Loading...
HomeMy WebLinkAboutWQ0043328_Application (FTSE)_20220329aW alley, willia OK E s 9 c r ngi17 erin,g • Architecture March 28, 2022 Mr. Alexander Lowe North Carolina Department of Environmental Quality Division of Water Resources 450 W. Hanes Mill Road Winston-Salem, NC 27105 Subject: Gravity Sewers Extension Application Pinnix Road Subdivision AWCK Project No. 21045 Dear Mr. Lowe: en & king, 1. and Sari' ying NC Dtep.rtrnent of Environmental Quality Received MAR / 9 2022 Winston-Salem Regional Office On behalf of the City of Burlington and Pinnix Road Dev, LLC, please find enclosed for your review and approval the following: 1. Original and one (1) copy of Fast Track Application with required certification. 2. Application Fee in the amount of $480.00. 3. Specifications for the Project (2 copies). 4. Color USGS map showing project and surrounding areas (2 copies). 5. Street Level Map (2 copies). 6. Flow Tracking Form FTSE-10/18 (2 copies). Pinnix Road Dev, LLC is developing Pinnix Road Subdivision in Burlington, NC. This project consists development of 26 single family homes and 1,274! linear feet of 8" public gravity sewer. This is the project I emailed you about a couple of weeks ago regarding the need for a variance; however, Mr. Charlie Miller has advised a variance is not required since we are using DIP pipe and that request can be made using the fast track method. We are proposing to install a cradle to support the storm sewer pipe as required by the City of Burlington and have provided specifications to address this issue. Requested flow allocation is 9,360 GPD. Sewer from this project will tie into an existing City of Burlington 8" sewer main and will then flow to the East Burlington Wastewater Treatment Plant (NC0023868). Should you have any questions or need any additional information, please feel free to contact me. With Best Regards, Alley, Williams, Carmen and King, Inc. isa7/7— Mark D. Reich, P.E. cc: Todd Lambert, City of Burlington Roy Alley, Pinnix Road Dev, LLC 740 Chapel Hill Road (27215) • P.O. Box 1179 • Burlington, North Carolina 27216 Tel. - (336) 226-5534 • Fax - (336) 226-3034 • awck.com ESTABLISHED 0 1960 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicants name: City of Burlington (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal IT Other 3. Signature authority's name: 17AY IT, C41FF1. per 15A NCAC 02T .0106(b) Title: 1r.YTFD e\ rITY_/IA{.IACeEit 4. Applicant's mailing address: PO Box 1358 / 425 S. Lexington Avenue City: Burlington State: NC Zip: 27216-1358 5. Applicant's contact information: Phone number: (336) 222-5022 Email Address: II. PROJECT INFORMATION: 1. Project name: Pinnix Road Subdivision 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Alamance 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.1088° Longitude: -79.4133° 5. Parcel ID (if applicable): 139226 & 139588 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Mark D. Reich License Number: 12634 Firm: Alley, Williams Carmen & King, Inc. Mailing address: PO Box 1179 / 740 Chapel Hill Road City: Burlington State: NC Zip: 27216-1179 Phone number: (336) 226-5534 Email Address: mreich@awck.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: East Burlington WWTP Permit Number: NC0023868 Owner Name: City of Burlington V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 8" inch ®. Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(e) been attached? ❑ Yes El No ZN/A 4. Origin of wastewater: (check all that apply): Z Residential (Individually Owned) 0 Retail (stores, centers, malls) ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Food and drink facilities ❑ Church ❑ Businesses / offices / factories ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool/Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic 0 % Commercial 0 % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes 0 No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? 0 Yes // No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(1)) Daily Design Flow a,b No. of Units Flow 3 Bedroom Single Family Residential Unit 360 gal/day 26 9,360 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 9,360 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 9,360 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1,274 PVC, VCP & DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: N/A 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - . 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per. minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump 0 Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): O Standby power source or 0 Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(0): 1. Does the project comply with all separations/altematives found in 15A NCAC 02T .0305(f) & (a)? 