HomeMy WebLinkAboutWQ0043282_Application (FTSE)_20220316NC Department of
Environmental dQuality
Re
MAR 16 2022
J. S. Beck Engineering, PLLC Winston-Salem
License No. P-1388 Regional Office
5537 Autumn Harvest Drive, Kernersville, NC 27284
Fox Chase Subdivision Phase 2
Trinity, North Carolina
Randolph County
Gravity Sewer Fast Track Application
Project # 2021-6
March 11, 2022
North Carolina Department of Environment & Natural Resources
Water Quality Section
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Enclosed is the gravity sewer application and supporting documents for Fox Chase Subdivision
Phase 2 in Randolph County. Should you have any additional questions or comments, please do
not hesitate to send me an email or call using the information below.
Sincerely,
Joshua Beck, PE
Enclosures:
(2) - FTA 14-16
(2) — FTSE 04-16 from City of Trinity
(2) — FTSE 04-16 from City of Thomasville
(2) - Project Narrative
(2) - USGS Topographic Map
(2) - Street View Map
Review Fee Check
E-Mail: JsbeckEng@gmail.com Cell: 336-420-4807
J. S. Beck Engineering, PLLC
License No. P-1388
5537 Autumn Harvest Drive, Kernersville, NC 27284
Project Narrative
For Fox Chase Phase 2
In Trinity, North Carolina
SEAL T.':
038556
•• ' 3/tl I nQ.
Fox Chase Subdivision Phase 2 is a small section consisting of 22 lot single family residential
subdivision off Highway 62 in Trinity, North Carolina. Located just north of Interstate 1-85 in Randolph
County, this 8.90 acre tract of land is bordered to the north by an unnamed branch of the Uwharrie River, to
the east by Fox Chase Phase 1, and to the west by Collett Farm Road. Once this phase of the subdivision is
complete, a variety of 4-bedroom single family homes will be constructed.
In recent years, the City of Trinity has built a significant amount of sewer infrastructure to spur
development within the area. One of those recent projects happens to be located just beyond the northern
edge of this parcel on an adjacent tract owned by the developer. To access this infrastructure, typical bore
and jack method under a stream will occur. This permit will cover the new construction of sewer mains
throughout this project and consists of 977 linear feet of 8" PVC and 270 linear feet of 8" ductile iron pipe.
The piping listed and installed under this permit will meet or exceed today's design standards and
regulations for both the City of Trinity and NCDENR.
The proposed sewer lines will tie to an existing 8" sewer outfall mentioned above. Based on the size,
the sewer line has more than sufficient capacity to handle the expected demand from this phase of the
project. A total of 10,560 gals/day is expected at full build out of the proposed subdivision using a daily flow
of 120 gals/day per bedroom. This total daily flow was calculated using a breakdown of 22 4-bedroom
homes.
At the completion of construction, the City of Trinity has agreed to take over maintenance of the
sewer mains and streets within the project since the utilities will be installed within a public right of way or
utility easement. The water mains within the area and this project will be owned and operated by Davidson
Water, Inc.
E-Mail: JsbeckEng@gmail.com Cell: 336-420-4807
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 06-21 & SUPPORTING DOCUMENTATION
Application Number: (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: City of Trinity, NC (company, municipality, HOA, utility, etc.)
