Entity Requesting Allocation: Harnett Regional Water
Project Name for which flow is being requested: AC and SH Elem. School Sewer Exts.
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: South Harnett Regional WWTP
b. WWTP Facility Permit #: NC0088366
Allflows are in MGD
c. WWTP facility's permitted flow 15
d. Estimated obligated flow not yet tributary to the WWTP 5.249
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
6.111
0.016
11.376
75.84%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
Pump
Station Firm
(Name or Capacity, *
Number) MGD
(A)
Design
Average Daily
Flow**
(Firm / pf),
MGD
SLS72 1.656 0.662
(13) (C) (D)=(B+C) (E)=(A-D)
Obligated,
Approx. Not Yet Total Current
Current Avg. Tributary Flow Plus
Daily Flow, Daily Flow, Obligated
MGD MGD Flow
0.199 0.416
Available
Capacity***
0.615 0.047
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): HARNETT REG. WATER
Downstream Permit Number: WQCS000166
Page 1 of 6
FTSE 04-16
III. Certification Statement:
I Steve Ward certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of tllyis wastewater flow.
Signing Official Signature Date
Page 2 of 6
FTSE 04-16