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ❑ Yes ®No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) t 36 inches ➢ If noncompliance with 02T.0305(f) or (g) see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Cape Fear ❑ No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version) and the Gravity Sewer Minimum���Design Criteria (latest version) as applicable? (yj Yes No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project the full technical review is required. 2. Professional Engineer's Certification: I, Mark D. Reich , attest that this application for Pinnix Road Subdivision (Professional Engineer's name from Application Item III.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) rmt«a n ` Li CAR • !n , North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): 34 7t " • Sec ?y 4;GINE ".y,IP.PBBi Yip^ °��a' I, Dfrato ct4ea , attest that this application for Pinnix Road Subdivision (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item II. I ) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: .3/0 FORM: FTA 06-21 Page 5 of 5 Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10-18) Enity Requesting Allocation City of Burlington Project Name for which flow is being requested: Pinnix Road Subdivision More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: East Burlington WWTP b. WWTP Facility Permit #: NC 0023868 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 12.00 1.889078 5.0740 0.009360 6.972438 58.1% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP : None (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Total Design Approx. Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Available Name GPD (Firm/pf), GPD GPD GPD Flow Capacity*** N/A * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity <_ 0. Downstream Facility Name (Sewer) : East Burlington WWTP Downstream Permit Number: NC 0023868 Page 1 of 2 FTSE 10-18 III. Certification Statement: I, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 37isf Zv Signing Official Signature Date City Engineer Title of Signing Official Page 2 of 2 FTSE 10-18 alley, williams, ca ENGINEERS & 740 chapel hill roars burlingion, tic 272-10 men, & king, inc. ARCHITECTS p.c. box 1179 (330)226--5534 — Pinnix Road Pinnix Road Sewer Burlington Sewer PINNIX ROAD SUBDIVISION STREETS MAP URLINGTON, ALAMANCE COUNTY, N.C. SCALE: 1" : 300' DATE: 1/25/22 SHEET OF 1 MAP BY TJN Pinnix Road Subdivision Burlington, North Carolina PINNIX ROAD SUBDIVISION CRADLE SPECIFICATIONS ntiltfillat • f.4x cr: 0 21045 • it yi s4't 'G I tl E�'@`•�a 4•`� 4 •••....••‘G••. GENERAL: The City of Burlington Standard Specifications and Detail Drawings shaffigittjb.tontract. Excerpts of the Standard Specifications are herein incorporated for the purpose of obtaining a variance from NCDEQ. DUCTILE IRON PIPE Ductile iron pipe shall conform to ANSI/AWWA C-151/A21.51-91. The pipe shall be thickness class 51 or greater. The pipe shall also be designed for trench condition type 2, (ANSI A-21.50) unless otherwise shown on the drawings. Thickness design of ductile iron pipe shall be in accordance with ANSI/AWWA C- 150A/21.50-91. If for any reason, the Engineer finds any or all ductile iron pipe unacceptable, the contractor shall be responsible far obtaining acceptable pipe. The Engineer's acceptance or rejection of all pipe will be final. Joints: Push -on Pipe joints shall be single rubber gasket push on type or mechanical joint type employing a single elongated rubber gasket to effect the joint seal and shall conform to ANSI A21.11 or AWWA C-111. Restrained Pipe Joints shall be push -on type with bolted retainer rings and welded retainer bars or the boltless type which includes ductile iron locking segments and rubber or neoprene retainers. Restrained Pipe and fittings shall be: 1) American Lok-ring 2) American Flex -ring 3) Griffin Snap-Lok 4) Clow Super - Lock 5) U.S. Pipe TR Flex 6) Or Approved Equal. Cement Lining: For water service pipe and fittings shall be cement lined in accordance with ANSI A21.3 or AWWA C-104. 4. Coating: For water service pipe and fittings shall be coated inside and outside with a bituminous coating in accordance with ANSI A21.4 or AWWA C-104, Section 4-14. For sanitary sewer service interior lining shall be Protecto 401 Ceramic Epoxy coated and outside with a bituminous coating. Protecto 401 Ceramic Epoxy Coating: All sanitary sewer ductile iron pipe and fittings shall be delivered to the application facility without asphalt cement lining, or any other linings on the interior surface and no coating shall have been applied to the first six inches of the exterior of the spigot end. Protecto 401 Ceramic Epoxy Coating material shall be an amine cured novalac epoxy containing at least 20% by volume of ceramic quartz pigment. Any request for substitution must be accompanied by a successful history of lining pipe and fittings for sanitary sewer service, a test report verifying the following properties, and a certification of the test results a. A permeability rating of 0.00 when tested according to Method A of ASTM E-96-66 Procedure A with a test duration of 30 days. b. The following test must be run on coupons from the factory lined ductile iron pipe: 1. 