Loading...
HomeMy WebLinkAboutNCG140095_Inspection Report_20220315Compliance Inspection Report Permit: NCG140095 Effective: 08/01/17 Expiration: 06/30/22 Owner : Chandler Concrete Co., Inc. SOC: Effective: Expiration: Facility: Chandler Concrete Co - Durham Pit #603 County: Durham 2700 E Pettigrew St Region: Raleigh Durham NC 27713 Contact Person: Kenneth E Waegerle Title: Phone: 336-226-1181 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/15/2022 Entry Time 11:OOAM Exit Time: 11:30AM Primary Inspector: Lauren Garcia Phone: 919-707-3648 Secondary Inspector(s): Brittany D Carson Phone Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140095 Owner -Facility: Chandler Concrete Co., Inc. Inspection Date: 03/15/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site was neat and well maintained. All requrested documents were present. The facility recycles treated water. All water onsite flows into the wastewater treatment system. Outfalls discharge to the city. Page 2 of 3 Permit: NCG140095 Owner -Facility: Chandler Concrete Co., Inc. Inspection Date: 03/15/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: The SWPPP was last updated in 2017. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3