Loading...
HomeMy WebLinkAboutNC0067342_Staff Comments_20220330Weaver, Charles From: Wiggs, Linda Sent: Wednesday, March 30, 2022 11:36 AM To: Davidson, Landon; Hennessy, John; Weaver, Charles Cc: Boss, Daniel J Subject: RE: [External] Important - North View Trailer Park I'd say Billy is sending out his annual letter for Mr. Rice, but the ball remains in Mr. Rice's court. Mr. Rice needs to find an Engineer. Unless CO has received a complete AtC application then nothing has changed. The Permit states an AtC has to be obtained, and Mr. Rice needs to find an Engineer that will complete the AtC for him. There are components in the ground and being used that should handle the 50k, and Mr. Rice did get an Engineer to sign off on those components back in 2015-16. I imagine getting an Engineer to submit for components in the ground and designed by another Engineer presents a challenge for Mr. Rice. The facility has not had compliance issues which is good news, I'd say. The facility is averaging < 20k, so Mr. Rice still has some flow available until he gets to 32k or 80% of that. It has not had issues with Limits violations and the Process Control Logs indicate it is being operated satisfactorily. The compliance issue in what Billy highlighted in yellow "provided the facility is being operated in a manner such that is it compliant with its permit", is the Owner is not operating the facility in a manner compliant with the permit because the permit clearly states at the beginning #2 that an AtC is to be obtained to advance to 50k flows and it appears it has not. I'd say we have all come along way with this facility, the operations and ownership appear to be keeping a tough to manage waste stream in check. What would another 20-30k look like in this system? He needs to get an Engineer to help him explain this on paper, hence the AtC. e_CZna T aleim Environmental ental Senior Specialist/Division I North Carolina Department of Environmer 828-296-4500 (Office) Linch.wig s ncdenr. ov &nal corresg)ofidence to and frtrn its address is sub ect to the North bra 1 rrr y be c1scbseci to tfair l From: Davidson, Landon Sent: Wednesday, March 30, 2022 9:46 AM To: Hennessy, John <john.hennessy@ncdenr.gov>; Wiggs, Linda <linda.wiggs@ncdenr.gov>; Weaver, Charles <charles.weaver@ncdenr.gov> Cc: Boss, Daniel J <daniel.boss@ncdenr.gov> Subject: FW: [External] Important - North View Trailer Park 1 Last info from ARO is below in email chain. Looks like an ATC is needed but still searching and awaiting response from Linda. G. Landon Davidson, P.G. Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon.Davidson@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 NC DEQ Permit Directory Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Wiggs, Linda Sent: Monday, February 22, 2021 10:51 AM To: Young, Brianna A <Brianna.Young@ncdenr.gov>; Xiao, Min <Min.Xiao@ncdenr.gov> Cc: Boss, Daniel J <daniel.boss@ncdenr.gov>; Davidson, Landon <landon.davidson@ncdenr.gov> Subject: RE: [External] Important - North View Trailer Park Nor have we. Thanks. tiConela Oki"; Environmental . North Carolina I 828-2 - 0 (C Linda.wisrsesiim Errrai caresporeence to and dam this address is s rrvy be cisaiomed to third pales From: Young, Brianna A Sent: Monday, February 22, 2021 10:50 AM 2 To: Wiggs, Linda <linda.wiggs@ncdenr.gov>; Xiao, Min <Min.Xiao@ncdenr.gov> Cc: Boss, Daniel J <daniel.boss(c@ncdenr.gov>; Davidson, Landon <landon.davidson@ncdenr.gov> Subject: RE: [External] Important - North View Trailer Park I have not heard anything either since our last discussions. Brianna Young, MS Environmental Specialist II Compliance and Expedited Permitting Unit NC DEQ / Division of Water Resources Office: 919-707-3619 Brianna.Young@ncdenr.gov (e-mail preferred during State of Emergency) Mailing address: 1617 Mail Service Center, Raleigh, NC 27699-1617 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Wiggs, Linda <linda.wiggs@ncdenr.gov> Sent: Monday, February 22, 2021 10:46 AM To: Xiao, Min <Min.Xiao@ncdenr.gov>; Young, Brianna A <Brianna.Young@ncdenr.gov> Cc: Boss, Daniel J <daniel.boss@ncdenr.gov>; Davidson, Landon <landon.davidson@ncdenr.gov> Subject: RE: [External] Important - North View Trailer Park Ok, thank you for your quick response. 