1. ASTM B-117 Salt Spray (scribed panel) - Results to equal 0.0 undercutting after one year. 2. ASTM G-95 Cathodic Disbondment 1.5 volts @ 77 o F. Results to equal no more than 0.5 undercutting after 30 days. PROJECT SPECIAL PROVISIONS PSP-I Pinnix Road Subdivision Burlington, North Carolina 21045 3. Immersion Testing rated using ASTM D-714-87. i. 20% Sulfuric Acid - No effect after one year. ii. 25% Sodium Hydroxide - No effect after one year. iii. 160 ° Distilled Water - No effect after one year. iv. 120 ° Tap Water (scribed panel) - 0.0 undercutting after one year with no effect. The lining shall be applied by a competent firm with a successful history of applying linings to the interior of Ductile Iron pipe and fittings. Prior to abrasive blasting, the entire area to receive the proactive compound shall be inspected for oil, grease, etc. Any areas where oil, grease, or any substance that can be removed by solvent is present shall be solvent cleaned using the guidelines outlined in DIPRA-1 Solvent Cleaning. After the surface has been made free of oil, grease or other substances, all areas to receive the protective compounds shall be abrasive blasted using compressed air nozzles with sand or grit abrasive media. The entire surface to be lined shall be struck with the blast media so that all rust, loose oxides, etc., are removed from the surface. Only slight stains and tightly adhering annealing oxide may be left on the surface. Any area where rust reappears before lining must be reblasted. After the surface preparation and within 8 hours of surface preparation, the pipe interior shall receive 40 mils nominal dry film thickness of Protecto 401. No lining shall take place when the substrate or ambient temperature is below 40 degrees Fahrenheit. The surface also must be dry and 5 dust free. If flange pipe or fittings are included in the project the lining shall not be used on the face of the flange. Due to the tolerances involved, the gasket area and spigot end up to 6 inches back from the end of the spigot end must be coated with 6 mils nominal, 10 mils maximum Protecto Joint Compound. The Joint Compound shall be applied by brush to ensure coverage. Care should be taken that the Joint Compound is smooth without excess buildup in the gasket seat or on the spigot ends. Coating of the gasket seat and spigot ends shall be done after the application of the lining. The number of coats of lining material applied shall be as recommended by the lining manufacturer. However, in no case shall this material be applied above the dry thickness per coat recommended by the lining manufacturer in printed literature. The maximum or minimum time between coats shall be that time recommended by the lining material manufacturer. No material shall be used for lining which is not indefinitely recoatable with itself without roughening of the surface. Protecto 401 Joint Compound shall be used for touch-up or repair in accordance with manufacturer's recommendations. Inspection: 1. All Ductile Iron pipe and fittings shall be checked for thickness using a magnetic film thickness gauge. The thickness testing shall be done using the method outlined in SSPC-PA-2 Film Thickness Rating. 2. The interior lining of all pipe and fittings shall be tested for pinholes with a nondestructive 2,500-volt test. Any defects found shall be repaired prior to shipment. 3. Each pipe joint and fitting shall be marked with the date of application of the lining system along with its numerical sequence of application on that date and records maintained by the applicator of his work. PROJECT SPECIAL PROVISIONS PSP-2 Pinnix Road Subdivision Burlington, North Carolina 21045 The pipe or fitting manufacturer must supply a certificate attesting to the fact that the applicator met the requirements of this specification, and that the material used was as specified FLOWABLE FILL Flowable Fill (controlled low -strength material) shall meet the requirements of NCDOT Standard Specifications for Roads and Bridges, (latest revision). Flowable fill shall have a minimum 28-day compressive strength of 125 psi and shall be mixed such that cement content is 100 to 150 pounds per cubic yard, air content is less than 35% and slump is between 7 and 9 inches. Amounts of fly ash and fine aggregate shall be used singly or in combination to make mix yield one cubic yard. STONE Graded stone material shall be in accordance with Section 1005 of the NCDOT Standard Specifications and gradation requirements in accordance with table 1005-1 of NCDOT Standard Specifications. TRENCH