Loading...
HomeMy WebLinkAboutNC0024406_1st Quarter Monitoring Report_20220404 Duke Energy DUKEBelews Creek Steam Station ENERGY® 3195 Pine Hall Road Belews Creek, NC 27009 (336)445-0644 OFFICE (336)445-0423 FAX March 22, 2022 ELECTRONIC SUBMITTAL Mr. Danny Smith, Director North Carolina Division of Water Resources RECEIVED Address: desocdata@ncdenr. ov APR 0 4 O22 Subject: Duke Energy Carolinas, LLC NCDEQIDWRINPDES Belews Creek Steam Station EMC SOC WQ S 18-004 1st Quarter 2022 Dear Mr. Smith: In accordance with paragraph 3.e.3) of the NC Environmental Management Special Order of Consent, EMC SOC WQ S18-004, Duke Ener Commission g hereby submitting the monitoring results for the 1st quarter 2022, y Carolinas, LLC is If you have any questions, please contact Ms. Lori Tollie (336) 408-2591. l certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. lam aware that there are significant penalties fore submitting false information, including the possibility of fines and imprisonment for knowing violations Sincerely, Mich ael Lanning General Manager III, Regulated Stations RRECC Belews Creek Steam Station Duke Energy Carolinas,LLC-Belews Steam Station Special Order by Consent-SOC No.S18-004 Monitoring Report for 1st Quarter of 2022 , * ? a, co a a H to a0 °� u E E E ° v a) .. > i n o .` 12 o o n a`)i u z E w •o 0 = v SAMPLING Date I- c LL iu m N Q 00 m r u L To J z Ti.) v 0 �, t I- - a c LOCATION Sampled o u u ra m u :° E ci - - - Total Total Total Total Total Total Total Total Total Total Total Total - - - - - Total - - mg/L mg/L SU ug/L ng/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ° ug/L ug/L mg/L mg/L mg/L mg/L mg/L mg/L °C umho/cm Downstream Dan River 3/1/2022 11 <5 7.4 <100 1.86 25 <5 <1 <50 <0.1 <1 <2 <0.2 0.492 <1 <1 0.35 <0.1 3.9 4.1 64 20.6 8.8 65 Instream Unnamed Tributary 3/1/2022 <2.5 <5 7.3 <500 0.931 44 <5 <1 1120 <0.1 <1 <2 <0.2 <0.2 1.22 <1 2.9 0.76 16 61 201 106 12 299 Belews Lake 2/28/2022 <2.5 <5 7.1 <100 <0.5 - 16 <5 <1 <50 <0.1 <1 <2 <0.2 <0.2 <1 <1 0.13 <0.1 5.6 5.4 63 24.8 15 82 Instream S-06 Belews Lake 2/28/2022 <2.5 <5 7 <100 <0.5 16 <5 <1 <50 <0.1 <1 <2 <0.2 <0.2 <1 <1 0.14 <0.1 5.7 5.4 62 24.7 21 83 Instream S-08 5-09 *Annual Monitoring Only **Duplicate was gathered at this location and the respective values averaged Duke Energy Carolinas,LLC-Belews Steam Station Special Order by Consent-SOC No.S18-004 Monitoring Report for 1st Quarter of 2022 z co* v v >. u c E E E E .. a) v c > in (� _ ` c N Oo cc .O 0.a. •ca u •Gci Z E fa 'o p co i� SAMPLING Date ~ a N m o = ~ - a -c COc LT_ m Q CO -c l.J H Z to N m W (Lj E c LOCATION Sampled o Cl)co u 'z - - - - Total Total Total Total Total Total Total Total Total Total Total Total - - - - - Total - - mg/L mg/L SU ug/L ng/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L mg/L mg/L mg/L mg/L mg/L °C umho/cm S-06 3/1/2022 10 <5 6.9 110 <0.5 24 <5 <1 540 <0.1 <1 <2 <0.2 <0.2 <1 <1 0.78 0.1 9.3 17 143 72.2 7 202 S-08 3/1/2022 7.1 <5 6.4 <100 1.09 50 <5 <1 85 <0.1 <1 <2 <0.2 <0.2 <1 3.62 0.31 <0.1 8.4 19 95 28.6 12 125 S-09 3/1/2022 11 <5 6.6 <200 2.35 32 13.6 <1 676 0.153 <1 <2 <0.2 <0.2 1.93 1.15 0.77 <0.2 140 8 274 131 9 360 S-10 3/1/2022 13 <5 6.6 <500 **4.89 206 <5 1.85 5970 0.495 <1 <2 0.229 0.296 6.7 <1 0.27 3.3 32 270 588 391 12 983 Upstream Dan River 3/1/2022 24 <5 7.1 <100 3.51 38 <5 <1 <50 <0.1 2 <2 <0.2 1.08 <1 <1 0.36 <0.1 4.6 5.1 84 28.4 9 108 *Annual Monitoring Only **Duplicate was gathered at this location and the respective values averaged