Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20211837 Ver 1_More Info Received_20220216
Moore, Andrew W From: Jennifer Robertson <jrobertson@atlasenvi.com> Sent: Wednesday, February 16, 2022 1:37 PM To: Anderson, Mitchell L Cc: Moore, Andrew W; Leslie, Andrea J; Brown, David W CIV USARMY CESAW (USA); Jesse Hanlin Subject: [External] RE: Request for Additional Information - DWR 21-1837, The Cottages at Roper Farm (Banner Farm Road) Attachments: 20002 DOCUSIGN Rev4 NCDEQ Stream Comments 2022-02-16.pdf; 1 _SoilsReport_Roper_Farms_II.pdf; Site Plan and Impact Map.pdf; PCN Revised.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mitchell, Attached are the construction plans, soils report, revised impact exhibit, and revised PCN. Jesse does not think that the sewer permit has been issued yet (the developer is handling that) however the attached soils report findings support 32 3-4 bedroom homes. The post construction stormwater plans have been reviewed by Mills River and they only had minor comments including requiring copies of the stream crossing approvals. Mills River will approve the plan once the 404 and 401 are obtained. Please let me know if you need anything else. Thank you, Jennifer L Robertson, President ATLAS Environmental, Inc. 338 S. Sharon Amity Road #411 Charlotte, NC 28211 (704) 512-1206 office (828) 712-9205 mobile www.atlasenvi.com Offices in Asheville and Charlotte IRONMENTAL From: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov> Sent: Tuesday, February 15, 2022 4:47 PM To: Jennifer Robertson <jrobertson@atlasenvi.com> Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Brown, David W CIV USARMY CESAW (USA) <David.W.Brown@usace.army.mil> Subject: Request for Additional Information - DWR 21-1837, The Cottages at Roper Farm (Banner Farm Road) Hello Ms. Robertson, 1 I regret not getting this request to you sooner. Your application was mistakenly forwarded to the wrong reginal office. However, this application has recently been received in the correct regional office and is currently under review. Please see the request for additional information below. On December 20, 2021, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Have the septic field area and potential septic field areas been permitted to accept wastewater from all the residences within the development? [15A NCAC 02H .0502(a)] 2. The development is within a Phase II and water supply watershed. Therefore, a review of post -construction stormwater management should be reviewed by the local water supply watershed coordinator, regardless of the percentage of built upon area. Please confirm with Henderson County that they will be reviewing the post - construction stormwater plan for the development. [15A NCAC 02H .0506(b)(1)] 3. Please provide a detailed engineering plan, profile view, and cross-section of all proposed culverts. These drawings must include details regarding stream alignment in relation to pipe alignment, pipe slope, pipe burial, and dissipater pad. Culverts must be placed below the elevation of the stream bed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches. [15A NCAC 02H .0502(a)(9)] 4. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. In addition, please ensure that the location of the temporary impacts are shown on the construction drawings and clearly indicated in the revised impact table. [15A NCAC 02H .0506(b)(3) and (c)(3)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days. If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Thank you, Mitchell Anderson Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 828-296-4662 office mitchell.anderson@ncdenr.gov 2 -1:1E Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 3 MOUNTAIN SOILS, INCORPORATED 71 LEDFORD DRIVE FRANKLIN, NC 28734 EMAIL: MOUNTAINSOILS@FRONTIER.COM OFFICE: (828) 524-5962 CELL: (828) 421-3149 ON -SITE SOIL AND SITE EVALUATION Roper Farm Subdivision 31-Acre Tract in Mills River, NC PIN# 9630-77-6176 Henderson County, North Carolina Prepared by: MOUNTAIN SOILS, INC. (25Y Steven J. Melin, LSS, #1254 November 15, 2021 MOUNTAIN SOILS,INCORPORATED 71 LEDFORD DRIVE FRANKLIN, NC 28734 EMAIL: MOLINTAINSOILS@FRONTIER.COM OFFICE: (828) 524-5962 CELL: (828) 371-2894 INTRODUCTION Mountain Soils, Inc (MSI) conducted an onsite wastewater feasibility study on an approximate 31- acre tract off of Banner Farm Road in Mills River (Henderson County), North Carolina. The evaluation for Roper Farm Subdivision was performed to see if lots are able to be accommodated with onsite wastewater systems. The soil/site evaluation was performed using hand turned auger borings, under moist soil conditions. In this evaluation, MSI utilized GPS (capable of sub -meter accuracy), Henderson County GIS data, and aerial photography to determine locations of auger borings, existing roads, proposed property lines, streams, and other noteworthy features (please note that all locations are approximate). The property was evaluated in accordance with North Carolina statutes for waste disposal ("Laws and Rules for Sewage Treatment and Disposal Systems", (amended June 2016)) as part of the planning process to evaluate areas of soil with potential for subsurface wastewater disposal. In order to determine the potential of a site to accommodate onsite wastewater systems, a thorough analysis and understanding about the characteristics of the site, especially the soil, are necessary to determine how the system will perform. The soil functions as a biological, chemical and physical treatment medium for the wastewater, as well as a porous medium to disperse the wastewater in the receiving environment as it percolates to the groundwater. Therefore, a careful and thorough site evaluation with emphasis on soil characteristics is necessary to assess the capacity of the site to hydraulically accept wastewater. PRIMARY INVESTIGATOR'S CREDENTIALS Steven J. Melin: N.C. Licensed Soil Scientist (Certification # 1254) Environmental /Soil Science Consultant (20+ years) Education: M.S. Natural Resource Administration - Soil Science Emphasis, North Carolina State University; Raleigh, NC B.S. Watershed Management, Soil Science Minor, University of Wisconsin - Stevens Point, Stevens Point, WI METHODOLOGY The site was investigated in May 2021 and September 2021 by making observations of the landscape (slope, drainage patterns, past use, etc.) as well as soil properties (depth, texture, structure, seasonal wetness, restrictive horizons, etc.) with auger borings to depths >48 inches when possible. These borings were advanced in specific landscape positions on the parcel. Also, the area was extensively probed to determine if restriction due to shallow rock is present. Each boring was GPS'ed and labeled in the field. MOUNTAIN SOILS,INCORPORATED 71 LEDFORD DRIVE FRANKLIN, NC 28734 EMAIL: MOLINTAINSOILS@FRONTIER.COM OFFICE: (828) 524-5962 CELL: (828) 371-2894 SITE FEATURES (+Noteworthy features which can restrict onsite wastewater) At the time of the surveys, the majority of the property was in open pasture land. Typical slopes ranged from 10% to 39%+. One jurisdictional stream is present. Please note that surface waters require a 50' setback distance for tanks and drainfields (without advanced pretreatment). No wells were located, however this tract nor adjacent tracts were not extensively searched. Please note that wells require a 100' setback (which sometimes can be reduced to 50' for individual wells (without encountering saprolite). SOIL CHARACTERISTICS Twenty-eight (28) borings and pits were advanced/evaluated at the site in addition to extensively probing to determine depth(s) to restrictive rock layers. Soil probing was done to confirm depths represented by the auger borings. Soil borings were advanced in representative landscape positions in areas likely to be outside the house footprint. From these observations, potential areas for wastewater disposal were identified. Soil Unit 1: These soils have the greatest potential to accommodate subsurface wastewater system(s). The pits typically reveal a sandy loam to loam surface horizon. The subsurface contains a clay loam texture with moderate subangular blocky structure. A friable, sticky, plastic (slightly expansive), consistency is noted. Hand textured, soil morphological loading rates (LTAR) typically assigned were 0.40 gallons/ft2/day (Group III). Saprolite was not typically encountered. Typically no restrictions were encountered in these auger borings or the restriction is deep enough in the soil profile not to limit its potential to accommodate an onsite wastewater system. These pits are representative of soils typically permitted for "conventional" systems (25% Reduction type systems) or sometimes 10" LDP type systems on steeper slopes. Please note that additional borings / pits will likely be required for permitting. Soil Unit 2: These soils also have very good potential to accommodate subsurface wastewater system(s). These soils are similar to Soil Unit 1, however restriction (typically rock or fragmented rock), are shallow that an engineered system (Aerobic Pretreatment Drip Irrigation) is required to augment shallower soil conditions. These systems are more expensive and require an operator. Please note that additional auger borings / pits will likely be required for permitting. MOUNTAIN SOILS,INCORPORATED 71 LEDFORD DRIVE FRANKLIN, NC 28734 EMAIL: MOLINTAINSOILS@FRONTIER.COM OFFICE: (828) 524-5962 CELL: (828) 371-2894 CONCLUSIONS Overall, the soils data gathered at the site is consistent with data approved by the local permitting authority (Henderson County Health Department) for onsite wastewater systems. Overall, the site has potential to accommodate wastewater with onsite wastewater systems for 3 to 4-bedroom homes for 32 lots. Please note that the placement of structures/houses, wells and driveways must allow adequate area for septic drainfields. It should be noted that wells should be placed in areas less suited for onsite wastewater Additional borings / pits will need to be advanced / excavated to determine ideal trench depths and location of the onsite wastewater systems. It is recommended that we work together during the planning and permitting process to ensure that the lot configuration will allow adequate space for the use of onsite wastewater systems. The findings presented herein represent MSI's professional opinion based on our site and soils evaluation and knowledge of the current laws and regulations governing on -site wastewater systems in North Carolina (Section .1900 of the North Carolina Administrative Code). This report is provided for preliminary planning purposes. Individual Improvement / Authorization to Construct Permits must be issued by the Henderson County Health Department (however, privatization which started in July 2016 allows an alternative to the County). We appreciate the opportunity to provide with you with our services. If you have any questions please do not hesitate to contact us. Sincerely, s p �, .ass Steven J. Melin, LSS Mountain Soils, Inc. DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 Sitework P CIVIL ENGINEER CO AG S A ROP R ARM © © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. DRAWN BY: WJH PREVISIONS: /11\ 11/22/2021 ESC-STORMWATER SUBMITTAL 12/09/2021 TOWN COMMENTS n 12/21/2021 TOWN AND STATE COMMENTS /4\ 02/16/2021 NCDEQSTREAM COMMENTS PROJECT # 20002 ORIGINAL ISSUE DATE: 11/16/2021 BLUE RIDGE ENGINEERING PLLC W. J ESS E HAN LI N, PE 924 MAIN STREET, SUITE 200 NORTH WILKESBORO, NC 28659 (336) 838-2500 PLANNING & ZONING DEVELOPER ,, ,%oQ.. - Q kill*, ;� ii,, "' -3C11EE7F55C2423... -o-k Ro .ssio.;./ti,�; SEAL 204 --G1J�P oz�l6�zozz ,,,�� 9 `.,; - MOORE AND SON SITE CONTRACTORS TOWN OF MILLS RIVER MICHAEL MALECEK BRIAN KIRK 124 TOWN CENTER DRIVE 103 McDOWELL ROAD MILLS RIVER, NC 28759 MILLS RIVER, NC 28759 (828) 890-2901 (828) 891-8900 STORM WATER EROSION CONTROL Blue Ridge Engineering PLLC Ilk 924 Main Street - Suite 200 North Wilkesboro, NC 28659 336.838.2500 www.ridge.blue Firm #P-0205 NCDEQ- LAND SECTION QUALITY TOWN OF MILLS RIVER 124 TOWN CENTER DRIVE FRED WALKER, PE MILLS RIVER, NC 28759 2090 US-70 HIGHWAY (828) 890-2901 SWANNANOA, NC 28778 (828) 296-4500 WATER EROSION CONTROL CONTACT H E MILLS N D E R S RIVER O N COUNTY NC CITY OF HENDERSONVILLE WATER MOORE AND SON SITE CONTRACTORS 305 WILLIAMS STREET BRIAN KIRK HENDERSONVILLE, NC 28792 103 McDOWELL ROAD (828) 697-2073 MILLS RIVER, NC 28759 (828) 891-8900 Project Narrative Prepared for: MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road MILLS RIVER, NC 28759 brian@mooreandson.net This project consists of development of a 31.9+ acre tract, PIN 9630776176, subdivision is proposed. Development will include three new private along Banner Farm Road. Each lot will be served by septic and this project. The subject property is in the Henderson County Farmland public residential water. Preservation located on Banner Farm Road in Mills River, NC. The property is currently vacant. A new 32 lot single family residential streets, stormwater and drainage features, and a water main extension. Access will be provided via a new driveway Water service is provided by the City of Hendersonville Water. Stream disturbance and filling of wetlands is proposed for program. Vicinity Map Site Map Drawing Index # Sheet Title Cover Sheet The Cottages at Roper Farm Banner Farm Road Mills River, NC C-1 Cover Sheet tC-2 Existing Conditions SUBJECT PROPERTY C-3 Overall Erosion & Sediment Control Plan o C�]OG�4C�] Z C-4 Erosion & Sediment Control Plan , C-5 Erosion & Sediment Control Plan 21 . Z. 20 22 024 25 26 27 28 30 31 ®a C C-6 Site Layout Plan (‘ - C-7 Overall Roadway Plan 1 / o �' I I 0 tea. 19 � �1 12 `*i C-8 Roadway Plan and Profile , o' `'0 .) 17 16% © O ® % o C-9 Roadway Plan and Profile 18 (,0no \- Banner Faun Rd °\ 13cc Lu z C-10 Storm Draina e Plan g ® < Q cc 15 14 CD O m C-11 Storm Drainage Plan 0 C-12 Overall Water Extension Plan Site J C-13 Water Extension Plan and Profile C-14 Water Extension Plan and Profile C-15 Erosion & Sediment Control Details SHEET C. 1 C-16 Erosion & Sediment Control Details C-17 Erosion & Sediment Control Details C-18 City of Hendersonville Details PRELIMINARY - NOT FOR CONSTRUCTION DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 CLEARING AND GRADING NOTES 1. GRADING SHALL NOT PROCEED UNTIL APPROPRIATE EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 2. LAND DISTURBING ACTIVITIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT ALL ASSOCIATED PERMITS AND APPROVALS HAVE BEEN OBTAINED FOR THIS WORK. NO WORK SHALL BE PERFORMED OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL ORDINANCES. CONTRACTOR IS RESPONSIBLE FOR ALL NESHAP NOTIFICATIONS REQUIRED. ALL SUCH NOTIFICATIONS SHALL BE MADE AT LEAST TWO WEEKS PRIOR TO ANY DEMOLITION WORK. 3. ALL ASPHALT, TREES, STUMPS, BRUSH, ROOTS, STRUCTURES, WALLS, FOUNDATIONS, CURBS, TANKS, BARRELS, FLOOR SLABS, CONCRETE, METAL, SEPTIC TANKS, FENCING, SIGNS, POLES, TRASH, OTHER DEBRIS, AND UNSUITABLE FILL MATERIAL SHALL BE PROPERLY DISPOSED OF OFF -SITE. ALL PAVEMENT AND CONCRETE EDGES SHALL BE SAWCUT. ALL CONCRETE SHALL BE REMOVED/REPLACED TO THE NEAREST JOINT. STORM DRAINAGE BOXES, GRATES AND PIPE TO BE REMOVED MAY BE REUSED IF FOUND TO BE SUITABLE BY THE ENGINEER, UNLESS OTHERWISE NOTED. 4. CERTAIN TREES WITHIN 10 FEET OF THE TOP OF ANY CUT SLOPE MAY BE REQUIRED TO BE REMOVED AT THE DISCRETION OF THE ENGINEER. CERTAIN TREES WITHIN 5 FEET OF THE CLEARING LIMITS SHOWN ON THE DRAWINGS MAY BE REQUIRED TO BE REMOVED AT THE DISCRETION OF THE ENGINEER. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY, METHODS, MEANS, PROCEDURES AND SEQUENCES OF ITS OPERATIONS. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL FOR ITS OPERATIONS. CONTRACTOR SHALL INSTALL ABUNDANT ORANGE SAFETY FENCING ON THE PROJECT TO PREVENT OTHERS FROM ENTERING THE WORK AREA. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SAFETY FENCING AS NECESSARY FOR THE DURATION OF THE PROJECT. SCOTT AND KELLY FRAZIER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630750904 6. THE LOCATION OF UTILITIES SHOWN ON THE PLANS SHALL BE CONSIDERED APPROXIMATE. ALL UTILITIES MAY NOT BE SHOWN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXISTENCE AND ACTUAL LOCATION OF ALL EXISTING UTILITY LINES WHETHER SHOWN ON THE PLANS OR NOT. CONTRACTOR SHALL CONTACT ULOCO. CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES HAVING UNDERGROUND UTILITIES ON SITE OR WITHIN RIGHT-OF-WAY PRIOR TO EXCAVATION. UTILITY ADJUSTMENTS AND/OR REMOVAL/RELOCATION IS INCLUDED IN THE SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR WORK ASSOCIATED WITH MAINTAINING/REPAIRING UTILITY SERVICES AS NECESSARY. 7. BLUE RIDGE ENGINEERING SHALL PROVIDE ALL CONSTRUCTION LAYOUT AND STAKING REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING FOR CONSTRUCTION LAYOUT AND STAKING SERVICES PROVIDED. THE CONTRACTOR SHALL PROVIDE BLUE RIDGE ENGINEERING 48 HOURS NOTICE FOR ANY STAKING SERVICES REQUESTED.CONTRACTOR SHALL IMMEDIATELY NOTIFY BLUE RIDGE ENGINEERING IF CONDITIONS ARE ENCOUNTERED THAT ARE NOT AS SHOWN. 8. ALL FILL PLACED SHALL PASS A PROOF -ROLL TEST BEFORE AND AFTER INSTALLATION OF STONE BASE, SLABS OR PAVEMENTS. SUBGRADE SHALL BE INSPECTED AND ACCEPTED BY THE ENGINEER PRIOR TO PLACEMENT OF STONE BASE. STONE BASE SHALL BE INSPECTED AND ACCEPTED BY THE ENGINEER PRIOR TO PLACEMENT OF ASPHALT. CONTRACTOR SHALL PROVIDE A LOADED TRUCK FOR ALL PROOF -ROLLS REQUIRED. 