EXCAVATION AND BACKFILLING A. Alignment and Grade All pipe shall be laid to the line and grade shown on the plans. Protection shall be afforded to all underground and surface structures, using methods acceptable to the Engineer. The contractor at his own expense shall furnish this protection. Deviations from line and grade may be made only with the permission of the Engineer when such deviations arise from grade or line conflicts with existing utilities, structures, or other sources of conflict. It is generally intended that no extra compensation shall be allowed for measures necessary to protect existing utilities or structures during excavation of construction or for measures necessary to negotiate crossings of existing utilities or structures. In cases where an existing utility follows a parallel path in close proximity to the utility under construction, and it is not practicable to remove theexisting utility or redesign the utility under construction, the Engineer may order special methods to be employed and allow extra compensation for such measures as are required. B. Excavation and Preparation of Trench Trench excavation shall be carried out in such a manner as to conform to the line and depth of cover shown on the plans, excavation shall proceed in advance of pipe laying at least fifty (50') feet, but only so far as the Engineer will permit. The trench shall be so braced and drained that workmen may work therein safely and efficiently. It is essential that discharge from pumps be led to natural drainage channels, to drains, or to storm sewers. Trench width may vary with the depth of trench and nature of the excavated material, but in any case shall be of ample width to permit the pipe to be laid and jointed properly and the backfill to be placed and compacted properly. The minimum width of unsheeted trench shall be twenty (20") inches, but in no case shall the width be less than twelve (12") inches greater than the nominal diameter of the pipe. PROJECT SPECIAL PROVISIONS PSP-3 Pinnix Road Subdivision Burlington, North Carolina 21045 Pipe foundation shall at all times be such that the pipe rests uniformly along its entire barrel length on the trench bottom. Bell holes shall be dug, and no pipe will be accepted where the bells of the pipe are supporting the weight of the pipe. Any part of the trench excavated below grade shall be corrected with approved compacted material before the pipe is laid. Where the subgrade is unstable or water is present in quantities sufficient to make uniform earth bedding of the pipe impossible, the contractor shall stabilize the trench bottom with #5 or #57 stone. The contractor shall keep all trenches free from water during the excavation for and laying of the utility lines. Pipe clearance in rock shall be a minimum of six (6") inches below the grade line of the pipe and nine (9") inches clearance on each side of the nominal diameter of the pipe shall be provided. Should rock be encountered in trenches, the trenches will be brought back to grade with crushed stone and properly compacted. Piling of excavated material shall be done in such a manner that danger to the work and inconvenience to the public is kept to a minimum. Street drainage shall be maintained by suitable means. The contractor shall remove by pumping any water, which may accumulate in the trenches and other excavations under this contract and shall build all dams and do all other work necessary to keep the trenches or other excavation free from water. The Contractor shall at all time have sufficient pumping machinery ready for immediate use. All surface water shall be prevented from entering the open ditches or excavations by proper grading of the ground surface in the vicinity of the excavation. C. Rock Excavation Any material shall be considered rock that in the opinion of the Engineer cannot be excavated except by drilling and blasting or drilling and wedging. Any materials, which can be removed by means other than those above specified, but which for reasons of economy, the contractor prefers to remove by drilling and wedging, will not be classified as rock. No soft or disintegrated rock, which can be removed with a pick, nor any material which can be broken down by sledge hammer, nor ledge or boulders less than 1/2 cubic yard in volume, nor loose, shaken or previously blasted rock, nor broken stone in rock fillings or elsewhere will be considered as rock excavation. All blasting operations shall be conducted in a safe and satisfactory manner. Any rock excavation within five (5') feet of underground utilities shall be done with a very light charge of explosives and the utmost care shall be used to avoid disturbing the existing utility. All exposed pipe lines and other structures shall be carefully protected from the effects of blasts and any damage done to them by blasting