Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8931105_Historical File_19980914
+State"of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality Mr. Maurice S. Emmart, Jr., General Partner Greenbriar South Partnership 99 Aqua Vista Drive Wilmington, NC 28409 Dear Mr. Emmart: ffl 0 �f NCDEN R MOL NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES September 14, 1998 Subject: Permit No. SW8 931105 Modification Greenbriar South High Density Subdivision Stonnwater Project New Hanover County The Wilmington Regional Office received the Stormwater Management Permit Application for Greenbriar South on May 26, 1998, with final information on July 10, 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 931105 Modification, dated September 14, 1998, for the construction of the project. Greenbriar Srn,rh This permit shall be effective from the date of issuance until September 14, 2008, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:\WQS\STORMWAT\PERMIT1931105.SEP cc: Mark Hargrove, P.E. Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An,Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper y State Stormwater Management Systems . Permit No. SW8 931 105 Modification 0 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the -provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Greenbriar South Partnership Greenbriar South New Hanover County FOR THE construction, operation and maintenance of 2 detention ponds and a curb outlet system in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 14, 2008 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The subdivision is permitted for 150 lots, each limited to a maximum built -upon area as follows: Lots 1-19 @5,775 ft2; Lots 20-40 @4,900 ft2; Lots 41-65, 89-100, 116-120, and 137-141 @3,200 ft2; and Lots 66-88, 101-115, 121-136, and 142-150 @3,500 ft2. 3. Approved plans and specifications for this project are incorporated_by-reference and are enforceable. -parts of the =pdrmif - - - 2 State Stormwater Management Systems Permit No. SW8 931105 Modification DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: Pond Depth, feet: Permanent Pool Elevation, FMSL: Total Impervious Surfaces, ft2: * # /3500 * # /3200 * # /4900 Roads/Parking, 112 Offsite @35%, ft2 Pool/Recreation Area Offsite Area entering Pond, ft2: Required Surface Area, ft2: Provided Surface Area, ft2: Required Storage Volume, ft3: Greenbriar South 931105 Modification New Hanover County Mr. Maurice S. Emmart, Jr., General Partner Greenbriar South Partnership 99 Aqua Vista Drive Wilmington, NC 28409 May 26, 1998 Mott Creek licit EXISTING POND 1 POND 2 7.5 4 19 21.5 767,039 142,375 59.5/208,250 3.5/12,250 28/89,600 19/60,800 0 1 /4900 178,499 42,725 227,165 0 0 21,700 14.9 acres @35% n/a * # of lots/BUA per lot 20,743 12,549 23,655 16,396 66,979 12,288 Provided Storage Volume, ft3: 94,325 12,783 State Stormwater Management Systems Permit No. SW8 931105 Modification 4. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. No piping shall be allowed in a curb outlet system swale. v 5. A portion of this project proposes a curb outlet system, located between Lots 3 & 4, 36 and 37, and beside 40. Each designated curb outlet swale shown on the approved plan is required to be 100' long with side slopes no steeper than 5:1 (H: V), have a longitudinal slope no steeper than 5 % , carry the flow from a 10 year storm in a non -erosive manner, and have a dense vegetated cover, per Section .1008 (g) of the stormwater rules. Other vegetated conveyances must have a minimum side slope of 3:1. 6. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 7. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system, including ponds, swales, and curb outlet system, shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. 2. --During construction, erosion -shall be kept:to a --minimum and any eroded areas of the'system will be repaired immediately. n State Stormwater Management Systems Permit No. SW8 931105 Modification 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 7. Records of maintenance activities must be kept and made availablc upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 8. