Loading...
HomeMy WebLinkAboutWQ0022224_More Information (Received)_20220307NORTH CAROLINA JOHNSTON COUNTY NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITY CONSTRUCTION AGREEMENT (UCA) DATE: 8/25/2021 AND WBS Elements: 80074 TOWN OF CLAYTON THIS AGREEMENT is made and entered into on the last date executed below, by and between the North Carolina Department of Transportation, an agency of the State of North Carolina, hereinafter referred to as the "Department" and the Town of Clayton, hereinafter referred to as the "Municipality." WI TNESSETH: WHEREAS, the Department has prepared and adopted plans to make certain street and highway improvements under Project W-5704B, in Johnston County, said plans consists of relocating water and sewer lines crossing U$ 70 at Shotwell road.; Johnston County; said project having a right-of- way width as shown on the project plans on file with the Department's office in Raleigh, North Carolina; and, WHEREAS, the parties hereto wish to enter into an agreement for certain utility work to be performed by the Department's construction contractor with full reimbursement by the Municipality for the costs thereof as hereinafter set out. NOW, THEREFORE, it is agreed as follows: PRELIMINARY ENGINEERING 1. The Department shall use its utility limited service agreement for Project W-5704B, JOHNSTON County. 2. The Municipality shall be responsible for the costs of the Preliminary Engineering Design. The actual cost to the Municipality is $8,509.44 as shown on the attached cost estimate, Exhibit "B". It is understood by both the Department and the Municipality that this is a final cost unless the Municipality requests additional work not covered under this Agreement, or plan review by the Agreement ID # 10968 1 Department and/or Municipality does not properly identify all existing conflicts or Department revises highway plans before or during construction. Under this agreement, the Municipality reserves the right to re -engineer plans due to the Department's plan revisions. Upon the satisfactory completion of the utility construction plans covered under this Agreement, the Municipality shall review and approve the plans, the associated estimated utility construction cost and special provisions to be made part of the Department's roadway contract for highway construction; the Municipality shall release the Department of any future responsibility for the design of the utility construction plans. Said releases shall be deemed to be given by the Municipality upon completion of the plans, estimate, special provisions and acceptance by the Department and [Short Name] for the plans to be made part of the highway roadway contract. CONSTRUCTION 4. The Department shall place provisions in the construction contract for Project W-5704B Johnston County, for the contractor to adjust and relocate water and sewer lines. Said work shall be accomplished in accordance with plan sheets, attached hereto as Exhibit "A", cost estimate attached hereto as Exhibit "B", and project specific provisions, if applicable, attached hereto as Exhibit "C". 