Loading...
HomeMy WebLinkAboutNCC215916_MODIFICATION Supporting Documents_20220331A H C D E G H J OWNER/DEVELOPER FUJIFILM DIOSYNTH BIOTECHNOLOGIES USA, INC. 101 J MORRIS COMMONS LANE MORRISVILLE, NC, 27560 7 (919) 583-2686 SITE DATA PROPERTY OWNERS ADDRESS: SITE AREA: WAKE COUNTY PIN DEED BOOK: DEED PAGE: ZONING: SITE AREA: WAKE COUNTY PIN 6 DEED BOOK: DEED PAGE: ZONING: 5 4 3 2 TOTAL SITE AREA: LIMITS OF DISTURBANCE Environments TvelgprpgJtPermit Permit No. L I LUL I )HOLLY SPRINGS Engineering Approval of these plans does not relieve develocerlovmer M1om responsibility of construcflon In —dance with Torn Board approvals, o,dl,m,,s, policies, e—, constructlon standards and spxlflwtlons. Issuance of Plan Approvalacesnotcons11 apProvalto ce gradln9 and umlry Installation acMmes onslre. These activl[les may lake Place only eher Me requlrM preconzlructlon.-doe haz been held and all permltz aJ. Daniel Colavito for KDP 10/13/21 Direcnar or Engineering cane Environmental Development Permit for the following Plan Approvals: X Lana Disturbance Permit -Erosion Control Plan Approval X Stormmter Permit -Stormwater Plan Approval X Flood Plain Development Permit- Floociplain Development Plan Approval As noted with the following conditions: E DO NOT SCALE FDB -PROJECT GALAXY CD PACKAGE -PHASE 1 11751 HOLLY SPRINGS NEW HILL RD HOLLY SPRINGS, NC 27540 12.64 ACRES 0639633688 017498 TOWN OF HOLLY SPRINGS 02164 RT SANITARY SEWER FLOWS WILL BE LIMITED TO MAXIMUM RATE PREVIOUSLY NEGOTIATED WITH THE TOWN OF HOLLY SPRINGS OF: PHASE 1: 400,000 GPD - CURRENT APPLICATION 139.98 ACRES PHASE 2: 760,000 GPD - FUTURE ADDITIONAL 0639721A1A TOTAL: 1,160,000 GPD 018040 01512 RT 152.62 ACRES 98.50 ACRES FDB GALAXY PROJECT BUILDING PHASE GROSS FLOOR AREA (SF)(2025) LAB/ADMINISTRATION 130,501 Phase 1: 18, 923SF Mechanical Space DRUG SUBSTANCE MANUFACTURING (DSM1 DSM2 AND HEADBLOCK) 360,200 Phase 1 : 22,200SF Mechanical Space DRUG PRODUCT/FINISHED GOODS (DPFG) 93,910 Phase 1: 21,9975SF Mechanical Space MECHANICALSPACE - MECHANICALSPACE IS INCLUDED IN THE GROSS FLOOR ATEA FOR EACH BUILDING WAREHOUSE 132,875 Phase 1: 34,170SF Mechanical Space CUB 91,507 Phase 1: 57, 231SF Mechanical Space ANCILLARY BUILDINGS - I FIRE PUMP HOUSE, GUARDHOUSE TOTAL 808,993 1 TOTAL BUILDING GROSS SQUARE AREA BUILDING NET AREA (USED TO CALCULATE REQUIRED MINIMUM PARKING) FDB GALAXY PROJECT PARKING BASED ON BUILDING AREA PHASE 1(2025) LAB/ADMIN ISTRATION 111,578 N ET BUI LDING AREA DRUG SUBSTANCE MANUFACTURING (DSM1 DSM2 ANDHEADBLOCK) 338,000 NET BUILDING AREA DRUG PRODUCT/H NISHED GOODS (DPFG) 71,913 NET BUILDING AREA MECHANICALSPACE 154,521 NO PARKING PROVIDED WAREHOUSE 98,705 NET BUILDINGAREA CUB 34,276 NET BUILDINGAREA ANCILLARY BUILDINGS - BUILDINGAREA IS INCLUDED IN MECHANICALSPACE TOTAL 808,993 TOTAL BUILDING GROSS SQUARE AREA REQUIRED MINIMUM PARKING (UDO TABLE 7.04-D) NOTES: PHASE 1(2025) LAB/ADMINISTRATION 391 (OFFICE/PROFESSIONAL)3.5PARKING SPACE PER 1,000 NET BUILDING AREA DRUG SUBSTANCE MANUFACTURING (DSM1 DSM2 338 AND HEADBLOCK) (MANUFACTURING) ONE PARKING SPACE PER 1,000 NET BUILDING AREA DRUG PRODUCT/FINISHED GOODS (DPFG) 72 (MANUFACTURING) ONE PARKING SPACE PER 1,000 NET BUILDING AREA MECHANICALSPACE - NO PARKING REQUIRED WAREHOUSE 33 (WAREHOUSE) ONE PARKING SPACE PER 3,000 NET BUILDING AREA