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2. The recorded statements must follow the form: a. "The maximum built -upon area per lot is as follows: Lots 1-19 @5,775 ft2; Lots 20-40 @4,900 ftz; Lots 41-65, 89-100, 116-120, and 137-141 @3,200 ft2; and Lots 66-88, 101-115, 121-136, and 142-150 @3,500 ft2, inclusive of that portion of the right-of-way between the lot line and the edge of pavement, structures, pavement, walkways of brick, stone, or slate, but not including open wood decking or the water surface of swimming pools. " b. "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State. " C. "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State. " d. "A11- runoff_ on=the lot must -drain -Into ;the permitted s stem:: This: ma : y y be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that naturally drain into the system are not required to provide these measures." 9.- _._.._A copy. of. the-recorded_-deedxestrictions_must::be�ubmitted.-to-xhe ivision vithini30 days':of the dafe of - - _ recording the plat, and prior to selling any lots. The recorded c- opy must be signed and dated by the Pernuttee, _and bear the -official deedbook.number and.:page stamp: - 5 State Stormwater Management Systems Permit No. SW8 931 105 Modification 10. '1'his shall become voidable unless the facilities are constructed in accordance with the conditions 6 permit, the approved plans and specifications, and other supporting data. v 1L Prior to transfer of ownership, the pond must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions. Records of maintenance activities will be required. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Perminee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, such as a copy of the deed of trust. Other supporting materials, such as a signed Operation and Maintenance plan in the case of engineered systems, will also be required. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. Permit issued this the 14th day of September, 1998. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 1 rim .t r -A-4 / a--� M --I A O 2"'1 A. Preston Howard, Jr., P.E., Director Division of Water Quality ,BX.Authgrity of ,the. Environmental ;Management Commission - - --.Permit Number SWS-931105 Modification_.. ,- - - 6 --- State Stormwater Management Systems Permit No. SW8 931 105 Modification Greenbriar South Stormwater Permit No. SW8 931105 Modification New Hanover County Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date STORMWATER OPERATION AND MAINTENANCE PLAN FOR I UhMWATER GREENBRIAR SOUTH E C E! V E WILMINGTON, NORTH CAROLINA MAY 2 61998 D PROJ # sw% I � ?� QO 1. The owner will be responsible for the proper operation and maintenance of the stormwater collection and treatment facilities. 2. The collection system will be inspected monthly by the owner to identify malfunctioning catch basins and drainage pipes. The collection system will be kept relatively clear of debris and sediment. The stormwater system shall be kept in good working order. Any malfunctioning component shall be repaired/replaced per approved plans as necessary to assure proper operation of the system. 3. The treatment facilities consist of two (2) stormwater ponds with outlet control. 2r x e curb cuf Lef These facilities will be inspected twice a year by the owner to determine the mean depth of Sew the ponds and identify any malfunctions. The mean depth of Pond No.1 (existing pond) under normal conditions, shall be 7.5 feet. The owner will remove the sediment from the pond if the mean depth is determined to be less than 5.2 feet and will correct malfunctions when necessary. The mean depth of Pond No.2 (new pond) under normal conditions shall be 4.0 feet. The owner will remove the sediment from the pond if the mean depth is determined to be less than. 3.0 f et and will gorrect malfunctions when necessary. Jam' n d GirC0M5fv47ce5 r-'- h2. cvdh be te55 Shari 3' 4. The outlet structure, orifice, and sidesteps will be inspected immediately after every runoff producing rainfall event. Any debris observed on the orifice and outlet structures will be removed. Eroded areas will be repaired and reseeded immediately after a rainfall event. 