HomeMy WebLinkAbout20220460 Ver 1_Buffer Notification_20220331Strickland, Bev
From: Kimberly Cerino <kcerino8@gmail.com>
Sent: Thursday, March 31, 2022 3:16 PM
To: Perez, Douglas J
Subject: [External] Re: Walkway Buffer Authorization (DWR #22-0460)
Attachments: scan0003.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Doug,
Thanks for your email. Attached is the signed document.
I need clarification on the other two requests, so I'll give you a call.
Thanks,
Kim
On Thu, Mar 31, 2022 at 2:58 PM Perez, Douglas J <doug.perez@ncdenr.gov> wrote:
Hello,
In reviewing the Buffer Authorization application you submitted, I had a few comments and questions.
First, if you would fill out and return the attached Catawba Riparian Buffer Form, that would be most
appreciated. I have attached it in two formats. Please fill out whichever one works best for you. Second, I
need to see a to -scale diagram of what you are planning on doing. Please include the length and width of
the walkway as well as how many square feet this walkway will impact in the buffer. I will also need
photos of the current condition of the buffer, for reference. Now it appears that your property was platted
prior to June, 3oth zoo', so that means you are only dealing with a 3o' buffer. Should you have any
questions, please feel free to reach out.
Thanks,
Doug Perez
1
DWR
Division of Water Resources
Doug Perez - Environmental Specialist
NC Dept. of Environmental Quality (NCDEQ)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 3oi, Mooresville, NC 28115
Phone: (704) 235-2162 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties unless the content is exempt by statute or other regulation.
Kim Cerino
(203) 520-0879
Kcerino8@gmail.com
2
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address:
�� k" —� cf�
l'lK� rhY_ILi
Lq County: (E Y,r.
Owner:
� M/)Q'YI.-7
( o0Vl
K....I.n.O
('n, ... .
Contractor/agent:
runt Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A
NCAC 02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be
removed. Minimal shaping and sloping along the immediate shoreline is allowed. [1SA NCAC 02B.0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B
.0243(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically
approved by the Division. There are limitation on size for decks. [35A NCAC 028 .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and SSA NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notiftc"aria,,
I, IUMII� ul cc_Y I `Q hereby state that I have been informed of the Catawba
Riparian Buffer le. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials. .�^rrrpp,� 4� Signature (owner): �Dn u�: Date: 5 Silas