9. ALL WORK IS SUBJECT TO INSPECTION OF THE OWNER, ENGINEER AND AUTHORITIES HAVING JURISDICTION. THE OWNER SHALL PAY FOR ALL QUALITY ASSURANCE TESTING REQUIRED. CONTRACTOR SHALL PROVIDE BLUE RIDGE ENGINEERING 48 HOURS NOTICE FOR ANY TESTING NECESSARY. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY APPROVALS, PERMITS, ETC. AND FOR PROPER DISPOSAL OF ANY MATERIAL REMOVED FROM THE SITE. MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630569334 11. EXISTING DRAINAGE PATTERNS SHALL BE MAINTAINED UNLESS OTHERWISE SHOWN ON THE PLANS. ALL AREAS OF THE SITE SHALL BE SHAPED TO DRAIN TO EROSION CONTROL DEVICES. 12. THE CONTRACTOR SHALL KEEP ALL STREETS AND ROADWAYS CLEAN. THIS SHALL BE ACCOMPLISHED BY STREET SWEEPING AND WASHING AS NECESSARY ON A DAILY BASIS. 13. ALL FILL SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT PREPARED FOR THIS PROJECT. DRYING OR WETTING OF FILL MATERIAL MAY BE REQUIRED TO COMPLY WITH MOISTURE LIMITS SPECIFIED. IF NO GEOTECHNICAL STUDY HAS BEEN PERFORMED, ALL EARTHWORK PLACED SHALL BE WITHIN 5% OF OPTIMUM MOISTURE AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR. 14. THE CONTRACTOR SHALL SMOOTH AND BLEND IN ALL GRADE TRANSITIONS AND PROVIDE POSITIVE DRAINAGE AROUND ALL BUILDINGS. THE TOP OF SLOPE FOR ALL CUT SLOPES SHALL BE ROUNDED. THE FINAL GRADE OF ALL CUT SLOPES SHALL BE SCARIFIED AND TRACKED AS NECESSARY FOR ESTABLISHMENT OF GROUND COVER. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY CLARIFICATION IS NEEDED CONCERNING THE INTENT OF THE DRAWINGS, INCLUDING SPOT GRADES, CONTOUR LINES, BREAK POINTS, DRAINAGE PATTERNS, ETC. THE CONTRACTOR SHALL DRAG AND RAKE THE ENTIRE SITE AND LEAVE THE ENTIRE SITE IN A CLEAN, NEAT, SMOOTH CONDITIONS SUITABLE FOR MOWING. 15. THIS PROJECT MAY INCLUDE MATERIAL TO BE IMPORTED/EXPORTED TO/FROM THIS SITE. CONTRACTOR SHALL BE RESPONSIBLE FOR PERMITTING AND APPROVALS REQUIRED FOR ANY OFF -SITE BORROW AREAS OR WASTE AREAS. 16. CONTRACTOR SHALL MAINTAIN A STAMPED APPROVED SET OF PLANS ON THE JOB SITE AT ALL TIMES. ( \ / / / // / I I I I I Io l I I rI I I I — / / / // // l / 1 I 1 1 1 I I I I II 1 ( / / / � ; M/I �TB A / I I I ( 1 I I I I —/ o/ / I I lu,l 1 1 III!/� j/////�// j/////�/ // 1 1 1 I I I I I I 1 ( r 11 I I I I I N I / /�� l ill ICI I^ I ICI 11� —�/i 60 '//� �i�io/ /i�/o.// / 1 I I I I I / / �NutRO MENAL!INC ( (' ( I I I N I N1 N I N� tih 5 // / h/ / 11 in I I 1 1 1 1 I I l \\ / / / I I I IT/ ti /ii titi /titiiti� 1 \ \ �� / J I \ 1 I I I I I I r // I I I 1/ ti t N \ \ III I I ////// l/ I/illlIII I II IIII II /��/ %�// /// //�/ / ( l \\ \\\\�\\\� �� s \ \ \ tio� \ \ \ o I I I I I I I / / ///// /II IIII I II (( / / r //� �! �( 1 `\�\(\\�� \\ \ \� \ i/ � ) I I I I I I / / (\ 1 ((`\\\/11 I I I 1 I 11111 11\1 \(\ 1 t �( mil\ \l I 1 �� \ \ \� \\ \ \ \ \ \ \ \ \ \\\\ / / / �� //// -Jill/I t \ \(\\ \\ \ \ \ \\ \11 I I I 1 \1� \\ \ \ \ \ \ \\�\�� �� ��� \ \ \ \ \\ \ \\�\\ �/ /— \ \ \ 1 I it 1 1 \\\ \\\ \ \ � \ ��� �N��� ��� \\ \\ \ \\\\ \\ \\ \ \\ / ( \\ \\ \\ \ \\� I I \\ \�\ \ \ �� \ \ 1 �\ \\ \\ / ( \, i/ , / t I I \ \ \ \\ \ \ \ \ \ \ I I I I I I I I I I III I \ \ I \ \ \\ \ \ \ \\ \ \\ \ \\ \ \ \ 1 \ 1 \ 1 I I IIII I 1 I \ \ ( 1 \ //� PERENNiALSTREA AS 1 1 1 \\ \ \ \ \ I I I I I I I I 1 I I I \ 1 I I I \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ 1 1 1 I I I I I I 1 / / I I \ \ \ \ \ \ DELINEATED BY Al�LAS I I I \ \ \ I I I I 1 \ \ \ \ \ \ \ \ \ \ \ \ I I I I / / 1 I I \ \ \ l ENVIRONMENTAL, AS 1 � \ 1 1 \ 1 I I I 1 Io1 1 1�, I Io I I �I I \ \ \ \ \ a \ \ \ \ \ o I I I I o \ \ \ \ \ ' 1\11\ NI III .9 11� �I II�I1 \�o \\ \1ss\\ \ \�so\\ \ \�1Q\\\\4\\\\ I I II 11 I I 11 / / 1 \\ \ \ \ 1 // /c I N N N N \ `s �O N N N ~ N \ \ \ �O \ \ dos \ 1 \ I ` 1 / \ \1 \ IIIIIIIIII 111 II III \\,\\ \ \ 1 \ I l I\I1>>1\\ IIII I III( 11 ` \ \\\\\ \ \ 1 I I \\ ►I 1\11 \ \ \ / / I 1111I I I I I 1 I \ I \ I 1 I / / / / / / / 1 / I I I 1 \ \ \\ ` \\\\\\\ \\ \ \ I (1 \ \\__�;G/ > 1 1 I I 111\ \ \ \—/ // %///11 I/1/ ) II 1 1 I I I I I I I I I / I I Ili II I I I / I I I I } \�\ \ \\\\ \ \ \\\\\ \\ \ / 1 1 I I /1 III 1 /l / l 11 I I \ \ \\ �\ \\\\ \\ \ \ \ \\I�✓/ \ / / } \ \ \ \ \ \ \ \ / % INTERMITTENT TR A ////ll/�/////1/ / 1 ////I /I l I I l 1 / /I ' / / l / / '/ //\\ `1 l l 1 IIII \ \ \ \ �� \N \\\ N \\\\\\\\\\\ \\ \� N \\ \\ I I \ I AS DELINEATED B AT A \\ II I I �\\\\ \\ \\ \\\\ \ \ �f / / / / / / / / //.� \ \ \ \ \ \ \ l i ENVIRONMENT L, NC \ I I 1 \ — i%/// ////�/// / /'// �/ // / / / / / / // / / �/ / // // >> \\\\ 1\// III 1 I 1 \ \ \ \ \\ \\\\ \ \\ \ \ \ \ \ \\ \\ l \ I �� / /// / / / // // / \\ / f \ \ \ \ \ \ \ 1 \ \�I I 1 / /// /j // / /i////// /// // // / / 11 \\ / 1 \ \\ \� \ \\ \ \\\ \\\ \ \ \\ N \ \\\ \ /o /� / to/ //�/// o / / o// /� / // �I ) o // / I I `��, \ \ \ �1� \ \ \��\ \ \`��1\\\\ �11\ �zoY\\ \ 10 o�\ \1��%///tij// //�� ////tiy/ ////y/////tiyh/////tiy%//j/ tij///�/ ^ itI//�°// �I o� \ \ \ s o\\ s\\ � \ \o /1/ I_ /• /t /I \ \ \ ��_\ \ \ \ \ I // //j / / // /// // / / / / \\ \\ \\ \ \\\ \\\\\� \ \ 11,% / / \I / / / \I \\ I \ // / / // //// // / /// // // //// //// // /o / /� lt— / / / / /// // / / / ////// ///// /i/// //// /////titi°/ //11/�/ / /// \ \ 21_1\1/ Elfi\\1)\ 1\11-1/Iii/C;;;_/:!//)/;) 1 / 1 I I / / / 1/ // //// ///// /////// // / ! I /l ////////// / ///// / /y`�/// /:// II/I TERM'ITTLN ST EAM// //// V �/ I AD �LIf�JEAE BYATLA\// / / —// 1 E VI 0 MIkNT INI I \ ��\d'// / ///// //////// / / / // /r \ \ o// / / //// ////// / //// // /i3o// //�/ /// //j // / /////// /i///titi/ /Ij \\90/// // / I/ / / ////// ///tih/ // /�///i//i/// I \ 'titi // // //// //// / // 1 ! / fi/�/,___ / o // l I I I ti Ill / / / 1/i// / /ll lIIII ( I rirriv(zz( / ( / — \ �— _''—///'//////lI / E \y30' VEGETATIVE STREAM / / // ///////////�//II ( / / /////// /////////// I11 /// // /BUFFER/I // ///i /// / III I I / I / // / // l l_� lam/ l \\ \ \ \ \ \ \ / l (�\ //1/N,11, IIIIII,IIII/jl///11/l l// \ \� \ \ \ 1 I I \� cr:\ rIII I /\ \\\\ / \ l llII1111,l/ l//1 \ \\ \ \ f l / — �\ III /11 /11, IIIIII,II�III //////// 11 VA \��s\\\1C 11\: vv—\ 1// vl I vI6 lII/ 1 I , 1/ l l lIIIIIIIII/////// I \\,J))II\\\ I 'IJ%\ � c''100! /// / 11 / 1111 /II11/ / / \ / / / / / / \ > \ \lt \\I/ / II //(/ // / // // //// // /\1 //1\\/1l/// I1,I I}((// / ////// / / / - _/ \\I/ I 1 1 I I IIII(\\ \1/////• //7/////'/// / / ///� j 1/ /I / II '`ter-- \\\\ �} I I I I I �/ ///// , III\ \\I 1/ ///, / /// / , / _ l l l / l / I I 1 I N I I I NI 1 \ �\ 1�'1 I / ///// / �/ / / Z/ /'// �// ti5 / / / // / / z1 �\ I III 1 / III \ I '// to / / / / / Zti / / / / �� \ / ----/ \os \ 1 I // ////I 1 ll� �\I +II o / /// / i / L. �/ f IIIIIIII I I (\ \ \ \ \ II"1 1 1 N //ti/ / / / / / t / / / / \ --/ \ I I I I it I 1 (( / // // / / t t / / ` \ \ \ \\\\\\\I(/(11 / vJ I ' 1 l l � l l 1 I I i I ► ) / / l ► / // ( \ // // // - � ����\1 111\111�1 l l l i\)) ). \\\\ \� \ ` I\ \ / / I // 1/ l I l / I —/ �/ �/ �/ / ?zo� �.� I IIII LEGEND PERENNIAL STREAM - AS DELINEATED BY ATLAS ENVIRONMENTAL, INC INTERMITTENT STREAM - AS DELINEATED BY ATLAS ENVIRONMENTAL, INC WETLANDS - AS DELINEATED BY ATLAS ENVIRONMENTAL, INC ---2100EXISTING CONTOUR LINE MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630677890 DAVID AND MICHELLE MASSULLO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 PAMALA ROSE ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 KERMITAND LYNN MCELROY ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 JEFFREY PARKER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630766244 PROPERTY BOUNDARY, 31.9 ACRES DAVID MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630768540 l l I I I 7 I/ I. ( I I I I j I/ 1 I } I I I I I I I I/ \ N II ) I I O I I O 1 ) / / / \ I 1 \ / EUGENE MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630862906 • • / JJ / WETLANDS AS DELINEATED BY ATLAS ENVIRONMENTAL, INC j//'� / / / / / , / / �// III 1 / Ill`\�\ 7— CHRISTOPHER AND STEPHANIE SCRUGGS ZONING: MR-30 PIN: 9630778902 INTERMITTENT SyREA // ////1 AS DELIKIEATE.aBY/// / / /// / I ENVIRONM2NTAL/I C / / / / oo (I I I o / \r- / ���' ��'�� / / / //" / )/ ICI ///�/ ` o I / 11! // 1111 1///1///' \ J� \ `1 //20 // III / \ 1 1 \ 1 \ l \ / _ 2095 — -2095. j 1 \ I 1 \ \ \\ \ I l a \ \ \ \ \ // ti // oe`' J (/rzoo — — — — — — I I N \ \ \ //j�/// //// d �- 2100- � \ 1 / 1 I \ \\ / /// / / 11 l o /// /,// /oo /�'� -----_�z1p0��1\1( — \ UST O�F�{SYL ON CREEK \ \ / / /�S/SHOWN HE/USGS — — — - \ I / '/ SH"O�IVUA M/kHORS E — , // ////, / titi----- / // / / / -- // ////--- — /'''' A�' ////--- _ _211°_ ��� \� yvtr Ko — — // ///DLI TED/BY�T KS / ,i / / �N>!/IRf N7�gL, INS/ — — — — — — — : �// j f/ / // /// ititi/ j� 12-1/51-1-1-1:11:111-laii; // ti////o�///////--// ////�// / / / /�� I PABLO AND TIFFANY ESPOSITO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630874334 0 O cc cr W m 80 160 — ■ SCALE: 1" = 80' 240 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. >- cc PROJECT # ORIGINAL ISSUE DATE: 0 REVISIONS: ESC-STORMWATER SUBMITTAL 0 TOWN COMMENTS 0 01 0 TOWN AND STATE COMMENTS 0 NCDEQSTREAM COMMENTS 7-1 : SEAL 204 0. • 0 336.838.2500 0 MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road o c Existing Conditions co LL cc 4-1 CO CD 0 Ian U co ci) CI) CC SHEET C-2 NOT FOR CONSTRUCTION DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 EROSION CONTROL NOTES 1. LAND DISTURBING ACTIVITIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT ALL ASSOCIATED PERMITS AND APPROVALS HAVE BEEN OBTAINED FOR THIS WORK. NO WORK SHALL BE PERFORMED OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 2. ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED WITHIN 7 DAYS OF ESTABLISHING FINAL GRADE OR IF CONSTRUCTION ACTIVITY CEASES FOR LONGER THAN 7 DAYS. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. 3. CONTRACTOR IS RESPONSIBLE FOR ALL NCDENR INSPECTION REPORTS AND RECORD KEEPING AS REQUIRED. CONTRACTOR SHALL SUPPLY AND INSTALL A RAIN GAUGE ON SITE. 4. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF A RAINFALL EXCEEDING 0.5 INCHES DURING A 24-HOUR PERIOD OR MORE FREQUENTLY IF REQUIRED BY GOVERNING NPDES GENERAL PERMIT. ANY REPAIRS OR MAINTENANCE DETERMINED NECESSARY SHALL COMMENCE WITHIN 24 HOURS AND BE COMPLETED WITHIN 48 HOURS OF INSPECTION AND REPORT. 5. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. CONTRACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO PREVENT SEDIMENT FROM REACHING ANY EXISTING WATER BODIES OR WETLANDS. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 6. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING GROUND COVER ON ALL DISTURBED AREAS, INCLUDING ALL SLOPES. ALL SLOPES SHALL BE HYDRO -SEEDED WITH TACKIFIER ADDED. EROSION CONTROL MATTING SHALL ALSO BE PROVIDED ON ALL SLOPES STEEPER THAN 2:1 AND ON ANY OTHER AREAS AS NECESSARY TO PREVENT EROSION AND ESTABLISH GROUND COVER. ANY AREA THAT SHOWS DISTRESS SHALL BE MATTED. 7. EXISTING DRAINAGE PATTERNS SHALL BE MAINTAINED UNLESS OTHERWISE SHOWN ON THE PLANS. ALL AREAS OF THE SITE SHALL BE SHAPED TO DRAIN TO EROSION CONTROL DEVICES. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 8. SILT FENCE STONE OUTLETS SHALL BE INSTALLED IF NECESSARY EVERY 100LF AND AT LOW POINTS ALONG THE SILT FENCE. SEDIMENT SHALL BE REMOVED FROM SILT FENCE BEFORE IT IS 33% FULL. 9. THE CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY, METHODS, PROCEDURES, AND SEQUENCES OF ITS OPERATIONS. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL FOR ITS OPERATIONS. 10. LOCATIONS OF UTILITIES SHOWN ARE BASED ON EVIDENCE OBSERVED AT THE TIME OF SURVEY. OTHER UTILITIES MAY EXIST THAT ARE NOT SHOWN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXISTENCE AND ACTUAL LOCATION OF ALL EXISTING UTILITY LINES, AND TO PROTECT THESE LINES DURING CONSTRUCTION. 11. THE CONTRACTOR SHALL KEEP ALL STREETS AND ROADWAYS CLEAN AT ALL TIMES. THIS SHALL BE ACCOMPLISHED BY STREET SWEEPING AND WASHING AS NECESSARY ON A DAILY BASIS. 12. CONTRACTOR SHALL MAINTAIN AN APPROVED SET OF PLANS ON THE JOB SITE AT ALL TIMES. 13. CONTRACTOR SHALL CONTACT EROSION CONTROL INSPECTIOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. SCOTT AND KELLY FRAZIER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630750904 DAVID AND MICHELLE MASSULLO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630569334 EROSION CONTROL NARRATIVE The construction plans provide two erosion and sediment control phases. The initial phase includes the installation of a temporary construction entrance, perimeter protection measures, and diversion ditches for the installation of the proposed residential street. The site will be accessed via a new driveway on Banner Farm Road. The proposed street will provide two stream crossings. All stream crossings shall be subject to associated permits. The second phase involves development of the residential lots. Any portion of the project directly up gradient from streams shall receive double row silt fencing with reinforced outlets. The contractor will develop the lots in a manner as to not expose the entire site at once without permanent stabilization. The project has been designed to balance earthwork, with no anticipated import or export. NOTES FOR WORKING AROUND STREAMS 1.) ALL WORK IS TO BE PERFORMED IN THE DRY. 2.) ALL MATTING WITHIN BUFFER TO BE 100% BIODEGRADABLE 3.) CONTRACTOR TO ONLY DISTURB STREAMS AND WETLAND IN ACCORDANCE WITH STREAM AND WETLAND DISTURBANCE PERMIT. 4.) DUE TO PROXIMITY OF SENSITIVE WATER ONSITE, ONLY APPLY FERTILIZER PER SOIL TEST RECOMMENDATIONS, NO FERTILIZER AND ONLY NATIVE MIXES MAY BE USED WITHIN STREAM BUFFERS MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630677890 •' I I 1 I H I l 1 I I, " 1 i I I I I I I /• I// I / / I I I,, I,, ,\ \�\ \�� \\ :., i °�� o♦ �,�►�/ / // l/// /, l I l l / / / / / / / ��\ \ 1 / l l� I I ( \ x \\ \ \ ♦, N�!%� ��- -' — \ I I vim_—� _� \ �_ \ \ \ %.�.;� -- — — — --- , �,� w� :�_ ---_ �im�: =a���� Dili--- ��a ��� ����� ----�� �� �w A1��`, �i,%%i � ,�'�/)/i�_ ,� �° rsr ioi mriawa fsin zwanws_�i ,� r � fi3�M r - yAT i IFII.�_�%_ � \ � ��- ...------4e4r--;-‘4_"-----if-----11.1r4.1.27if..vaTal-4111..--F--4=-_--- 1 1r =��i / //i Il / /// ti� // 1 /// / / / _ I 11-\'213.6\11\Z) \ \ \`���J��1 / lIl:I ll/ 1 II\ / - // �� t/ti, I/ / I / I //�/lvl�/'/i-/' / / it\ /ti� / 1� I / / 1 iI�UI 1 ) 1I11 /�IA;. �////3�/= _ /—_ ►� �i \ i�/ ///N I I / 1 ,,iI i'1IOl ii' i%�__ _ ��- / i �40411 U!�I7 �/lll I I I l �l I / � ' I \ ,� )16%01 4f(, J /orti /i / ti3 — -- _ / / / _ — I �11 ;/ /////��//� / J I I i Il I l )r / �,V --�o � AD \\ % / / : 'i�47J, // /_ -- // 'TARN - / titi5 :,,9/////// / / / I I �\���,�// �- /' � �i�l ></ / // / / / / ti I I l I /�Oj���,�\ ` - N,titi / / l / I12: / IrCAI�\ \ // *Irk /.-- �J / <//-,/ / / 1I I �\ \ \ \ / / ( / ` /it \\\ 13\ / -4— 1�, NJIi\\��:1)/ -\\ II %�.� \ \ \ \ \ \ \ \ \ < < �\A`� 1. I I I ktV) � \ \ \ I \ \ \ \ \ \ .\ �� / \ _`\\ I I /II \\ \ \ � j I �) I I\\\\ \ zoo' I I I/ /,\ / / / / \ \\ r\\\�I IC/ // \10 \ I / 1 !l/ l �- \ 1 / / / ^� ' / -�titi° / / 'I^'\'\ \` 1 1 I I .// i / / /'/�,��.., ��/ // �// /,�/ / I "ter— -\\ \ \ 1 (Il I I I/ /, ��/ / /�/ 5/ / -o / / _�� ��\ \` IIII/ 14 / / 1 / / / 21 I/ o // / // -/�' /21 / / , / �i� f�°S.\ \ 1 1I1 1 I III 1 1 ////� // //' �- / / / (� \J 1 I 1 �// // (/ o / / / / -- I II 1�`l\�l//1(II ti// / / ////- \ \� I I I I I I I II PAMALA ROSE ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 KERMIT AND LYNN MCELROY ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 JEFFREY PARKER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630766244 PROPERTY BOUNDARY, 31.9 ACRES DAVID MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630768540 EUGENE MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630862906 LEGEND PABLO AND TIFFANY ESPOSITO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630874334 DISTURBED LIMITS - 20.5 ACRES TEMPORARY DIVERSION TEMPORARY SEDIMENT FENCE STONE/WIRE MESH INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE AREAS THAT REQUIRE 7 DAY STABILIZATION (SEE NCG01) CHRISTOPHER AND STEPHANIE SCRUGGS ZONING: MR-30 PIN: 9630778902 0 80 0 cc cc cc W IZ m 160 240 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. >- Q� cc 0 PROJECT # ORIGINAL ISSUE DATE: REVISIONS: ESC-STORMWATER SUBMITTAL 0 N rq TOWN COMMENTS 0 N 01 0 TOWN AND STATE COMMENTS N 0 N NCDEQSTREAM COMMENTS N O N 0 «CC ,,,,,,ttl/1,,,,, ♦' -\ CAgo ,,moo .oFEssialti9 ;'QQ SEAL �!, —Doc"srt,yMj. per.♦ 3C11EE7F55C2423... 02/16/202 2 rn Ln LD 00 N U z 0 0 In _- 0 z Aft 336.838.2500 W (J') (/) z oc 0 0 H U z� < 1- �z 0 O 0 2 ATTN: Brian Kirk 103 McDowell Road 4 -, • a) • c 00 0 to U z L� LEI > °o c) J c Overall Erosion and Sediment Control Plan SHEET C-3 NOT FOR CONSTRUCTION SCALE: 1" = 80' DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 EROSION CONTROL NOTES EROSION CONTROL SEQUENCE 1. LAND DISTURBING ACTIVITIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT ALL ASSOCIATED PERMITS AND APPROVALS HAVE BEEN OBTAINED FOR THIS WORK. NO WORK SHALL BE PERFORMED OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 2. ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED WITHIN 7 DAYS OF ESTABLISHING FINAL GRADE OR IF CONSTRUCTION ACTIVITY CEASES FOR LONGER THAN 7 DAYS. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. 3. CONTRACTOR IS RESPONSIBLE FOR ALL NCDENR INSPECTION REPORTS AND RECORD KEEPING AS REQUIRED. CONTRACTOR SHALL SUPPLY AND INSTALL A RAIN GAUGE ON SITE. 4. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF A RAINFALL EXCEEDING 0.5 INCHES DURING A 24-HOUR PERIOD OR MORE FREQUENTLY IF REQUIRED BY GOVERNING NPDES GENERAL PERMIT. ANY REPAIRS OR MAINTENANCE DETERMINED NECESSARY SHALL COMMENCE WITHIN 24 HOURS AND BE COMPLETED WITHIN 48 HOURS OF INSPECTION AND REPORT. 5. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. CONTRACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO PREVENT SEDIMENT FROM REACHING ANY EXISTING WATER BODIES OR WETLANDS. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 6. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING GROUND COVER ON ALL DISTURBED AREAS, INCLUDING ALL SLOPES. ALL SLOPES SHALL BE HYDRO -SEEDED WITH TACKIFIER ADDED. EROSION CONTROL MATTING SHALL ALSO BE PROVIDED ON ALL SLOPES STEEPER THAN 2:1 AND ON ANY OTHER AREAS AS NECESSARY TO PREVENT EROSION AND ESTABLISH GROUND COVER. ANY AREA THAT SHOWS DISTRESS SHALL BE MATTED. 7. EXISTING DRAINAGE PATTERNS SHALL BE MAINTAINED UNLESS OTHERWISE SHOWN ON THE PLANS. ALL AREAS OF THE SITE SHALL BE SHAPED TO DRAIN TO EROSION CONTROL DEVICES. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 8. SILT FENCE STONE OUTLETS SHALL BE INSTALLED IF NECESSARY EVERY 100LF AND AT LOW POINTS ALONG THE SILT FENCE. SEDIMENT SHALL BE REMOVED FROM SILT FENCE BEFORE IT IS 33% FULL. 9. THE CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY, METHODS, PROCEDURES, AND SEQUENCES OF ITS OPERATIONS. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL FOR ITS OPERATIONS. 10. LOCATIONS OF UTILITIES SHOWN ARE BASED ON EVIDENCE OBSERVED AT THE TIME OF SURVEY. OTHER UTILITIES MAY EXIST THAT ARE NOT SHOWN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXISTENCE AND ACTUAL LOCATION OF ALL EXISTING UTILITY LINES, AND TO PROTECT THESE LINES DURING CONSTRUCTION. 11. THE CONTRACTOR SHALL KEEP ALL STREETS AND ROADWAYS CLEAN AT ALL TIMES. THIS SHALL BE ACCOMPLISHED BY STREET SWEEPING AND WASHING AS NECESSARY ON A DAILY BASIS. 12. CONTRACTOR SHALL MAINTAIN AN APPROVED SET OF PLANS ON THE JOB SITE AT ALL TIMES. 13. CONTRACTOR SHALL CONTACT EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. X LEGEND DISTURBED LIMITS - 20.5 ACRES TEMPORARY DIVERSION TEMPORARY SEDIMENT FENCE STONE/WIRE MESH INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE AREAS THAT REQUIRE 7 DAY STABILIZATION (SEE NCG01) i / , / TE 18'x 4' WIDE SPILLWA 1.5"-5KIMMER WI ALL INLETS TO BE SEE DETAIL / / / / / 30 / 1. PRIOR TO LAND DISTURBING ACTIVITIES A PRE -CONSTRUCTION MEETING SHALL BE HELD ON -SITE WITH THE CONTRACTOR AND SUBCONTRACTOR(S) PERFORMING THE WORK. CONTRACTOR SHALL NOTIFY NCDEQ LQS INSPECTOR, OWNER, AND ENGINEER OF MEETING DATE AND TIME AT LEAST 48 HOURS PRIOR. 2. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE. 3. INSTALL PERIMETER SEDIMENT FENCE AS SHOWN. 4. INSTALL SEDIMENT BASINS. CONTRACTOR IS NOT TO CONDUCT MAJOR GRADING OR BASIN INSTALLATION DURING WET WEATHER OR PERIODS OF PREDICTED WET WEATHER. 5. COMMENCE CLEARING, STRIPPING, GRUBBING AND DEMOLITION OPERATIONS. THIS WORK SHALL BE PERFORMED ONLY IN AREAS WHERE EARTHWORK WILL COMMENCE WITHIN 7 DAYS. 6. ALL WORK IN OR ADJACENT TO STREAMS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA. SEE DETAIL FOR STREAM DEWATERING MEASURES. 7. INSTALL STREAM CROSSING PIPES AND HEADWALLS. ALL WORK WITHIN PERINEAL STREAMS SHALL BE DONE IN THE DRY. CONTRACTOR TO ENSURE ALL THE PORTIONS OF STREAMS AND WETLANDS PERMITTED ARE DISTURBED. ALL STREAM CROSSING PIPES SHALL HAVE THE BOTTOM 20% BURIED, SEE STORM DRAIN PLAN. 8. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY. ALL STORMWATER SHALL DRAIN TO AN APPROVED SEDIMENT CONTROL DEVICE. 9. IMPLEMENT TEMPORARY OR PERMANENT STABILIZATION FOR ALL AREAS OF THE SITE WHERE ACTIVITY HAS CEASED FOR MORE THAN 7 DAYS. 10. PROVIDE OWNER WITH COPIES OF ALL INSPECTIONS AND RECORDS, WEEKLY. 11. COMMENCE SITE GRADING. 12. INSTALL STORM DRAINAGE AS GRADING PROGRESSES, ALONG WITH INLET PROTECTION. 13. MAINTAIN PERIMETER PROTECTION MEASURES, INLET PROTECTION, AND SHAPE AREAS TO DRAIN TO SEDIMENT CONTROL DEVICES. 14. INSTALL ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES AS NECESSARY. 15. PROVIDE OWNER WITH COPIES OF ALL INSPECTIONS AND RECORDS, WEEKLY. 16. IMPLEMENT TEMPORARY OR PERMANENT STABILIZATION FOR ALL AREAS OF THE SITE WHERE GRADING ACTIVITY HAS CEASED FOR MORE THAN 7 DAYS. 17. FINALIZE PAVEMENT SUB -GRADE PREPARATION. MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE UNTIL STONE BASE IS INSTALLED. 18. INSTALL CURB AND GUTTER. INLET PROTECTION MAY BE REMOVED TEMPORARILY FOR THIS CONSTRUCTION. REPLACE ANY REMOVED INLET PROTECTION AT THE END OF EACH DAY. 19. COMPLETE FINAL GRADING, BACKFILLING AND PERMANENT SEEDING, PLANTING AND MULCHING STABILIZATION. REPAIR ANY RUTTING OR WASHOUTS OF SLOPES AND OTHER AREAS UNTIL FINAL STABILIZATION IS ACHIEVED. 20. INSTALL STONE BASE MATERIAL AS REQUIRED FOR PAVEMENT. IF NECESSARY, REMOVE INLET PROTECTION AROUND INLETS AND MANHOLES IMMEDIATELY PRIOR TO PLACING STABILIZED BASE COURSE. INLET PROTECTION WITHIN PARKING AREAS MAY BE CONVERTED TO SILT BAG INLET PROTECTION DURING STONE BASE INSTALLATION. 21. INSTALL PAVEMENT. INLET PROTECTION IS TO REMAIN AT ALL INLETS UNTIL CONTRIBUTING AREA ACHIEVES FINAL STABILIZATION AND/OR ALL POTENTIAL POLLUTANT SOURCES ARE ELIMINATED. 22. INSPECT AND CLEAN STORM DRAINAGE SYSTEM. BMP INSPECTIONS, MAINTENANCE, RECORD KEEPING AND SITE POSTING SHALL CONTINUE UNTIL FINAL STABILIZATION. 23. REMOVE SKIMMER BASINS UPON INSTALLATION OF STONE BASE. REMOVE SKIMMERS AND INSTALL INLET PROTECTION AT INLETS. 24. COORDINATE WITH OWNER AS NECESSARY TO "CLOSE OUT" OR "TURN OVER" MAINTENANCE RESPONSIBILITY ON THE PROJECT INCLUDING: NOTIFYING NCDEQ LQS INSPECTOR WHEN PROJECT IS READY FOR CLOSE OUT, TERMINATE NPDES NCG010000 COVERAGE BY FILING AN E-NOT. PORARY SKIMMER BASIN 3 6 x2 DEEP �I✓ITH BAFFLE / H 0.5" ORIFICE, TABILIZED Jr =- DOUBLE ROW TEMPORARY SEDIMENT FENCE, PROVIDE STONE/WIRE OUTLETS 1P0' k \ \ 0/C AND AT ALL LOW POINTS I x x \-x X x = / I / ‘ TPERIcIANE /T DITCH, 1 / ALIL DITCHES SHALL f DECEIVE NAG-SC15tN / / \ I / LI ER,ISEE DETAIL. / 2 (PROVIDE STRAW \ \\ / / 1, l / / / / / / // / / I *A� LE CHECK DAMS / \ ) / \ Lam/ // // // / ) �0'0/�CPRIORTO / I C _____-__-_-----_1,..,J // // / / f 1RADIj�G C�PERAT1IONS / / /, j ice' r I I l / l I // �/ / 7/I I I I 1 1/ / / // �i / / / / / / / / / / / -/ 7 �� �/ / / / / / / / / / l 1 7 /.77 �/ //// / / /©/ / / 1 / i // / / 5 / / / / / / / i / ti1ti//.i///// // / / / / / / / i /� / / / / / / / / / /� / / / / / / / / / / -/ / / / /71(1 / o/ // / / / / i ti / / �.� �� V / / / // / / 1 X./ / / / //./ / / N I / / / / / 1 / 1 1 I I / / /_ / / / / / / / / DISTURBED LIMITS x \ / 1 11 11 1 11 1 / II /1� / 18'x3A'x2' DEEP WITH BAFFLES C 4'1WIDE SIPILLWAY 1.5" SKIMMER WI H 0.5" ORIFICE, \ ALL IN, TO BE S 1 STABILIZED 1 - // I I I - > II \ \ \ f dole°-?:; '1 0/C AND AT ALL LOW POINTS I I� \\\\\\ moo CONTRACTOR1TO \ \ ENSURE WETLAND AREA REMAINS 1 DOUBLEI ROW TEMPORARY DIMEK FENCE, PROVIDE SiQNE/WIRE OUTLETS 100' \ \ \ UNDISTURBED l TEMPORARY FLEXIBLE HOSE, TYP. SPECIAL STILLING BASIN (SEE NOTE 7) EXISTING STREAM CHANNEL IMPOUNDMENT IMPERVIOUS DIKE, TYP. DRY WORK AREA 12, BYPASS PUMP FOR CLEAN UPSTREAM CHANNEL BASE FLOW TEMPORARY FLEXIBLE HOSE DEWATERING PUMP FOR SEDIMENT LADEN WATER WITHIN WORK AREA BANKFULL IMPERVIOUS DIKE, TYP. PLAN VIEW TYPE II FABRIC 8" STONE OR APPROVED ALTERNATIVE SPECIAL STILLING BASIN SPECIAL STILLING BASIN WITH STABILIZED OUTLET STREAM BASE FLOW BY-PASS PUMP OUTLET WITH TEMPORARY STABILIZED OUTLET, TYP. NOTES: 1. ALL STREAM WORK TO BE PERFORMED "IN THE DRY" EITHER BY PUMP -AROUND OR STREAM DIVERSION WITH SILT CURTAIN. 2. IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED THE SAME WORKING DAY. 4. MAINTENANCE OF STREAM FLOW OPERATION SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES PUMPS AND HOSES. 5. PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. 6. GRADED STREAM BANKS SHALL BE STABILIZED, WITH MATTING, PRIOR TO PREDICTED RAIN FALL EVENTS. THE EXIT LOCATION SHALL BE CHOSEN TO PREVENT EROSION. 7. GRAVITY -BASED GEOTEXTILE BAG (SPECIAL STILLING BASIN) FILTERS SHALL BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DEWATERING. 8. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL PUMPING OPERATIONS, UNLESS NATIVE STREAMBED STONE MATERIAL IS DEEMED SUITABLE BY DESIGNER AT DISCHARGE LOCATION. 9. TYPE II FABRIC SHALL BE USED UNDERNEATH ALL STONE/RIP-RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, AND SPLASH PADS. 10. REFER TO THE CONTRACT DOCUMENTS FOR ADDITIONAL NOTES. 11. STABILIZE WORK AREA AT THE END OF EACH DAY. 12. REFER TO SPECIAL PROVISIONS FOR PUMP AROUND OPERATION, SPECIAL STILLING BASIN, AND IMPERVIOUS DIKE FOR MORE DETAILS. / / / / / 1 / DIVERSION DITCH /TEMP,OR/ARi SK/INAUER/B)ArSIN1#1, 7 11 / APPROXIMATE BASE FLOW WATER SURFACE TOE OF BANK PROTECT UPSTREAM SIDE OF IMPERVIOUS POLYETHYLENE WITH SANDBAGS, RIP -RAP, OR OTHER APPROVED NON -ERODIBLE MATERIAL TOP WIDTH 3.0' MIN. FLOW HEIGHT 1/2 BANKFULL FABRIC OVERLAP MIN 1 FOOT TYPE II FABRIC TEMPORARY FLEXIBLE HOSE (SEE NOTE 8) SPLASH PAD/STABILIZED I I. OUTLET THICKNESS 2 MAX -11 COVER WITH IMPERVIOUS POLYETHYLENE MEMBRANE, 20 MIL THICK DRY WORK AREA EXISTING STREAM BED SANDBAGS, RIP -RAP, OR OTHER APPROVED NON -ERODIBLE MATERIAL SECTION A -A IMPERVIOUS DIKE RIP -RAP SPLASH PAD LENGTH TYPE II FABRIC TEMPORARY STABILIZED OUTLET 0 STREAM DEWATERING DETAIL SCALE: NTS NOTES FOR WORKING AROUND STREAMS 1.) ALL WORK IS TO BE PERFORMED IN THE DRY. 2.) ALL MATTING WITHIN BUFFER TO BE 100% BIODEGRADABLE 3.) CONTRACTOR TO ONLY DISTURB STREAMS AND WETLAND IN ACCORDANCE WITH STREAM AND WETLAND DISTURBANCE PERMIT. 4.) DUE TO PROXIMITY OF SENSITIVE WATER ONSITE, ONLY APPLY FERTILIZER PER SOIL TEST RECOMMENDATIONS, NO FERTILIZER AND ONLY NATIVE MIXES MAY BE USED WITHIN STREAM BUFFERS SEDIMENT FEN% PROVIDE ) --OUTLET PROTECTION RTP-RAP APRON 2097- - STONE/WIRE MESH 0 0 0 oo 0 02/16/2022 CONCRETE AlASHOUT 40 80 SCALE: 1" = 40' 120 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. 0 SHEET NOT FOR CONSTRUCTION cx LiJ cx C-5 DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 30'SETBACK 10' LANDSCAPED BUFFER (REAR LOT LINES AT PERIMETER) BUFFER PLANTING REQUIREMENTS IF NATURAL BUFFER IS REMOVED CONTRACTOR TO REPLANT BUFFER AT THE FOLLOWING RATES: 1 LARGE SHADE TREE PER 40 LF (MIN. MATURE HT: 15') 3 SHRUBS PER 10 LF (MIN. MATURE HT: 36") 30' SETBACK 0 TYPICAL LOT DETAIL SCALE: NTS 35,958SF SCOTT AND KELLY FRAZIER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630750904 10' VEGETATIVE BUFFER AROUND PERIMETER OF SUBDIVISION, SEE TYPICAL SECTION DAVID AND MICHELLE MASSULLO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 21 30,721SF R50' (ROW) R35' 19 (EOP) 31,816SF 30,020SF PAMALA ROSE ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 KERMITAND LYNN MCELROY ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630569334 22 30,010SF R35' (EOP) 10' VEGETATIVE BUFFER AROUND PERIMETER OF SUBDIVISION, SEE TYPICAL SECTION 23 30,013SF MAVRICK DRIVE (PRIVATE) R20' (ROW) 30,016SF JEFFREY PARKER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630766244 R25' (EOP) 20' EOP 24 30,013SF R35' (EOP) R35' (EOP) 14 30,262SF 25 30,013SF 12 33,515SF 13 30,462SF 26 30,006SF SITE LAYOUT NOTES 1. THIS IS NOT A PROPERTY SURVEY. SEE SURVEY FOR BOUNDARY INFORMATION. 2. ALL WORK SHALL COMPLY WITH LOCAL ORDINANCES, NCDOT STANDARDS AND OWNER SPECIFICATIONS. ALL SIGNS AND PAVEMENT MARKINGS SHALL COMPLY WITH MUTCD STANDARD. 3. BLUE RIDGE ENGINEERING SHALL PROVIDE ALL CONSTRUCTION LAYOUT AND STAKING REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING FOR CONSTRUCTION LAYOUT AND STAKING SERVICES PROVIDED. CONTRACTOR SHALL IMMEDIATELY NOTIFY BLUE RIDGE ENGINEERING IF CONDITIONS ARE ENCOUNTERED THAT ARE NOT AS SHOWN. 4. CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY, METHODS, PROCEDURES AND SEQUENCES OF ITS OPERATIONS. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL FOR ITS OPERATIONS IN COMPLIANCE WITH MUTCD AND NCDOT STANDARDS. CONTRACTOR SHALL NOTIFY NCDOT, OWNER, AND ENGINEER AT LEAST 72 HOURS IN ADVANCE OF ANY LANE CLOSURE OR TRAFFIC SHIFT. 5. ALL WORK IS SUBJECT TO INSPECTION OF THE OWNER, ENGINEER AND AUTHORITIES HAVING JURISDICTION. THE OWNER SHALL PAY FOR ALL QUALITY ASSURANCE TESTING REQUIRED. CONTRACTOR SHALL PROTECT THE WORK UNTIL SUCH TIME THAT THE PROJECT IS APPROVED AND OPENED TO TRAFFIC. 6. SUBGRADE SHALL BE ACCEPTED BY THE ENGINEER PRIOR TO PLACEMENT OF STONE BASE. CONTRACTOR SHALL PROVIDE A LOADED TRUCK FOR ALL PROOF -ROLLS REQUIRED. 7. STONE BASE SHALL BE ACCEPTED BY THE ENGINEER PRIOR TO ASPHALT PLACEMENT. CONTRACTOR SHALL PROVIDE A LOADED TRUCK FOR ALL PROOF -ROLLS REQUIRED. 8. PAVING CONTRACTOR SHALL PROVIDE A CERTIFIED ROADWAY QUALITY CONTROL TECHNICIAN WITH A NUCLEAR GAGE AT ALL TIMES ASPHALT IS BEING PLACED. IF REQUESTED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING ASPHALT CORE SAMPLES FOR VERIFICATION OF COMPACTION AND THICKNESS. 9. CONTRACTOR SHALL MAINTAIN AN APPROVED SET OF PLANS ON THE JOB SITE AT ALL TIMES. WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. MAVRICK DRIVE (PRIVATE) 30,046SF 10 33,971SF R20' (ROW) LUCY LANE — (PRIVATE) R35' (EOP) R35' (EOP) 10' VEGETATIVE BUFFER AROUND PERIMETER OF SUBDIVISION, SEE TYPICAL SECTION DAVID MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630768540 R25' (EOP) 45' R/W 20' EOP 30,028SF R50' (ROW) 28 30,206SF 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 25 LF, 0.001 ACRES 30,367SF 30,187SF 2' VALLEY CURB 32,191SF 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 3OLF, 0.001 ACRES 30,40SF 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 30 LF, 0.001 ACRES 15" HP -STORM DRIVEWAY PIPE -FOR MAINTENANCE ACCESS TO SEPTIC STREAM IMPACT: 3OLF, 0.002 ACRES 39,221SF EUGENE MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630862906 WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. 35,644SF MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630677890 ZONING COMPLIANCE DATA GENERAL LATITUDE LONGITUDE PIN PROPERTY AREA ZONING 35° 22' 00" N 82° 33' 49"W 9630776176 31.9 +/- AC. MR-30 PROPOSED USE SINGLE FAMILY RESIDENTIAL 32 LOTS MIN LOT SIZE 0.688 ACRES (30,000 SF) SETBACKS FRONT SIDE REAR WATERSHED CLASSIFICATION MAX BUA LOW DENSITY 60' 30' 30' WS-IV PROTECTED 2 UNITS PER ACRE, 24% BUA (WITH CURB AND GUTTER) EXISTING SURFACE WATER: 0.61 ACRES TOTAL PROJECT AREA: 31.29 ACRES PROPOSED BUA WITHIN STREET R/W 1.55 ACRES ON LOTS 3.67 ACRES +/- (ASSUMED 5,000 SF IMPERVIOUS PER LOT) TOTAL PROPOSED BUA 5.22 ACRES (16.7%) PROPOSED WETLAND/STREAM IMPACTS STREAM IMPACTS 0.019ACRES 299 LF WETLAND FILL 0.009 ACRES 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 3OLF, 0.002 ACRES UT OF BOYLSTON CREEK AS SHOWN ON THE USGS 7.5 MINUTE MAP HORSE SHOE QUADRANGLE PROPOSED PIPE CROSSING, STREAM IMPACT: 89LF, 0 I I6 ACRES WETLAND AREAS TO* BE FILLED 0.009 ACRES PROPOSED PIPE / CROSSING, STREAM IMPACT: 0.006 ACRES 30,206SF 30' LOW DENSITY STREAM BUFFER PER NCDEQ WATERSHED PROTECTION PROGRAM CHRISTOPHER AND STEPHANIE SCRUGGS ZONING: MR-30 PIN: 9630778902 MAVRICK DRIVE (PRIVATE) 0 30,288SF PABLO AND TIFFANY ESPOSITO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630874334 WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. I 33,255SF 0 cc W 03 60' VEGETATIVE STREET BUFFER 80 160 ■ SCALE: 1" = 80' 240 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. PROJECT # N 0 O O N ORIGINAL ISSUE DATE: N 0 c-I REVISIONS: ESC-STORMWATER SUBMITTAL 0 N TOWN COMMENTS 0 0 0 TOWN AND STATE COMMENTS 0 N NCDEQSTREAM COMMENTS 0 c-I 0 «CC �,,•�Q.�N CAgp ,,moo >" E.S3f6 7 e0 :Q l: SEAL 2020 D°cu- rteti /VGNs p, C 3C11EE7F55C2423.. 02/16/2022 U J a dA L Ol a) O N LD CD oo C aJ C cn z LVbA ' o • a1 •� 01 C t� • G 0 m rn 336.838.2500 MI (7) () z Ioc 0 0 H U z� < 1- �z O� 0 2 ATTN: Brian Kirk 103 McDowell Road Overall Site Layout Plan SHEET C-6 NOT FOR CONSTRUCTION DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 ROADWAY SCHEDULE Road Name MAVRICK DRIVE (Private) LUCY LANE (Private) SKYLAR LANE (Private) Classification Collector Local Local Pavement Width 20' 20' 20' 50' RADIUS - RIGHT OF WAY ROW Width 50' 45' 45' Total Length 1,952' 177' 234' SCOTT AND KELLY FRAZIER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630750904 35' ASPHALT 8" MIN COMPACTED ABC (MAVRICK DR.) 6" MIN. COMPACTED ABC (LUCY AND SKYLAR LANE) 1.5" ASPHALT SLOPE VARIES 0 TYP. CUL-DE-SAC SECTION 2' 6' 3% 10' VEGETATIVE BUFFER AROUND PERIMETER OF SUBDIVISION, SEE TYPICAL SECTION DAVID AND MICHELLE MASSULLO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 SCALE: NTS SCALE: NTS PAMALA ROSE ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 KERMITAND LYNN MCELROY ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630569334 10' VEGETATIVE BUFFER AROUND PERIMETER OF SUBDIVISION, SEE TYPICAL SECTION / R20' (ROW) JEFFREY PARKER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630766244 3:1 SLOPE / v / Leh 1_ o titi�h �4 \ 24 \ ,,s 0 n N I 3:1 SLOPE 50' 6' SHOULDER @ 3%, FILL WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. MAVRICK DRIVE (PRIVATE) R20' (RO`' LWCY LANE RIVATE) R35' (EsP R35' (EOP,, 10' VEGETATIVE BUFFER AROUND PERIMETER OF SUBDIVISION, SEE TYPICAL SECTION DAVID MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630768540 R50' (ROW) ROW F- 2% 1.5" ASPHALT 2% / 28 \N 0 15" HP-STOR DRIVEWAY PIPE STREAM IMPACT: 25 LF, 0.001 ACRES VALLEY CURB 8" MIN COMPACTED ABC (MAVRICK DR.) 6" MIN. COMPACTED ABC (LUCY AND SKYLAR LANE) 0 TYP. ROADWAY SECTION 2' VALLEY CURB SCALE: NTS SCALE: NTS 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 3OLF, 0.001 ACRES f 31 1 STREAM 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 30 0 LF, 0.001 ACRES 15HP-ST' RM DRIVEWAY INTENANCE ACCESS TO SEPTIC STREAM IMPACT: 3OLF, I 0.002 ACREs,- EUGENE MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630862906 WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630677890 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 3OLF, 0.002 ACRES 6' SHOULDER @ 3%, CUT 1' BOTTOM WIDTH WITH 4:1 SIDE SLOPES, SEE DITCH SECTION A UT OF BOYLSTON CREEK AS SHOWN ON THE USGS 7.5 MINUTE MAP HORSE SHOE QUADRANGLE PROPOSED PIPE CROSSING, STREAM 6; � IMPACT: :9LF, 0!!6 ACRES / / PROPOSED PIPE °>O/ CROSSING, Q, STREAM IMPACT: c > 65LF,0.006ACRES ti 0 ® / / 30' LOW DENSITY STREAM BUFFER PER NCDEQ WATERSHED PROTECTION PROGRAM T 3:1 SLOPE CHRISTOPHER AND STEPHANIE SCRUGGS ZONING: MR-30 PIN: 9630778902 MAVRICK DRIVE (PRIVATE) — — 2115 — PABLO AND TIFFANY ESPOSITO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630874334 0 WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. 