Loading...
HomeMy WebLinkAboutNCC215215_Modification Confirmation Email_20220405Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Tuesday, April 5, 2022 1:42 PM To: gknapp@nvrinc.com Cc: Georgoulias, Bethany; Morman, Alaina; gknapp@nvrinc.com; abeck@nvrinc.com Subject: Modification Confirmation This e-mail is to notify you that the modification information for COC No. NCC215215 for the project Stockbridge at Tanglewood Phase 2 that you submitted on 4/4/2022 has been added to the permit file records as of 4/5/2022. Modification Reason: Additional Lots/Outparcels Approved - E&SC Revised Additional Details (if provided): Adding lots 174,182,190 and 191 Also added older lots 167 and 175 for a correction per Samir Dumpor You can find all Construction COC Permit files in our Document Repository here. Questions? Please contact The NC Stormwater Program at (919) 707-3640. This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.