3 trZ-nala Environmental North Carolina I 828-296-4500 (C Linda_wiggs.gm Emai coTespondence to ard ban this address is s rry be discbsed to third partes From: Xiao, Min Sent: Monday, February 22, 2021 10:44 AM To: Wiggs, Linda <linda.wiggs@ncdenr.gov>; Young, Brianna A <Brianna.Young@ncdenr.gov> Cc: Boss, Daniel J <daniel.boss@ncdenr.gov>; Davidson, Landon <landon.davidson@ncdenr.gov> Subject: RE: [External] Important - North View Trailer Park Linda, I have not received an ATC application of the NV MHP so far. Thanks, Min Xiao, El Environmental Engineer NPDES Industrial Permitting NC DEQ / Division of Water Resources / Water Quality Permitting 919-707-3644 min.xiao@ncdenr.gov 512 North Salisbury St. 1617 Mail Service Center, Raleigh, NC, 27699-1617 4 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Wiggs, Linda <linda.wiggs@ncdenr.gov> Sent: Monday, February 22, 2021 10:37 AM To: Young, Brianna A <Brianna.Young@ncdenr.gov>; Xiao, Min <Min.Xiao@ncdenr.gov> Cc: Boss, Daniel J <daniel.boss@ncdenr.gov>; Davidson, Landon <landon.davidson@ncdenr.gov> Subject: FW: [External] Important - North View Trailer Park Importance: High We received the inquiry at the bottom about NV MHP. Below is the last email from Brianna we have regarding this facility. Brianna, Min have you heard/received anything back on this one? Good morning Mr. Rice, The Division has reviewed the request for flow expansion from the Northview Mobile Home Park WWTP as permitted in Section A. (2) of NPDES permit NC0067342. Per the current NPDES permit, effective April 1, 2018, in order to expand from a permitted flow of 0.032 MGD to 0.050 MGD, the permittee was required to obtain an Authorization to Construct (ATC) for 0.050 MGD and the Division had to perform an instream assessment of the receiving stream. The Division completed an instream assessment in September 2018; however, Eaven Brice Partnership has not obtained an AtC for an expansion to 0.050 MGD. Based on information available to the Division, all requirements to allow expansion have not been met. Therefore, the Division is unable to grant Eaven Brice Partnership permission to expand their discharge up to 0.050 MGD from the Northview Mobile Home Park WWTP at this time. The attached ATC Application Form along with any supplementary materials (plans, specifications and calculations, etc.) must be completed and submitted to request plant expansion. The permittee can also refer to this website for more information regarding the ATC permit: https://deq.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/npdes- wastewater/authorization-to-construct. Once the Division receives a formal ATC application, a staff engineer will review the request. If an AtC is granted, and all requirements and certifications are completed, Eaven Brice Partnership may submit another request to expand flow at the WWTP. If you have any questions, please contact John Hennessy at John.Hennessy@ncdenr.gov. Mr. Hennessy is also copied on this email. Thank you, Brianna Young, MS Environmental Specialist II Compliance and Expedited Permitting Unit NC DEQ / Division of Water Resources Office: 919-707-3619 Brianna.Young@ncdenr.gov (e-mail preferred during State of Emergency) 5 Environmental North Carolina I 828-296-4500 Linda.wiggs.&( EJnai CUI►eSpOlde/aGe to and boor►? this address is s may be cisabsed to third parties From: rbelinc@charter.net [mailto:rbelinc@charter.net] Sent: Saturday, February 20, 2021 12:07 PM To: Davidson, Landon <landon.davidson@ncdenr.gov> Cc: Wiggs, Linda <linda.wiggs@ncdenr.gov> Subject: [External] Important - North View Trailer Park Importance: High CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Landon, I hope you are doing well in these trying times. It has been a couple years since I've reached out but am interested in getting access to current testing and capacity water and sewage information with regard to North View