5. A permanent stand of grass shall be maintained at all times. Mowing during the growing season will be done as needed, otherwise, the grass height will not exceed 6" 6. The grass swells shall be inspected twice a year by the owner to determine if sediment has accumulated in the swale and to determine if any erosion has occurred. Mowing will be accomplished as needed according to the season. Grass height will not exceed 6" at any time. Swales will be inspected monthly or after every runoff rainfall event for sediment build-up, erosion and trash accumulation. Accumulated sediment and *rash tkrill be removed as necessary. Swales will be reseeded or sodded following sediment removal. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed based on the monthly inspections. Catch basins, curb cuts, velocity reduction PAGE 1 OF 2 STATE OF MAXIMUM IMPERVIOUS SURFACE AREA FOR GREENBRIAR SOUTH No more than 3,200 square feet for lots 41 through 65, 89 through 100, 116 through 120, and 137 through 14i, and 3,500 square feet for lots 66 through 88, 101 through 1152 121 through 136, and 142 through 150, including that portion of the right-of- way between the edge of pavement and the front lot line, shall be covered by impervious structures including asphalt, gravel, concrete, brick, stone, slate or similar material but not including wood decking or the surface of swimming pools. This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. STORMWATER D E C E I V E AP D R 0 91998 PROJ # 05 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STCZRMWATER MANAGEMENT PERMIT APPLIC:AUION FORM This form may be photocopied for use as 'an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Greenbriar South -Partnership 2. Print Owner/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): 3. Mailing Address for person listed in item 2 above: 99 Aqua Vista. Drive may: Wi]mincxton State-'.* NC .Zip: 28409 Telephone Number ( 910 ) '791-1711 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): . Greenbriar South 5. Loon :bf Facility (street address): ..Located between Greenbriar Subdivision off NC 119 and Rar!Fnn fmka C.itjr TeTilmi nai-rm Cotaltj�' New HanrnTr�r 6. Directions to facility (from nearest major intersection): ± ' mile north of intersection of NC 13.2 and Carolina Beach Prod 7. Latitude`' 340 08' 30" Longitude 77° 52' 45" of facility 8. Contact person who can answer questions about the facility: Nam Maurice 5. 1~�tanart , Jr. Telephone Number: (gtp ) 791-1713 II. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal -modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existingpern- tnumber 931105 and its issue date (if known)December 20. 1993 Form SWU-101 Januan, 1998 Page 1 of 4 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other a 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control 404 Permit III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated with the use of two stormwater ponds sized to achieve a 90% reduction in total suspended s li 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3: Total Project Area: Gc' •2 acres 5. How many drainage basins does the project have? 3 4. Project Butt Upon Area'-39 • -" % 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. I . I I a I 3 �o On -site Stream Name Stream Class Basin Area a envious" Area xa ervious*Area ions" Area (total) Streets trib. to JUnnamed trib. to 52.07 1 8. ts,l: ac -n_ 1 -0- ..a = ; V ..,....;. 178 N/A Other on -site N/A Off -site .165 Total: J £_ 746,039 sf=17.13 ac =1 " Impervious area is defined as the built upon area inch areas, sidewalks, gravel areas, etc. A Unnamed trib. to sf= 3.27 ac 1-189 938 sf= 4.- ��rJ iut not limited to, butldtngs, roads, parking 7. How was the off -site impervious area listed above derived?