CUB 11 (WAREHOUSE) ONE PARKING SPACE PER 3,000 NET BUILDING AREA ANCILLARY BUILDINGS NO PARKING REQUIRED TOTAL REQUIRED 845 MINIMUM REQUIRED 634 75% of required minimum (waiver required)(land bank to 100%) MAXIMUM 930 110% of required minimum REQUIRED OFF-STREET LOADING (UDO TABLE 7.05-A) NOTES: PHASE 1(2025) (OFFICE/PROFESSIONAL SERVICES) 2 LOADI NG SPACED PER 100,000-300,000 GFA + 1 2 LAB/ADMIN ISTRATION ADDITIONAL FOR EACH ADDITIONAL 350,000 GFA DRUG SUBSTANCE MANUFACTURING (DSM1 DSM2 (INDUSTRIAL) 3 LOADING SPACED PER 100,000-200,000 GFA + 1 ADDITIONAL FOR EACH 4 AN D HEADBLOCK) ADDITIONAL 200,000 GFA DRUG PRODUCT/FINISHED GOODS (DPFG) 2 (INDUSTRIAL) 2 LOADING SPACED PER 40,000-100,000 GFA MECHANICAL EQUIPMENT - NO LOADING SPACES REQUIRED (IN DUSTRIAL) 3 LOADING SPACED PER 100,000-200,000 GFA + 1 ADDITIONAL FOR EACH 3 WAREHOUSE ADDITIONAL 200,000 GFA CUB 2 (INDUSTRIAL)2 LOADING SPACED PER40,000-100,000 GFA ANCILLARY BUILDINGS - NO LOADINGSPACES REQUIRED TOTAL REQUIRED 13 PROPOSED PARKING SPACES AND OFF-STREET LOADING NOTES: PHASE 1 (2025) Including 18ADAAccessible Parking Spaces (HC), three of which are Van Accessible (UDO TOTALSITE PARKING 845 TABLE7.04-C) ADA Accessible Parking space (HC) 18 Including 3- Van Accessible Parking Spaces (UDO TABLE 7.04-C) Accessible Electric Vehicle Charging Parking Space 1 Not counted in total site parking (2018 NCBC 1103.1) TOTAL BIKE PARKING 48 TOTAL MOTORCYCLE PARKING 34 IN ADDITION TO SITE PARKING TOTALSITE OFF-STREET LOADING 14 14-55' by 12' loading spaces N VICINITY MAP NOT TO SCALE Construction Drawings Approval Date: 3r30r22 Approved By: L— ��'HOLLY SPRINGS Development Services Approvald/fheseplansdoesnotrelieve,eveloped bo/rom responsbilhy of ros, andllon In accordance nd town d speC pprovals, 1—ce of Plan As, and/or sermon coon standards and spee#leatlbns. Issuance of Plan Approval does not constitute approval to commence grading and utility ins(alladon activities onsite..tr These g activities may fake place p.mher the beer Iss d.onstruction meeting M1as been held aneau permn:noes Haan Issuatl. Wafer Permit #: Wastewater Permit #: Reclaim Permit #: 111 WAKE COUNTY NC I .10 r - r( AREA 1 ` T/ V\Vtti� rsir „/ ram- S� } l i lr' / / / u ./ / ��} tt l J 1 �� / Iflf /// / i '✓� 7\ V� r, i / ` ( �"✓ f/" %/r r'�-^�M1/J S` •y�J"��.+ _`\N �r /J tr1Jr `r( t `-...-,-f//f J�/�///� / \\S l //Irk/� �'% --� w s\�/�/� TT I / AREA 2 v } C D KEY MAP SCALE: 1 " = 600' N AERIAL PHOTO NOT TO SCALE PROJECT NUMBER: 21-DP-10 PROJECT'S MASTER PLAN PROJECT NUMBER: 20-MAS-02-AO1 OAKVIEW INNOVATIONS CONDITIONS OF APPROVAL: 1. SEWER MAIN FROM MH 3 TO EXISTING MH 4 (PUBLIC SANITARY SEWER STRUCTURE BY OTHERS) SHALL NOT BE LAID UNTIL A CIVIL CD REVISION HAS BEEN SUBMITTED, REVIEWED AND APPROVED BY TOHS DEVELOPMENT SERVICES. 2. LANDSCAPING PLANS HAVE NOT BEEN APPROVED WITH THIS CIVIL CONSTRUCTION DRAWING. PRIOR TO THE FIRST CERTIFICATE OF OCCUPANCY, A FINAL LANDSCAPING PLAN SHALL BE APPROVED AS A CIVIL CONSTRUCTION DRAWING REVISION. 