5. The Municipality shall be responsible for water and sewer lines cost as shown on the attached Exhibit "A". The estimated cost to the Municipality is $37,935 as shown on the attached Exhibit "B". It is understood by poth parties that this is an estimated cost and is subject to change. The Municipality shall reimburse the Department for said costs as follows: REIMBURSEMENT TO THE DEPARTMENT — FINAL BILLING 6. The Municipality shall reimburse the Department for said costs as follows: A. Upon completion of the utility construction plans, the Department shall submit an invoice to the Municipality for 9osts inpurred. Billing will be based upon the negotiated cost and any supplemental agreements rpade part of this agreement. Reimbursement shall be made by the Municipality in one final payment within sixty (60) days of said invoice. Agreement ID # 10968 2 B. Upon completion of the highway work, the Department shall submit an itemized invoice to the Municipality for costs incurred. Billing will be based upon the actual bid prices and actual quantities used. C. Reimbursement shall be made by the Municipality in one final payment within sixty (60) days of said invoice. D. If the Municipality does not pay said invoice within sixty (60) days of the date of the invoice, the Department shall charge interest on any unpaid balance at a variable rate of the prime plus (1 %) in accordance with G.S. 136-27.3. E. Said interest rate shall be set uponfinal execution of the Agreement by the Department. The Municipality will be notified of the set interest rate by the Department's approval letter upon receipt of the fully executed agreement. F. Any cost incurred dye to additional utility work requested by the Municipality after award of the construction contract, shall be solely the responsibility of the Municipality. The Municipality shall re(mburse the Department 100% of the additional utility cost. G. In the event the Municipality fails for any reason to pay the Department in accordance with the provisions for payment hereinabove provided, North Carolina General Statute 136-41.3 authorizes the Department to withhold so much of the Municipality's share of funds allocated to said Municipality by North Carolina General Statute, Section 136-41.1, until such time as the Department has received payment in full. H. At any time prior to final billing by the Department, the Municipality may prepay any portion of the estimated cost by sending a check with the WBS Element noted to the below address. The Department will provide a final billing based on actual costs, less any previous payments that have been made. REMITTANCE ADDRESS: NC Department of Transportation ATTN: Accounts Receivable 1514 Mail Service Center Raleigh, NC 27699-1514 Agreement ID # 10968 3 7. Upon the satisfactory completion of the relocations and adjustments of the utility lines covered under this Agreement, the Municipality shall assume normal maintenance operations to the said utility lines. Upon completion of the construction of the highway project, the Municipality shall release the Department from any and all claims for damages in connection with adjustments made to its utility lines; and, further, the Municipality shall release the Department of any future responsibility for the cost of maintenance to said utility lines. Said releases shall be deemed to be given by the Municipality upon completion of construction of the project and its acceptance by the Department from its contractor unless the Municipality notifies the Department, in writing, to the contrary prior to the Department's acceptance of the project. 