Loading...
HomeMy WebLinkAbout20150580 Ver 2_27-22 Mark and Regina Long_20220330aaaoaaaaaaaawaaaooaaaaaaaanaaaaa aaaaa Z. .9::>aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaoa Permit Class 44.0 NEW Authorizing development in Sunset Beach $ (MP-1 and MP-4) , including work plan drawings (3) Sheets 2-4 of 4, dated 11/21/21. This permit, issued on March 16, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission jfrmtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 27-22 Issued to Mark and Regina Long, 3744 NC Hwy 210 East, Harrells, NC 28444 Brunswick County at adj. to AIWW, at 516 Twisted Oak Lane in , as requested in the permittee's application dated 11/23/21 Docking Facility 1) This permit authorizes only the docks, piers, gazebo, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes a maximum of 2 formalized boat slips. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. s 2 a fd . Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. w Signature of Permittee pp aaoaaaaaaaaaaaaaaaaaaaaaaaaaaaaaeaaooaaawaoawaaaaaaaaaaaaaa3 10004999459-0999449-009-0 p44999999}94pgg1049944999Mtr99999440. 499tr9999994M99 SO< .>00, iNN .r e9999trtr999tr994999999944444949944499999>'> " ' Permit No. 27-22 >9W9949449 ADDITIONAL CONDITIONS g $ 3) No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of $ the width of the water body. Measurements to determine width of the water body shall be made from the a l: mean high-water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. ; Mark and Regina Long Page 2 of 3 Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) In accordance with commitments made by the permittee and in order to satisfy concerns of the resource agencies, physical stops shall be placed on the floating dock and boatlift at a minimum height of 18" above a the bottom substrate to prevent the floating dock and boatlift from disturbing the bottom substrate. The 1 physical stops shall remain in place for the life of the permitted docking facility. 7) The authorized gazebo shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches are permitted. Lattice is specifically excluded from being used under this authorization. The roof of the gazebo shall not be designed for second story use. 9) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 10) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 11) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. Sedimentation and Erosion Control 12) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 13) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. $-0409900990944+499 94499909900099009490999909a999WaW00 69-09694WM0944494494trpp444444444W94trtrtrttr000040990990-0-094i" `9v .944{449944 99 04444444o-0444aa4a 44a4aa44494a44aa4aro4aa4aa4aa4aaaaaaaaa4aaaaa444a9. ,,.v--w..99eea44494a4aae44aaa0a49041a0a4909aeeee49a0 NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4622 and assigned the project DWR Project No. 20150580v2. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the mean high-water level. NOTE: An application processing fee of $400 was received by DCM for this project. Mark and Regina Long Permit No. 27-22 Page 3 of 3 ADDITIONAL CONDITIONS General 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the €$ written approval of the Division of Coastal Management. 15) All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. 16) -- The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2015- 01264 a I 1 F49999a99W 444-0449-04-0999W-049949-049949949-049949949• e. ee .M4..^^5 ..:94a99{4446444-04490-0a494a4444444-04449-00004 /""`