Trailer Park in Weaverville. I know that houses and trailers have been added since we were engaged in the water quality and sewage issues from the owner of the park. I was recently looking on the county website GIS (aerial views) and it appears that about 65 street addresses have been assigned to the hillside that is on the Martin Ford Road side (across from 60 Martin Ford). I've attached a screenshot showing them (blue dots with address in the wooded area). Additionally there are approximately 30 new hopes (red outlines in attached), most of which have yet to built. So the plan appears to be to have almost 100 new residences tightly packed and using North View's water and sewage systems. Is North View currently meeting legal requirements? Have they asked for expansion and have they received approvals (if sowould like details please). The reason I was on the county's GIS site is to collect information for an appeal on incredibly high tax assessments for our properties on Martin Ford Road. It would seem like a trailer park across from our property 6 would dramatically and negatively impact our property values. Also, our parents fought legally with the Park for years because when the started to clear the area on Martin Ford road, the runoff flooded our hay fields; the runoff with just the woods there now still causes flooding in the spring. The trash, noise and crime continue to be an issue from the existing Park and adding another 100 home sites won't improve that either. I realize all of this is not in your area of responsibility but would appreciate feedback on where the Park stands with your departments testing and how new home sites would be managed asap please. I would also like to know who does the testing for them now; are they being trusted to do their own testing when it was proven that they misreported data in the past? Thank you, Rhonda (Bradburn) Belinc From: "Davidson, Landon" To: "rbelinc@charter.net" Cc: Linda" Sent: Wednesday June 13 2018 6:18:34AM Subject: RE: [External] Fwd: Northview Yes, anytime. Additionally, the fecal coliform number for the Monday grab sample (unannounced) was 26 CFU/100 ml and the effluent was clear. Thanks. G. Landon Davidson, P.G. Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon. Davidson@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: rbelinc@charter.net [mailto:rbelinc@charter.net] Sent: Tuesday, June 12, 2018 5:04 PM To: Davidson, Landon <landon.davidson@ncdenr.gov> Cc: Wiggs, Linda <linda.wiggs@ncdenr.gov> Subject: RE: [External] Fwd: Northview CAUTION: External email. Do not click links or o ! en attachments unless verified. Send all sus . icious email as an attachment to Thanks for the detailed feedback and update on testing! From: "Davidson, Landon" To: "rbelinc@charter.net" Cc: Linda" Sent: Tuesday June 12 2018 11:39:16AM Subject: RE: [External] Fwd: Northview Rhonda, Apologies for the delay in responding. You are welcome to send out this email to your group but I did not want to `reply all' from your email due to the number of recipients. Your primary question seems to center around how we implement the tap moratorium. For the planned new development, we work with the local building inspection department to limit subdivision platting, etc. which is currently on hold. We were also working with them (building inspections) even before the moratorium to keep them posted on the compliance state of the treatment facility. Implementing that portion of the moratorium that restricts new renters is more of a challenge as you point out. There is no baseline census nor a required reporting of unit occupancy. Our agency must utilize other methods to try and ensure Mr. Rice complies with this portion of the moratorium. To do this, we will periodically check the mobile home community for what appears to be vacant units and look for changes in those units' status. We were at the facility June 1st and today observing. We are also exploring other means to monitor as there are in inherent challenges. I reiterated to Mr. Rice in -person at the site June 1st that he cannot