8. It is further agreed that the following provisions shall apply regarding the utilities covered in this Agreement. I. The Municipality obligates itself to service and to maintain its facilities to be retained and installed over and along the highway within the Department's right-of-way limits in accordance with the mandate of the North Carolina General Statutes and such other laws, rules, and regulations as have been or may be validly enacted or adopted, now or hereafter. J. If at any time the Department shall require the removal of or changes in the location of the encroaching facilities which are being relocated at the Municipality's expense, the Municipality binds itself, its successors and assigns, to promptly remove or alter said facilities, in order to conform to the said requirement (if applicable per G.S. 136-27.1), without any cost to the Department. 9. The other party to this Agreement shall comply with Title VI of the Civil Rights Act of 1964 (Title 49 CFR, Subtitle A, Part 21) and related nondiscrimination authorities. Title VI and related authorities prohibit discrimination on the basis of race, color, national origin, disability, gender, and age in all programs or activities of any recipient of Federal assistance. 10. A copy or facsimile copy of the signature of any party shall be deemed an original with each fully executed copy of the Agreement as binding as an original, and the parties agree that this Agreement can be executed in counterparts, as duplicate originals, with facsimile signatures sufficient to evidence an agreement to be bound by the terms of the Agreement. 11. By Executive Order 24, issued by Governor Perdue, and N.C. G.S.§ 133-32, it is unlawful for any vendor or contractor ( i.e. architect, bidder, contractor, construction manager, design professional, Agreement ID # 10968 4 engineer, landlord, offeror, seller, subcontractor, supplier, or vendor), to make gifts or to give favors to any State employee of the Governor's Cabinet Agencies (i.e., Administration, Commerce, Environmental Quality, Health and Human Services, Information Technology, Military and Veterans Affairs, Natural and Cultural Resources, Public Safety, Revenue, Transportation, and the Office of the Governor). Agreement ID # 10968 5 IN WITNESS WHEREOF, this Agreement has been executed, in duplicate, the day and year heretofore set out, on the part of the Department and the Municipality by authority duly given. L.S. ATTEST: BY: - ►) nb A -H O E BY: TITLE ToLor\ CIList_ TITL DATE: 'e�rrlbe c- r, ayO a I N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization. TOWN DPLAYTOC� ' n '~ ATED1. ��rnRPD BY: This instrument has been pre -audited in the manner required by the Local Government Budget and Fiscal C• to�. Federal Tax Identifipation Number -‘eP/iov74r Remittance Address: Town of Clayton A9' 7f &5Y7 D,l� i�Go27Psr7p DEPA gta4QgyTRANSPORTATION 7 L. k-aat...., 4.t.,. DATE: 11/17/2021 DS APPROVED BY BOARD OF TRANSPORTATION ITEM 0: 10/7/2021 (Date) Agreement ID # 10968 6 04-AUG-202114:45 S9S41-SERNAMESS$S OJECTS\2021\A2021302.00_SEPI_Shotwell Road \ Design \Utllitles\Engineering \ Agreement \ plans \80074_1J+_tsh_IJCI_psh.dgr. TOWN OF CLAYTON COST STATE COST (NCDOT) COST BREAKDOWN LEGEND 1t 3_SEP alk p\�,aagn\U<alataea\Enganee.ang\Ag.eement\Plen,8007<_Iltaym_UC2_Pda.Egn UOTIeWJOIUI ;o pu3 sanFTun 6uT}sTx3 uod. 03SOd0>:ld uawuo;sueui uamod 0T0e3 uo; aToH pueH ;ueJpRH 8JTJ enoway m o o m®•• ONI 0 ;noueaT6 uamaS RuelTueg ® b ® OH Underground SS Forced Main Line a puea aaJ6aa 41zz puaa aajMad ¢ill —s z"s za zs r '* SF t+ t, t t Bind auoydaTai S108WAS S3I1I1I1(1 9NIISIX3 6 a6 Ten asaaTay ATV EN r W en S108WAS a31VM 03SOdOl:id PROPOSED MISCELLANOUS UTILITIES SYMBOLS