80 60' VEGETATIVE STREET BUFFER 160 240 SCALE: 1" = 80' © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. r m Z x a � 0 PROJECT # REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS TOWN AND STATE COMMENTS NCDEQ STREAM COMMENTS 3C11 EE7F55C2423... 02/16/2022 U 1 1 0. C LCU O a) O N N 5 C v, W N 13.0 Cn C r QNl Ql L.r1 lfl 00 N U z O 1 0 _Q aJ _c 0 z 336.838.2500 MI O (0 Q N d MOORE AND SON SITE CONTRACTORS a-+ aJ c 0 f0 v O 0 co 0 Overall Roadway Layout Plan L vo LL L CU Q O CC CO un CU tU0 c6 O U Banner Farm Road Mills River, NC SHEET C-7 z O U (/) z 0 U CC O u_ 0 z o�c z_ 2 cc 0_ DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. DRAWN BY: WJH PREVISIONS: A\ 11/22/2021 ESC-STORMWATER SUBMITTAL • 12/09/2021 TOWN COMMENTS © 12/21/2021 TOWN AND STATE COMMENTS ® 02/16/2021 NCDEQSTREAM COMMENTS 2140 2140 212.000' VC PROJECT # 20002 - L.P.=8+92.04 L.P. ELE\J.=2104.260' PV1=9+98.04 PVI ELEV.=2107.20 2130- I K=38 2130 ORIGINAL ISSUE DATE: 11/16/2021 — - ` — e �, o ^ olri — 85.000' 2120—\8 0 \ \ fulLu L.P L.P. EL=V..2100.568' VC- =2+36.61 2120 - — \ \ \ \ c + PV PVI ELEV.=2101.42 =1+94.11 K 60 ° co �i,,i,n,u , ' , �•� Q•OF......0 •.• /�9 O ESS! ; �•Q� / . _ SEAL At CA. 20 = ';�L'• & 1OiI�ii4rti , 11i' . J �,`i4v1itv1 �3C11EE7F55C2423... 02/16/2022 2110— \ cc L °C o ; m o 155.000' L.P. L.P. ELEV.=2095.400' VC =5+27.46 o o ,/, `c o N N �, Gi N . U m — — 2110 \ _ ` _- _ __� � so o N F✓1=5+4U.00 PVI ELEV.=2094.50 K=32 No ° 4 o w w m 3' — �� /til / �� w 2100— o �- 2100 m / \ , — / _ / — ` _ _ '— _ "-STA:7+76.32 15" STORM 2093.96 _ _ "' ^ / / — / STA:1+93.27 24" STORM Blue Ridge Engineering PLLC NO It 924 Main Street - Suite 200 North Wilkesboro, NC 28659 . 336.838.2500 www.ridge.blue Firm #P-0205 2090-INV: STA:5+75.72- 2090 DOUBLE 36" INV: 2087.10 STORM / \ — — — / / / INV: 2093.66 2080 =In N — N ° _ N — ,, P'� oeo N o o_ N — - N N 2 o o_ N .o - o- N co— ^ o_ N o„, - o`° N ° N ,N o�° N o °� O STA:5+16.88 18" INV: STORM 2086.19 LO ol17 N u� ON p ��STA:4+95.92 DOUBLE 36 INV: 2084 STORM 04 oo 0'^ N o "? O N 0 0'°' N 0 o "' p W 0- o- s oO N- N °N o N — p O N o o o N p rn o co co N 2080 11+75 11+00 10+00 9+00 8+00 7+00 MAVRICK DRIVE 6+00 PROPOSED CENTERLINE 5+00 PROFILE 4+00 3+00 2+00 1+00 0+00 O �— , — / /' / / t i ( 1 I I HORIZONTAL VERTICAL I I I SCALE: I SCALE: 111 = 111 = 10' 40' I I I I ......."1.,.......„.5 / �� l / / / / / �r / /�/ / . �/ / t I I / / / /, /i / I I \ \ \ \ \ \ \ \\\ \ \ \ � / \ I I l — - \ / I // / / f / // / r /l // / / / — — // f / / j / / � / / r / // �/ �i> �� / / / I ( I I I \ \\ \ 1 / t / / I I I 1 \ / / / 1 1 \ \ \ \\ / / / / III / / l \ t \ I I I I i // / / I I I I I I I I I I / —I— I I I I �^ I I l T I �r I I I I I II I I I I I I I I / 1 I I I I I II I I I I I I I I / / I a o N ` I I I I I I I I I I I I I I I I I I I 1 ) I I I I I \ I I \ I I \ I I I ` \ \ \ \ \ /� / � kk /, kkk kkk � I/ / kk /k \ti - kk kk I I I I :; k k k k III-1/ kf�kk ,._, ik, ��kk kk l / / / / / / / / V k k/k / / kkkkk / / / / / / / / / / / kk / //// / / / / / k kk kk kk / / / / / / / / / / / / kk kkk k/kf k / / / / / / / / }�kk / / / / / / / t k/ kk k k k // / / / kk kk kk kkk / / / / / I / / / // k� / / 1 l Prepared for: MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road MILLS RIVER, NC 28759 brian@mooreandson.net \\ \ \ \ I I I \ \ \ \ / I l I \ \ \ r / / 1 / / IPI I I I \ \ \ \ I \ \ \ \ \ \ \ \ / I \ \ � ` / / �✓ -� / / 29 / ) / � // /� l / / / , / / / / / / / / / / / / 30 / J / I I I/ I / / / 1 I / I I / / 11 11 / / I 1 / I \ 31 \ \ \ \ \ \ \ \ / / / ( / 1 / / r \ ) / /` r-____ I I .../ I \ I ` \ \ 1 \ / j \ � / / �F /\ �.• / I \ \I �' r \ \ \ \ \ 1 \ \\ \ / 1 I 1 ' l 1 kk k kk jkkk kk kk k k kk / / / I / / / / �J k kkk�kkk k / I I kk k./ k l I � I I�I / k k k k k k / I I I \ © ( J k�kk kk k/k k I I I \\ \ \ ( kkk I �'� I \ k kk 1 kk �kk kk kk ` \ \ \ \ \ \ \\ \\ `\ / 4 k k\ k k \\ \ \ \ \ \ _ ` \ \ \ \ �� WETLANDS TO REMAIN I I I \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / I / � I I I \ I I \ �) / � L I ��� DI I I 1 I I I PERE NIAL STREAM! I I I 1 _ k k k \ \\ `� �k\k kk k \\ \ ����-�= \\ ��k k\k k \ \ \ \ \\ \ —` \ \ \ \ \ \ \ \ \ 2j �\ \o° \ \ \ \ \ _ S� \ UNDISTURBED \ \ \ \ \\ \ \ \ \ \ N. \ \ \ \ 1 \ \ \� �\ �� \\ ) yam— = -- �- �/ / 1 I I 30 STREAM -SUFFER �.- \ \ \ \ ) \ \\� \ \ \— _ — \ \ \ \ �I - Roadway Plan and Profile The Cottages at Roper Farm Banner Farm Road Mills River, NC N \ RMITT�NT \ klEAM _jr = _ — , / — — / 1 1 I I I / / / .. \ — — \ \ \ �\ \ \ ` \ —_^ ,��\\\\\\INT _ --_ ��/ f I ( 1 .\ \\ \ \ 4 \ \ \ \ \ \ -- \ / \ \ / L�/ I I I I \ , _ J UT OF BOYLSTON CREEK �- / '- — k — = 1 I l I \ \ \ \ \ \ \ \ \ I I I I I 1 i / N \ \ N \ \ \\ \\ \ \\ \\ N \\ \ I I I \ I I I I I I _ \ /�/ I r� / , .0 3. I /Rlo I �i — , \ \ \ \ \ \ \ \ \ \ \ \ �: VALLEY�URB , \ 1 I I I % !'\J \ '- /, / .w—� 1I,� \ \ \ \ \ ` I 1 l 1 / - — -- \\ \ \ / PRC:131.23 . I ' ‘111111"4111111'"11111111.111&62m......."11111111.1.11111111rVill ' "4141 N -"...41"11"14111--- % ( '� '�v� v ` AVICK IVY PR E) o A -, k k v ,- / pop vv �� _ •,, � �— o !: Mit t -1 air 6.21 ' w liar Jr...., ___/,,/ * al \* -I'l'I'lr''''''''4111;;;;IL 1 i / WiPis idt47.1t0174 Pi ----allia.... .Prii:iij .10MilirialOPIIP.iggegillirillY1.111.:11ilik �:: I � \ ' � � / / / 09� \ `��9 ��®\ I ARC 47.35 / R30' I CC 14144 _ \ � •• .,;; / / / k.:,`.`ra ' / BEA ING S °28'(18"W I CH0 D 14 04' ( I / I / 1 / / �_ 1/(rt=T% �� 2090 T `�,it ..i' \ CC \ / \ \ \ 1 / / / / / / / / I I I / / RADIUS 500.OG� f / � ��1_ o' 1 • ����� 1��� — — — �' 11 11 \ \ U. MIAVfiICK DRI�E \ \ OP \ \ \ — / / \ \ \ \ / 1 / / / / I / ARC •225.28 — — _ T� t `��� ` �o Cr \ \ \ \ \ \ \ / / \ \\ 1 I / 1 / / I I I BEARING 543°31'48"W / i — I/ i�I h'��� 2096 ���-�•,e.../ 209 / I (PI�IV/�TE)1 \ \ W — — — \ I / / / I � �- \ \ \ \ \ \ / \ 1 I I / / / / / 0 1 I I CHORD 22/' -> - !� � �/ z _1 7- — 1 I \ \ \ / \ L - ii l/ l /l l/ 1 `� I o / / / / / / ( I I I / / 2090 / o ........ PRC: 5+1:. ��• �� • *•�°i / 7 7// I I3_4_1 — / �97 — — — / co I I \ o \ — I /�lll I I l 1 I I / I I I 1 \ �'• _�` .if .........p...........s. �i a a� -- ....... / I I\ \ / \ \ \ \ — / / / — — / o� / / / � � / � � / / 1 / / / / l 1 / / / / / / / / / / I J I �t // / i/ I I \ \ \ I I \ \ \�� \ Iao \ �CliT�I / / / , / / / I �, \ 46- /4/// / / / \ J _ -2ioo— \ \ / I �1 / J I \ \ I I l �� // /' �� �/ // /— i — ,/ // g /—/ �' / L11 — / / //—/ //—>\—-- / // / / / / / / / / / / / —//// / / / / / / // /-�// / / / / / / / , / / / , / / / / / // / / / �` /�L / I 1 ) / / / // // / I I l I , I I 1 I / I l� II / ti \ }/f/ J / 0 ,�,� it--\ •/// / / j / /�/ II / / ����� �' `/JII J� i / / ,� .� \ �O9s \ \ \ \\ \ \ ° p4 \ \\ \ \ \ 1 \ \ \ \ \ \ \ \ I \ \ \ \ I I \I I I I I I \ '1 I I I / 1 1 / , / / ,,� I ,�C� / �/ I �/ / 11 / //l 11 l l k y i / // / / / / / )OVETL�cNDS TO / / , , / / / / / / / / ETLANDS T6 REMAIN/ / l / / / /// / BE FLED / // p� titi / // / // — / / — / — // /r // - RADIUS 300.0� — — — — ARC 324.99' /--BfAR+NGs25°2 1e�1L� CHORD 309.33' __`�\ — \ \ \ \\ Z10 °� \ \�`\ // I / O \ 1 I I �I�/ I 1 \ / \ _ / / ---- .../ \�\URIliD � , \\\�ZOI`\��__---- I I I \ \ \ \ \ \ / \ 1 1 II / / I I l-- I i / SHEET c_g —�— ,�/ M .--- / \ \ / / / / — .� / / VYYO / / / t / / / / / i\f / / / / / / / / // ..�\\ / / 11 / / '\ \\ \ \ \ / � / I JJ / I / / / \ / \ \ 1 I I I I I I I I f k i/./:k/k//��//ici kkk/k/, / I /� // /// //// / / / / / / / / / / --------� O 1 -� '�- -2 nr• I / \ \ \ \ \ , // \ _ � � J \ \ �.,i /� / / '\ �� �� / / / % / / 1 t 1 I \ I I 1 I / 1 / k k k /. / / k/ ✓ / / / / / _ _ SCALE: 1" = 40' NOT FOR CONSTRUCTION DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 2160 H.P.=0+30.05 H.P. ELEV.=2150.20 PVI=0+55.05 PVI ELEV.=2148.96 K=9 50.000' VC if) r ) O O • N 217 216 215 214 213 212 19+52 \ I \ \ \ �' I N \ LSTA:18+96.10 \ 2.4 �6 . in "' in ®ct,°' L.P 155.000' L.P.=16+07.15 ELEV.=2146.695' VC 18" STORM INV: 2166.88 \ \ \ \ , ) - " Lij 0o > > P\ PV1=16+84.65 1 ELEV. =21,0.36 K=3I Lu W up ri) in m \\ \ \ \ -- -..._ o• — N 200.000' VC- 1 STA:17+32.97 15" STORM INV: 2150.29 J U111 U m m \ \ - H.P.=1,+99.47 H.P. ELEV.=2136.88 PVI=12+99.47 N rn ' o+rn nN cii w Pvi ELE\.=2i32.ib K=56 — /---,,\ 4.730 I- \ m LULU L STA:14+35.68 18" STORM �\ \ \ \ \ 4r o o, "' 2176.577 11 INV: 2133.17 _ — — N IBVCS: IIi 2124.2E BVCE: 212 .p , N^ _ • N o N o • s m M? NL( N O m °;" N4 n s o O s N � N o Ma Nrn .o , �OMo c,- (71rn N • N STA:12+82.4 18" STORM INV:2125.88 6 ? '� r+) Ni ni 19+00 10 + O iV -u U �Z �%-4. 09k 2150- 2140 2130 0+00 \ STA: 18" L+48.87 STORM 1p•58i O N N 2160 2150 -:Q tO 0 1+00 INV: 2134.54 2+00 2140 O N � '-2130 2+34 rn 18+00 SKYLAR LANE PROPOSED CENTERLINE PROFILE 17+00 16+00 15+00 MAVRICK DRIVE CENTERLINE PROFILE HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' 14+00 13+00 12+00 11+75 2130 2120 170 160 150 140 130 120 N CO Os as + N O N H.P.=0+49.84 H.P. ELEV.=2124.49 PVI=0+99.84 PVI ELEV.=2121.99 K=29 100.000' VC -2.00% 4 00 CO CO Os • += — N LI_I U U L-• sO 00 2110 c•' 0+00 LC) N N 1+00 STA:1+19 38 18" STORM INV: 2115,39 M 2130 2120 0 LUCY LANE PROPOSED CENTERLINE PROFILE HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' 7 / \ I I / // 1// / I I I I I I I II Ili' I I I \ �� \ �\ �\ \ �\ \ \ I / I I l I ' I I \ / \ I I l \ \ \ I I I I I I I I c\\\\\11\\\ \ I l / / I \ N N \ ` \ \ \ �� \ \ \ \ \ \ \ \ \ \ \III 1 1 1 I 1 I 1 I I I \ \ \\\ \ \ \ \ \ \ \ \ \ N \ \ \N \ \ �� �\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I I 1 I 1 \ \ \ \ \ N N N \ � N \ � � \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ I I I III 1 I I 1 I I I zz \ \ \ \ \ \ \ \ 23 \ \ \ \ \ \ 2s \ \ ` \ \ 26 \ \\\\ 1 I I I I 1 I I \ \ \\ \ 1 1 1 1 I \\ I\ \ II 1 1 I l 1 \ N 1 1 1 1 N 1 11 1 1 I 1 1 I / 11 / IIIIill I I I / // / I I I I l - J J / / / — / / ---/ -% // - / - / / / 2'0 19 --/ // / 35' / -- -- -- / (EQP)/ / / - -- —/z// / / / / -- -/ - / // / / / / / / /// �— -- / // / /// j/// //// — / / / / / / /// / -- _ ,2tia� / // / / / / / / / / / -- - / / / / / // / / ��— -- �///// //// /// /,/ / / /// / / ///// / ,/ / // // / /// / / / / / 7/ // / ///,// \ \ \ N N \ \ \ \ \ \\ \ \ \ \ \ \\ N \ - \� �� \� �\ \ \ \ \ \ \ \ \ 1 \ \ 1 \ 1 \ \ \ \ \ \ \ \ \ �\ �\ \ \ \ �\ \ \ \ 1 \ \ I I I I I \ \ I I \ \ \ \\ \ \ \ \\ \\ \\ \\ \ \\ \ \\ \\ \ \\\\ \ \\ \ \ I I I 1 I I I \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \\ \\ \\ \ \ \ \ \ I I I I I I I I I I I 1 \ I \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I I I I I I I T I \ \ \ �� \ \ \ \ \ 1 \ \ \ M I I I o I I I I N I N \ \ �o \ \ \ \ ss \ \ \ so \ \ \ StS \ \ )70 \ \ I I I I i I i I I II I I \ \\ \ \ \ \ \ \ \ \ \ \ \ \ 1 1 \ \\ \` \ \ \ \I \\ 1 I I N 1 1 1 I I I I \ \\ \\ \ \ 1 \ I I ) ) I I j ) I I I,) ) I 1/ I 1 \ 11 I I I 1 1 1 1 I I\// / ,, l, l 1 1 I 1 I I I I I I, I\\ I I I I I I, I I I I I// 1 1/ l / 1 I I \ I , , ' , I I I , I I ' I I I I , / / I f I I I I I I, I I I I I I ) I I / MA�iRICK QRIVE // / / / f III I I I, I I `\ \\ \\ / / l 1 / / l J / ! I 1 I / (PsIVATE�/ / / / / / / \ \ 1 I , I I I , I \ / , / r� / ii/ ,/216 ,ii ��w� — - ^ _— _� \ \ � 2130 —i,_ \ \ \ ►�����.r��.���`r.'��,�a���►�`�r. _ ter � tigustassaturroz-- _ d��► g o .'+�i� ---�,vm;/ •� m i® __vmutot1� �\unis AlWiNglatiginiiiii Ems ; - — ; - = ,� I \ / / �� MAMMA' 9/W- / / / / / / / / / / / / / / / / / / / / / / - / - / / / // / - - - - / - //// / // / / / /// ///// /// j-z-� /----/ / / / / / / / / / / / hh / / / / /-- - -- -- /// / // / / / ti / - / // / / / / / / // ti ////////////- --- % / / / / / / / / / / / / / /� -- -/ // / / / // / / / / //////// //- / — --- / / / / / / / // / - // / / / ///// / / / // / / /// / // 16 - - KY,tAI�L.AN€- / / / / / / / / / / / / / / / / / / / / / - (PR If/ATf�- / / / / / / / / / / / /�o / / / / - - - / iN-/// // / // // �// / // // /// / / / ////f: ti;/ 1/r ,////r//; j �— / / / ,ylo / 7/ , // / / / / / / / // / / //// I/ %IIII I 1 / / / / / / / / / / / / / / 1 I / / /1 // / / // /// //// // / / / �//17 ///�/ // // /1 /I j j I I ,' / l l / m // / // //// // ,/ /// //// / /// / // / //// I I , I I I / / / / / / / / / / / //// / / / / / // / / / // 1 I I I / /' / I ,' // //� / // // /// /// /// / / // // / // / / / I I I l l 1 I l l I l l / 1 1 1 1 / /' / /' / l'' l'/ /, // N/ 1 1 1 ill 1 1 / I I/ / l, l , /' I/ I I I I', I I I' I I I, I I I I//// I ' I l I I I I I 1 1 1 I I I I I I I �1 / l l l f II 11 I 1 1', l l l I I I l, I I I I /// ' ,' ; ; ; I I I 1 I ' I ► ; I ; I ; l' l 1/ I I I I; 11 I 1 I►; ;; I I I , / I I 1 1 I I , I i/ I I I I I I I I I I I I j I I I I l 1 1 1 1 1 / / I I 1 1 / l l/ I I I I' I I I I I I •��// / / // // // // / /////// /// ci' / / / / / / / / / / / / //// // /// / // // /// / //// //// //// / / / / ,/ / //// / // / / / / ,/, - - - I1 I I / / / / /'//'/ / , / ,' / / / / ,// I r / // / 1/ I ( / ( / // 1 \ , I \ 1. 1 / / / / / / / \ 1 — // / / /// / / / g/777 /_\ I ////// // ///// i__7/// 7// / / /�I//// 7 /titi/ ////1 I —//j/////y/// / // / / -� //I�----// // // // .i / / / // / 2/ // / — 11/ / // /// / / / / / / / / / / / ///// ------ '� / / / / ////�////-------�\ / -/ - // / / // 7 / / / / / / / 7 7 /7 / 1 '/ / ///"`(/\ I �\ ', \ / / \ \\ \\ \\ \\ \\\\ \ l \ \ \ \ \ \ \ \\ \ \ \\ l \ 1 \ \ \ I \\ 27 \ \ I \ \ \I \ \ / / / / / i j I1 11 1 I I I I l I / / / 1 I I I \ / / / / / I I \ \\ \ / / / � / / / 1 1 \ I/ / 0 / / 1 11 \\ \\ I I / N I N\ I I I \ < 1 I \\\\\\ 1 1 \ \ \ \ \ \\ \\ �\ \\ N \\ \ \ \ �. \ \ \ \ N \ \ N \ \ \\� N \ \\\ \\ \\ N \ \ \ \ \ N N \ \N \\ \ \ N N ' RX R50' • 40 80 120 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. >- 03 PROJECT # REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS 0 0 TOWN AND STATE COMMENTS NCDEQSTREAM COMMENTS 02/16/2022 0. cu LU bb co Si oo 0 tn 336.838.2500 M I o claj MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road oo -o roc roc • Roadway Plan and Profile co LL CU CC 4-1 ro 4-1 Banner Farm Road Mills River, NC SHEET C-9 NOT FOR CONSTRUCTION DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 STORM DRAINAGE NOTES 2100 2100 2100 2100 PROPOSED GRADE 1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY, METHODS, MEANS, PROCEDURES AND SEQUENCES OF ITS OPERATIONS. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL FOR ITS OPERATIONS. 2. THE LOCATION OF UTILITIES SHOWN ON THE PLANS SHALL BE CONSIDERED APPROXIMATE. ALL UTILITIES MAY NOT BE SHOWN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXISTENCE AND ACTUAL LOCATION OF ALL EXISTING UTILITY LINES WHETHER SHOWN ON THE PLANS OR NOT. CONTRACTOR SHALL CONTACT ULOCO. 3. BLUE RIDGE ENGINEERING SHALL PROVIDE ALL CONSTRUCTION LAYOUT AND STAKING REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING FOR CONSTRUCTION LAYOUT AND STAKING SERVICES PROVIDED. CONTRACTOR SHALL PROVIDE BLUE RIDGE ENGINEERING 48 HOURS NOTICE FOR ANY STAKING REQUESTED. 4. DURING STORM DRAIN PIPING INSTALLATION, PIPE ENDS SHALL BE PROTECTED OVERNIGHT WITH FILTER FABRIC, WASHED STONE, OR OTHER APPROPRIATE MEASURES TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM SHOULD A RAINFALL EVENT OCCUR. 5. ALL BACKFILL IN UTILITY TRENCHES SHALL BE TESTED. ALL BACKFILL SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT. DRYING OR WETTING OF FILL MATERIAL MAY BE REQUIRED TO COMPLY WITH MOISTURE LIMITS SPECIFIED. IF NO GEOTECHNICAL STUDY HAS BEEN PERFORMED, ALL EARTHWORK PLACED SHALL BE WITHIN 5% OF OPTIMUM MOISTURE AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR. 6. ALL WORK IS SUBJECT TO INSPECTION OF THE OWNER, ENGINEER AND AUTHORITIES HAVING JURISDICTION. THE OWNER SHALL PAY FOR ALL QUALITY ASSURANCE TESTING REQUIRED. CB-2F BC:2110.59 INV.OUT:2106.60 2120 2110 PROPOSED GRADE CB-1F BC:2110.58 INV.IN:2106.48 SE INV.OUT:2106.38 2100 0+00 L 15" 24LF 2120 EXISTING GRADE 2110 FES-F INV.:2106.14 - 18" HP -STORM HP -STORM 48LF @ 0.50% @ 0.50% 0 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' 2100 0+74 7. ALL DRAINAGE STRUCTURES SHALL BE PRE -CAST AND SHALL CONFORM TO NCDOT STANDARD #840 UNLESS OTHERWISE APPROVED BY THE ENGINEER . ALL DRAINAGE STRUCTURES AND PIPING SHALL BE DESIGNED FOR HEAVY DUTY TRAFFIC LOADING. 8. ALL STORM DRAIN BOX INVERTS SHALL BE GROUTED OR FILLED WITH CONCRETE SO THAT THERE IS NO SUMP WITH STANDING WATER UPON COMPLETION. 9. WHERE PIPE CONNECTIONS ARE MADE AT BOXES, VOID SPACES SHALL BE GROUTED SOLID WITH MINIMUM 6" MASONRY/GROUT. 10. ALL STORM DRAINAGE PIPE SHALL BE ADS HP STORM GRAY POLYPROPYLENE (ADS HP STORM) PER ASTM F2881 WITH WATERTIGHT JOINTS. INSTALLATION AND FILL HEIGHTS SHALL CONFORM TO MANUFACTURER'S GUIDELINES AND ASTM D2321. SEE HP STORM INSTALLATION GUIDE STD 1301B. REINFORCED CONCRETE PIPE, CLASS III, MAY BE SUBSTITUTED WITH DESIGN ENGINEER'S APPROVAL. ANY OTHER SUBSTITUTIONS SHALL BE APPROVED BY THE DESIGN ENGINEER. STORM DRAINAGE BOXES AND GRATES MAY BE REUSED IF FOUND TO BE SUITABLE BY THE ENGINEER, UNLESS OTHERWISE NOTED. 11. CONCRETE ANCHOR FOOTINGS SHALL BE INSTALLED ON ALL STORM DRAINAGE PIPING EXCEEDING 20% SLOPE. 