HomeMy WebLinkAboutNCC201411_Contact Update Request (Billing)_20220404Selkane, Aziza
From: Safrit, Don <Don.Safrit@duke-energy.com>
Sent: Monday, April 4, 2022 11:45 AM
To: Selkane, Aziza
Cc: Smith, Mike M; Grant, Nathan L; Dellario, David J
Subject: RE: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Aziza,
Sounds good — please proceed to designate David as the billing person.
Thanks, Don
Donald (Don) Safrit, P.E.
Lead Environmental Specialist
Duke Energy I Permitting and Compliance, Carolinas
410 S. Wilmington Street I Raleigh, North Carolina 27601
Office: (919) 546-6146 1 Cell: (984) 209-0940
fn DUKE
ENERGY:
From: Selkane, Aziza <aziza.selkane@ncdenr.gov>
Sent: Monday, April 4, 2022 11:36 AM
To: Safrit, Don <Don.Safrit@duke-energy.com>
Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Grant, Nathan L <Nathan.Grant@duke-energy.com>; Dellario, David J
<David.Del lario@duke-energy.com>
Subject: RE: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411
Good morning,
What I can do is add David Dellario as the billing person, this way he will receive all communication emails regarding the
permit.
Scott Martin is the Legally Responsible Person. The update for it can be done using the following link
https://edocs.deg.nc.gov/Forms/NCGOI-Modification
Please confirm that David will be the billing person before I proceed with the change.
Thank you.
Aziza Selkane
Stormwater Program Billing Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, Office 640J, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
919-707-3710
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
D; E
NORTI I l AR3i.IHA
U*FV*lWCIIFnrironnwlnial{j ,i11
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
From: Safrit, Don [maiIto: Don.Safrit@duke-energy.com]
Sent: Monday, April 4, 2022 11:21 AM
To: Selkane, Aziza <aziza.selkane@ncdenr.gov>
Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Grant, Nathan L <Nathan.Grant@duke-energy.com>; Dellario, David J
<David.Del lario@duke-energy.com>
Subject: FW: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Aziza,
Could you update your billing records to send annual fee invoices to David Dellario ( david.dellario@duke-energy.com )
as opposed to Scott Martin? Dellario is the signature of the subject FRO / NCG NOI and Scott is no longer responsible for
this site/system.
Please let us know if any questions or concerns with this request.
Thanks, Don
R& COOPER
f,nlw
KRARI ETH S. RIUR
samvus
BRIIAN WRDN
A4'ed%w
NORTi4 GAQr1J NA
Fnrif#iMnfie�F�y�h�
February 22, 2021
LETTER OF APPROVAL
Uuke Energy Progress, LLC
ATTN= Mr. David Dellarlo
526 South Church Street
Charlotte, North Carolina 28202
RE. Project [Name: 1964 Ash Basin DecommissiDning - Phase 2. 3, and 4
Modification
Acres Approved. 3.7 acres Phase 1, 5.3 acres Phase 2, 49.7 acres Phase 3, 55_0
acres Modification, 59 tatal acres approved.
Project 10: OU NCO-2020-014
County: Buncombe
City: Arden
Address: 200 CP and L Drive
River fiasin: French Broad
Stream Classification: B
Submitted By: Mr, LukeC, WiIIiams, P,F-
Date Originally Received by LQS; Apr[[ 2, 2020
Dale Revision Received by LQS: February 17, 2022
Plan Type. Industrial
Dear Mr. Deliarfo,
If you have any questions regarding an invoice, billing, or the ePayment System, please contact
Aziza SelkanE at (919) 707-3710.
Donald (Don) Safrit, P.E.
Lead Environmental Specialist
Duke Energy I Permitting and Compliance, Carolinas
410 S. Wilmington Street I Raleigh, North Carolina 27601
Office: (919) 546-6146 1 Cell: (984) 209-0940
fe� DUKEENERGY.
From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov>
Sent: Monday, April 4, 2022 9:58 AM
To: Martin, Scott <Scott.Martin @duke-energy.com>
Cc: Grant, Nathan L <Nathan.Grant@duke-energy.com>
Subject: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411
Dear Construction General Permit Permittee:
Certificate of Coverage (COC) no. NCC201411 has been successfully renewed by payment of the 2022 annual
fee. This project remains actively covered under North Carolina's NPDES General Stormwater Permit for
Construction Activities.
(Note, if this COC was recently terminated, the payment was successfully applied to invoice period.)
This COC is for 1964 Ash Basin Decommissioning Crest Lowering in Buncombe County, issued to Duke
Energy Progress, LLC. The payment was applied to Invoice no. NCC201411-2022.
If you have any questions, please contact the Stormwater Program Billing Specialist at (919) 707-3710, or visit
https://deq.nc.gov/NCGOI.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.