UTILITIES PLAN SHEET SYMBOLS z z 00 z m x W UG!!AMaOSECTS\2021\R29213B2.BO,B,Sho<well Faed\Oea�gn\llt�la4ea\Eng�neer�ng\Agreement\Plena\8M1_Il�notea_UC3_paM1.dgn z A m z z m O m ITo N O D O* c Z O Z 1 0 D 0 1 c c? D o A m Z O C T O O A* W W y -0 1 n> mOTm0m1AZTAT TrAOrOz 01m0VOT11 vp[md<OTZCW<mmiD m m01 m OXMOxNNANA DOyAi__A1 3�2 iti -r_{= rT0_A1mrNTG�xr A3A�G2 im.0mTZANZO pf�ilml{mDZZclAA�<<C DAAO m1OO�sz DAOZm O[NAZ-_im�mizmm m- pD*A ,Z AADD1� DDri mD mm>CWDOm(5O-D1 m1O1OTOti �DDOmAD-DDD iDZ1ZDCODII- rr rNZOmmmT z�m OS 1 m Z01�xlzziz0 1DNAOArc10<Om_11< �r rNZA1NrA WD�<DZ O-7°,g_ ��umi AAOzm(miiOAtZ/rD0?4mi fma� - 27012r43 86DZ c7, 1 NO<ZCAEC�OmO zOODOZC=zz=ZA2zm ZAx XCMmmmAG2m1 000nT,zr A0011�10A 11AO11mOOOD mm00 OZ Oc<DOO{NAZOTO m3*2-� 00M0Wmr0'-Z1 WZ'IZOM0Cf011A00m < ODDOAcr*NpO01W DAzmumi �-0m-4mmv=Am 0OO� mAvrn.>>01-Zi mn <MD1n3AmZ 1.0 1WOOW O T O A D 0 1 0 N D N' O O N m 1 2-10 m 2 N m D O Z m Z000<mOANNm ZZ=1mOAop ZO.mz2 PAN-ZIOZOmZ0C1 VoA10 OZOA0 D mOAZO A v�Op�Zzm uDiZziX n1��O��NOO�R1 <`noD011 N-Apl T 1T m ZD Am2 Am OTZ Z 1,-N >Zz0 �z O Zpx <0 -I mmOm mpW z<�czi x m mZ� -r_{Dv 0A * 1 x ▪ z co 1 A mp 1 A m m x 1-0X�x1 0TzmFm 3T COZp DA 10m0 m1m1T ONODmm mTZADO (nTH mrr >010_ z>zC00om0 DA0 Do>TAz Z0 mNi 1.3 - • C c m - mz co 10,-"ON1<-. ,ATDMOZOMMMP O Z ADm()DW 012.1 001TDOTDOc-1 Z?+ "o AzAm 0m O >00 mmc0 ODZ0D m1nAD NWmnOOMODZZ_O-Ir�O▪ x pDpmZQyz >00<<c NmAAZmAm 1m,1m 1▪ mm_101-1-CAmOK, 01mZZOD� 0 . or �N�zpmTO vcD'>D�Z ��Z•tayaimzN��� N Om01Nz0 Nzm�� {�.m�-lfmz c▪ zm� m0mmO1ND0>-4zm mA c�xmvl T ODT--TcoOT nmNo3 N�100m r11f70 OzDTOzzmlmATO 1 Z mOmr�AN T�o�m G�=m=-c-li ominz >CIEMOmMDmZ>AO� N N O Z+ v D m= 1 1 N Zo z m -1 z m z D m N O N 0 2 i ZOOpz1DT OoC=m zomr-Cmi'W -1 vziN� mD�ODTAI1L�Drm Z 073 0, rm ZOW<N !II! mO. jO Z10DOA<2 rOqZATmZDrO NOmx aZ, >>—IZ • z1ZmOmmb-D+rjmA1mmOZm =D1mAm..OT Ommm1f1W-las=10m OD02cmymT m N O m N0=2OWZx0mZ2T1 z N D-1m1, Z{ D2 AmmO=)Cic O .Z0101Vrri- 1 1 Z m m A Z Z 1 N Dz�TO �zfi11� Om* ,�m� m am z T Z 0 O m z co AN-A ANAwT ANN AN--• N NA0DND+TD+ D+-T +A1oA1•Ai 1i-o2I-0r-• 0m•0zO mm-Z,i3O ZO mO m0 Om OM OW O ONO 0ON0 0 •N0 0ON0 OLD°°_ OADrn OiDrn OLDN i T _i 1 1 1000 100`2 1002 100* czx cZD czD czD T 0 o 0 T O" 1 T O 0, 1 T O_.1 T 1 m m � 1 f n V 1 1 1 T 1 m -0 1▪ m mr;m mr+A mr+A mr+A m.ID • m r mOr mgr o'm QAm o-4m A...,,m Z r A Z r T Z r T 0,-, A A z-A m3 m0 m0 m0 --1 7m ry <m D1 1 J' 0 0 0 Z Z SNVld IN3W33HOV :S31ON 1VH3N30 :S31ON OI3IO3dS lO3r0Hd 411 PU to if . 14,7202Iagl ROSECTS\2021\P2021302.00_SEPI_SAotvell Roed\Oeaa \Utattaea\En 5sa gIS��NP�1F18!! 9^ 9aneerang\Agreement\Plena\000)4_Utdt3_UC3e_pah.dgn tnDOr mm-am • oz Z m w mO < 0 m m N D D 0 N m m mwz(./ r > 0 n m O �m {ADO mAO� (OmmZ �n<m2 mr z0 0m zm m • D < m mm z� —I mm 7Jm rm— O z O 0 • W D O 0 z 11 r SO I mni m LJ =<p p -1 no rx pSyz x X mti CmTy p 2 L=ili7n'i_n: z o0 m Z-"idn�ldn: cT�i � p pp v ac m ▪ / 1ync3 "nn Pelm --J_ n m A>m <770 mho mom ADO mam <"70 FA m A�v A Id a31VM Id .Zl mco m m c Z 0 1- cn>A *m'00 Z"0 r-co 0000 > rn D I Z 000-0 Z*2xD Amm m A Z * m m 0_A-I =vim z Z m .TJ 05 0 v c m mm 2 mo m � D A Lk ILL z2 �1cr— g�mz Gm S1 I`dl30 1VOI dAl 103 f'Obd Ae O" >BGAdVi:10JECTSS2021,2021302.00_SEPI_Shoteell RoedtDeflgnAUtilitlea\En rneeo-rn\Pgreemen,Plen,1309J4_Ut_dtl_LIMB_oth.d ,ig'ISC�NP�rlff 9 9 gn MAXIMUM TRENCH WIDTH AT TOP OF PIPE NOMINAL NOMINAL PIPE SIZE TRENCH WIDTH PIPE SIZE TRENCH WIDTH (INCHES) (INCHES) (INCHES) (INCHES) 4 28 20 44 6 30 24 48 8 32 30 54 10 34 36 60 12 36 42 66 14 38 48 72 16 40 54 78 16 42 YIn 4 SEWER & WATER MAIN PIPE LAYING CONDITIONS ��;j(). / 7. n, mm�mg ._-m -4 nN?. lQ oV o$ fam fix; mho 11r .ro ., _ 6� ofp TOWN of CLgAYTOARD @NUSE WTI TM LITYX rurrox ONLY II o Nm u nOiD2rr �.. 