-----.:--------. prwic us pa mt irr1uded 14.9 acres CE cffsite area clr nirig to =rd @ 35% JLMOEMCUS IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS cts Deed restrictions and protective covenants are required ttachment A recorded speciffor all ic density items that must ben orded. all subdivisions prior to the sale of any lot. Please see Form SVJTJ-101 January 1998 Page 2 of 4 By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm): W.K. Dickson & Company, Inc. MailngAddtess: 3177 Wrightsville Avenue Wilmington State: N.C. Zip: 28403 Phone:( 910 ) 762-4200 VII. SUBMITTAL REQUIREMENTS Fax:( c)i 0-?762-4201 This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal. 1. Please indicate that you have provided the following required information by signing your initials in the space provided next to each item. Applicant's Initials • Original and one copy of the Stormwater Management Permit Application Form .i9NIJ • One copy of the applicable Supplement Form(s) for each BMP (see Attachment A) • Permit application processing fee (see Attachment A) /!7N • Two copies of plans and specifications including: N • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: �► N - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, parking, cul-de-sacs, sidewalks, and curb and gutter - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage basins delineated - Vegetated buffers (where required) V. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Maurice S . Emira-rt ,_ ar - certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions in accordance with Attachment A of this form will be recorded with all required permit conditions, and that to the best of my knowledge the proposed project complies with the requirements of 15A NCAC 2H .1000. Form SWU-101 January 1998 Page 3 of 4 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. 1. PROJECT INFORMATION (please complete the following information): Project Name: Greenbriar South Contact Person: Mark N- Hargrove, P.E. Phone Number: ( 910 ) 76 _-4 00 For projects with multiple basins, specify which basin this worksheet applies to: Pond #2 Basin Bottom Elevation 17.50 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 21.50 ft. (elevation of the orifice) Temporary Pool Elevation 22.25 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 16,396 sq. ft. (water surface area at the orifice elevation) Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA1 used 8.87 ac. (on -site and off -site drainage to the basin) 3.24 ac. (on -site and off -site drainage to the basin) 43.8U_ cu. ft. (combined volume of main basin and forebay) 12.781 cu. ft. (volume detained above the permanent pool) 2,441 cu. ft. 3.10 Diameter of Orifice 2 in. Design TSS Removal 90 II. REQUIRED ITEMS CHECKLIST (surface area to drainage area ratio) (85% TSS removal required, see item k below) The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC_'. 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 January 1998 Page 1 of 2 Applicants Initials ArN9 a. The temporary pool controls runoff from the 1 inch storm event. IJ1Nf� b. The basin length to width ratio is greater than 3: 1. Z?AM c. The basin side slopes above the permanent pool are no steeper than 3:1. /npj,7 d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). Owd e. Vegetation above the permanent pool elevation is specified. NO f. An emergency drain is provided to empty the basin. (Pon d w. 0 b-- ?vmp e r/ : ( Mece_44aryI CNN g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). /n N/1 h. The temporary pool draws down in 2 to 5 days. ANC i. A trash rack is provided for both the overflow and orifice. /0N# j. The forebay volume is approximately equal to 20% of the total basin volume. mNii k. Sediment storage is provided in the permanent pool. AIJA 1. A 30-foot vegetative filter is provided at the outletz (include erosive flow calculations) 1�1 N1� m. Recorded drainage easement for each basin including access to nearest right-of-way. I7 NO n. A site specific operation and maintenance (O&M) plan is provided. ANX o. A vegetation management/mowing schedule is provided in the O&M plan. /")V l' p. Semi-annual inspections are specified in the O&M plan. /"IV# q. A debris check to be performed after every storm event is specified in the O&M plan. mod r. Specific clean -out benchmarks are specified in the O&M plan (elevation or depth). A&& s. A legally responsible parry is designated in the O&M plan3 (include name and title). NNE t. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin. Footnotes: 1 When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. . 3 The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. Form SWU-102 January 1998 Page 2 of 2 Greenbriar Subdivision Stormwater Project No. 931105 New Hanover County Engineer's Certification I, Pwmw Ap2E v —ryw , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically the construction of the project, (eject) for MAyme !!