HomeMy WebLinkAboutNCC200640_NOT Request Not Approved_20220331 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Thursday, March 31, 2022 1:14 PM
To: mbenitez@peachtreeres.com
Cc: Morman, Alaina; mbenitez@peachtreeres.com; MBENITEZ@PEACHTRERES.COM;
pseaton@peachtreeres.com
Subject: NOT Request Not Approved
This email is to notify you that your request to rescind COC No. NCC200640 for the project BLACKWOOK
KNOLL was not approved for the following reason:
The uploaded inspection report notes that there are still two lots that are not yet stabilized. The COC cannot be
terminated until all of the lots are stabilized and closed-out according to the Town of Huntersville.
Additionally, there is an outstanding fee for this COC that must be resolved. The annual fee was billed on
February 1, 2022 and was due on March 1, 2022. The fastest way to resolve outstanding fees is to pay
electronically using the ePayments website: https://deq.nc.gov/about/divisions/energy-mineral-and-land-
resources/stormwater/stormwater-program/stormwater-epayments.
Once all lots are stabilized, upload the final inspection report(s) into a new NOT request. Thank you.
If you have any questions, please contact Alaina Morman with the NC Stormwater Program at
alaina.morman@ncdenr.gov or(919) 707-9236.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i