1 j 4 7{ "k I I I f l l l 00o moti gg c. OO -, oa m g �2 i� _. ,tg r y a. BURY MP. SNVld 1N31113380V X 2 CO ti t3 0- 'se 30 le ". t 1,. I 0 -3 r t wi s.st 0 4' A ,.,),, : : 1-1 a - F IMR,1111 p 33 /' •-' ,-- \ ‘ ', \ )7.'., 1 T(MNaCIAYMN BUTTERFLY VALVE (16" and LARGER) in PRECAST MANHOLE TOWN of CLAYTON HORIZONTAL BLOCKING DETAIL ..XL. for BENDS, TEE, & PLUG R E 3 - , " : - , ' - *.83 1 / ismoore-- Ar744c. U.. .3i 14 11113.'' el 3- Alb. - Jiell i . - . .i 1 • • is ' i ' ! . . 1 ' loll I .,....1 t....c.:';:re ... ij I qa g a o 54 if e' (Amur PRESSURE .150 PS11 33- .3: t.:• 4",..-...e.t.,..i,g4...8,..3.E44. '..:.,i4s,8,....:. il %43:, 18i HORIZONTAL BLOCKING DETAIL for BENDS, TEE, & PLUG rfI — - — _ erirri Mai iTiiilits*s 84888 883.! ' 4 '61Vali ViTla 43456E1123,S rli.iii.“3 Vc1W ' ' 1:13restItn:11:=:V =bloc.. ;ler Meters blwegn ecru 1,14. compulaMon. III•ra Ivea7n; ten': TOWN of CLAYTON nl; ;;;;;Intl:rali; UP; 1:4 iii...;il e.;ai .;i—iiii;iiiii iiiiii stseas ,-: R i'i:ii:i iiiiii"i ;i'iii , - g z:iii 2331 41: sr: r sts ,411% ir ilPf" SNVld IN3W321:19V X CO j m 930 r—ED-1"-FriFFI " i“3 0 ?c, -1 rUP, 8 CI) C 0 —1 I—. X 0 - z BUZSUOJECTS 2021,42021302.0.SEPI_Shotvell RoacADeale,UtalittosSEnglneerIng Pgreement,len,8421074 Ut UC30 psh.chan ' , i :.,' _ TOWN of CLAYMN WATER MAIN ...W.:. .5= EMBEDMENT DETAILS 1°X1 e d , % 4= a ..a c. _ a . • 1 :v .. "4 - PIPE EMBEDMENT DETAILS .vn;2 ;-:". I if 2 14.! . • 1 1 1 A , 4 N.. .. -, ,,,...• 1., 1 5 -. 0 _ an I_. X -b i , 4 2 0 $ 2 1 g : - .. TOWN of CLAYTON PIPE EMBEDMENT DETAILS .....• — „ •-•.— ..:.11:,.... ,r,,:z ". ' .."4-".74:17:4.4 • r• .1.-.4::::-• .. -.1 .• -I- a - ,.. . ....... , cu. ts. tart, ... . . . '',... .. - 9, -° 0>4 cri F r.t7. oft SlIta30 1V3IdAl _1_03rald Pi I I 0-11i9;2020:06„ 0 jEcTs,2021„2022,02.._,Epi.s,puen Rp„,noplgp,u,,Lt.,..,Ep9p,ppr‘p„4„pepppt, uc_. pm, $4.1.0.61.1elesg F rIm I °I 211 C.7; •:19 PROJE TS 2021,24121302.04LSEPI_Shotwell Rood Oesag,thilatles EngIneerIngSAgreemen,Plen, n 11111111111111111111111111111111111111111 ... . .... 111111111111111313131111111111111111 UG;202k1•:%.0 JE Ts,2.21\ 02.2.0,sEpLs,otwo1j no.,,Dewgmut,t,e,,En„,..mng n,PlanzN8 - -p -p • g 111111111111111111111 111111111111111311111313111111111111 CD CL 0 Town of Clayton 653 Highway 42 West P.O. Box 879 CLAYTON, NC 27520 VENDOR NO. 13066 NC DEPT OF TRANSPORTATION MATERIALS & TESTING UNIT 1563 MAIL SERVICE CENTER RALEIGH, NC 27699-1563 REFERENCE # QUANTITY 1.0000 UNIT Each 03 Town of Clayton 111 East Second Street P.O. Box 879 CLAYTON, NC 27520 Purchase Order No. 2022-00000267 DATE 09/10/2021 PURCHASE ORDER NUMBER MUST APPEAR ON ALL INVOICES, SHIPPERS, BILL OF LADING AND CORRESPONDENCE DELIVER BY SHIP VIA FREIGHT TERMS PAGE 1 of 1 ORIGINATOR: Kristie Germano DESCRIPTION Water/Sewer Items - Utility Construction Agreement 300-56-60-52 39 - Op Exp Maint and Repair - System 46,444.44 UNIT COST 46,444.4400 TOTAL COST $46,444.44 SUBTOTAL SALES TAX TOTAL DUE $46,444.44 $0.00 $46,444.44 Special Instructions THIS INSTRUMENT HAS BEEN PREAUDI TED IN THE !MANNER REQUIRED BY THE LOCAL GOVERNMENT BUDGET AND FISCAL CONTROL ACT B-y acceptance of this purchase order: vendors, contractors, and/or subcontractors affirm they are not listed and will not utilize a Subcontractor listed on the Final Divestment