2. Applicant type: 0 Individual ❑ Corporation 0 General Partnership 0 Privately -Owned Public Utility
0 Federal 0 State/County ® Municipal 0 Other
3. Signature authority's name: Jerry Rothrock per 15A NCAC 02T .0106(b)
Title: Interim City Manager
4. Applicant's mailing address: PO Box 50
City: Trinity State: NC Zip: 27370-
5. Applicant's contact information:
Phone number: (336) 431-2841 Email Address: citymanager@trinitv-nc.gov
II. PROJECT INFORMATION:
1. Project name: pox Chase Subdivision Ph 2
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000 and issued date:
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: W000
3. County where project is located: Randolph
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.8756° Longitude: -80.0203°
5. Parcel ID (if applicable): 6797769298 (or Parcel ID to closest downstream sewer)
IH. CONSULTANT INFORMATION:
1. Professional Engineer: Joshua Beck License Number: 038556
Firm: J.S. Beck Engineering, PLLC
Mailing address: 5537 Autumn Harvest Drive
City: Kernersville State: NC Zip: 27284-
Phone number: (336) 420-4807 Email Address: ibeckeng@gmail.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Hamby Creek WWTP Permit Number: NC0024112
Owner Name: City of Thomasville
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ
2. Downstream (Receiving) Sewer Information: inch ❑ Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
FORM: FTA 06-21
Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes 0 No ®N/A
3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and
supplementary documentation as required by 15A NCAC 02T.0115(c) been attached?
0 Yes ❑ No ® N/A
4. Origin of wastewater: (check all that apply):
® Residential (Individually Owned)
❑ Residential (Leased)
❑ School / preschool / day care
❑ Food and drink facilities
0 Businesses / offices / factories
❑ Retail (stores, centers, malls)
❑ Retail with food preparation/service
❑ Medical / dental / veterinary facilities
❑ Church
❑ Nursing Home
❑ Car Wash
❑ Hotel and/or Motels
❑ Swimming Pool/Clubhouse
❑ Swimming Pool/Filter Backwash
❑ Other (Explain in Attachment)
5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? 0 Yes 0 No
6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? 0 Yes ® No
> If ves, provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow a,b
No. of Units
Flow
Single Family Residential Homes 4bdrm
480 gal/day
22
10,560 GPD
gal/
GPD
gal/
GPD
gall.
GPD
gall
GPD
gal/
GPD
Total
10,560 GPD
a See I5A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 10,560 GPD (per 15A NCAC 02T .0114)
> Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
O Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 06-21
Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
977
PVC
8
270
Ductile Iron
> Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - .
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day (firm capacity)
D. This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s) per pump(s):
gallons per minute (GPM) at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify)
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or ❑ Standby pump
> Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B):
> Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
> Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(10(1)(C):
❑ Portable power source with manual activation, quick -connection receptacle and telemetry -
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
> Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
> If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 06-21 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(0):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)?
15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
18 inches
'Water mains (vertical - water over sewer preferred, including in benched trenches)
18 inches
2Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as WL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical) 1
36 inches
> If noncompliance with 02T.0305(f) or (g) see Section X.1 of this application
*15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? Z Yes 0 No 0 N/A
➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? 0 Yes 0 No ® N/A
> Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
> No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? 0 Yes Basin name: ® No
If yes, does the project comply with setbacks found in the river basin rules per I5A NCAC 02B .0200? 0 Yes 0 No
> This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits 0 Yes ® No
or 401 Water Quality Certifications?
> Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
7. Does this project include any sewer collection lines that are deemed "high -priority?" 0 Yes ® No
Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspectionsdocumented per 1SA NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 06-21 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version) and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently withthe approval of the permit, and projects requiring a variance approval may be subject to longer
review times. For projects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the project, the full technical review is required.
2. Professional Engineer's Certification:
I, Joshua S Beck , attest that this application for
Fox Chase Subdivision Ph 2
(Professional Engineer's name from Application Item III.1.) (Project Name from Application Item II.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOh — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fme not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application
information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject
the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
\N.\ C A O �i
.a SEAL r.:�
036556
- F)2IZVI� +. 1
I, Jerry Rothrock , attest that this application for Fox Chase Subdivision Ph 2
(Signature Authority Name from Application Item I.3.) (Project Name from Application Item al)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fme not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature:
FORM: FTA 06-21
Date: 3/.2,(22--
Page 5 of 5
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: City of Trinity
Project Name for which flow is being requested: Fox Chase Subdivision Ph 2
More than one FTSE may be required for a single project if the owner of the YVWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Hamby Creek
b. WWTP Facility Permit #: NC0024112
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
All flows are in MGD
0.01056
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Average Daily Approx. Not Yet Total Current
Pump Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity***
Pike Street 0.259 0.104 0.018 0.027 0.045 0.059
Steeplegate 0.72 0.288 0.202 0.137 0.339 -0.051
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is <0.
