Loading...
HomeMy WebLinkAbout20011836 Ver 3_Permit Extension Email_20220404From: To: Cc: Subject: Date: Attachments: Matthews, Kathryn H Dunn, Maria T.; Snider, Holley; Coats, Heather; Harding, Kimberlee k Currey, Gregory E CIV USARMY CELRP (USA) Re: [External] Holden Beach permit extension Monday, April 4, 2022 1:01:47 PM imaae002.onq CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. I agree with Maria - she captured all of my concerns. Thanks, Kathy Please note that I am teleworking almost exclusively. Email is the best way to reach me. Thanks, Kathy Matthews NC Renewable Energy Coordinator & Fish and Wildlife Biologist U.S. Fish and Wildlife Service 551-F Pylon Drive Raleigh, NC 27606 919-856-4520, x. 27 From: Dunn, Maria T. <maria.dunn@ncwildlife.org> Sent: Monday, April 4, 2022 12:33 PM To: Snider, Holley <holley.snider@ncdenr.gov>; Coats, Heather <heather.coats@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov> Cc: Currey, Gregory E CIV USARMY CELRP (USA) <Gregory.E.Currey@usace.army.mil>; Matthews, Kathryn H <kathryn_matthews@fws.gov> Subject: RE: [External] Holden Beach permit extension Heather, NCWRC does not have specific comment with regard to the request to extend dredge operations to April 8. Our comments for this project were more specific to activities on the beach. Therefore, all activities, including equipment removal, smoothing the beach, or addressing any other concerns (tilling, escarpment removal, non -compatible material removal) should be conducted prior to the start of sea turtle nesting season on May 1. Please do not hesitate to call or email if there is anything additional. We look forward to forthcoming information regarding project progression, completion, or any complications. Thank you. Maria Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 office: 252-948-3916 www.ncwildlife.org Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Snider, Holley <holley.snider@ncdenr.gov> Sent: Monday, April 4, 2022 9:34 AM To: Coats, Heather <heather.coats@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org> Cc: Currey, Gregory E CIV USARMY CELRP (USA) <Gregory.E.Currey@usace.army.mil> Subject: RE: [External] Holden Beach permit extension Good afternoon AM, The DWR will defer to the NC Wildlife Resources Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries (DMF), and/or National Marine Fisheries Service (NMFS) for compliance with all moratoriums on construction activities beyond the dates established by the permit conditions. The DWR 401 approval contains the following condition: The Permittee shall comply with any moratoriums as required by the NC Division of Marine Fisheries, NC Wildlife Resources, US Fish and Wildlife and National Marine Fisheries. Exceptions to this condition require written approval by the resource agency responsible for the given moratorium. If such activities should take place during periods of high biological activity (e.g. shorebird, or sea turtle nesting), biological monitoring may be required at the request of other state and federal agencies and coordinated with these dredging activities. Feel free to call or email me if you have any questions. Sincerely, Holley Snider .•" ,><((((°>•' .•.,,..><((((°>.•— Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 E 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Coats, Heather <heather.coats@ncdenr.gov> Sent: Wednesday, March 23, 2022 11:39 AM To: Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org> Cc: Snider, Holley <holley.snider@ncdenr.gov> Subject: FW: [External] Holden Beach permit extension Hi Kim, Well, I didn't get much more than this, but Fran did say the additional requested time is for both dredging and demobilization. Please see his request below for 8 additional days of moratorium relief (allowing work through April 8). Maria, I believe you requested a May 1 start to the moratorium, but want to make you aware of this as well in case you have any questions or concerns. Holley, I don't think you guys have date restrictions on the 401, but want to also let you know in case I'm mistaken! I believe the ACE permit runs through April 30, but I'm also confirming that with Greg. I'm attaching the last QC report- as of Monday they had completed Thanks ladies! H. From: Francis Way <FWay@appliedtm.com> Sent: Tuesday, March 22, 2022 4:59 PM To: Coats, Heather <heather.coats@ncdenr.gov> Subject: [External] Holden Beach permit extension CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Heather, Per our discussions, the town of Holden Beach would like to extend the beach nourishment permit to Friday, April 8, 2022. Weeks is doing their best to finish by the end of March and get to their next project but they may need a little more time. Thanks Fran Fran Way, PE (SC, NC) ► CFM Senior Professional Engineer ATM -ter A Geosyntec Company ATM, a Geosyntec Company' Geosyntec Consultants of NC, P.C.2 941 Houston Northcutt Blvd, Suite 201 Mount Pleasant, SC 29464 Direct: 843.414.1050 Cell: 843.819.4009 www.appliedtm.com www.geosyntec.com 1— Outside of North Carolina 2 — When working in North Carolina