12. ALL CATCH BASIN FRAMES, GRATES, AND HOODS SHALL CONFORM TO NCDOT STANDARD #840.03, TYPE E, UNLESS OTHERWISE NOTED. ALL JUNCTION BOX MANHOLE FRAMES AND COVERS SHALL CONFORM TO NCDOT STANDARD #840.54, UNLESS OTHERWISE NOTED. ALL PIPE PLUGS SHALL CONFORM TO NCDOT STANDARD #840.71, UNLESS OTHERWISE NOTED. 2110 PROPOSED GRADE - EXISTING GRADE 2100 CB-2E BC:2101.07 INV.OUT:2094.02 2090 CB-1E BC:2101.08 INV.IN:2093.90 INV.OUT:2093.8 E 0 2110 2100 0+00 15' HP STORM 18" HP -STORM 24LF @ 0.50% 39LF @ 0.66% 2090 PROPOSED STREAM CROSSING PROFILES M CB-1F BC:2110.58 INV.IN:2106.48 SE INV.OUT:2106.38 FES-F INV.:2106.14 M 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 25 LF, 0.001 ACRES 0+65 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 3OLF, 0.001 ACRES M FES-E INV.:2093.54 CB-1E BC:2101.08 INV.IN:2093.90 SE INV.OUT:2093.80 HEADWALL D2 SEE NCDOT DETAIL 838.40 20% OF END OF PIPE TO BE BURIED l,_ ° FES-E INV.:2093.54 18" HP -STORM 39LF @ 0.66% 2090 PROPOSED GRADE 2080 o+o Stream Crossing #2 STREAM CROSSING #2 DOUBLE 36" RCP 75LF @ 5.50% STREAM M 15" HP -STORM 24LF @ 0.50% CB-2F BC:2110.59 INV.OUT:2106.60 CB-2E BC:2101.07 INV.OUT:2094.02 15" HP -STORM DRIVEWAY PIPE FOR MAINTENANCE ACCESS TO SEPTIC STREAM IMPACT: 3OLF, 0.002 ACRES 0 36" HP -STORM 75LF @ 5.50% EXISTING GRADE 0 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' HEADWALL D1 SEE NCDOT DETAIL 838.40 NCDOT DETAIL 838.40 2090 -2080 0+77 20% OF END OF PIPE TO BE BURIED 20% OF END OF PIPE TO BE BURIED, LIMITED TOPO IN THIS AREA, CONTRACTOR TO ENSURE ADEQUATE PIPE SLOPE AS SHOWN HEADWALL B2 SEE -\ 2090 HEADWALL B1 SEE NCDOT DETAIL 838.40 2090 EXISTING GRADE 36" HP -STORM-' 57LF @ 0.50% 2080 2080 0+00 0+58 Stream Crossing #1 PROPOSED STREAM CROSSING PROFILES CB-1C BC:2095.44 INV.IN:2086.13 SE INV.OUT:2086.10 HW-D1 SEE NCDOT DETAIL 838.39 HW-D2 SEE NCDOT DETAIL 838.39 15" HP -STORM DRIVEWAY PIPE STREAM IMPACT: 30 LF, 0.001 ACRES SED PIPE CROSSING, STREAM IMPACT: 89LF, 0.006 ACRES CB-2C BC:2095.44 INV.OUT:2086.25 WETLANDS TO REMAIN UNDISTURBED FES-C I N V.:2085.99 I STREAM STORMWATER INSET 15" HP -STORM DRIVEWAY PIPE I STREAM IMPACT: 3OLF, 0.002 ACRE? SEE INSET 1 1 k k k k k k k k k 7 / WETLANDS TO REMAIN/ UNDISTURBED STREAM EDGE OF WATER STREAM HW-B1 SEE NCDOT DETAIL 838.40 WETLANDS TO BE FILLED HW-B2 SEE NCDOT DETAIL 838.40 WETLAND AREAS TO BE FILLED 0.009 ACRES PROPOSED PIPE CROSSING, STREAM IMPACT: 65LF, 0.006 ACRES 0 20% OF END OF PIPE TO BE BURIED, LIMITED TOPO IN THIS AREA, CONTRACTOR TO ENSURE ADEQUATE PIPE SLOPE AS SHOWN STREAM CROSSING #1 DOUBLE 36" RCP 57LF @ 0.50% 20 M M 40 60 SCALE: 1" = 20' OPEN SPACE WETLAND AREAS PER ATLAS ENVIRONMENTAL, INC. HW-A1 INV.:2093.27 SEE NCDOT DETAIL 838.80 24" HP -STORM 17LF @ 1.00% 24" HP -STORM 24LF @ 1.00% CB-A4 BC:2101.62 INV.IN:2093.88 E INV.OUT:2093.78 CD 2110 CB-A4 BC:2101.62 INV.IN:2093.88 E INV.OUT:2093.78 2100 HEADWALL Al SEE NCDOT DETAIL 838.80 24" HP -STORM 14LF @ 1.00% 2110 PROPOSED GRADE 24" HP -STORM 24LF @ 1.00% 2090 0+00 CB-A3 BC:2101.60 INV.IN:2093.54 E I NV.O UT:2093.44 2100 HEADWALL A2 SEE NCDOT DETAIL 838.80 24" HP -STORM 17LF @ 1.00% 2090 0+56 PROPOSED STORMWATER PROFILES HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' CB-A3 BC:2101.60 INV.IN:2093.54 E INV.OUT:2093.44 24" HP -STORM 14LF @ 1.00% HW-A2 INV.:2094.02 SEE NCDOT DETAIL 838.80 0 cc cc u_ W 40 80 120 SCALE: 1" = 40' © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. >- m z x a � 0 PROJECT # N 0 0 0 N ORIGINAL ISSUE DATE: N 0 lD REVISIONS: ESC-STORMWATER SUBMITTAL N 0 N N N TOWN COMMENTS N 0 N 0 0 N TOWN AND STATE COMMENTS N 0 a\i N NCDEQ STREAM COMMENTS N 0 N lD �o .oFEssio�lti9 :QQ SEAL Lila '"` 204 �l�il�e• Doc uAped :M \At% 13t ��, tk n. ' 'cp.- ""C}art �/1 �, h, -3C11EE7F55C2423... 02/16/2022 336.838.2500 M I uJ N z cc 0 0 U z� Q LJ.J z cc O 0u 0 2 ATTN: Brian Kirk 103 McDowell Road C 00 N N U z'cc ce w % OLoa) J CC E i S2 Storm Drainage Plan EE L.L_ CD Q CC CO N o CAA oC U c6E z (13 +.a LL (DL- O U � l F SHEET c-10 z 0 U tY (/) z 0 CC O LL 0 >- IY z_ J LJJ cc DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 217 18" HP-ST 24LF @ 1 216 215 214 213 212 0+00 15" HP -STORM 11LF @ 0.50% 2160 DI-I9 RIM :2154.06 INV.OUT:2150.50 2150 0+00 CB-17 EXISTING GRADE 2160 2150 0+35 CB-I8 BC:2155.26 INV.IN:2150.45 NW INV.OUT:2150.35 15" HP -STORM 24LF @ 0.50% CB-I5 BC:2155.25 INV.IN:2151.00 SW INV.IN:2150.23 NW INV.OUT:2150.13 CB-H2 BC:2138.62 INV.IN:2133.39 NW INV.OUT:2133.29 2140 DI-H3 RIM:2137.42 INV.OUT:2133.50 18" HP -STORM 11LF @ 1.00% 2130 PROPOSED GRADE r CB-H1 BC:2138.61 INV.IN:2133.05 NW INV.OUT:2132.95 2140 1 1 18" HP -STORM 18" HP -STORM 42LF r7a 0.73% 2130 24LF @ 1.00% n o BC:2171.10 INV.OUT:2167.00 CB-I6 BC:2171.10 INV.IN:2166.76 NW vTvv vTO.. INV.OUT:2166.66 D PROPOSED GRADE \ \ OR .00°/ \\ \ \ \ \ \Z-NS EXISTING GR4DE • \ \ BC:2155.25 INV.IN:2151.00 INV.IN:2150.23 INV.OUT:2150.13 \ \ SW NW JB-14 RIM:2151.75 INV.IN:2148.00 INV.OUT:2147.90 \ \ 0 18" 36_F HP -STORM @ 5.98% CB-I3 BC:2139.04 INV.IN:2135.25 NW INV.OUT:2135.15 CB-I2 2150 \ BC:2139.06 INV.IN:2133.94 INV.OUT:2133.84 SW D- 18" HP -STORM 135LF @ 9.36% \ INV.IN:2125.38 I N V.OUT:2125.28 BC:2129.23 W 2140 \ 18" HP -STORM 24LF @ 5.00% 18" HP STORM 85LF @ 0.57% D 18"HP-STORM 99LF @ 8.55% _----- - _ \ 2130 7 lc 1+00 R35' (EOP) 2+00 CB-17 BC:2171.10 INV.OUT:2167.00 M 18" HP -STORM 24LF @ 1.00% 18" HP-STOF,M 163LF @ 9.601 CB-I6 BC:2171.10 INV.IN:2166.76 NW INV.OUT:2166.66 3+00 15" HP -STORM 11LF @ 0.50% 15" HP -STORM 24LF @ 0.50% CB-I5 BC:2155.25 INV.IN:2151.00 SW INV.IN:2150.23 NW INV.OUT:2150.13 0 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' 4+00 5+00 PROPOSED STORMWATER PROFILES DI-I9 RIM:2154.06 INV.OUT:2150.50 CB-I8 BC:2155.26 INV.IN:2150.45 NW I NV.OUT:2150. 18" HP -STORM 36LF_• 5.98'° 18" HP -STORM 24LF @ 5.00%- CB-I3 BC:2139.04 INV.IN:2135.25 NW INV.OUT:2135.15 �3+ SKYLAR LANE M DI-H3 RIM:2137.42 INV.OUT:2133.50 CB-H2 BC:2138.62 INV.IN:2133.39 NW INV.OUT:2133.29 M M MAVRICK DRIVE 0 18" HP -STORM 24LF @ 1.00% 5+67 EXISTING GRADE FES-H INV.:2132.64 PROPOSED GRADE CB-L3 BC:2120.22 INV.OUT:2115.75 2130- 212 18" HP -STORM 24LF @ 3.00% 2110 2140 PROPOSED GRADE CB-G2 BC:2130.15 INV.OUT:2126.00 2130 18" HP -STORM 24LF @ 1.00% EXISTING GRA 2120- DE 0+00 CB-L2 BC:2120.20 INV.IN:2115.03 SW INV.IN:2113.74 NE INV.OUT:2113.64 0+00 CONTRACTOR TO PROVIDE SWALES AT OUTFALLS TO CONVEY STORMWATER BEHIND HOME SITE, SEE TYPICAL DITCH SECTION 18" HP -STORM 8n1LF @ 1.00% m FES-G INV.:2125.29 18" HP -STORM 19LF @ 2.00% M M CB-G1 BC:2130.17 INV.IN:2125.76 SE INV.OUT:2125.66 18" HP -STORM 24LF @ 1 00% JB-14 RIM:2151.75 INV.IN:2148.00 INV.OUT:2147.90 CB-I2 BC:2139.06 INV.IN:2133.94 SW INV.OUT:2133.84 r CB11 BC:2129.23 INV.IN:2125.38 W INV.OUT:2125.28 ��( 18" HP -STORM 99LF @ 8.55% R35' (EOP) CB-H1 BC:2138.61 INV.IN:2133.05 NW INV.OUT:2132.95 FES-H INV.:2132.64 CONTRACTOR TO PROVIDE SWALES AT OUTFALLS TO CONVEY STORMWATER BEHIND HOME SITE, SEE TYPICAL DITCH SECTION R50' (ROW) FES-I INV.:2124.80 ccm 0 N O a@) x LL J 00 N CONTRACTOR TO PROVIDE SWALES AT OUTFALLS TO CONVEY STORMWATER BEHIND HOME SITE, SEE TYPICAL DITCH SECTION CB-G2 BC:2130.15 INV.OUT:2126.00 7 CB-L2 BC:2120.20 INV.IN:2115.03 SW INV.IN:2113.74 NE INV.OUT:2113.64 CB-L3 BC:2120.22 INV.OUT:2115.75 18" HP -STORM 24LF @ 3.00% CONTRACTOR TO PROVIDE SWALES AT OUTFALLS TO CONVEY STORMWATER BEHIND HOME SITE, SEE TYPICAL DITCH SECTION 4 LUCY LANE M 2140 C B-G 1 L BC:2130.17 INV.IN:2125.76 SE INV.OUT:2125.66 2130 18" HP -STORM 19LF @ 2.00% 2120 0+51 83LF @ 3.05% FES-G INV.:2125.29 2130 EXISTING GRADE 1+00 2120 2110 1+27 CB-1K BC:2114.70 INV.IN:2111.10 W 1 NV.OUT:2111.00 M 18" HP -STORM 13LF @ 2.00% DI-L1 RIM:2118.43 INV.OUT:2114.00 R50' (ROW) 18" HP -STORM 19LF @ 0.50% FES-K INV.:2110.91 CB-1K BC:2114.70 INV.IN:2111.10 W INV.OUT:2111.00 0 40 80 120 SCALE: 1" = 40' © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. r m r PROJECT # N 0 O O N ORIGINAL ISSUE DATE: ti N 0 lD ci ci REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS TOWN AND STATE COMMENTS NCDEQ STREAM COMMENTS N O N LO 9.Mo �•,, 0FESSipk...17 icc SEAL 20 • . • !VGINEs••��: ,-Docusio,fti p` .` tWelt "-3C11 EE7F55C2423... 02/16/2022 U J 0. C 1 Irn O cu WO . - 0 C v, LL I r N bb ▪ 0 CO rn Ql 00 N U z 0 0 _0 aJ _c 0 z 336.838.2500 CU Ln bn 0 O - O 'L M I LJJ z cc O O v U z� aI- LL] z cc o Ov 0 2 ATTN: Brian Kirk 103 McDowell Road a-+ 0J c 0 v 0 0 E co 0 Storm Drainage Plan L LL L CU 0 CC co (/Y CU C,lA U CU SHEET c-11 0 I- (/) z 0 U 0 L._ 0 z cc z_ 2 J uJ cc 0_ DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 LLY FRAZIER JTIAL 2 -RURAL 750904 ICHELLE MASSULLO ENTIAL 2 -RURAL 630765055 MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630569334 ESMT ESMT -1053 - FIRE HYDRANT ASSEMBLY, SEE DETAIL PAMALA ROSE ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 KERMITAND LYNN MCELROY ZONING: RESIDENTIAL 2 -RURAL PIN: 9630765055 FIRE HYDRANT ASSEMBLY, SEE DETAIL JEFFREY PARKER ZONING: RESIDENTIAL 2 -RURAL PIN: 9630766244 S T ESMT ESMT ESMT PROVIDE 1" SERVICE — LATER LS TO EACH LOT, SEE CITY NDERSONVILLE DETAILS ESMT-11/ESMT ,.,S(}1T. ESMT ESMT ESMT DAVID MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630768540 101S3 101S3 1 101S3 6" PLUi` SEE DETAIL FIRE HYDRANT ASSEMBLY, SEE DETAIL ESMT ESMT EUGENE MONTEITH ZONING: RESIDENTIAL 2 -RURAL PIN: 9630862906 MILLS RIVER FARM LLC ZONING: MR-30 PIN: 9630677890 CHRISTOPHER AND STEPHANIE SCRUGGS ZONING: MR-30 PIN: 9630778902 PROPOSED WATER LINE EXTENSION TO BE USED AS CONSTRUCTION WATER SOURCE PROPOSED 2,675 LF OF 6" CLASS 350 DIP WATER LINE EXTENSION (MIN 3' COVER) ES ESMT3 I \ Wililltibil 25' UTILITY EASEMENT / 1 EsWr 0#c" ,'• 13 "1 � M / , i - 0 m FIRE HYDRANTCr - -1t3 - ASSEMBLY, SEE I O DETAIL ® w I cr /I/J oW PABLO AND TIFFANY ESPOSITO ZONING: RESIDENTIAL 2 -RURAL PIN: 9630874334 0 8" PLUG, SEE DETAIL 8"x6" TEE PROPOSED 525 LF OF 8" CLASS 350 DIP WATER LINE EXTENSION (MIN 3' COVER) 10'x20' BORE PIT APPROXIMATE LOCATION OF END OF 8" CITY OF HENDERSONVILLE WATER MAIN. REMOVE EXISTING 8" PLUG, TIE INTO EXISTING MAIN. COORDINATE WITH CITY OF HENDERSONVILLE. CONTRACTOR TO COORDINATE WITH CITY OF HENDERSONVILLE AND ENGINEER. 80 160 ■ SCALE: 1" = 80' 240 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. r m r PROJECT # N O O O N ORIGINAL ISSUE DATE: REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS TOWN AND STATE COMMENTS NCDEQ STREAM COMMENTS t „.`, ACARO C ,,,, d OFESSIp'ti //9 :Q l: SEAL ��1�� 1' 14► 20 1� �� Docu y�i NGINE:•' 10% lit pt„,_" + t' , 14,1 "-3C11 EE7F55C2423... 02/16/2022 U J a dA C iCU o co N 5 C v, W r N b 4J • � Cn 0 r CO rn rn up 00 N U Z 0 0 _0 0) _c 0 z 336.838.2500 mo MI ATTN: Brian Kirk 103 McDowell Road a-+ 01 aJ Ir) C 00 0 N U D Z 0 v W >0 cc E J - i 0 EE LL CD Q O CC CO N 0 CAA U c6 s z +� +� O u 1:11 l F SHEET C-12 z 0 U c~ z 0 CC u_ 0 >- CCC z_ 2 J uJ cc 0_ DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. 2130 2130 _ DRAWN BY: WJH /REVISIONS: A\ 11/22/2021 ESC-STORMWATER SUBMITTAL n 12/09/2021 TOWN COMMENTS • 12/21/2021 TOWN AND STATE COMMENTS /+\ 02/16/2021 NCDEQSTREAM COMMENTS 2120 2120 IIIIIIII%hwhiu 18" INV: STORM 2106.36 I PROJECT # 20002 2110 r.-. ,. — _ STA: 6"x6" Tee 7+61.30 2110 `\ // - 6" GV / ORIGINAL ISSUE DATE: 11/16/2021 PROPOSED GRADE / EXISTING GRADE — / 2100— I —6"GV 2100 f \—STA:7+5-4.2- m— L / 9 — t�—/' STA:1+83.20 18" STORM r� / HYDRANT TEE 24" STORM 2090 INV: 2093.77 ^ ' ll'll 1` - . b / STA: 2+21.21 INV: 2093.40 2090 ,��rrtnrrrrr �,.'`�N CAR,'•, O� FESS/p •• % _ ?4Z ! '' SEAL tiotaik.. 20 ;� 'NGIN�N•';0 �ooausT�k� .;'••......NPR,. EE7F55C2423... 02/16/2022 �: 9 _ _ \j/ / ItkST4+632S STA:5+34.85 4+91 18" STORM INV: 2085.90 INV: 2086.08 36" STORM INV: 2083.96 I 2080 12+00 11+00 10+00 9+00 8+00 MAVRICK 7+00 DRIVE WATER 6+00 EXTENSION PROFILE 2080 5+00 4+00 3+00 2+00 1+00 0+00 v3C11 O V\ flV// L 8 `'. \\\\ 29 3 0 VERTICAL IT SCALE: 31 O SCALE:"1"0' 40' ••: •♦ \ 1 / k k k k k l © 1 kk kk kk k` kkk kkk kkk kk kk k I\\ I k k k k I k k kk k kk kk k kk k k k k k k k k k k 8" PLUG, SEE DETAIL \ Blue Ridge Engineering PLLC II a 924 Main Street - Suite 200 North Wilkesboro, NC 28659 . % 336.838.2500 www.ridge.blue Firm #P-0205 ;• ;� 32 I I I ^ k k k k k kk k kk k k / k k k kk k k kk k k 1 k PROPOSED WATER LINE ^ k kk EXTENSION TO BE USED AS k k — > I k k CONSTRUCTION WATER ' I SOURCE � k e,ji• WV 1,4 • PROVIDE 1" SERVICE tea+ -- " ; 5�00 ,, k ^ �k • LATERALS TO EACH LOT, SEE CITY OF HENDERSONVILLE DETAILS HYDRANT TEE � ti, ''� \ 1 k k k 1 STA: 7+61.30 FIRE HYDRANT \ PROPOSED 2,675 LF OF 6" CLASS ESMT ESMT 350 DIP WATER LINE EXTENSION 6" GV ASSEMBLY, SEE DETAIL ^ \ , \ SMj— (MIN 3' COVER) ESMT ESMT ESMT ESM ESMT ESMT ESMT E.$GOT ESMT ESMT E' T 'j ESMT ESMT - M I c/ ESMT O W ©SMT ESMT M 0 0 0 0 0 0 o T W ESMT\ I 8"x6" TEE HYDRANT TEE 1ws3 1WS3 STA: 2+21.21 1W53 M M M M M M nA M M Mom • M M— _ FIRE HYDRANT k \ �S0 -- M ES k k ^ I ASSEMBLY, SEE DETAIL I / ;,i4 -lWs3 - lINS3 1WS3 1WS3 'WS3 'WS3 'WS3 'WS3 -1WS3 1WS3 1WS3 DRIVE 1WS3 1WS3� 1WS3 l O �� 4ri'p''MAVRICK - Prepared for: MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road MILLS RIVER, NC 28759 brian@mooreandson.net w 3 �� '4r 25' UTILITY EASEMENT S \A\' IUI 0 T ` O .' SMT 1WS3 1WS3 `• ``''!• �'` \i M , \����O`\� -//w ESMT ESMT G � `�/© ♦ ;, ESMT ESMT \53 o/ / y ♦ v *1WS3 WS3 1' I- i w I k ,, k� N / \ ® in C w WI \ © / O / rV / ,---1 / / I / ® // / / / / / ^ / k / k k k k k k kk 3 k k k kk .kk kk kk k/ k I 1W 3 I 2 0 / O 00 1. 7• . L 7 c cc~ L C , Q W ) COk W / / W W 200 / Water Extension Plan and Profile The Cottages at Roper Farm Banner Farm Road Mills River, NC 2120 I 2120 w W 8" PLUG, SEE DETAIL / 3 211 ., 2110 8 C(qs,5 350 CIF \ 1 — 8" GV W h I PROPOSED 525 LF OF 8" CLASS \ \ _ _ ' � -- — 3 350 DIP WATER LINE EXTENSION (MIN 3' COVER) APPROXIMATE LOCATION OF END OF 8" CITY r — — — OF HENDERSONVILLE WATER MAIN. REMOVE P 2100 EXISTING 8" PLUG, TIE INTO EXISTING COORDINATE WITH CITY OF HENDERSONVILLE. CONTRACTOR TO COORDINATE WITH MAIN. CITY OF 8" CC 8"x6" Tee STA: 4+64.12 2100 10'x20' BORE PIT 1 00 HENDERSONVILLE AND ENGINEER. w ' 2090 0+00 1+00 2+00 BANNER FARM 3+00 ROAD WATER EXTENSION 4+00 PROFILE0 2090 5+00 5+25 APPROXIMATE LOCATION OF END OF 8" CITY OF HENDERSONVILLE WATER MAIN. REMOVE / EXISTING 8" PLUG, TIE INTO EXISTING MAIN. COORDINATE WITH CITY OF HENDERSONVILLE. s3 CONTRACTOR TO COORDINATE WITH CITY OF HENDERSONVILLE AND ENGINEER. HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' lws3= / / 0 40 80 120& SHEET 1 3 _ . SCALE: 1" = 40' z 0 I- U (/) z 0 U 0 0 z OTC z_ 2 J W cc 0_ DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 V - l i — \ \ 0 / / ,r6"GV \ \ \ \\ ,� 0 STA:17+12.33 � ORM INV: 2150.47 r 6 GV ,— PROPOSED EXISTING GRADE GRADE N � 6 CLASC3S e• A+15.10 6"x6" Tee STA: 16+82.80 / \ \ 0 I. 18" STORM V: 2133.43 STA:12+61.88 18" STORM 0 - n _ INV: 2125.58 A: 1+3203 rn 6" GV rx6.1T_t_c •JI-� MAVRICK DRIVE WATER EXTENSION PROFILE HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' HYDRANT TEE STA: 16+82.82 6" GV \ \ \ \ \ PROPOSED GRADE II 6"x6" Tee STA: 16+82.80 \ EXISTING GRADE \ \ -- 'SS3 I 6" PLUG, SEE DETAIL 0 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' SKYLAR LANE WATER EXTENSION PROFILE 0 - PRnPncFn c,RAnF �.---6" GV r- EXISTING GRADE 6, \ \ 35p Dip \ 6' PLUG, 6"x6" Tee SEE DETAIL STA: 12+32.03 HYDRANT TEE \ \ STA: 0+38.32 n 0 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 10' LUCY LANE WATER EXTENSION PROFILE © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 VEGETATIVE PLAN Seedbed Preparation (SP) SP-1 Fill slopes 3:1 or steeper to be seeded with a hydraulic seeder (permanent seedings) 1) Leave the last 4-6 inches of fill loose and uncompacted, allowing rocks, roots, large clods and other debris to remain on the slope. 2) Roughen slope faces by making grooves 2-3 inches deep, perpendicular to the slope. 3) Spread lime evenly over slopes at rates recommended by soil tests. SP-2 Fill slopes 3:1 or steeper (temporary seedings) 1) Leave a loose, uncompacted surface. Remove large clods, rocks, and debris which might hold netting above the surface. 2) Spread lime and fertilizer evenly at rates recommended by soil tests. 3) Incorporate amendments by roughening or grooving soil surface on the contour. SP-3 High -maintenance turf 1) Remove rocks and debris that could interfere with tillage and the production of a uniform seedbed. 2) Apply lime and fertilizer at rates recommended by soil tests; spread evenly and incorporate to a depth of 2-4" with a farm disk or chisel plow. 3) Loosen the subgrade immediately prior to spreading topsoil by disking or scarifying to a depth of at least 2 inches. 4) Spread topsoil to a depth of 2-4 inches and cultipack. 5) Disk or harrow and rake to produce a uniform and well -pulverized surface. 6) Loosen surface just prior to applying seed. SP-4 Gentle or flat slopes where topsoil is not used. 1) Remove rocks and debris. 7.30 2) Apply lime and fertilizer at rates recommended by soil tests; spread evenly and incorporate into the top 6" with a disk, chisel plow, or rotary tiller. 3) Break up large clods and rake into a loose, uniform seedbed. 4) Rake to loosen surface just prior to applying seed. Seeding Methods (SM) SM-1 Fill slopes steeper than 3:1 (permanent seedings) Use hydraulic seeding equipment to apply seed and fertilizer, a wood fiber mulch at 45 lb/1,000 ft2, and mulch tackifer. SM-2 Gentle to flat slopes or temporary seedings 1) Broadcast seed at the recommended rate with a cyclone seeder, drop spreader, or cultipacker seeder. 