Loading...
HomeMy WebLinkAboutNCG140445_Inspection Report_20220315Compliance Inspection Report Permit: NCG140445 Effective: 08/01/17 Expiration: 06/30/22 Owner: Carolina Sunrock LLC SOC: Effective: Expiration: Facility: Muirhead Distribution Center (MDC) County: Durham 1503 Camden Ave Region: Raleigh Durham NC 27704 Contact Person: Scott Martino Title: Phone: 919-747-6336 Directions to Facility: Camden Avenue just north of 1-85/70 overpass. System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/15/2022 Entry Time 12:OOPM Primary Inspector: Lauren Garcia Secondary Inspector(s): Certification: Phone: Exit Time: 12:30PM Phone: 919-707-3648 Brittany D Carson Phone : Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140445 Owner - Facility: Carolina Sunrock LLC Inspection Date: 03/15/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Facility is a combined asphalt and concrete plant. The facility contacts were told an NCG160000 General permit for Asphalt will be required. A seperate Notice will be sent. Sampling records are maintained on an internal database. Several DMRs for 2019-2021 were available in our Laserfiche Wek Portal. Wash water goes through a weir and is piped to basins to treat pH. Page 2 of 3 Permit: NCG140445 Owner - Facility: Carolina Sunrock LLC Inspection Date: 03/15/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: The SWPPP was dated 2019. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page 3 of 3