Loading...
HomeMy WebLinkAboutNCC201411_Contact Update Request (Billing)_20220404Selkane, Aziza From: Safrit, Don <Don.Safrit@duke-energy.com> Sent: Monday, April 4, 2022 11:45 AM To: Selkane, Aziza Cc: Smith, Mike M; Grant, Nathan L; Dellario, David J Subject: RE: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Aziza, Sounds good — please proceed to designate David as the billing person. Thanks, Don Donald (Don) Safrit, P.E. Lead Environmental Specialist Duke Energy I Permitting and Compliance, Carolinas 410 S. Wilmington Street I Raleigh, North Carolina 27601 Office: (919) 546-6146 1 Cell: (984) 209-0940 fn DUKE ENERGY: From: Selkane, Aziza <aziza.selkane@ncdenr.gov> Sent: Monday, April 4, 2022 11:36 AM To: Safrit, Don <Don.Safrit@duke-energy.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Grant, Nathan L <Nathan.Grant@duke-energy.com>; Dellario, David J <David.Del lario@duke-energy.com> Subject: RE: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411 Good morning, What I can do is add David Dellario as the billing person, this way he will receive all communication emails regarding the permit. Scott Martin is the Legally Responsible Person. The update for it can be done using the following link https://edocs.deg.nc.gov/Forms/NCGOI-Modification Please confirm that David will be the billing person before I proceed with the change. Thank you. Aziza Selkane Stormwater Program Billing Specialist Division of Energy, Mineral and Land Resources Department of Environmental Quality 512 N. Salisbury Street, Office 640J, Raleigh, NC 27604 1612 Mail Service Center, Raleigh, NC 27699-1612 919-707-3710 Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater D; E NORTI I l AR3i.IHA U*FV*lWCIIFnrironnwlnial{j ,i11 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Before printing this email, please consider your budget and the environment. From: Safrit, Don [maiIto: Don.Safrit@duke-energy.com] Sent: Monday, April 4, 2022 11:21 AM To: Selkane, Aziza <aziza.selkane@ncdenr.gov> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Grant, Nathan L <Nathan.Grant@duke-energy.com>; Dellario, David J <David.Del lario@duke-energy.com> Subject: FW: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Aziza, Could you update your billing records to send annual fee invoices to David Dellario ( david.dellario@duke-energy.com ) as opposed to Scott Martin? Dellario is the signature of the subject FRO / NCG NOI and Scott is no longer responsible for this site/system. Please let us know if any questions or concerns with this request. Thanks, Don R& COOPER f,nlw KRARI ETH S. RIUR samvus BRIIAN WRDN A4'ed%w NORTi4 GAQr1J NA Fnrif#iMnfie�F�y�h� February 22, 2021 LETTER OF APPROVAL Uuke Energy Progress, LLC ATTN= Mr. David Dellarlo 526 South Church Street Charlotte, North Carolina 28202 RE. Project [Name: 1964 Ash Basin DecommissiDning - Phase 2. 3, and 4 Modification Acres Approved. 3.7 acres Phase 1, 5.3 acres Phase 2, 49.7 acres Phase 3, 55_0 acres Modification, 59 tatal acres approved. Project 10: OU NCO-2020-014 County: Buncombe City: Arden Address: 200 CP and L Drive River fiasin: French Broad Stream Classification: B Submitted By: Mr, LukeC, WiIIiams, P,F- Date Originally Received by LQS; Apr[[ 2, 2020 Dale Revision Received by LQS: February 17, 2022 Plan Type. Industrial Dear Mr. Deliarfo, If you have any questions regarding an invoice, billing, or the ePayment System, please contact Aziza SelkanE at (919) 707-3710. Donald (Don) Safrit, P.E. Lead Environmental Specialist Duke Energy I Permitting and Compliance, Carolinas 410 S. Wilmington Street I Raleigh, North Carolina 27601 Office: (919) 546-6146 1 Cell: (984) 209-0940 fe� DUKEENERGY. From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Monday, April 4, 2022 9:58 AM To: Martin, Scott <Scott.Martin @duke-energy.com> Cc: Grant, Nathan L <Nathan.Grant@duke-energy.com> Subject: [EXTERNAL] Construction SW General Permit Annual Fee Received - NCC201411 Dear Construction General Permit Permittee: Certificate of Coverage (COC) no. NCC201411 has been successfully renewed by payment of the 2022 annual fee. This project remains actively covered under North Carolina's NPDES General Stormwater Permit for Construction Activities. (Note, if this COC was recently terminated, the payment was successfully applied to invoice period.) This COC is for 1964 Ash Basin Decommissioning Crest Lowering in Buncombe County, issued to Duke Energy Progress, LLC. The payment was applied to Invoice no. NCC201411-2022. If you have any questions, please contact the Stormwater Program Billing Specialist at (919) 707-3710, or visit https://deq.nc.gov/NCGOI. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.