2) Rake seed into the soil and lightly pack to establish good contact. Mulch (MU) MU-1 Steep slopes (3:1 or greater) In mid -summer, late fall or winter, apply 100 lb/1,000 ft2 grain straw, cover with netting and staple to the slope. In spring or early fall use 45 lb/1,000 ft2 wood fiber in a hydroseeder slurry. MU-2 High -maintenance vegetation and temporary seedings Apply 90 lb/1,000 ft2 (4,000 lb/acre) grain straw and tack with 0.1 gal/yd2 asphalt (11 gal/1,000 ft2). MU-3 Grass -lined channels Install excelsior mat in the channel, extend up the channel banks to the highest calculated depth of flow, and secure according to manufacturer's specifications. On channel shoulders, apply 100 lb/1,000 ft2 grain straw and anchor with 0.1 gal/yd2 (11 gal/1,000 ft2) asphalt. Maintenance (MA) MA-1 Refertilize in late winter or early spring the following year. Mow as desired. MA-2 Keep mowed to a height of 2-4 inches. Fertilize with 40 lb/acre (1 lb/1,000 ft2) nitrogen in winter and again the following fall. MA-3 Inspect and repair mulch and lining. Refertilize in late winter of the following year with 150 lb/acre 10-10-10 (3.5 lb/1,000ft2). a height of 3-4 inches. Mow regularly to MA-4 Topdress with 10-10-10 fertilizer if growth is not fully adequate. MA-5 Topdress with 50 lb/acre (1 lb/1,000 ft2) nitrogen in March. If cover is needed through the following summer, overseed with 50 lb/acre Kobe lespedeza. MOUNTAINS - ELEVATION BELOW 2,500 FT. TEMPORARY SEEDING SCHEDULE DATES SPECIES RATE (LB / ACRE) SOIL ADDITIVES RATE (LB / ACRE) FEBRUARY 01 - MAY 01 RYE (GRAIN) ANNUAL LESPEDEZA (KOREAN) 120 50 DUE TO PROXIMITY OF SENSITIVE WATER ONSITE, ONLY APPLY FERTILIZER PER SOIL TEST RECOMMENDATIONS, NO FERTILIZER AND ONLY NATIVE MIXES MAY BE USED WITHIN STREAM BUFFERS MAY 15 - AUGUST 15 GERMAN MILLET OR SUDANGRASS 40 50 AUGUST 15 - DECEMBER 15 RYE (GRAIN) 120 PERMANENT SEEDING SCHEDULE - GENTLE SLOPES BEST DATES POSSIBLE DATES SPECIES RATE (LB / ACRE) SOIL ADDITIVES RATE (LB / ACRE) MARCH 01 - APRIL 01 & AUGUST 15 - SEPTEMBER 01 MARCH 01 - MAY 10 & JULY 25 - SEPTEMBER 15 TALL FESCUE 60 DUE TO PROXIMITY OF SENSITIVE WATER ONSITE, ONLY APPLY FERTILIZER PER SOIL TEST RECOMMENDATIONS, NO FERTILIZER AND ONLY NATIVE MIXES MAY BE USED WITHIN STREAM BUFFERS PERMANENT SEEDING SCHEDULE - STEEP SLOPES BEST DATES POSSIBLE DATES SPECIES RATE (LB / ACRE) SOIL ADDITIVES RATE (LB / ACRE) MARCH 01 - APRIL 01 & AUGUST 15 - SEPTEMBER 01 MARCH 01 - MAY 10 & JULY 25 - SEPTEMBER 15 CREEPING RED FESCUE KENTUCKY BLUEGRASS 160 5 DUE TO PROXIMITY OF SENSITIVE WATER ONSITE, ONLY APPLY FERTILIZER PER SOIL TEST RECOMMENDATIONS, NO FERTILIZER AND ONLY NATIVE MIXES MAY BE USED WITHIN STREAM BUFFERS 0 SEEDING SPECIFICATIONS SCALE: NTS 7.31 PRE -CAST CATCH BASIN PER D.O.T. HEAVY DUTY TRAFFIC RATING PRE -CAST STRUCTURE PER D.O.T. HEAVY DUTY TRAFFIC RATING ROUND PRECAST CAN BE SUBSTITUTED FOR SQUARE NEENAH R-3246 TYPE C GRATE VULCAN V-4060-1 EAST JORDAN 7030M2 GRATE, TI BACK US FOUNDRY 5130-6168 J❑❑❑❑❑Liuuu❑❑CIO 6" MIN IN. 0 CURB INLET SCALE: NTS NEENAH R-1878-B7G VULCAN V-5660 US FOUNDRY 4139-6429 =I 1I— -1 1' WASHED STONE 1" DIA. WEEPHOLE 1 REQUIRED CAST -IN -PLACE CONCRETE INVERT 12" TYP MIRAFI 140N NON -WOVEN FILTER FABRIC OR EQUAL 12" THICK WASHED STONE (TYP.) —�fTl�fII-111E111E111E111E111-111 • ��I I I—III—III—III—III—III-1 � 1-1 � 1= .. I I—III—III—III—III—III-1 � 1-1 � 1- —1 11-1 I I —III —III —III —III —III —I I I • �I-1�I-1�I-1�I-111E1I-1�I ;1II,� • • -111EI I I-III-111-1- 11 11 _ 11=1 11=1 11-1 11=I I h II 0 DROP INLET SCALE: NTS CAST -IN -PLACE CONCRETE INVERT 12" THICK WASHED STONE (TYP.) © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. r m r PROJECT # N O O O N ORIGINAL ISSUE DATE: REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS TOWN AND STATE COMMENTS NCDEQ STREAM COMMENTS iq 7:1-‘°:eNs ��, ' •.E�••��. J. •+�, 1Jtl)(v�r.. ���"4fr.1(h 3C11 EE7F55C2423... 02/16/2022 U J a c LCU O a) O N .— b.0.5 C v, W r bp 2 L 13 (In C CO CNj Ql L11 Up 00 N U z O 0 _Q aJ _C 0 z 336.838.2500 MO 0 (13 CL N d LJJ z oc 0 0 U z� Q I— LL] z cc O 0 o 0 2 ATTN: Brian Kirk 103 McDowell Road II) 00 U z w CC V) J J a-+ 0) c 0 (13 v 0 0 E c0 S2 MISCELLANEOUS DETAILS EE pa LJ_ L CU Q C) CC ro CU C,lA 4-J CO SHEET c-15 0 U (/) z 0 U 0 u_ 0 z OTC z_ 2 uJ cc DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the g Stabilize theground sufficientlyso that rain techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations onplans. Locate earthen -material stockpile areas at least P P 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality CLEANLY NOM SOME camor.../-somos swim Gnaw lou ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER rift. TOIL MTw•EE E MO S. TIE COME VOW Enucn/a0 •EL E NOMAD WIEM NE MO Mann MO WADES TOE TIE MOLT= EaOETE OEM SO OOR IEOE TE E CLEARY Alan VIM mME MRER EVO: BrI nW f:RAJ W HIT CTRI FTIPr SMINIANS CITN, In STARES COMO IMIEED SOME vAs •ur OOR DEVICE WNW •Io I I FALL LTAMOI ETFMI.O t M OMTE WAVILY STO MA= EE LL E IMNTAIIO NON TK LINO NRIS Sall POCKS TEE V M STIOXTURCE CAPACTY TO POVME AEWMTE ILLOR CAPACITY VIM A NNW! M ROCS V iTEOW& STRUCTIME KOE ETE E � NANO vino MOW OMB SCAM ABOVE GRAj )cPUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. 2. 3. Create designated hazardous waste collection areas on -site. Place hazardous waste containers under cover or in secondary containment. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDCs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill cr release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NORTH CAROLINA Environmental Quality NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 6" (15cm) 5 4"-6" (10-15cm) r 4 6" (15cm) Drawing Not To Scale 2 8 12"(30cm 6" (15cm) ,..1=11 r- III_-1 N CRITICAL POINTS A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope Vertices /;Bic 4"(10cm) 6" (15cm) 7 4"(10cm) 2"-5" (5-12.5cm) 6 044 o�` ono ��1=11, ,::� I 11=11 _111-4,11,1=III 3UfflIllE -1 1-1 1-1 11-1 1 1 _ 1= 11 NOTES: *Horizontal staple spacing should be altered if necessary to allow staples to secure the critical points along the channel surface. **In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. NORTH AMERICAN GREEN 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-722-2040 www.nagreen.com Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. Drawn on: 5-4-17 CHANNEL INSTALLATION DETAIL 1. Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2. Begin at the top of the channel by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12"(30cm) of RECPs extended beyond the up -slope portion of the trench. Use ShoreMax mat at the channel/culvert outlet as supplemental scour protection as needed. Anchor the RECPs with a row of staples/stakes approximately 12"(30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12" apart across the width of the RECPs. 3. Roll center RECPs in direction of water flow in bottom of channel. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4. Place consecutive RECPs end -over -end (Shingle style) with a 4"-6" overlap. Use a double row of staples staggered 4" apart and 4" on center to secure RECPs. 5. Full length edge of RECPs at top of side slopes must be anchored with a row of staples/stakes approximately 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. 6. Adjacent RECPs must be overlapped approximately 2"-5" (5-12.5cm) (Depending on RECPs type) and stapled. 7. In high flow channel applications a 9 PP staple check slot is recommended at 30 to 40 foot (9 -12m) intervals. Use a double row of staples staggered 4"(10cm) apart and 4"(10cm) on center over entire width of the channel. 8. The terminal end of the RECPs must be anchored with a row of staples/stakes approximately 12" (30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. DITCH SCHEDULE TYPE TYPE BOTTOM WIDTH SIDE SLOPE LENGTH LINER RIP -RAP CHECK DAMS A TRAPEZOIDAL 12" 4:1 VARIES NAG SC150-BN - O PERMANENT DITCH DETAIL SCALE: NTS COMPACTED SOIL 2' MIN. t� 18" MIN. O TEMPORARY DIVERSION DITCH SCALE: NTS MIN. 4 DOWNSLOPE STAKES FILTER FABRIC OR DITCH LINER MIN 2 UPSLOPE STAKES 12" DIAMETER STRAW FILLED WATTLE I� c fi • \Nik_ vAvAT vfr" WAYVAV fAi�AAMA' / PROFILE STRAW WATTLE DETAI L SCALE: NTS DITCH LINE FLOW © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. r m r PROJECT # N O 0 Fs; ORIGINAL ISSUE DATE: N 0 lD REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS TOWN AND STATE COMMENTS c-1 c-1 c-1 N N N 0 0 0 N en IN 0 CV 0- N N r r � NCDEQ STREAM COMMENTS N 0 N N 0 336.838.2500 MO Ln 0 N O li E w Zloc 0 0 v U z� Q wcc z 0 u 0 2 ATTN: Brian Kirk 103 McDowell Road L LL L CU Q O CC CO CU CO WlJ 4-1 4--1 U CU SHEET C-16 z 0 I- U z 0 0 LL 0 z z_ 2 J w cc Iz DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 INFLOW TO BE VIA DIVERSION DITCH THROUGH BASIN EMBANKMENT INFLOW TO BE VIA DIVERSION DITCH THROUGH BASIN EMBANKMENT SILT FENCE den IN '11 BAFFLES INLET ZONE 25% FIRST CHAMBER 25% PLAN SECOND CHAMBER 25% C OUTLET ZONE 25% DEWATERING ZONE I II _ _1 1I1- I =III=111 -111= SEDIMENT STORAGE ZONE 3' 4' BAFFLES • 41111,...4110• �• �•f"i`t I_!_dl_I_I_!_i CROSS-SECTION SILT FENCE (SEE DETAIL) RIP -RAP, CLASS B W/ #57 STONE (SEE SECTION) 1 1-1 1 I-1 1 I -I I I -II I -I I I' ELEVATION SEDIMENT STORAG E PIT T-POST PERIMETER SILT FENCE DISTURBED AREA ;5% 11- -III=1 I I=1 I I=1 I I=1 1 1- ' '- EMERGENCY SPILLWAY DRAPE BAFFLE MATERIAL OVER WIRE STRAND AND SECURE WITH PLASTIC TIES AT POSTS AND ON WIRE EVERY 12" 9 GAUGE MIN. HIGH TENSION WIRE STRAND 1\_ SHALL BE SECURED TO POST TO SUPPORT BAFFLE MATERIAL CONNECT SKIMMER TO STORM STRUCTURE, SEE STORM DRAIN PLAN 1' FREEBOARD f 3' MIN. COIR FIBER BAFFLE MATERIAL EMBANKMENT EMERGENCY SPILLWAY, 6" BELOW FREEBOARD CONNECT SKIMMER TO STORM STRUCTURE, SEE STORM DRAIN PLAN 0 SKIMMER BASIN W/ BAFFLES SCALE: NTS DISTURBED AREA - 7- SILT FENCE SEDIMENT STORAGE PIT PERIMETER 9 SILT FENCE UNDISTURBED AREA LOW POINT STONE OUTLET UNDISTURBED AREA RIP -RAP, CLASS B SECTION FLOW #57 WASHED STONE 18" MIN. SEDIMENT STORAG E PIT 4LF SILT DISTURBED FENCE AREA UNDISTURBED AREA DISTURBED AREA OS/ T-POST - STONE OUTLET ALONG SLOPES 0 SILT FENCE STONE OUTLET SCALE: NTS FLOW III III- 11111II=111II=11_ PERIMETER SILT FENCE NOTES: 1. INSTALL AT ALL LOW POINTS AND ALONG PERIMETER SILT FENCE AS NECESSARY TO PREVENT STORM WATER FROM BEING COLLECTED AND CONCENTRATED AND TO ALLOW FILTERED STORM WATER TO RELEASE THROUGH STONE OUTLETS. 2. STORM WATER FLOW SHALL BE DIRECTED TO THE STONE OUTLETS WHERE INSTALLED. 3. EXCAVATED SEDIMENT STORAGE PITS SHALL BE CLEANED OUT WHEN 50% FULL. 1 BAFFLE MATERIAL, EACH SIDE OF T-POST 11 GAUGE LANDSCAPE STAPLE, 12" LONG, SECURED TO BOTTOM AND SIDES OF BASIN. BAFFLE CROSS SECTION 4' MAX 1 1 11- I-1 I I ; I 6' STEEL T-POST, 2' BELOW GROUND BAFFLE ELEVATION i 1 EXTEND 9 GAUGE WIRE TO BASIN SIDE OR INSTALLT-POST TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL POST. SECURE BOTTOM OF BAFFLE TO GROUND WITH 12" STAPLES AT 12" MAX. SPACING NOTES: 1. BAFFLES MADE OF 700 g/m2 COIR EROSION BLANKET OR EQUIV. INSTALLATION IS SIMILAR TO A SEDIMENT FENCE. TYP. 3 EA. BASIN, (2 IF BASIN IS LESS THAN 20' IN LENGTH. 2. BASIN SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT. 3. SEDIMENT SHALL BE EXCAVATED WHEN ACCUMULATED DEPTH REACHES 25% OF TOTAL CAPACITY. 4. BAFFLES SHALL BE REPAIRED IF THEY ARE DAMAGED. RE -ANCHOR BAFFLES IF STORMWATER IS FLOWING UNDER OR AROUND BAFFLES. 5. INSPECT AND REPAIR EMBANKMENTS SHOULD ANY ERODING OR SETTLEMENT OCCUR. EXISTING GROUND FILTER CLOTH SECTION 50' 50' PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE & PUBLIC RIGHT-OF-WAY EXISTING40,110p10........00 �'i-• g• t• t• t• j• j• t• �• • GROUND i /0. //.�//,�//.�//.�/,.�//.�//.�/� 4 x/x/\ AP �i ;SIP & &I W N w se WAS PLAN VIEW `/I 2" - 6" CLEAN STONE EXISTING PAVEMENT WIDTH 1 LENGTH RIPRAP STONE OVER GEOTEXTILE FILTER FABRIC WIDTH 2 DIAMETER NCDOT RIPRAP CLASSIFICATIONS CLASS d,MIN d,50 d,MAX APRON THICKNESS A 2" 4" 6" 9" B 5" 8" 12" 18" 1 5" 10" 17" 26" 2 9" 14" 23" 35" RIPRAP APRONS - MIN. DIMENSIONS APRON DIAMETER WIDTH 1 WIDTH 2 LENGTH STONE SIZE THICKNESS ALL 18" Outlets 18" 11.5' 4.5' 10' A 9" Outlet A 24" 16' 6' 14' B 18" TEMPORARY 12" HDPE PIPE IF NECESSARY TO CARRY STORMWATER TO EROSION CONTROL MEASURE EXISTING PAVEMENT 1. 2. 3. 0 OUTLET PROTECTION SCALE: NTS 6" APP7 I PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. EROSION CONTROL BLANKETS SHALL BE INSTALLED FOLLOWING MANUFACTURERS' SPECIFICATIONS. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS. EXTEND12" OF BLANKET BEYOND THE TOP OF SLOPE. 0 EROSION CONTROL MATTING FOR SLOPES SCALE: NTS 0 TEMPORARY CONSTRUCTION ENTRANCE SCALE: NTS CONSTRUCTION SPECIFICATIONS 1. STONE - USE CLASS 'A' STONE (2 - 6 INCH STONE) 2. LENGTH - AS EFFECTIVE, BUT NOT LESS THAN 50 FEET. 3. THICKNESS - NOT LESS THAN EIGHT (8) INCHES. 4. WIDTH - NOT LESS THAN FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS. 5. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS OR OTHER APPROVED METHODS. 6. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS -OF -WAY MUST BE REMOVED IMMEDIATELY. 7. PROVIDE GEOTEXTILE FOR DRAINAGE BENEATH STONE. FLOW TOP & BOTTOM STRAND SHALL BE 10 GAUGE MIN. 8' MAX. WITH WIRE HORIZONTAL AND VERT. WIRES SHALL BE 14 GAUGE MIN., 6" SPACING 5' STEEL POST I ■IA I ■� I I I 1 1 18" - 24" I 1 Al a. -II I -III I I III 11 1' I -I I I WIRE u PLASTIC OR J WIRE TIES NATURAL GROUND FILTER FABRIC COMPACTED FILL I I II I II I II I II II 1- FILTER FABRIC PER ASTM 6461 STEEL POST DRIVEN 2'-0" BELOW GRADE III-1 I I-III-1 I EXTEND FABRIC AND WIRE INTO TRENCH. EXTEND FABRIC ACROSS BOTTOM OF TRENCH. #5 OR #57 WASHED STONE 1' THICK x 2' HIGH (MIN) POST SPACING 4'-0" MAX. NOTES: 1. FILTER FABRIC SHALL BE A MINIMUM OF 36" WIDTH AND SHALL BE FASTENED ADEQUATELY TO THE WIRE. NO MORE THAN 24" OF FABRIC IS ALLOWED ABOVE GROUND. 2. INSTALL SUPPORT POST ON THE DOWNHILL SIDE OF SILT FENCE. 3. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN THE SEDIMENT IS 25% THE HEIGHT OF THE FENCE. 4. REPLACE ANY TORN, COLLAPSED, OR DECOMPOSED FABRIC. 5. INSPECT FENCES AT LEAST ONCE PER WEEK AND AFTER EACH RAINFALL. MAKE REPAIRS IMMEDIATELY. 0 SEDIMENT FENCE SCALE: NTS CLASS B RIP RAP PERSPECTIVE VIEW #5 OR #57 WASHED STONE 1' 3' SECTION .// SEDIMENT STORAGE AREA FINISH GRADE CLASS B RIP RAP ROCK DOUGHNUT INLET PROTECTION SCALE: NTS FLOW FLOW WASHED STONE FILTERED WATER 1 \1/4`- AVERAGE BOX DIMENSION VARIABLE SECTION MULTI -DIRECTIONAL FLOW NOTES: 1. STONE SHALL BE #57 WASHED STONE. 2. WIRE MESH SHALL BE HARDWARE CLOTH 19 GAUGE AND SHALL HAVE 1/4 INCH MESH OPENINGS. 3. PLACE A 2-FOOT FLAP OF WIRE MESH UNDER THE GRAVEL FOR ANCHORING. 4. STEEL POST SHALL BE 5 FT. IN HEIGHT, BE INSTALLED 2.0 FT. DEEP MINIMUM, AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 5. POST SPACING SHALL BE A MAXIMUM OF 4 FT. 6. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. FLOW 1/4" WIRE MESH .16W. iiii�i •I•S•- •-•-•-•-•c • • • .tip •. • .4 •• • • ' ..got PLAN FLOW MULTI -DIRECTIONAL FLOW 0 INLET PROTECTION SCALE: NTS © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. PROJECT # N O 0 0 N ORIGINAL ISSUE DATE: ti N 0 N lD -1 REVISIONS: ESC-STORMWATER SUBMITTAL TOWN COMMENTS TOWN AND STATE COMMENTS N N N 0 0 0 eV Cs1 N C CV 0 CV \ N N r r r o NCDEQ STREAM COMMENTS N 0 N SEAL "-3C11 EE7F55C2423... 0 2 / 16 / 2 02 2 U J a bA C LCD O cu O N .- C v, W W 0J bA °J • c r m QNl Ql Ll1 lfl 00 N 0 z 0 0 _a 0) _c O z 336.838.2500 MO Ln 0 N O E 0 0 v z loc 0 0 U z� Q LJ.J z cc p 0 0 0 2 ATTN: Brian Kirk 103 McDowell Road 01 00 0 z uJ cc V) J J a c 0 f0 a 0 0 E co JO EROSION AND SEDIMENT CONTROL DETAILS L.L CU Q CC CU CO HEET C-17 0 U z 0 0 LL 0 z >- z_ 2 cc uJ DocuSign Envelope ID: B1438177-4731-46FC-94B3-DAE177E72519 © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. DRAWN BY: WJH P�REVISIONS: A\ 11/22/2021 ESC-STORMWATER SUBMITTAL 12/09/2021 TOWN COMMENTS © 12/21/2021 TOWN AND STATE COMMENTS ® 02/16/2021 NCDEQSTREAM COMMENTS I GENERAL NOTES: 1. WATER CONSTRUCTION ON THIS SITE IS AUTHORIZED BY PERMITS ISSUED BY THE NORTH 20. MAINTAIN 18 INCHES VERTICAL SEPARATION BETWEEN STORM DRAIN AND WATER, OR CAROUNA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) AND AUTHORIZED BY THE INSTALL FERROUS MATERIAL WATER UNE WITHIN 10 FEET EACH SIDE OF CROSSING. STAR PIPE PRODUCTS TRACE -SAFE CONNECTOR #107 VALVE BOX (H20) 2' MIN. CITY OF HENDERSONVILLE. THE WORK IS SUBJECT TO INSPECTIONS AT ALL TIMES BY 21. TAPS GREATER THAN ONE -INCH IN DIAMETER IN EXISTING, ACTIVE WATER MAIN ARE TO BE REPRESENTATIVES OF NCDEQ, THE CITY OF HENDERSONVILLE, THE OWNER OR THE PERFORMED BY THE CITY UNLESS OTHERWISE APPROVED IN WRITING BY THE CITY. TAPS IN ENGINEER. THE PERMITS REQUIRE CERTIFICATION OF COMPLETION OF THE WATER SYSTEMS NEW CONSTRUCTION ARE TO BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH BY THE ENGINEER AND THE APPLICANT PRIOR TO ISSUANCE OF FINAL OPERATION CITY REQUIREMENTS. APPROVAL IN -LINE WITH LOCATING CLIP OR APPROVED EQUAL AND MOUNTING HOLE (MOUNT TO PVC RISER WITH 304 SS BOLT 24"x24"x6" CLASS B FORD STAINLESS STEEL TAPPING SLEEVE - FIRE HYDRANT .� /% ( O\ 5-1/4" STORZ NOZZLE WORD "WATER" CAST INTO TOP 22. ALL WATER METERS WILL BE SET BY CITY STAFF UNLESS THE CONTRACTOR IS GRANTED CONCRETE THRUST (.- PROJECT # 20002 2. MATERIALS AND INSTALLATION FOR WATER CONSTRUCTION SHALL CONFORM TO THE LATEST WRITTEN PERMISSION BY THE CRY. VERSIONS OF CRY SPECIFICATION AND DETAILS AND AWWA STANDARDS AND REQUIREMENTS. 22.1. THE CONTRACTOR WILL PROVIDE THE CITY NOTICE OF 10 WORKING DAYS MINIMUM PRIOR 3. CONTRACTOR SHALL NOTIFY NC811 & APPROPRIATE UTILITIES AGENCIES PRIOR TO TO THE DATE OF METER INSTALLATION. CONCRETE PAD TYPICAL FINISHED GRADE BLOCK GATE VALVE .