rent units that become vacant while the moratorium is in place. The moratorium will remain in place until we feel the facility is compliant and able to treat incoming flow. Based on our June 1st inspection, there have been many improvements at the plant and the new treatment units are operational. There is also a new operator that we believe is working to make the plant compliant. They are also collecting samples in accordance with the new permit which required additional sampling. We noted several changes we need to see in plant operation, sampling point, etc. during our June 1st review. Also of note, we collected a grab sample Friday on an unannounced visit and the preliminary results indicate 11 CFU/100m1 for fecal coliform, well below their daily max limit of 400CFU/100 ml. We also collected a sample yesterday which results are currently pending. 8 I hope this addresses your questions. Thanks. Landon G. Landon Davidson, P.G. Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon.Davidson@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: rbelinc@charter.net [mailto:rbelinc@charter.net] Sent: Friday, June 08, 2018 8:19 AM To: Davidson, Landon <landon.davidson@ncdenr.gov> Cc: 'Howard Borland' <hborland@charter.net>; 'pesb72@gmail.com' <pesb72@gmail.com>; 'Rodney Bradburn' <Hindsight83@wyan.org>; 'Randy Bradburn' <r2brad53@yahoo.com>; 'Rex & Tammy Bradburn' <rbrad99550@aol.com>; 'Walter & Talitha Sprouse' <Tlbsprouse@icloud.com>; Wiggs, Linda <linda.wiggs@ncdenr.gov>; 'alexkamenel@gmail.com' <alexkamenel@gmail.com>; 'bikerbilly@bikerbilly.com' <bikerbilly@bikerbilly.com>;'caenglish0l@earthlink.net' <caenglish0l @earthlink.net>; 'deamira@ymail.com' <deamira@ymail.com>; 'hborland@charter.net' <hborland@charter.net>; 'john@jfhent.com' <john@jfhent.com>; 'kaijugrammy@gmail.com' <kaijugrammy@gmail.com>; 'kathywood1944@hotmail.com' <kathywood1944@hotmail.com>; 'omrhythm@gmail.com' <omrhythm@gmail.com>; 'coliver988@gmail.com' <coliver988@gmail.com>; 9 'pshelton@partnershippm.com' <pshelton@partnershippm.com>; 'Hindsight83@wyan.org' <Hindsight83@wyan.org>; 'r2brad53@yahoo.com' <r2brad53@yahoo.com>; 'rbrad99550@aol.com' <rbrad99550@aol.com>; 'rnom2boys@gmail.com' <rnom2boys@gmail.com>; 'bradburn.ron@gmail.com' <bradburn.ron@gmail.com>; 'itisfilthy@gmail.com' <itisfilthy@gmail.com>; 'roy@bradburn.net' <roy@bradburn.net>; 'bradburnr2@gmail.com' <bradburnr2@gmail.com>; 'suzib22@yahoo.com' <suzib22@yahoo.com>; 'tlbsprouse@icloud.com' <tlbsprouse@icloud.com>; 'troutgir1919@gmail.com' <troutgir1919@gmail.com>; 'alexkamenel@gmail.com' <alexkamenel@gmail.com>; 'bikerbilly@bikerbilly.com' <bikerbilly@bikerbilly.com>; 'caenglish0l @earthlink.net' <caenglish0l @earthlink.net>; 'deamira@ymail.com' <deamira@vmail.com>; 'hborland@charter.net' <hborland@charter.net>; 'john@jfhent.com' <john@jfhent.com>; 'kaijugrammy@gmail.com' <kaijugrammy@gmail.com>; 'kathywood1944@hotmail.com' <kathywood1944@hotmail.com>; 'omrhythm@gmail.com' <omrhythm@gmail.com>; 'coliver988@gmail.com' <coliver988@gmail.com>; 'pshelton@partnershippm.com' <pshelton@partnershippm.com>; 'Hindsight83@wyan.org' <Hindsight83@wyan.org>; 'r2brad53@yahoo.com' <r2brad53@yahoo.com>; 'rbrad99550@aol.com' <rbrad99550@aol.com>; 'rnom2boys@gmail.com' <rnom2bovs@gmail.com>; 'bradburn.ron@gmail.com' <bradburn.ron@gmail.com>; 'itisfilthy@gmail.com' <itisfilthy@gmail.com>; 'roy@bradburn.net' <roy@bradburn.net>; 'bradburnr2@gmail.com' <bradburnr2@gmail.com>; 'suzib22@yahoo.com' <suzib22@yahoo.com>; 'tlbsprouse@icloud.com' <tlbsprouse@icloud.com>; 'troutgir1919@gmail.com' <troutgir1919@gmail.com> Subject: RE: [External] Fwd: Northview CAUTION: External email. Do not click links or o e en attachments unless verified. Send all sus . icious email as an attachment to Hi, Checking in on this. Also, the folks are wondering how long something like this would take to resolve? In thinking about this further we wonder if there was a census or baseline prior to the moratorium? In order to be certain about whether the "mobile home park community" has increased or not it would require knowing