shall be properly repaired by the contractor, at his own expense. Sufficient warning shall be given to all persons in the vicinity of the work before blasting. The site of the blast shall be covered with blasting mats or other devices to prevent damage from flying rock. The time of blasting and the number and size of charges must be satisfactory to the Engineer. Blasting shall be performed by experienced persons. Where blasting takes place within one thousand (1,000') feet of a utility, structure or property which could be damaged by vibration, concussion, or falling rock, the contractor shall be required to keep a blasting log containing the following information for each and every shot: (1) Date of shot (2) Time of shot (3) Foreman's name (4) Number and depth of holes (provide sketch) (5) Approximate depth of overburden (6) Amount and type of explosive used in each PROJECT SPECIAL PROVISIONS PSP-4 Pinnix Road Subdivision Burlington, North Carolina 21045 hole (7) Type of caps used (instant or number of delays) (8) Weather Conditions including temperature and humidity (9) Station number or reference to the construction base line survey data (10) Manufacturer and type of explosive This blasting log shall be made available to the Engineer upon request and shall be kept in an orderly manner. Compliance of the contractor with these specifications does in no way relieve him of legal liabilities relative to blasting operation. All blasting operations will be conducted in strict accordance with existing ordinances and accepted safe practices relative to the storage and use of explosives. Where blasting takes place within five hundred (500') feet of a structure, the contractor: 1. Shall employ the services of an independent qualified blasting consultant to inspect the blast site and provide sufficient written and photographic documentation to accurately reflect the pre -blast condition of the structure. 2. Provide vibration -recording instruments to record peak particle velocity (2.0 inches per second maximum allowable) and frequency (15 hertz minimum allowable). 3. Provide post blast inspection upon completion of the project. D. Backfilling Trenches Backfill material shall be ofgood quality and free of cinders, frozen material, ashes, refuse, boulders, rocks or organic material. Rock and boulders shall be excluded from backfill for at least two (2') feet above the top of the pipe, and no stone larger than eight (8") inches in its largest dimension shall be used in backfilling. Backfilling along the sides of the pipe and immediately above the pipe will be done with extreme care to assure that backfill material is distributed properly and to proper grade and alignment. Backfill material will be placed and compacted in six (6") inch layers or as directed by the Engineer. All trench backfill under paved areas (or proposed paved areas), parking areas, sidewalks, and shoulders shall be compacted to a density of ninety-five (95%) of maximum dry density as determined by AASHTO Method T-99. Cross-country water lines shall have backfill compaction of ninety (90%) percent of maximum dry density unless otherwise directed by the Engineer. Dry material used in refilling will be sufficiently moistened, as directed by the Engineer, so that moisture content will be within five (5%) percent of optimum and future settlement will be at a minimum. It shall be the contractor's responsibility to maintain all pavement cuts until paved or accepted by the owner. No water tamping of backfill will be allowed. Under no circumstances shall pipe be allowed to be laid in water. The contractor shall not have open in excess of two hundred (200') feet of water and/or sewer main trench at one time. Backfilling shall be completed at the end of each day's work. E. Trench and Excavation Safety The contractor shall at no extra cost to the City follow guidelines set up by the Occupational Safety and Health Administration (OSHA) of the U.S. Department of Labor for safe trenching and excavation work. All trenching over five (5') feet deep will be sloped, shored, sheeted, braced and otherwise supported. When soil conditions are unstable, excavations shallower than five (5') feet also must be sloped, PROJECT SPECIAL PROVISIONS PSP-5 Pinnix Road Subdivision Burlington, North Carolina 21045 supported or shored. The type of OSHA construction safety standard used is optional to the contractor. Shoring or sheeting below the top of the pipe should be left cut off above the pipe. INSTALLATION OF SANITARY SEWER PIPE All materials for laying and jointing the pipe in the trench will conform to the specifications for such material herein given and will be furnished by the contractor. Grade lines for aligning and grading the pipe in the trench will be established by the Engineer, and all labor and materials required will be furnished by