••• -- -- / 24" X 24" X 6" PERFORMING ANY WORK. 4. REGULAR WORKING HOURS SHALL BE FROM 7:00 AM TO 5:00 PM MONDAY THROUGH 22.2. THE CONTRACTOR WILL PROVIDE A UCENSED PLUMBER DURING THE METER INSTALLATION TO VERIFY UNE SERVICES IN ALL MULTI -METER BOXES. FRIDAY, EXCEPT IN CASES OF EMERGENCY OR OTHERWISE APPROVED IN WRITING BY THE TYPICAL FINISHED GRADE IN PAVED AREAS IN UNPAVED AREAS (SEE INSTALLATION DETAIL) \ p' z CLASS B CONCRETE PAD CRY OR AUTHORIZED REPRESENTATIVES. THE CONTRACTOR SHALL ENSURE THE 23. ALL PUBLIC WATER MAIN CONSTRUCTION SHALL BE PERFORMED BY A NORTH CAROUNA b. 24" X 24" X 6" I CONSTRUCTION SITE IS SAFE FOR ANY PERSONS WHO MAY BE ON SITE DURING LICENSED UTILITY CONTRACTOR. CLASS B CONCRETE PAD FINISHED GRADE NON -WORKING HOURS. 24. ALL WATER APPURTENANCES ARE TO BE MADE USING LEAD FREE MATERIALS. PIPE, A , ,• �1I� O C N 5. ALL PERSONS SHALL BE COURTEOUS AND RESPECTFUL TO THE PUBLIC. CURSING OUR FITTINGS, VALVES, HYDRANTS, PIPE CLAMPS, RESTRAINTS, FLANGES, CASTINGS, REBAR, / A A _' g a - -, '/\ ,--� /\\\r A � � 7 ORIGINAL ISSUE DATE: 11/16/2021 FOUL LANGUAGE IS NOT PERMITTED AND WILL NOT BE TOLERATED. HATCHES, INLETS, METER BOXES AND ALL OTHER CAST IRON COMPONENTS SHALL BE • �• • • • • • • • • •. • • • • �- • • • a <�. 2Ai �i .... .... .... .....Y MANUFACTURED IN THE USA. "I;;`• • •.•y=,• 1 1 01.0 1 1 •e0:0 I •Ail I Iy1 � - , u 'I' • �/� 6. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC CONTROL ON ALL ROADWAYS 25. RESTRAINED JOINTS BY AN APPROVED PIPE MANUFACTURER ARE TO BE USED FOR ALL ,�/ �. �. �. �. �. �. �. �. �. - /�j/�//�//�//�j/�j/�j/�j/�j/1 �. �, �. �. �. �� �� �� �� �� /�j/�j/�j/�j/�j/�j���������/ c p �, ;� \/\\'/\\'/\\ _ \ �\�\� ° I . - :/' \�\/\ z „ DURING THE PROJECT. THE CONTRACTOR SHALL NOTIFY LOCAL EMERGENCY, SCHOOL AND PUBLIC WATER LINES WHERE THRUST RESTRAINING IS REQUIRED IN ACCORDANCE WITH THE // \������\��\�����\��������������� ������������������/�\\'\\, A \/\`//\/ ,• \ // \//\// \ ..+ ,�..',/\�\/\1i� .. \�� OTHER NECESSARY AUTHORITIES PRIOR TO ANY STREET CLOSING OR TRAFFIC CHANGE. PLANS AND MANUFACTURER'S SPECIFICATION. CONCRETE THRUST BLOCKS ARE PERMITTED // /�� �� �� �� �� �� �� �� �� . �� �� �� �� �� �� �� �� �� / .. w \�4�,���\� '/'/^'••.. . �\ \�% 7 ADJACENT PUUBIJCRAND PHIS SHALL AND RIVATE ROADWAYS CLEANKEEP THE DURING THE PROJECTOTHEN ITCONTRACTOR ONLY WHERE CONNECTIONS ARE MADE TO EXISTING WATER LINES OR WHERE THE USE OF MECHANICAL RESTRAINT IS NOT FEASIBLE./% IS ALSO RESPONSIBLE FOR CONTROWNG DUST WffHIN THE PROJECT AREA. \/\�\����/j������� ��I \/�\\t ,���������\/ � �� ��\��/���/� \/ \�\%\%\// \ \ \ \ / \ j\ �/ \ / \ \ \ / \//\ \\\ \� 26. ALL FIRE HYDRANTS, VAULTS, BACKFLOW PREVENTERS, HOT BOXES AND WATER METERS i',. v-,► •••• Iy1;\��. \ \ N /\/\ / / SEE VALVE 8. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION IN ACCORDANCE WITH THE ARE TO BE INSTALLED ON RELATIVELY FLAT AREAS OUTSIDE OF PAVEMENT. •�•-�-�� 1�d/YdjT�j{:' > •`�/i\/%/�Y %��j�/�/\� /\� INSTALLATION DETAIL LINES, GRADES AND ELEVATIONS SHOWN ON THE PLANS OR AS GIVEN BY THE ENGINEER IN THE FIELD. 27. TAMPERING WITH OR ILLEGAL USE OF THE PUBUC WATER SUPPLY WILL RESULT IN 12" CABC !.-`!.-"! !.- -_:�- :�- .�.% '%�', w • EXISTING MAIN O \ \ , O.-. ✓/ ,\\/ \ \ ` / SUSPENSION OF WATER SERVICE, INCLUDING DOMESTIC AND COMMERCIAL, UNTIL FINAL o m , NOTE: a \/\/y ,),2; `/ 9. CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND THE ELEVATION FOR ALL UTILITIES, APPROVAL BY THE CITY IS ISSUED. A PERSON FOUND TO BE USING WATER ILLEGALLY 1 8" TYP - / ( ) D O m z // / \\�\\ RESTRAINED HYDRANT TEE RESTRAINED DRAINAGE AND OTHER UNDERGROUND FACILITIES BOTH EXISTING AND PROPOSED, AND SHALL BE SUBJECT TO PENALTIES OR FINES, AS PRESCRIBED AND APPROVED BY CITY O j Ir J• z 8" PVC, SDR 35 I x 12" X 12" AND 16' X 16" TAPPING `. / \/ (SEE RESTRAINT DETAIL) SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO CONSTRUCTION. COUNCIL La I z o DRILL HOLES IN PVC RISER AS w (RISER) ; V SLEEVES NOT ALLOWED. PLAN \< •ARE M //T\ 10. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING CONSTRUCTION. REPAIRS SHALL BE MADE IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES AT THE TESTING & INSPECTION: i7 U REQ'D. FOR WIRE PENETRATION HIGH DENSITY GATE VALVE (SEE INSTALLATION DETAIL) �\\\\/ �y�\` I I %,t� IMI, ♦♦♦```,IA OAR ���71,, ♦ 'C O ♦ P �/ i , Q _ SEAL - 2 • • - • = i ` • ••N(��NE \` DocuSig •J• NP`` Oinirt,f,,. �v<pa. ` 14,I/LilVl, c3C11EE7F55C2423... 02/16/2022 FART CDURINGTCONSTRUCTION PLASTIC VALVE . C.Y. OF #57 ,//// r +yr� 1. EER AT I 5 ING YS BEFORE TCONSTRUCTION HE CITY OF HENDERSONVILLEINSCHEDULE CILITIES WASHED STONE \,//��/� 'I�11�1�1 STARTING TOAND 11. THE CONTRACTOR SHALL MAINTAIN THE OPERATION OF EXISTING OFEWA RIF A PRE -CONSTRUCTION CENTERING RING I ��~ \ \\\/•�•. '1-.. - i %' /\/%•, \ \ UTILITIES WITH THE I FAST AMOUNT SERVICE INTERRUPTION POSSIBLE IN COORDINATION CONFERENCE. THE ENGINEER SHALL PERIODICALLY INSPECT THE PROGRESS OF TEE SPLICE, TRACE -SAFE® MAIN Ills // A •. • �_I .✓ . �' :.(t _". _ \\ o \ \/\/ WITH THE CRY OF HENDERSONVILLE. CONTINUOUS SERVICE, PUBUC HEALTH AND SAFETY INSTALLATION AT A MINIMUM AND SHALL COMPLETE A FINAL WATER CERTIFICATION. . TO LATERAL CONNECTION (T-S 19) ,,,...../ • •;•. • - SHALL EXCEED ALL OTHERS AND CONTRACTORS SCHEDULE, PLANS AND 2. ALL CHANGES TO THE APPROVED CONSTRUCTION PLANS AND SUBMITTALS MUST BE• 24" MAXIMUM CONCRETE THRUST/\CONSIDERATIONS Oo �\ WORK SHALL AT ALL TIMES BE SUBJECT TO ALTERATION AND REVISION IF NECESSARY FOR APPROVED IN WRITING BY THE CITY PRIOR TO IMPLEMENTATION IN THE FIELD.CONCRETE THRUST BLOCK+/ THESE CONSIDERATIONS. COMPACTED BACKFILL BLOCK /�\\/' II.�� 3. THE CONTRACTOR SHALL FURNISH SECURE AND PROVIDE ALL NECESSARY TESTING �����..•••• '/\,'• . -IL/\/\ / //�/,/ �\�\/ 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TEMPORARY OR PERMANENT MATERIALS, EQUIPMENT, LABOR. THE CONTRACTOR SHALL COORDINATE TESTING, FLUSHING, • ••::t%:�:�:�: • • • • • • o • • • _ • • • • • • • iY / / Y /\/ �/ �• \\ RELOCATION OF STRUCTURES AND UTILITIES, INCLUDING BUT NOT UMITED TO POLES, SIGNS, DISINFECTION, AND BACTERIOLOGICAL SAMPUNG WITH CITY INSPECTOR. ••••:♦0•i i 000c. i• i 04.000 i i•• _ /��� /\ / � / %/%�/\/ / /� / / \/ TRACE -SAFE® •••••••••••N•••••••••• •••••r ... •••••• _ • - \j\\ • :/\\ \ \ \ \ \ \\y \ \y FENCES, HYDRANTS, VALVES, PIPING, CONDUITS AND DRAINS THAT INTERFERE WITH THE4. THE ENGINEER OR CONTRACTOR SHALL NOTIFY THE CITY CONSTRUCTION INSPECTORS 72 `•••••••••••••s••••••••••••••••••• •WIRE ••••e• DIMJ GATE VALVE / /�. • • .... • . a• • • � /�/ s\ \��� /`\/ // USE 4" X 16" X 8" SOLIDf\\ //�/ 11��,// POSITIONING OF THE WORK AS SHOWN ON THE DRAWINGS. HOURS (MINIMUM)PRIOR TO ANY WATER MAIN OR TESTING OPERATIONS. AT A MINIMUM TRACING •••• 44,44•�•�•�•�•�•�•�444,40 •••••••••••••••••••••••••••••••••• . ❖��: ••r••••••••••••••••••••••••• •-• -�_•-� •_•_ \ \/ CONCRETE BLOCKS UNDER BEND/ // - / / / //, �\j \ 13. CONTRACTOR SHALL BE REQUIRED TO CONFORM AND COMPLY WITH ALL RESTRICTIONS CITY STAFF SHALL BE NOTIFIED PRIOR TO TAPS, TESTING, FLUSHING, DISINFECTION, AND AND EASEMENT CONDITIONS AND IS RESPONSIBLE FOR ALL RELATED INCIDENTAL COSTS SAMPUNG. • = = =: = • = = = = 4 �44 2: •__�.� 0•S•S•�•S•!•�•_•!•� •-: 2•-•.:•i•� • O• _•_•_•_•�:•••••••••••••••••••• t:•� •• . I� kl ON #57 WASHED STONE BASE LAYER ��/ /\//\// / //\//\//\ / / ///\ `y '\\ / \\/\\\ \,\ �\/.&., \• INVOLVED. -rrrr•-•-rrmr*.PP••••••••I; _: •• �•� Cam• ! '' •g:- _ i • P• • •-•-P• z� O (6" MIN) �j\\%\\%\\�%\\%\\%\ /\\j\\%\\%\ X‘ ., 5. PRESSURE TEST WATER MAINS TO 200 PSI MIN. FOR A MINIMUM OF TWO HOURS IN 14. EXISTING WATER SERVICES SHALL BE REPLACED TO THE EXISTING METER UNLESS ACCORDANCE WITH CITY REQUIREMENTS AND AWWA C600. OTHERWISE APPROVED IN WRITING BY THE CITY. SPLICING OF THE WATER SERVICE ON THE D.I. CL. 350 WATER LINE _ ♦ II 'I _ \%\\//\ ,„ ,,,\ K\\/.\�/ JOINT RESTRAINT DOWNSTREAM SIDE OF THE METER IS NOT PERMITTED. CERTIFIED TESTING LABORATORY IN ACCORDANCE WITH CRY REQUIREMENTS AND AWWA 6. DISINFECT WATER LINES AND PROVIDE ACCEPTABLE BACTERIOLOGICAL TEST FROM Aiiil t 1 O 0(SEE • III• RESTRAINT DETAIL) 15. ALL DISTURBED AREAS, INCLUDING BUT NOT LIMITED TO ASPHALT, CONCRETE, DRIVEWAYS, C651. THE CONTRACTOR MAY ELECT TO USE THE CITY'S CERTIFIED TESTING LABORATORY. II MAIN O O Air •IIII A ROADS, LANDSCAPING, SHALL BE REPAIRED TO EQUAL OR BETTER CONDITION THAN THE -• e NOTES: ORIGINAL SITE. GRASS AND LANDSCAPED AREAS FILL MATERIAL MUST BE REPLACED IN 7• PRIVATELY OWNED FIRE STSILMS SHALL BE APPROVED BY THE APPROPRIATE LOCAL TRENCH TO GRADE AS SOON AS WATERUNE CONSTRUCTION ALLOWS. ADEQUATE SEEDING PERMITTING AUTHORITY. THE CRY ENGINEERING OR WATER AND SEWER DEPARTMENTS ARE AND STRAW OR MULCH SHALL THEN BE APPUED TO THE DISTURBED TRENCH AREA. NOT RESPONSIBLE FOR ENSURING COMPLIANCE WITH APPROPRIATE FIRE PROTECTION ADDITIONAL FILL AND SITE RESTORATION MAY BE REQUIRED WITHIN THE WARRANTY PERIOD REGULATIONS. THE CRY DOES NOT PROVIDE ANY GUARANTEE OF RS WATER STSItM'S AT THE CRY'S DISCRETION. CAPABILITY TO DELIVER WATER FLOW AND RESIDUAL PRESSURE THE FIRE PERMITTING AUTHORITY MAY REQUIRE. 16. CONTRACTOR SHALL PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF AS 8.ALL BACKFLOW PREVENTION ASSEMBLIES SHALL BE USC APPROVED AND REVIEWED BY REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUETHE CIY'S. PROTECTION OF THE PUBUC WATER DISTRIBUTION SYSTEM SHALL BE TO RUNOFF FROM CONSTRUCTION. APPROVED RESTRAINT �1 RESTRAINED DIMJ OR YDRANT "TEE" DEVICE FORD STAINLESS STEEL TAPPING SLEEVE ELEVATION EXISTING MAIN 1. FIRE HYDRANTS SHALL BE RATED TO A MINIMUM 250 PSI WORKING PRESSURE IN ACCORDACE WITH AWWA C-502 UNLESS SPECIFIED AS 350 PSI BY THE CITY. HYDRANTS SHALL HAVE A 51k-INCH BARREL AND STORZ CONNECTION. 2. ALL VALVES AND HYDRANTS SHALL HAVE M. J. CONNECTIONS WITH IRON RETAINING GLAND M.J. RESTRAINT. Blue Ridge Engineering PLLC " Ilk 924 Main Street - Suite 200 North Wilkesboro, NC 28659 336.838.2500 www.ridge.blue Firm #P-0205 17. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO FOLLOW ALL APPUCABLE ASSURED BY INSPECTION OF THE INSTALLATION AND TESTING OF OW PREVENTION FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO DEVICES IN ACCORDANCE WITH APPROPRIATE LOCAL, STATE, AND FEDERAL REGULATIONS. CONSTRUCTION OPERATIONS. 9. CONSTRUCTION WATER SOURCING MUST BE APPROVED IN WRITING BY THE CITY. 18. ALL WATER MAINS SHALL HAVE 3 FEET MINIMUM COVER. CONSTRUCTION WATER CONNECTIONS SHALL BE PAIRED WITH AN IRRIGATION METER AND APPROVED BACKFLOW PREVENTION ASSEMBLY. THIS ASSEMBLY INSTALLATION MUST BE 19. INSTALL FERROUS PIPING FOR BOTH WATER AND SEWER WITHIN 10 FT. OF A CROSSING TESTED BY A UCENSED PLUMBER AND TEST RESULTS SUBMITTED TO THE CITY BEFORE NOTES• 1. TOP OF COVER SHALL BE STAMPED "WATER" 2. VALVE PAD REQUIREMENTS SHALL NOT BE APPUCABLE FOR PAVED SURFACES.PLACE MEGALUG OR EQUAL NOTE: 3. FIRE HYDRANT SHALL BE FACTORY PAINTED YELLOW, WITH FIELD PAINTED TOUCH-UP, BEFORE PROJECT IS ACCEPTED. 4. HYDRANT VALVE SHALL BE PLACED AS CLOSE AS POSSIBLE TO THE MAIN, BUT DO NOT VALVE IN PROPOSED OR EXISTING CURB AND GUTTER. IF THE STREET IS SOIL IF: USE OF CONSTRUCTION WATER. 19.1. SEWER UNE CROSSES OVER WATER, DE 10. SECURE FINAL WRITTEN ACCEPTANCE FROM THE CITY OF HENDERSONVILLE PRIOR TO 3. PAVEMENT REPAIR SHALL MATCH EXISTING ROAD PAVING SECTION. SEE ASPHALT REPAIR DETAIL # 654.01. NCDOT 12" X 12" AND 16' X 16" TAPPING SLEEVES ARE NOT ALLOWED. TABLE A-1 AND NO PAVING IS TO BE DONE AT THIS TIME, THE LOCATION OF THE VALVE IS TO BE DETERMINED BY THE ENGINEER. 19.2. VERTICAL CLEARANCE BETWEEN WATER AND SEWER IS LESS THAN 18 INCHES. ACTIVATION OF THE SYSTEM. WATER SERVICE WILL NOT BE PROVIDED UNTIL WRITTEN ACCEPTANCE OF THE STSILM IS ISSUED BY THE CRY. 19.3. MAINTAIN 10 FEET HORIZONTAL SEPARATION BETWEEN SEWER AND WATER MAINS UNLESS LAID IN SEPARATE TRENCHES WITH THE BOTTOM OF THE WATER UNE AT IFAST 11. THE ENGINEER SHALL SUPPLY THE CRY WITH FINAL AS -BUILT DRAWINGS AND COMPLETE 18 INCHES ABOVE THE TOP OF THE SEWER UNE OR USE FERROUS MATERIAL FOR BOTH ALL PROJECT CLOSE OUT REQUIREMENTS. WATER AND SEWER. 4. WHEN OPERATING NUT DEPTH EXCEEDS 3'-0" BELOW FINISHED GRADE, STANDARD 2" SQUARE OPERATING NUT, TOP OF NUT SHALL BE WITHIN 5. TRACER WIRE WILL BE A 19 GAUGE, TIN COATED, COPPER CONDUCTOR PROVIDE 5" TO WITH EXTENSION 9" POLYETHYLENE STEM WITH OF FINISHED GRADE. INSULATION. TBD NOTE: 5. FIRE HYDRANTS SHALL BE PLACED AS DIRECTED BY THE ENGINEER. 6. HYDRANT BRANCH SHALL NOT BE BACK FILLED UNTIL INSPECTED AND APPROVED BY THE ENGINEER. DISCLAIMER THE STANDARD WATER DETAILS ARE FOR THE SOLE USE OF PROJECTS DIRECTLY FOR, OR THOSE PROJECTS IN WHICH OWNERSHIP WILL BE TRANSFERRED TO THE CITY OF HENDERSONVILLE. THESE TYPICALS ARE INTENDED TO SHOW THE CITY OF HENDERSONVILLE'S EXPECTATIONS FOR THE GENERAL LAYOUT, ARRANGEMENT, AND THE QUAUTY OF EQUIPMENT AND MATERIALS FOR WATER DISTRIBUTION SYSTEM ITEMS AND THEIR RELATED APPURTENANCES. IT REMAINS THE SOLE RESPONSIBIUTY OF THE ENGINEER IN RESPONSIBLE CHARGE (ERC) OF EACH APPUCATION TO DETERMINE, DESIGN TO, AND CERTIFY TO THE DESIGN PARAMETERS FOR EACH INSTALLATION. THE ERC MUST ALSO ENSURE THE DESIGN COMPLIES WITH THE MINIMUM DESIGN CRITERIA OF NC DMSION OF ENVIRONMENTAL QUALITY AND ALL LOCAL AND STATE LAWS AND REGULATIONS. CORE MATERIAL COMPRISED OF HIGH -TENACITY, WOVEN POLYESTER WITH ENCAPSULATED IN 30 MIL. BLUE HDPE JACKET PROVIDING CORROSION STRENGTH AND 1800 LBS. TENSILE STRENGTH. TRACER WIRE WILL NOT CURRENT WHEN STRUCK BY UGHTNING AND IS DESIGNED FOR DIRECT APPLICATIONS. WHEN SPLICES AND LATERAL CONNECTIONS ARE MADE, DESIGNED FOR WIRE WITH WOVEN POLYESTER FIBER CORE ARE TO BE CONNECTORS SHALL BE TRACE -SAFE® WATER BLOCKING TRACER WIRE MANUFACTURED BY NEPTCO, INC., OR APPROVED EQUIVALENT, AND PRODUCED AMERICA. WATER RESISTANCE, CONDUCT BURY ONLY GEL USED. AND RELATED BLOCKING AND FILLED TRACER IN YARNS FLEXIBILTY, IMPACT AN ELECTRICAL DIRECTIONAL BORING CONNECTORS WIRE AND CONNECTORS, THE UNITED STATES OF 1. CONCRETE SHALL BE 3000 PSI. 2. CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT FITTINGS BY THE INSTALLATION OF POLYETHYLENE FILM PLACED BETWEEN THE FITTINGS AND POURED CONCRETE. 3. SEE TABLE A 1 FOR AREA OF CONCRETE REQUIRED FOR MAIN SIZED 6-INCH THROUGH 16-INCH. 7. GATE VALVE AND BOX SHALL BE IN ACCORDANCE WITH STANDARD DETAIL. 8. HYDRANT EXTENSIONS AND/OR OFFSETS SHALL BE APPROVED BY THE ENGINEER. 9. FIRE HYDRANTS WHICH HAVE BEEN INSTALLED MUST BE TAGGED "OUT OF SERVICE" AND BAGGED, UTILIZING A RED CANVAS BAG WITH WHITE LETTERING, UNTIL SUCH TIME AS THE WATER MAIN TO WHICH CONNECTED IS DISINFECTED AND CONNECTED TO THE ACTIVE WATER SYSTEM. DATE: 03/14/2019 WD DWG. NO. 1 •........... .. D DATE: 01/12/2019 WD DWG. NO. 5 •.......... .. ••`"N D e DATE: 01/12/2019 WD DWG. NO. 6 ., •.............. DATE: 04/24/2019 WD DWG. NO. 12 .............. E SCALE: NOT TO SCALE ; • BEN E RSO .• SCALE: NOT TO SCALE : Rso •.• SCALE: NOT To SCALE • Nsv'$ o E Rsa •'•• SCALE: NOT To SCALE FIRE HYDRANT �N ° RS WATER DETAILS �'0 r- - ti� �•o.►-- STANDARD TAPPING SLEEVE �•o •� ti� �• �•o •��- • -tip''• _ • ®`_ti�' Cityof Hendersonville Engineering Department 9 9 p >' . ' ' "' ' . h ,... City of Hendersonville Engineering Department VALVE INSTALLATION D ETA I L •. ,' .. o a ° 2* it h .. „.. , r Cit of Hendersonville Engineering Department Y 9 9 P �. > ' ' ' "' ' ' f : h ...n.. , City of Hendersonville Engineering Department Y 9 9 p STANDARD INSTALLATION -. ' "� , - h 1 *PRA1 I '` r 305 Williams Street Hendersonville, NC 28792 GENERAL NOTES • • - _ • • u m : 305 Williams Street Hendersonville, NC 28792 - ' '- -- ' " U. ►� 305 Williams Street Hendersonville, NC 28792 AND VALVE ASSEMBLY v m : 305 Williams Street Hendersonville, NC 28792 » v m (828) 697-3000 (office) • 4- c' : y (828) 697-3000 (office) ' o ? �' y (828)697-3000 (office)ter, y (828) 697-3000 (office) DETAIL •' s, ,, www.cityofhendersonville.orq se r1847� 7 www.citvofhendersonville.orq se r1847� www.citvofhendersonville.orq .. r1847� 7 www.citvofhendersonville.orq se ••1847� • Prepared for: MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road MILLS RIVER, NC 28759 brian@mooreandson.net 4/30/2019 10:47:16 AM, mpomraning 4/30/2019 11:00:33 AM, mpomraning 4/30/2019 11:02:39 AM, mpomraning 4/30/2019 11:16:34 AM, mpomraning METER SIZE METER BOX SIZE METER BOX STRAIGHT BALL SERVICE VALVE STRAIGHT DUAL CARTRIDGE CHECK VALVE :' O÷Ni 1.t' ••, 0 FIRE HYDRANT O C�••••. Nil 4, 0 O t'•'•: 0 / * 3/4" 3/4" / FORD CB111-233-NL FORD B81-233W-NL HHC81-333-NL . ��• ■. Q' •.. ■..' 1" 1" FORD CB111-444-L-T-NL FORD B81-344W-NL HHC81-444-NL i. O6"X6" 2 6"x12" 6"x24" WORD "WATER" ~- 2 O = 2 * REQUIRES REDUCER L84-34G NL :•,�'y ''�• :=1 STORZ NOZZLE A 18 30"41":•• CAST INTO TOP • .. y•"i �s��17 ■. I. y 'A� ••••• m m B 6" 12" 24" y �0 A 11 J '3a ••�•'••.,,,,..•••••• •• �Q A 117 � •••• 2' OFF R W OR EASEMENT / ........... ••• / SIZE 6" DIA. X OFFSET 24" X 24" X 6" CLASS B CONCRETE PAD = MBX-5A METER BOX AND LID LID IS NOT TO HAVE ........... •••• z Qo METER BOX MUST NOT BE LOCATED IN DITCH OR ON SLOPE io m o \ FINISHED GRADE o HOLE IN TOP. FINISHED GRADE 6 LL.� CITY OF HENDERSONVILLE STANDARD DETAILS The Cottages at Roper Farm Banner Farm Road Mills River, NC (DEPENDENT ON METER SIZE -SEE TABLE) FINISHED GRADE Z O .