what the community size was beforehand (or now, if no prior count was known). How do you confirm the community isn't increasing? Are changes in incoming and outgoing residents monitored? Is Mr. Rice giving some regular reporting on changes within the park? Based on prior behavior Mr. Rice cannot be trusted to provide accurate information without independent third -party verification. Thank you, Rhonda 10 From: "Davidson, Landon" To: "rbelinc" Cc: "Howard Borland", "pesb72@gmail.com", "Rodney Bradburn", "Randy Bradburn", "Rex & Tammy Bradburn", "Walter & Talitha Sprouse", Linda" Sent: Thursday May 31 2018 6:09:42AM Subject: RE: [External] Fwd: Northview The Feb. 22nd letter does also state, "Additionally, should a currently occupied unit be vacated, that unit cannot be reoccupied until the moratorium is lifted." Apologies, it appears there may be an issue with this unit and possibly others we need to look into. Thanks for bringing this to my attention, we'll review the details of the situation and take appropriate action. Regards, Landon G. Landon Davidson, P.G. Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon. Davidson(a�ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: rbelinc [mailto:rbelinc@charter.net] Sent: Thursday, May 31, 2018 7:55 AM To: Davidson, Landon <landon.davidson@ncdenr.gov> Cc: Howard Borland <hborland@charter.net>; pesb72@gmail.com; Rodney Bradburn <Hindsight83@wyan.org>; Randy Bradburn <r2brad53@yahoo.com>; Rex & Tammy Bradburn 11 <rbrad99550@aol.com>; Walter & Talitha Sprouse <Tlbsprouse@icloud.com> Subject: RE: [External] Fwd: Northview CAUTION: External email. Do not click links or o . en attachments unless verified. Send all sus • icious email as an attachment to In reading the moratorium letter, it does state that "furthermore this is to be interpreted to mean that the current occupancy of the mobile home park community cannot be increased." It would seem like a validation of number of occupants would be required before determining whether this is acceptable or not. Sent from my Verizon, Samsung Galaxy smartphone Original message From: "Davidson, Landon" <landon.davidson@ncdenr.gov> Date: 5/31/18 7:39 AM (GMT-05:00) To: rbelinc <rbelinc@charter.net> Cc: Howard Borland <hborland@charter.net>, pesb72@gmail.com, Rodney Bradburn <Hindsight83@wvan.org>, Randy Bradburn <r2brad53@yahoo.com>, Rex & Tammy Bradburn <rbrad99550@aol.com>, Walter & Talitha Sprouse <Tlbsprouse@icloud.com> Subject: RE: [External] Fwd: Northview Good morning, The tap moratorium would only prohibit new sewer connections; there would be no impact on renting units that are already connected. Thanks. 12 G. Landon Davidson, P.G. Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon.Davidson@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: rbelinc [mailto:rbelinc@charter.net] Sent: Wednesday, May 30, 2018 11:14 PM To: Davidson, Landon <landon.davidson@ncdenr.gov> Cc: Howard Borland <hborland@charter.net>; pesb72@gmail.com; Rodney Bradburn <Hindsight83@wyan.org>; Randy Bradbum <r2brad53@yahoo.com>; Rex & Tammy Bradburn <rbrad99550@aol.com>; Walter & Talitha Sprouse <Tlbsprouse@icloud.com> Subject: [External] Fwd: Northview CAUTION: External email. Do not click links or o . en attachments unless verified. Send all sus . icious email as an attachment to 13 Sent from my Verizon, Samsung Galaxy smartphone Original message From: Penny Briggs <pesb72@gmail.com> Date: 5/30/18 9:43 PM (GMT-05:00) To: rbelinc@charter.net Subject: Fwd: Northview Sent from my US Cellular Android Device Forwarded message From: Penny Briggs <pesb72@gmail.com> Date: Wed, May 30, 2018, 9:39 PM Subject: Northview To: <rblinc(a,charter.net>, <Landon.Davidson@ncdenr.gov> Cc: <Hborland@charter.net> Hello, As I was scanning through a local yardsale page on Facebook tonight I came across a post for a mobile home already in a park, I noticed that it was at Northview, as I understand they are under a moratorium not to allow any empty homes to be rented. Please see the attached screen shot. Thank you, Penny Sent from my US Cellular Android Device 14