Downstream Facility Name (Sewer): City of Trinity Colonial Heights Area
Downstream Permit Number: W00023742
Page 1 of 6
III. Certification Statement:
I Jerry Rothrock certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been perfonned in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
Signin gal:Signature Date
Page 2 of 6
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available
Capacity is < 0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
47.6 % and -0.051 MGD of the Available Capacity (E) in Pump Station
Steeplegate PS ; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
0.040 MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
Steeplegate PS capacity expansion is in design or under construction with
planned completion in by June 2024 ; and/or
d. The following applies:
The overall project based obligations not built result in -0.051 mgd below the caculated
available flow for the Steeplegate PS, includes flows from homes that will be built out over
the next 4 to 5 years that will average only 0.040 mgd per year over the period
During the same period homes will be constructed reducing the obligated flow since only
5000 gal per month adf (or only 168 gpd ) vs the oblicated calculation base on 360 gal per
day per bedroom
See attched schedule for the expansion of Steepegate PS to a firm design capacity of
1181 gpm or up to 1.7 mgd rate
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to
allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the
system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste
disposal system.
Sign g Official Signature
z/eti
at
Page 3 of 6
Division of
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: City of Trinity
Project Name for which flow is being requested: Fox Chase Subdivision Ph 2
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Hamby Creek
b. WWTP Facility Permit #: NC0024112
All flows are in MGD
c. WWTP facility's permitted flow 6.0
d. Estimated obligated flow not yet tributary to the WWTP 0.9274
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
2.46
0.01056
3.39796
56.6%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): City of Thomasville
Downstream Permit Number: WQCS00057
Page 1 of 6
FTSE 04-16
III. Certification Statement:
I Morgan Huffman certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
SigniniffcialSignyufe / Da%
Page 2 of 6
FTSE 04-16
r4
ri
ij NATIONAL
.5
80°33 086
SOL3=:-r
NADS3/WG884 OM Zone 17 _ MILES
201v ,:zieral vc� .. _ a :-Te-S. Flea ;KIer to >..,_z _C on p_ca
High Point West, NC S-
0 1000
tiFIE •
4000 5000
FEET
USGS 7.5` Map Series (}
SO r W SyS 390
'r 8O' i
1
1030
C_r:7i
KILOMETERS
METERS IEJO
@/sdew/woo eI6
Z9 C9[94 L0'08-'EL
Wd EEB'MIA
G)
0
0
to
co
0
N
J. S. Beck Engineering, PLLC
License No. P-1388
5537 Autumn Harvest Drive, Kernersville, NC 27284 Regional Office
NC Environmental ali y
Received
MAR 2 8 2022
Winston-Salem
Fox Chase Subdivision Phase 2
Trinity, North Carolina
Randolph County
Gravity Sewer Fast Track Application
Project # 2021-6
March 23, 2022
North Carolina Department of Environment & Natural Resources
Water Quality Section
Attn: Alex Lowe
450 West Hanes Mill Road,LSuite 300
Winston Salem, NC 27105
Dear Mr. Lowe,
Enclosed is the original signed gravity sewer application and FTSE forms from both the City of
Trinity and Thomasville along with a copy as requested in the email on Monday March 21, 2022
for Fox Chase Subdivision Phase 2 in Randolph County. Should you have any additional questions
or comments, please do not hesitate to send me an email or call using the information below.
Sincerely,
Joshua Beck, PE
Enclosures:
(2) - FTA 14-16
(2) — FTSE 04-16 from City of Trinity
(2) — FTSE 04-16 from City of Thomasville
E-Mail: JsbeckEng@gmail.com Cell: 336-420-4807