Loading...
HomeMy WebLinkAboutWQ0041270_Worksheets_20220330f)F State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested: AC and SH Elem. School Sewer Exts. More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Harnett Regional WWTP b. WWTP Facility Permit #: NC0088366 Allflows are in MGD c. WWTP facility's permitted flow 15 d. Estimated obligated flow not yet tributary to the WWTP 5.249 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 6.111 0.016 11.376 75.84% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station Firm (Name or Capacity, * Number) MGD (A) Design Average Daily Flow** (Firm / pf), MGD SLS72 1.656 0.662 (13) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Avg. Tributary Flow Plus Daily Flow, Daily Flow, Obligated MGD MGD Flow 0.199 0.416 Available Capacity*** 0.615 0.047 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): HARNETT REG. WATER Downstream Permit Number: WQCS000166 Page 1 of 6 FTSE 04-16 III. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of tllyis wastewater flow. Signing Official Signature Date Page 2 of 6 FTSE 04-16