HomeMy WebLinkAboutNCC215215_Modification Confirmation Email_20220405Georgoulias, Bethany
From:
laserfiche@ncdenr.gov
Sent:
Tuesday, April 5, 2022 1:42 PM
To:
gknapp@nvrinc.com
Cc:
Georgoulias, Bethany; Morman, Alaina; gknapp@nvrinc.com; abeck@nvrinc.com
Subject:
Modification Confirmation
This e-mail is to notify you that the modification information for COC No. NCC215215 for the
project Stockbridge at Tanglewood Phase 2 that you submitted on 4/4/2022 has been added to the permit file
records as of 4/5/2022.
Modification Reason: Additional Lots/Outparcels Approved - E&SC Revised
Additional Details (if provided): Adding lots 174,182,190 and 191
Also added older lots 167 and 175 for a correction per Samir Dumpor
You can find all Construction COC Permit files in our Document Repository here.
Questions? Please contact The NC Stormwater Program at (919) 707-3640.
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.