HomeMy WebLinkAbout20201257 Ver 1_Pre-Filing Meeting Information_20201117Contact Name*
Joey Lawler
Contact Email Address*
jlawler@smeinc.com
Project Owner*
Piedmont Natural Gas
Project Name*
Line 5 Section 1 HDD - Rock Fish Creek
Project County*
Hoke
Owner Address:*
Street Address
9751 Southern Pine Blvd
Address Line 2
aty
State / Province / Region
Charlotte
NC
Postal / Zip axle
Country
28273
USA
Is this a transportation project?*
C Yes c: No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
F Individual Permit F Modification
F- Shoreline Stabilization
Does this project have an existing project ID#?*
C Yes (: No
Do you know the name of the staff member you would like to request a meeting with?
Chad Turlington
Please give a brief project description below.*
Piedmont Natural Gas needs to replace a damaged segment of 12-inch
diameter Line 5 natural gas pipeline with a new segment that will be
installed by horizontal directional drill (HDD), partially within a new 30-foot
wide easement adjacent to their e)asting 50-foot wide easement.
This site is located north of Arabia Road and south of Pittman Grove
Church Road in Hoke County. Appro)amately 730 linear feet of the e)asting
pipe is proposed for replacement by HDD. This segment of Line 5 is
located beneath Rock Fish Creek and its adjacent riparian wetlands.
Mechanized land clearing of forested wetlands will likely be required.
The project may require pre -construction written approval under
Nationwide Permit No. 12 and General Water Quality Certfication No. 4133.
Please give a couple of dates you are available for a meeting.
10/30/2020
Please attach the documentation you would like to have the meeting about.
Line 5 Section 1 HDD - Rockfish Creek.pdf 288.57KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 10/8/2020