the Contractor. Pipe laying in general will conform to ASTM C-12. Prior to being lowered into the trench, each pipe will be inspected by the crew foreman. Faulty pipe shall be rejected and removed from the work site. No pipe will be laid in the trench until the Engineer has been notified of the intention of the contractor to lay pipe, giving the Engineer sufficient time to check the lines and grades before pipe laying is begun. The Engineer may order the removal of and relaying of any pipe laid without such notice having been given and without direction from the Engineer to proceed having been received. No pipe will be stockpiled or temporarily laid out within ten (10) feet of excavation in earth or within thirty (30') feet of rock that must be blasted for removal. The open end of all pipes will be plugged when pipe laying is not in progress, and all pipe will be protected against injury from falling rock when blasting. Pipes having any defects which are insufficient to cause the rejection of the pipe will be laid so as to bring defects in the top half of the sewer, observing such special directions as the Engineer may give with reference thereto. Pipe will be laid uphill with the bell of the uphill end of the pipe. A bell hole will be dug for each bell, but only of sufficient size to insure that the pipe will bear evenly throughout its length on the bottom of the trench. Unless rock is encountered, all vitrified clay pipe shall be laid in accordance with class "B" or class "C" bedding requirements. See drawing detail SS-1. All vitrified clay pipe laid shall have #5 or #57 stone placed beneath the pipe a minimum of four (4") inches or one -eighth of the outside diameter of the pipe, whichever is greater. (See TRENCH EXCAVATION AND BACKFILLING, paragraph B. Excavation and Preparation of Trench.) The pipe and fittings will be laid in the trench so that after the sewer is completed the invert of the pipe will conform accurately to the line and grade given by the Engineer. A laser beam shall be used to obtain horizontal and vertical alignment. Whenever the Engineer's drawings show, or for other reasons it may be necessary to change from ductile iron pipe to vitrified clay pipe, or visa versa) the Contractor will furnish a donut 30 manufactured by Fernco Joint Sealer Company, or approved equal, or a flexible coupling with two stainless steel clamps, manufactured by Fernco, or approved equal, to make the joint. A brick and mortar collar will be constructed around all joints where couplings or donuts are used. PROJECT SPECIAL PROVISIONS PSP-6 Pinnix Road Subdivision Burlington, North Carolina 21045 In trenches of excessive depth, concrete encasement may be required. Class C concrete will be placed around the pipe as indicated on the drawings. In severe soil conditions requiring unusual treatment, the actual amount of concrete placed around the pipe will be determined by the Engineer. Whenever the Contractor, through carelessness or otherwise, has excavated trenches of widths or depths not in accordance with the specifications, the extra amount of concrete or other material required to properly bed the pipe and secure the results above specified will be placed by the Contractor at his own expense. Concrete placed in trenches that require sheathing will be permitted to set not less than three (3) days before sheathing is removed. Backfilling of trenches, whether the pipe is bedded in concrete or not, will be carefully done with selected material thoroughly tamped to a point above the top of the pipe as specified under "Trench Excavation and Backfilling". Upon completion of the entire work, all lines will present a clean and unbroken barrel. All lines will be thoroughly cleaned and inspected by the Contractor before asking for final inspection by the Engineer. Any defective lines will be repaired and any deposits removed by the contractor, at his own expense. Any materials left along the line of the trench after work on the sewer is completed will be removed by the contractor, and if not owned by the contractor, stored as directed by the Engineer. CRADLE INSTALLATIONS Contractor shall excavate a minimum of 4-inhces below bottom of 8" DIP sewer main for stone bedding and place stone bedding to line and grade of proposed sewer main. Stone bedding shall extend from MH No. 7 to 10-ft beyond 18" DIP Storm sewer pipe. Install 8" DIP sanitary sewer line to proposed grade. Install filter fabric over 8" DIP to prevent flowable fill adhering to the pipe. Install 18" DIP storm sewer pipe to proposed line and grade installing a joint over center of 8" DIP. Place flowable fill under 18: DIP to at least mid -point of 18" DIP. Confirm that 18" DIP does not move during placement of flowable fill. Backfill trench after flowable fill has sufficiently cured. END OF SECTION PROJECT SPECIAL PROVISIONS PSP-7