3. THE CULVERT PROVIDING ACCESS TO THE GENERATOR YARD SHALL REMAIN "ON HOLD" FOR CONSTRUCTION UNTIL A CONSTRUCTION DRAWING REVISION HAS BEEN SUBMITTED, REVIEWED, AND APPROVED BY TOHS DEVELOPMENT SERVICES. NO GEODETIC MONUMENTS WITHIN 2,000 FT BUFFER BASE ON THE TOWN OF HOLLY SPRINGS EXHIBIT. i� -This project shall be constructed in accordance with the following plans, and the adopted Engineering Design and Construction Standards of the Town of Holly Springs. These plans were prepared in conformance with the approved preliminary plan approved by the Town. Furthermore, the engineer whose seal and signature appear below this certifies that the Town of I Iolly Springs Engineering Design and Construction and Standards have been thoroughly reviewed for applicability to this particular project. These plans were prepared using survey grade data in all areas where work is being proposed including utility crossings and other environmentally sensitive areas. Any proposed exceptions or deviations from either the standards and/or from the approved preliminary plan are listed below: (The professional engineer shall then list such deviations) I Existing topographic data is LiDAR }cased, as noted. 2 Minor design advancements from preliminary approvals. A�����t ti t r� r t r rjrrrfv es U2 V, ,,• GENERAL NOTES (AS APPLICABLE): 1. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS. 2. CONSTRUCTION DRAWING APPROVAL IS REQUIRED BEFORE CONSTRUCTION ON THIS PROJECT MAY BEGIN. DEVELOPMENT FEES ARE DUE BEFORE CONSTRUCTION DRAWING APPROVAL. 3. THE ESTIMATE SEWER FLOWS SHOWN ARE BASED ON ASSUMED TENANT MIX AT THE TIME OF THE SUBMITTAL. THE ESTIMATED FLOWS WILL BE UPDATED WITH EACH DEVELOPMENT PLAN SUBMITTAL. 4. THE PLAN IS SUBJECT TO REVISIONS DURING CONSTRUCTION DRAWING APPROVAL PROCESS. 5. THE MONUMENT CONTROL POINTS FOR THIS PROJECT IS: TOWN OF HOLLY SPRINGS GEODETIC MONUMENT "ALFORD 33" PUBLISHED COORDINATES N=693,650.75' E=2,041,575.85' ELEV.=377.10'. THE TOWN OF HOLLY SPRINGS HAS INSTALLED A LOCAL GEODETIC MONUMENT) SHALL REFERENCE THE NEAREST MONUMENT AND SHALL BE CLEARLY NOTED ON THE FIRST SHEET OF, BOTH CONSTRUCTION PLANS, AND AS-BUILTS SUBMITTED TO THE TOWN. NO GEODETIC MONUMENTS WITHIN 2,000 FT BUTTER BASE ON THE TOWN OF HOLLY SPRINGS EXHIBIT. 6. IF THERE IS A GEODETIC MONUMENT LOCATED IN THIS SITE, IT MUST BE PROTECTED OR IF RELOCATION IS NEEDED IT WILL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE IT WITH SURVEY ACCURACY. 7. ACCESS TO TOWN OF HOLLY SPRINGS PUMP STATION MUST BE MAINTAINED AT ALL TIMES UNTIL ALTERNATE PUMP STATION ACCESS IS AVAILABLE FROM THE SOUTH. STORM DRAINAGE DATA: TOTAL LENGTH STORM DRAIN: 17,775 LF TOTAL HOLLY SPRINGS NEW HILL ROAD WIDENING 1,507 LF TOTAL IMPERVIOUS AREA: 66.9 AC QUANTITY OF STORMWATER CONTROL MEASURES: 2 QUANTITY OF STORMWATER CONTROL MEASURES WITH DRAINAGE AREA > 5 AC: 2 PUBLIC UTILITY LENGTH SIZE MATERIAL WATER LINE 1,750' ± 1211 DIP 0 ISSUE CONSTRUCTION JR RA \ JM DP 23MAR22 REV DESCRIPTION DRN CHK APP PROD CDENT DATE \P \P 7 6 5 4 3 CAll ��� ROB %, 2 FUJ I lM ;����Qo�Ess;oN.�tiq-% 9 I'f \ l fSE D!, synth synth 02 - biotechnologies FNGINE.;..- prings New Hill Rd ��iG����� Holly Springs,SNC 27540 Phone: +1 919 337 4477 23 MARCH 2O22 FOR CONSTRUCTION EDB PROJECT .jacobs NO: P20200048 2 Crowne Point Drive, Suite 100 NORTH CAROLINA ARCHITECTURAL FIRM REG. No. 50757 Cincinnati, Ohio 45241 — U.S.A. NORTH CAROLINA ENGINEERING FIRM LICENSE No. F-0287 Phone: +1 513 595 7500 JACOBS PROJECT No. 22FHGR03 SUBJECT: BUILDING 000 SITE COVER SHEET A N SD D A H C D E E G SCALE Cd ANSI D: NSA H DRAWING NO: REV: A000 CI000190 0 J