- N _ 1 O O (_ 24" X 24" X 6" CLASS B CONCRETE PAD ¢ EXISTING OR ¢ FINISHED GRADE > J \��//� /\ \ o BRASS NIPPLE Q \/ \ \ vz/ m w M SERVICE LIN %TERAL INSTAL I J `i�i L •� E HYDRANT INSTALLATIC ///BALL VALVE INSIDE BOX y \' EITHER HORIZONTAL \\ / __��` \ \\// OR VERTICAL UNDISTURBED EARTH //\'//\' / //\ '\�\/ NIPPLE ' ll I _ /�%/ //,o 11>\A.2 RID-040 1" COMBINATION AIR VALVE /,\,\/\/\ \ �,' \//\// / / /\\/\\/ \IR RELEASE LATION DETD o w ,; ,:• , •, \ \/BRASS / j _ _ o ) J - •• • •` \„ \/ /\ z o- Z o- w SIDE DRAINAGE DITCH " O ^• o C.Y. OF #57 /i J WASHED STONE(TYP)RESTRAINED JOINT SEE VALVE J E 1' FLEXIBLE SERVICE PIPE // ADAPTOR o CROSS -LINKED POLYETHYLENE PEXa K /\ I f/\ a p O DI WATER MAIN iq O //� cbi.. �:ft.IA , INSTALLATION DETAIL Q \\ // , y ram/ \\\\ \ \�� „ RESTRAINED JOINT RESTRAINED JOINT �. z \Ny%/j / / �� �� 24" WASHED STONE UNDER STRAIGHT BALL SERVICE VALVE RESTRAINED JOINT FORD F1000-NLnp�����i�� AIR RELEASE VALVE BOX (DEPENDENT ON METER SIZE -SEE TABLE) M AWWA C153 W CORPORATION STOP // 6"- 57 WASHED STONE # IN 6" NDS ROUND BOX W/OVERLAPPING UNDER METER BOX •" •' • DI OFFSET E r • • • • • • • • • • • •. �! . PLASTIC COVER PART 107BCW ( # ) J • uur•Ir•u i i f' i CONNECTOR PIPE M.J. SPLIT GLAND \ 7 r ,r . . r .r SMITH BLAIR 313 DOUBLE BALE • •�• • • • • • • • • •• • J 1" FLEXIBLE SERVICE PIPE HEIGHT ADJUSTED WIDTH 6" PVC PIPE � � ' frLJ II__i - ° r 2 �• 0 CROSS -LINKED POLYETHYLENE PEXa C O LLI . • • ��/ _ o o SERVICE SADDLE W/ 304 STAINLESS jiji� j j ••• • • j�� •' .r r . T T 0 FORD F1000-NL - - I' .!' PRESSURE LL U STEEL BALE, NUTS AND WASHERS t v s•••••••••••••:• D Z V� `���lr CLASS 350 o o .Y • Y • '- CORPORATION STOP " IIll PIPE 0 0 r • • • I . • • :� I I •-. Q SMITH BLAIR 313 DOUBLE BALE i DI mil• o • • • • • • • • I • • 1=• • /Tip !-'• • • •.• • • �=• •=li I0 Z SERVICE SADDLE W/ 304 STAINLESS STEEL BALE, NUTS AND WASHERS _ uJ m n•„s. .,;.....,....,-. •I thil ELEVATION VIEW -a 1- NOTES: p I AWWA C153 (/) DI OFFSET CONNECTOR PIPE 1. THE CITY OF HENDERSONVILLE SHALL INSTALL WATER METERS. STRAIGHT DUAL CARTRIDGE CHECK VALVE 2. NO METERS WILL BE INSTALLED NOR WATER SERVICE PROVIDED, UNTIL A WRITTEN FINAL (DEPENDENT ON METER SIZE -SEE TABLE) DATE: 04/29/2019 WO DWG. NO. 8 SCALE: NOT TO SCALE O.D. OF 6" AWWA C153 DI PIPE=6.90" RESTRAINED JOINT DATE: 01/12/2019 WD DWG. NO. 13 SCALE: NOT TO SCALE WATER MAIN NOTES: DATE: 04/08/2019 WD DWG. NO. 7 ACCEPTANCE OF THE SYSTEM IS ISSUED BY THE CITY. 3. METER BOX SHALL BE BITUMINOUS COATED, CAST IRON BASE, INNER BARREL, AND OUTER BARREL WITH RESTRAINED JOINT A M.J. CONNECTION WITH IRON RETAINING GLAND M.J. RESTRAINT (SEE RESTRAINT DETAIL) 1. PIPE AND FITTINGS SIZE SHALL MATCH THE SIZE OF THE PROPOSED AIR RELEASE VALVE 1-7/8" TOUCH -READ HOLE IN LID. 4. EXTEND TRACER WIRE FROM MAIN TO METER BOX. WIRE NOT SHOWN FOR CLARITY. TRACER WIRE WILL BE A 19 GAUGE, TIN COATED, COPPER CONDUCTOR WITH POLYETHYLENE INSULATION. CORE MATERIAL COMPRISED OF HIGH -TENACITY, WOVEN POLYESTER WITH WATER BLOCKING YARNS City of Hendersonville Engineering Del,x 305 Williams Street Hendersonville, NC 28792 (828) 697-3000 (office) www.cityofhendersonville.orq TOTAL LENGTH OF OS PIPE NOTES: City of Hendersonville Engineering DepN 305 Williams Street Hendersonville, NC 28792 (828) 697-3000 (office) www.cityofhendersonville.org TO BE INSTALLED. 2. LOCATION TO BE THE SAME AS METER BOX DETAILS. ENCAPSULATED IN 30 MIL. BLUE HDPE JACKET; PROVIDING CORROSION RESISTANCE, FLEXIBILITY, IMPACT STRENGTH AND 1800 LBS. TENSILE STRENGTH. TRACER WIRE WILL NOT CONDUCT AN ELECTRICAL CURRENT WHEN STRUCK BY LIGHTNING AND IS DESIGNED FOR DIRECT BURY ANDDETAIL DIRECTIONAL BORING APPLICATIONS. WHEN SPLICES AND LATERAL CONNECTIONS ARE MADE, ONLYAPPROVED GEL FILLED CONNECTORS DESIGNED FOR WIRE WITH WOVEN POLYESTER FIBER CORE ARE TO BE USED. TRACER WIRE SHALL BE TERMINATED IN METER BOX AT MOUNTED TRACE -SAFE® LOCATING CLIP, MOUNTED A MAXIMUM OF 3" FROM TOP OF BOX WITH 304 SS BOLT. TRACER WIRE AND CONNECTORS SHALL BE TRACE -SAFE® WATER BLOCKING TRACER WIRE AND RELATED CONNECTORS, MANUFACTURED BY NEPTCO, INC., OR EQUIVALENT APPROVED BY ENGINEER, AND PRODUCED IN THE UNITED STATES OF AMERICA. 1.SEE FIRE HYDRANT STANDARD INSTALLATION FOR ADDITIONAL REQUIREMENTS.WATER 2. ALL VALVES AND HYDRANTS SHALL HAVE M.J. CONNECTIONS WITH IRON RETAINING GLAND M.J. RESTRAINT. 3. FIRE HYDRANT OFFSET CONNECTOR SHALL BE PLACED AS APPROVED BY THE ENGINEER. 4. OFFSET CONNECTOR SHALL NOT BE BACK FILLED UNTIL INSPECTED AND APPROVED BY ENGINEER. 3. TRACER WIRE NOT SHOWN FOR CLARITY. TRACER WIRE SHALL BE CONNECTED TO MAIN TRACER USING CONNECTORS BY THE MANUFACTURERS. (SEE VALVE BOX INSTALLATION) 4. ACTUAL LOCATION OF AIR RELEASE VALVE SHALL BE COORDINATED WITH THE CITY AND PROPERTY OWNER. F City of Hendersonville Engine 305 Williams St Hendersonville, NC (828) 697-3000 (c www.cityofhendersoi 4/30/2019 11:08:24 AM, mpomraning 4/30/2019 11:24:35 AM, mpomraning 4/30/2019 1:49:42 PM, mpomraning SHEET C ig NOT FOR CONSTRUCTION Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: 10 Permit a Section 404 Permit ❑ Section 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: lc. Has the NWP or GP number been verified by the Corps? ❑ Yes a/ No 1d. Type(s) of approval sought from the DWQ (check all that apply): — Regular ❑ Non-404 Jurisdictional General Permit — Express ❑ Riparian Buffer Authorization /1 401 Water Quality Certification ❑ 401 Water Quality Certification 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: For the record only for Corps Permit: ❑ Yes ' No ❑ Yes a No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes a/ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ' No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ' No 2. Project Information 2a. Name of project: The Cottages at Roper Farm (Banner Farm Road) 2b. County: Henderson 2c. Nearest municipality / town: Mills River 2d. Subdivision name: The Cottage at Roper Farm 2e. NCDOT only, T.I.P. or state project no: not a DOT project 3. Owner Information 3a. Name(s) on Recorded Deed: Vine Ripe Properties LLC 3b. Deed Book and Page No. See Attached Parcel Report, there is one project parcel 3c. Responsible Party (for LLC if applicable): Brian Kirk 3d. Street address: PO Box 609 3e. City, state, zip: Horse Shoe, NC 28742 3f. Telephone no.: (828) 243-1846 3g. Fax no.: No Fax Number 3h. Email address: brian@mooreandson.net Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Mr. Brian Kirk 4c. Business name (if applicable): Moore & Son Site Contractors 4d. Street address: 103 McDowell Road 4e. City, state, zip: Mills River, NC 28759 4f. Telephone no.: 828-891-8900 EXT 109 4g. Fax no.: No Fax Number 4h. Email address: brian@mooreandson.net 5. Agent/Consultant Information (if applicable) 5a. Name: Jennifer L Robertson 5b. Business name (if applicable): Atlas Environmental, Inc. 5c. Street address: 338 S. Sharon Amity Road #411 5d. City, state, zip: Charlotte, NC 28211 5e. Telephone no.: 704-512-1206 5f. Fax no.: no fax 5g. Email address: jrobertson@atlasenvi.com Page 2 of 10 PCN Form — Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): Vine Ripe Properties LLC 1 b. Site coordinates (in decimal degrees): Latitude: 35.367698 Longitude: - 82.562200 lc. Property size: 32 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Boylston Creek 2b. Water Quality Classification of nearest receiving water: WS-IV 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The Northern and Central portions of the review area are actively used for farming. There is also a forested drainage in the center of the property covering approximately 14.6 acres. The surrounding area consists predominantly of farmland and residential homes.. The field areas have been used for agriculture for the duration of aerial imagery reviewed. The majority of the review area has been used for agriculture and is an open field. 3b. List the total estimated acreage of all existing wetlands on the property: 0.453 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2,416 3d. Explain the purpose of the proposed project: Residential development 3e. Describe the overall project in detail, including the type of equipment to be used: The project purpose is for the construction of 32 single family residential homes. The development will also require the construction of utilities. The proposed construction will across the project site. The project will require mechanized land clearing for grading to remove existing vegetation and to prepare the ground surface for construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? /1 Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? I Preliminary ❑Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): A Baggarley, J Robertson, J Sinclair Agency/Consultant Company: Atlas Environmental, Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. November 10, 2021; SAW 2021-02273 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes a No Unknown 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ' No 6b. If yes, explain. N/A Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la. Which 0/ sections were Wetlands completed ' below for your project (check all that apply): Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction Corps (404, 10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Seep No Corps 0.009 W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total wetland impacts: 0.009 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ — non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert CH 100 PER Corps 4 65 / 0.006 S2 P Culvert CH 500 INT Corps 3 89 / 0.006 S3 P Culvert CH 200 PER Corps 3 30 / 0.002 S4 P Culvert CH 200 PER Corps 1.5 30 / 0.001 S5 P Culvert CH 200 PER Corps 1.5 30 / 0.001 S6 P Culvert CH 200 INT Corps 1.75 25 / 0.001 3h. Total stream and tributary impacts: 299 / 0.019 3i. Comments: Impact S7 P - Culvert - CH 500 - INT - Corps - 3' / 30 linear feet (0.002 acre); Impact S8 T - Pump Around - CH 100 - PER - Corps - 4' / 10 linear feet; Impact S9 T - Pump Around - CH 100 - PER - Corps - 4' / 10'; Impact S10 - Pump Around - CH 500 - INT - Corps - 3' / 10'; Impact S11 - Pump Around - CH 500 - INT - Corps - 3' / 10'; Impact S12 - Pump Around - CH 200 - PER - Corps - 3' / 10'; Impact S13 - Pump Around - CH 200 - PER - Corps - 3' / 10/; Impact S14 - Pump Around - CH 200 - PER - Corps - 1.5' / 10'; Impact S15 - Pump Around - CH 200 - PER - Corps - 1.5' / 10'; Impact S16 - Pump Around - CH 200 - PER - Corps - 1.5' / 10'; Impact S17 - Pump Around - CH 200 - PER - Corps - 1.5' / 10'; Impact S18 - Pump Around - CH 200 - INT - Corps - 1.75' / 10'; Impact S19 - Pump Around - CH 200 - INT - Corps - 1.75' / 10'; Impact S20 - Pump Around - CH 500 - INT - Corps - 3' / 10'; Impact S21 - Pump Around - CH 500 - INT - Corps - 3' / 10' Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts: 4g. Comments: 5. Pond If pond or or Lake Construction lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer impact number- Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total buffer impacts: 6i. Comments: Page 5 of 10 PCN Form - Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts to aquatic resources have been minimized to the greatest extent possible. There is approximately 2,416 linear feet of stream channel and 0.453 acres of wetlands. Only 0.009 ace of wetlands will be filled for the entrance road and 299 linear feet of stream will be impacted. Stream impacts are proposed to less than 13% of the streams on site. Wetland impacts are proposed to less than 2% of the wetlands on site. The two road crossings impacts are necessary to gain access through the property to high ground. Streams 100 and 500 flow across the entire parcel therefore crossing these two streams are unavoidable. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction and engineering techniques are being applied to further minimize impacts from the development to aquatic resources. Additional stream impacts were avoided by placing house pads away from the stream corridors. Only driveway crossings are proposed at the lots. Originally stream impacts totaled 327 linear feet. Additional reduction was completed to reduce stream impacts another 28 linear feet. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes /1 No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: none 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity none Quantity none Quantity none 3c. Comments: none 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): none square feet 4e. Riparian wetland mitigation requested: none acres 4f. Non -riparian wetland mitigation requested: none acres 4g. Coastal (tidal) wetland mitigation requested: none acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes // No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 none none 3 (2 for Catawba) none Zone 2 none none 1.5 none 6f. Total buffer mitigation required: none 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). not applicable 6h. Comments: no comments Page 7 of 10 PCN Form — Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes 0 No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes 01 No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 16.7 2b. Does this project require a Stormwater Management Plan? ❑ Yes 0/ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: less than 24% 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ❑ Phase II NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): ❑ Coastal counties ❑ HQW ❑ ORW ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes / No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? ❑ Yes ❑ No 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: n/a ❑ Yes ❑ No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? ❑ Yes /1 No 2b. Is this an after -the -fact permit application? ❑ Yes /1 No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes / No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project will require shared septic systems. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes // No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ No Yes 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPAC and the NC natural hetitage program; FWS Asheville office coordination 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes a/ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes // No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC HPO Buffer Map 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes a/ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA floodmaps GIS layer Jennifer L Robertson Applicant/Agent's Printed Name ielitk+ o� Jf��� Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) 11/4/21 Date Page 10 of 10 PCN Form — Version 1.4 January 2009 Stream Impact S6 25' / 0.001 acre intermittent, CERNE2,00 Lot 29 Driveway Stream Im. S18 and Stream Impact S5 30' / 0.001 acre perennial, CH 200 Lot 30 Driveway Stream Impacts S16 and S17 20' pump around, temporary 2Crp:ump-ar / \\ I I \ \ \ \ \ \ l \ \ \ \\ �\ / / f / I ' \ \\1 I .gym' 1 I I II ' I I \ I I I \ \ \ I I ti \ \ I !, 1 \ \\ I I N \\ \\ \ I \ \ \ \ \ \\ \\ \\ \ \ N N N \ \ \ \ \ \ \ N N\ N\\ \ \\ \\\\ \\ \\ \ \ \ \ \ \ \ N \ \ \ \ \ \ \ \\\ \\ N\ \ \ \ \ \ \\\ \\ \N \ \ \\ \\ \ \ \ \ \ X \\ \ \ \\\ \ \ \\ \ \ \ \ \\ \\ \ N \\ \\ \ \ \\ \ \\ \ \ N3 4, /6'10 126.00 i! • � erOporfy LID N /) / o\ N30° 41' 44.76"E 15" HP -STORM \DRIVEWAY PIPE STREAM IMPACT: \ 30LF;s0.001 ACRES 127.00' / \\EOP) \\ \\\\\\ 7.7./....____::::::__ / ( /// / / / // / // \ \ \ \ \ \ - --/ / `\ \\ 1 Ill I I / / / / / / / / / 15"HP' yy \ \ \ \ \ \ \ \I/ r / f / / /u TENANE ACCESS1T0 SEPTIC// I I / o // STIL §t bairiIpadS,4Y //// JI N I I / / / / // / I �/ _ ____ _____,,, �r0=. AaCT1- - r J////l/l I I Jr �l / l 1 / l/ II 1 / I / 1/ / I I /// /� /30,367SF// // / �T , l l / / // //�liffiAl// / // / / / / / J l / i / 2 / / 32 191SF / /' / / / / / / �/ / I I 5 J� J %-- 41n11. /// ////I w I I39221SF/////--0/ // / // / / / / I I I /� /�l /84 / //Asili iN II / / earrrimp 41 / 7 p .-- / -44 �� / / / / /1 :Uhl */ trefily li 01 . fljf 1 I I I ORMIDRIVEWA PIPE FOR M IMPACT: 3OLF, 0.602 ACRESI I I I I I >f Stream Impact S7 30' / 0.002 acre intermittent, CH 500 Maintenance Access Road for Septic Stream Impacts S20 and S21 20' pump around, temporary N30° 41' 44.76"E w h N ml 0 / WATERSHED CLASSIFICATION MAX BUA LOW DENSITY PROPOSED BUA WITHIN STREET R/W ON LOTS TOTAL PROPOSED BUA WS-IV PROTECTED 2 UNITS PER ACRE, 24% BUA (WITH CURB AND GUTTER) 3 UNITS PER ACRE, 36% BUA (WITHOUT CURB AND GUTTER) 1.5 ACRES +/- 3.67 ACRES +/- (ASSUMED 5,000 SF IMPERVIOUS PER LOT) 5.17 ACRES (16.2%) PROPOSED WETLAND/STREAM IMPACTS STREAM IMPACTS 0.019 ACRES 299 LF WETLAND FILL 0.009 ACRES N30° 41' 44.76"E 140.00' Stream Impact S3 30' / 0.002 acre perennial, CH 200 Lot 32 Driveway Stream Impacts S12 and S13 20' pump around, temporary / / / / // / / / // / I1T(�FBdYLS1ONC1EEKASSH6WN/ NTHjUSGS /7.5 IN1JTE AP I�ORSE/SHOV QUApRAN LE / / / J(1 15" HP -STORM DRIVEWAY('PIPE STREAM IMPACT: 30 LF, 0.091 ACRES / I I RISSIN6 S 'EAPACT GOLF, 0,006 I I \ \ I � / / P OPOS' D PIP /CROSSING,/ / STISAM jfMIPAC.. / LF, (406 ACRES / yoo ti / Stream Impact S2 89' / 0.006 acre intermittent, CH 500 Entrance Road Stream Impacts S10 and SII 20' pump around, temporary / 30,288SF CHRISTOPHER AND STEPHANIE SCRUGGS ZONING: MR-30 PIN: 9630778902 BANNER FARM Rpgp 2097- — — / rPa /@cre I / 133,255SF \ \ rance Co- ;1') 210 trem 1 rnpac4 S't 65' / 0.006 acre perennial, CH 100 Entrance Road Stream Impacts S8 and S9 20' pump around, temporary 0 40 80 120 SCALE: 1" = 40' © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. PROJECT # N O O O N REVISIONS: REVISED STREAM DISTURBANCE /1\ 12/07/2021 SAA itzt,‘"‘.1,f(, OR% <Pl.(' L.) lD 00 N U z 0 0 0) 0 z 336.838.2500 MI 0 t- ^0 (13 0- a, a MOORE AND SON SITE CONTRACTORS ATTN: Brian Kirk 103 McDowell Road STREAM AND WETLAND IMPACT EXHIBIT L.L 0_ 0 cc ro cu 4-1 4-1 s Banner Farm Road Mills River, NC SHEET EXHIBIT 1-0 NOT FOR CONSTRUCTION z 2 uJ cc