Loading...
HomeMy WebLinkAboutNCC200626_NOT Closeout Documents_20220329THECITYOF ASHEVILLE CERTIFICATE OF COMPLETION fol. SEDIMENT AND EROSION CONTROL Hilliard Park LLC 302 Dahlonega St. Cumming, GA 30040 RE: Project Name: 360 Hilliard Ave Project Address: 360 Hilliard Ave Permit Number: 18-05006 Inspection Date: February 10, 2022 Inspector: Gary Jarvis DaVelopmerrl 5andea Daluutmont City of Asheville PO BOX 7140 Asheville, NC 28802 This document certifies that the project has been inspected by a City of Asheville Site Engineering Inspector, and the final grading inspection has been approved. The approved final grading inspection certifies that the land disturbing activity for the above referenced project is complete, and the temporary sedimentation and erosion control measures have been removed, all permanent measures installed and that the site has been satisfactorily stabilized sufficient to restrain erosion, per the approved plan. The project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: deq.nc.govNCGO1 Please note that this correspondence must be uploaded as part of completing the NOT process. Monte Clampett, CESSWI, CPII Site Inspection & Zoning Enforcement Supervisor