HomeMy WebLinkAboutNCC221314_ESC Approval Submitted_20220405Iredell County Planning & Development
Erosion Control Section
349 North Center Street
P.O. Box 788
Statesville, NC 28687
Date: March 181h 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Joe F. Teague, Jr.
Madison Capital Group Holdings, LLC
6805 Morrison Blvd. Ste. 250
Charlotte, NC 28211
RE: Project Name: Blue Gate Mooresville
Acres Approved with Modifications: 11.00
Project ID: MVLLE-2022-083
Project Location: PIN 4647871979.000
Submitted By: ACRO Development Services
Date Received: February 25`h 2022
Plan Type: New
Dear Mr. Teague:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and herby issue this Letter of Approval with Modifications.
Modifications must be received in this office no later than two weeks prior to the project start
date. Failure to submit modified plans can result in a violation and fine under the Iredell County
Land Development Code. The Modifications required for Approval are listed on the attached
page. The Certificate of Approval issued by Iredell County must be posted at the job site. This
plan approval shall expire three (3) years following the date of this approval as is required by
Title 15A NCAC 413.0129 and Appendix H of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code
requires that a copy of the approved erosion control plan be on file at the job site. Any
amendments and/or revisions to the approved plan must be reviewed and approved prior to
implementation in order for the site to remain in compliance. Failure to submit plans for approval
may result in administrative actions and/or penalties as indicated in the Iredell County Land
Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix
H of the Iredell County Land Development Code, of our right of periodic inspection to insure
compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
Letter of Approval with Modifications
Blue Gate Mooresville
March 18"' 2022
Page 2 of 3
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Iredell County Land Development Code and the
Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through
66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval. it is the responsibility of the applicant to obtain all other required permits or
approvals.
As of May 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days. As of
May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it is required that this
office to be notified of the proposed starting date for this project. Failure to notify this office of
the starting date may result in a Notice of Violation and civil penalty. As required in the
approved plan construction sequencing, please schedule a preconstruction conference with our
staff prior to land disturbing activity.
Your cooperation is appreciated.
Sincerely,
Jonathan Williams
Erosion Control Inspector II
Enclosures: Modifications
Fact Sheet on the New NCGO1 Permit
Permit
Letter of Approval with Modifications
Blue Gate Mooresville
March 18" 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Blue Gate Mooresville
Project ID: MVLLE-2022-063
County: Iredell
Reviewed by: Jonathan Williams
Required changes are designated as "RC" under legal authority from NC
General Statutes Chapter 113A Article 4 and the Iredell County Land
Development Code.
Suggested changes are designated as "SC" for improvement of the plan.
1. Label all stormwater bypass channels, note their installation in the construction sequence
and provide a detail that includes the immediate stabilization of the channel once
installed. Downslopes of the channels must be protected during installation. —RC
2. Install a diversion or swale to the south of Basin 3 to direct runoff behind the 3'd baffle
furthest from the skimmer. —RC
3. In erosion control note 7 change language to include that all stockpiles must be at least 50
feet from all diversions and basins, have silt fence installed around the immediate
downslopes and stabilize once inactive for 7 days. —RC
4. In the Phase I Construction Sequence, include verifying NCGO1 permit has been
obtained prior land disturbance and bring copies of all applicable Town of
Mooresville/NCDOT permits for disturbances related to utility installation and/or road
right-of-way work. —RC
5. In Erosion and Sediment Control Narrative: Construction Drive, sediment tracked onto
the road is to be cleaned immediately, not daily. —RC
6. Adjust Basin 1 Phase 1 orifice size to 1.5 inches. --RC
7. Adjust Basin I Phase 2 orifice size to 2 inches. —RC
8. Adjust Basin 2 orifice size to 1.5 inches. —RC
9. Adjust Basin 3 orifice size to 1 inch. —RC
10. Use slope drains for all diversion entry points into the basins. Provide detail. —SC
11. Install a 3" baffle between diversion ditch 2 entry point into Basin 1 and the skimmer. --
SC
12. Use straw wattles in place of rock checkdams in the diversion ditches. Provide detail. -SC