List or Iran Parent a.nd Subsidiary Guidance List created by the State Treasurer pursuant to N.C.G.S_ 14 3-6A-4 Iran Divestment Act Certification. FINANCE DIRECTOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR Date: November 24, 2021 WBS ELEMENT: 80074 COUNTY: Johnston DESCRIPTION: US 70 BUS at Shotwell road improvements Dear Mr. Baird: SUBJECT: Utility Construction Agreement — Town of Clayton County: Johnston Project: 80074 Executed: November 17, 2021 J. ERIC BOYETTE SECRETARY Attached is a fully executed copy of the Utility Construction Agreement that covers the adjustment and relocation of certain municipally -owned water and sewer lines. Under the terms of the attached agreement, the municipality shall reimburse the Department in one final payment within sixty (60) days of date of the invoice. The Department will charge interest at the prime rate plus one percent (1%) on any unpaid balance. Based on the approval date of this agreement by the NCDOT Board of Transportation, the prime rate of 3.25% will be used to calculate payment on any unpaid balance due after sixty (60) days of said invoice. Thank you for your assistance in the execution of this agreement. If you have any questions, please email Kyle Pleasant, Utilities Engineer at kapleasant@ncdot.gov or call (252) 640-6403. S1610g4N,by: [±7, Pl&cvloPra. 5F7C536,F6E704F5... Kyle Pleasant Division Utilities Engineer CC: Kevin Bowen, PE: Division Engineer Corey McLamb, PE: Division Construction Engineer Sam Lawhorn: District Engineer Addison Gainey, PE: Project Development Engineer Matt Daughtrey: Accounts Receivable Mailing Address: Telephone: (252) 237-6164 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (252) 234-6174 509 WARD BOULEVARD DIVISION FOUR OFFICE Customer Service: 1-877-368-4968 WILSON, NC 27895 POST OFFICE BOX 3165 WILSON, NC 27895 Website: www.ncdot.gov V. SEPARATION DISTANCES 1. Provide the actual minimum separation distance (in feet) from the reclaimed water distribution system to each item listed in accordance with 15A NCAC 02U .0403(h), (i), and (j): Separation Parameter Horizontal Vertical Required Actual Required Actual Any water line (feet) 1 0 N/A 1.5 N/A Any well 50 N/A N/A Sewer lines (reclaimed over sewer) 2 N/A. 1.5 N/A Final earth grade N/A 2. Are the separation requirements listed above met? El Yes or No If No, has documentation been provided to show that piping and integrity testing procedures meet water main standards in accordance with 15A NCAC 18C? Yes or No Note: In no case shall reclaimed water lines be closer than 25 feet to a private well. VI. PUMP STATION INFORMATION IF MORE THAN ONE PUMP STATION, PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. Are there any reclaimed water pump stations proposed as part of the distribution system? Yes or [E] No ,( If no, then skip the remaining items in Section VI. 2. Complete the table below by providing the required information regarding the reclaimed water pump station(s) Pump Station Design Plan Sheet Number Specification Page Number Internal dimensions (L xWxH or y x H) ft ft ft Volume gallons Inlet Elevation ft Outlet Elevation ft Number of pumps Pump capacity GPM Lead pump on elevation ft Lag pump on elevation ft Lead pump off elevation ft Lag pump off elevation ft High water elevation ft Audible/Visual high water alarm 3. What is the 100-year flood elevation? (ft) 4. Precautions to be taken to protect the pump station from flooding: (ft) FORM: RWDL 06-16 Page 3 of 5