HomeMy WebLinkAbout20211739 Ver 1_28-22 John Franck_202203302002404-04-0o-0o-0o6e.
Permit Class
$ NEW
1
i
-0-0Weeboobe
000aoaaww000-0. >--ca0a0ae0000000004-040<a40000040000400-0-0ooaoaao-0aaoaae00004.0a-0
Permit Number
28-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
jcrmit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to John Franck, 1224 Pembroke Jones Rd., Wilmington, NC 28405
Authorizing development in New Hanover County at adj. to Middle Sound, at 24 Sandy Point Dr.,
s
i
on Figure Eight Island in Wilmington , as requested in the permittee's application dated 10/5/21
(MP-1 & MP-4), including work plan drawings (1) Sheets 1-1 of 1, dated 11/8/21.
This permit, issued on March 16, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility - Expansion
1) This permit authorizes only the dock, boatlift, platform, and other structures and uses located in or
over the water that are expressly and specifically set forth in the permit application. No other
structure, whether floating or stationary, shall become a permanent part of this docking facility
without permit modification. No non -water dependent uses of structures shall be conducted on, in or
over Public Trust waters without permit modification.
2) This permit authorizes 2 additional formalized boat slips for a maximum of 4 formalized boat slips at
this docking facility.
(See attached sheets for A
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
1,00002.W W-0-0ebwe
1
dditional Conditions)
Signed by the authority of the Secretary of DEQ and the Chair I
of the Coastal Resources Commission,
d7
C Ar Braxton C. Davis, Director
Division of Coastal Management.
This permit and its conditions are hereby accepted.
1
Signature of Permittee
eeee000-0-00Wee00,00eee06000049040W-0-0WW948-0W-040 e%6..[.i iiWWWe0W-000-0-0e0ee0ebe 0.5400-0-0-0-0-0eeeeee-0ee-0.% -0eee§e09489
444444d•••>0.. 4a4444444444444444W444444440d4a444444*IS44W. '.P .i+ 'pi
ddd4444444444ad0d40004ddOddOd4.M.4dOP5P. O.0 444d44d0dd
John Franck Permit No. 28-22
Page 2 of 2
ADDITIONAL CONDITIONS
No portion of the authorized docking facility shall extend more than one quarter of the width of the water
body. Measurements to determine width of the water body shall be made from the normal high-water line
or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more
restrictive.
Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six
feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured
from the bottom of the decking.
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
Sedimentation and Erosion Control
In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
10) All construction debris associated with the removal or construction of the permitted docking facilities
shall be contained within the authorized project area and disposed of in an approved upland location.
11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE:
NOTE:
NOTE:
This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4501 and assigned the project DWR Project No. 20211739.
Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $250 was received by DCM for this project.
lba4a4e4aaaaae4444.,,, ,,• ,..;'549s4,04aa4a44a44.4a4a44a04a40aa49a65.aa. oa Pt 4%4a$5gaa4aaaaaaa40a0aaa40aaaaa4aasa44aaaaWW94dfla9aMbaa-0Oaaaaaa4a