderson Farm II Mitigation Bank Parcel  Hydrologic Unit Code 03020201170040  River Basin  Neuse (Excluding Falls Lake)  Geographic Location (Lat, Long) 35.251662, ‐78.103729  Site Protection Instrument (DB, PG) BK 3710 PG 286  Total Credits 42,798.000 ft² Buffer Mitigation Credits; 30,745.765 lbs. N   Types of Credits Riparian Buffer and Nutrient Offset  BPDP Date October 2021  Initial Planting Date March 2022  Baseline Report Date April 2022  MY1 Report Date December 2022  MY2 Report Date December 2023  MY3 Report Date December 2024   MY4 Report Date December 2025  MY5 Report Date December 2026   Anderson Farm II Mitigation Bank Parcel – Memo    Wildlands Engineering, Inc.    page 2  April 4, 2022    Table 2. Credit Viability  Feature Name  (BPDP) Classification Buffer Credit Viable Nutrient Offset Viable  UT1 Stream Yes  Yes   UT2 Stream Yes Yes  UT3 Stream Yes Yes  Ditch A Ditch No Yes  Approximately 15.95 acres have been protected under the conservation easement. The mitigation  activity for 14.35 acres was riparian restoration, of which 0.92 acres are proposed for buffer mitigation  credit while 13.43 acres are proposed for nutrient offset credit. The Buffer Interpretation /Clarification  Memo #2008‐019 applies to Ditch A where maintenance of diffuse flow onsite is unattainable, therefore  a total of 1,982 square feet have been removed from the creditable area of Ditch A.     The land use within 200 feet from top of bank of the project features had been maintained and cleared  for row crop cultivation prior to restoration activities; therefore, soil disturbance during project planting  was minimal. Bare root trees were planted using a dibble bar at a spacing of 7 feet by 12 feet, which  resulted in a stem density of 502 stems per acre. Prior to planting, herbaceous cover established  naturally, therefore seeding was deemed unnecessary. Table 3 includes a list of tree species planted  along with their density and composition at planting.   Table 3. Tree Species Selected for Planting  Species Common Name Number Planted % of Total  Diospyros virginiana Common Persimmon 764 (50 stems/acre) 10%  Platanus occidentalis Sycamore  1,131 (74 stems/acre) 15%  Betula nigra River Birch  1,131 (74 stems/acre) 15%  Quercus pagoda Cherrybark Oak 764 (50 stems/acre) 10%  Populus deltoides Eastern Cottonwood 764 (50 stems/acre) 10%  Quercus michauxii Swamp Chestnut Oak 764 (50 stems/acre) 10%  Celtis laevigata Sugarberry 396 (26 stems/acre) 5%  Ulmus americana American Elm 396 (26 stems/acre) 5%  Prunus serotina Black Cherry 396 (26 stems/acre) 5%  Magnolia virginiana Sweetbay 396 (26 stems/acre) 5%  Acer negundo Boxelder 764 (50 stems/acre) 10%  Easement boundaries have been identified in the field to ensure clear distinction between the Parcel  and adjacent properties. Boundaries are identified by 6 foot “t posts” with attached easement placards.  Signage along the outer perimeter of the Parcel has been placed at 100‐foot intervals where the  easement does not directly parallel the NCDMS conservation easement. In areas where the Parcel  Anderson Farm II Mitigation Bank Parcel – Memo    Wildlands Engineering, Inc.    page 3  April 4, 2022  easement directly parallels the NCDMS easement, NCDMS placards have been placed so that they are  within the range of 100 to 200 feet apart.    Attachments:  Credit Service Area Figure  Monitoring Map  Vegetation Plot Photographs    Credit Service Area Map Anderson Farm II Mitigation Bank Parcel Site Walk Request Memo Neuse River Basin (03020201) 0 105 Miles Wayne County, NC ¹ ^_ County Boundaries HUC03020201 Riparian Buffer Credits and Nutrient Offset Credits Service Area ^_ Anderson Farm II Parcel Location 03020201 Monitoring Map Anderson Farm II Mitigation Bank Parcel Site Walk Request Memo Neuse River Basin (03020201) 0 250125 Feet Wayne County, NC ¹UT1UT1UT3 UT2Ditch A1 4 5 3 6 12 11 2 7 8 9 10 Project Location Bank Parcel Conservation Easement NCDMS Conservation Easement Project Stream Project Ditch Riparian Restoration for Buffer Credits Riparian Restoration for Nutrient Offset Credits Not for Credit Vegetation Plot Non-Project Stream 2019 Aerial Photography                           VEGETATION PLOT PHOTOGRAPHS                                           Anderson Farm II Mitigation Bank Parcel Site Walk Request Memo – Vegetation Plot Photographs    VEG PLOT 1 (3/21/2022) VEG PLOT 2 (3/21/2022)     VEG PLOT 3 (3/21/2022) VEG PLOT 4 (3/21/2022)     VEG PLOT 5 (3/21/2022) VEG PLOT 6 (3/21/2022)     Anderson Farm II Mitigation Bank Parcel Site Walk Request Memo – Vegetation Plot Photographs    VEG PLOT 7 (3/21/2022) VEG PLOT 8 (3/21/2022)    VEG PLOT 9 (3/21/2022) VEG PLOT 10 (3/21/2022)    VEG PLOT 11 (3/21/2022) VEG PLOT 12 (3/21/2022)