LETTER OF APPROVAL
FOR SEDIMENTATION & EROSION CONTROL
January 26, 2022
Saddlebrook Phase I
John Coley
517 Chrismill Lane
Holly Springs, NC 27540
Re: Project Name:
Saddlebrook Phase I
Permit Number:
2021-02549
Location:
Green Hills Road
Submitted By:
Stocks Engineering
Acres Approved
41.6 acres
To whom it may concern:
This office has reviewed the subject erosion and sedimentation control plan sealed by J. Michael
Stocks, PE. We find the plan to be acceptable and hereby issue this letter of approval. This letter
of approval shall be valid for a period not to exceed twenty-four months, or the time required for
the proposed construction activities, whichever comes first.
Please be advised that Section 801, Sub -section E12 of the City of Rocky Mount's Land
Development Code (hereinafter referred to as LDC) requires that a copy of the approved erosion
control plan be on file at the job site. Also, you should consider this letter the notice required by
the LDC, Section 802, Sub -section Q1 of our right of periodic inspection to ensure compliance
with the approved plan.
The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented,
requiring protection of the natural resources and adjoining properties. If following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of
the City of Rocky Mount (Section 801 of the LDC, also NCGS 113A-51 through 66,) this office will
require revisions to the plan and implementation of the revisions to ensure compliance with the
�252) 972-1121 1 331 S. Franklin St., PO Box 1180. Rocky Mount, NC 27802-1180 / www.rockymountnc.gov
Ordinance. Performance Reservations for this plan are included as part of this approval. The
developer is responsible for the control of sediment on -site. If the approved erosion and
sedimentation control measures prove insufficient, the developer must take additionalsteps
necessary to stop sediment from leaving this site. Each sediment storage device must be inspected
after each storm event, Maintenance and/or clean out, is necessary. anytime the device is at .54%u
capacity.
Please be aware that this. approval is .based. in part. on the accuracy of the information in the
Financial Re sponsibilitylQwnership Farm, which you have provided. You are required to file an
amended form if there is: any change in the information included on the form. Also; please note
that this approval does not relieve the permittee of the :responsibility to obtain any other Federal,
States or Local approvals or permits; The responsible party may need to contact the appropriate
Federal, State, and Local agencies prior to beginning work. This approval does not permit the.
construction of any impervious surface, nor does it allow. for the placement of fill in any area for
which a floodplain development permit is -required.
In addition, LDC Section 801 -El 0. requires that you notify this office of the proposed starting date
for this prof ect. Your cooperation is appreciated, and we look forward to working with you on this
proj ect.
Also; this letter gives the notice required by G.S. 113A. 61.1(a):of our right of periodic inspection
to ensure compliance with the approved plan.
.As of April 1, 2019, all new construction activities are required to complete and submit an.
electronic Notice of Intent (NOI) form requesting a Certificate of `Coverage (COC) under the
NCGO10000 Construction 'Stormwater General Permit. This fo m MUST be submitted prior to
the. commencement of any land disturbing activity on the above.project. The NOT form may be
accessed at:de .ne. ovINCGO1. Please direct questions about the NOI form. to Annette Lucas at
.Annette.lucas(aAcdenr.gay or Paul Clark at Paul.clark&nedenr.gov.
After you submit a complete and .correct NOI Form, a COC will be emailed to you within three
business days..A $100 fee will be charged annually. This fee must lie sent to the DEMR
Stormwater Central Office staff in Raleigh.
Title I SA NCAC 4B :0118(a) and the NCGO 1 permit require that the following documentation
be kept on file at the j ob .site:
L. The approved E&SC plan as. well as any approved deviation.
2. The NCG0.1 permit and the COC; once it is. received.
3. Records of inspections made during the previous 30 days.
(252y 972=1325 1 331 S..Fran kGn St.Box 1180, Rocky Mount; NC 27802-1186 1 www.rodymDOninc.gov2.
Also, this letter gives the notice required by G.S. 113A-G1.1(a) off'our:right of periodic inspection
to ensure compliance with the: approved plan.
Please complete the e-NGl submittal process as soon as you. receive this letter for the
subject site. Please visit: Litt s:llde .nc. ovINCGO 1.
The General Contractor or dele aced agent is reg aired to set up a Pre -construction
meetin . before construction begins) with. the Control Inspector.
Sincerely;
Scott A Miles,.P.E.
Stormwater Engineer
City of Rocky Mount
M-972-1340
1252) 972-1325 1 331 S. Franklin St., PO Box 1180, Rocky Mount, NC 27802=.1180.1 www..roc kymountnc.gM3