�. Eonaer . TQ. (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature 7 OSl H Registration Number 1' :S-74 $E Date • Id ' `'1$ s 179 r CID LLJ rt Lt.J.� ti LiJ Ls. E' C, LIJ !Z. ^r c.r, EC tJ ILI 1 ��,� Q- (3-- Ca C3 L1J � � U �Lgi�Z O LU o } a =Ir LLJ U LU to O LL, F— Q in x c-3 r .� .Of J cv-3 CD 'i N O z H a u do U401 F= Emu O �. H ER U 04 � N E E 0= W O aE PLI z co � ERO H H 0 U pq Q 004 4 H L�7 �W za z° 0 z. u 0 W co rn > a) -� w ci a W � o� C) > a) H-( 'O 4J E H U H ri ET Ea w roW 0 OC a �4r-Mm0b a0119or.04 ,)qzs 9 . •'da)>,L:W .. > 0 � 1-> a) H � (Od 9 -H 4-) U N O .r1 o tr x 9 4 H -rt o ro (d N � .0 ui � ®[B to -'+ A -� � -P rd -r-I L: Ei cd 4J +J 0 0) 4J 4a 43 a.► }.I, 0 -1 aJ ro ro o •O O �+ N ro p,' N N N 9 4a to ;J -4 5 9 aJ k M (d O ro O ro ,U ,0 � LOW N cN ro a) ro ro ro >~ O a) N ro ro sy r ah 4(.e a 9 4 •d to A 0 0 a) f� s~ :~ 44 . -.-I 3 to r, -ri a) a) O it �„ ro +� N 44 x •r1 x U p W 0° Z 34 -r1 p -r+ p U 0 r1 A+ 9 0. 0 9 M ro L� O -r1 U •r1 L; O 0$4 M a) O H 0 a) o 3 k A W (a H ro 4) -r1 > 0 o r� "4 3U3 0 aproH 030a)--1 Nga�b$44a-r-1O0r4 o0R >R.•CB�>4a - wy4 0 rn 0 C7 J~i > H )~ 'i7 U 0 -r•I O .4 ,A O �' V 0 O N O H w aw o'0 0 0 U L� 0 U 0 0V4J N N Z a)z� 0 0 � U O .�w ro a 0A O 0 L: O O K O � 0A 'O ro 4J 44 a) W Je 4J }-I a) LO 4a Jr: '� 0 0 +� O p) o414Ea )Oto9 mNZ>mO�ODU ro� 4a1L,dA-�0N0y40 -ri � ,>.: U i~ N N N 4J U (U 4' N .� M $4 W U ea V ro- a) 0 0 p ° t4,; , m ,o N p 124 U 0 i4 U U m 0 0x ro c. -,i g 3a )�. N,rr.O A (dA� L~ O Z4 9 M g N 9 >4 (a a) a) A U E 1 ri ri - d' O ri p ro '0 -J 4.1 -P p o a) 04. a-► ,--1 L: M N N 9: -1 Lb r3 H U o 4J 4 O 11i Ch a) 0 'U (Od r L; 4a 4J �� •ri ri � 4-) -H � � o 4I -� 0 0 ro 100 (d 0 +� 'O 0 .r ro !~ L: aJ rr. � r-1 ri >y N 04 p-P'r->13�W4a13 `gip O4)-r1��p '�-riO •pro ���g�U'Opro)°moo �1) 1`( 0 4J -H a) P4 0 0 9.p In N L~ 9 to a) W 004 0 aJ ro J' to id tp H O -a) g $4 0 O rd Q.. Sri 41 ro a) 'O H M aJ •a) }pr 0 a). ro m +� •� ri k. 0 x Uri - 1 U .� m O N a) 'IJ 0 ro $4 k L: a 'O i' I. U '0 o 0 4J 04 0 0 0 01 iy '� ro 0 !~ s� ri ro U '^I N (U Jo -rl M 44 O OrotO 'oa),Opro a)0rop00>O0O °-r1 n a-�+L-r1O .r♦ a) tp 7y ri +1 4J Z x 9 4 .p 0 LJ 9 fy ri 4J m as a) ro U. ro 0 V W 0 01 ri ro V m ., W U N )4, 't3 )-I rye tr0ro 0 4) Ix wa) MmIgurk OOP a) xrf 0 +L4-1 0 -N 0 V 4a .O >I �J 0 r1 'ty N U 4 � ro !� _ X 4J U � � f]. U .,i .G 0 UNro I +�t~O ��•OroNN UroOa)r0 aJO'O 0 a) �C�U 3t7+ tea) -H 9 0 ro k JZ Ly �) -'i O O $4 m L; 0 p >1 `O' O �% U m S L R a) -ri m r-I 0 S1,•rl ro M •'� O ro a) 9 ro U m Q) 4-1 043 ° A p ��tp 31-P A00N0) 0A44 OJ~9 wU Nro .0r-0 m c: >1 L �}. -r-1>~ OO +)UE-10AP.0 0 Nro1Jto `ro=00L; 3 `9#v v a)� r,pa) U rl to a) 0 -•� 0 ••-I 0 a) 9; o O L: ro Jr -A A to ' L: 'a O ro +� tr p +� 0 � 41 N L: > > 3 N A k A tT -rl .,� 'O N- L ro a! r-I aJ . p ro c 0 +� Lo m +� N 3 0 A. '0 -� S-1 0 m r- N >1 a) a) -ri 0) r-1 p p 9 C%j i g: ro 10 ro (U fa r O w O ID, m a) c 4a A to V ri �. �{ $4 a) .,i •r1 �1 `� tn. '0 0 � H 43 43 LO , 4J O +J O •'-1 Z $1 w- O N .O "14 ro ro L: >i O �+ IJ L: O 0 ro N 0 �( 0) N .N RS N O -r1 O o' rOf vOi N N N O a N -N 1`4 $4 -ri H am a) L: ri U Z7 H 14 0 U ro a) x -r1 14 d -ri'm -P a) ° 0 Ej p M O r-L O 0 ri •r1 4J 0 0� U �. Q 0 J J coo O -P ri (d . • � 'b od U ),.I 0 -rl (d M m N • + -' r-1 r. ri •rI (' V O W 4 � `� 'ty _� .r1 O t�i W a 4 J !d f� , o -r-1 i<` �e O -ri -' 1 a) "" "I N $4 )-I . U N ro )4 a) to �' U 'ti °V. 0 O � (d rn N � � � to W �4 on U 4J .0 -A � -rl a x . ri . +'r♦ O A O 0 rd ''a aJ .O V M V a 4 U 3 �J -'i U -� U Q '� N N )a (a ro F3 U U .0 O ri O O 0 ..,-� k ri a) H x ro ro U 4a A r0 G p x tr 0 O ak .�J ra m ro� ri V o Uri a) N ro b ro O ,a �J EI .r, K �+ o V W L?' • j '� +J O f1i O ro s~4 �A U 00 0 ro 0 O U.O �� r, U 0 00 M 0 0 04a U a 0 O t -ri 0 ro roH 0 44O N)-I ro Sri (d ro NO ro . U �" W�,��� m 0aJr-1 >, M k b 1 p H )-I Ei N W W pro p '0 (V-,4 to U •rl '�' {9 �" >� J H }J Id°o°bro (o() 4) .L' ro ((d3�'N9N -'1> ro.4'C"44 EiroJCQ ` faroMg U Z Z 4J U !q 9 ('� j � m 0 'fir' '-i Li -'� O �" • � •� }°I 4-) k •rUI ,d � N v �0 � N � j� a cd O `p L: 0 �J.rt>a�JO.°�� UUO �a)OHUA� O�.r.L �0�$4 )-1L:000 n> >r >i 0 A O ° U =r1 +1 O np -r1 ''� ZO ° a 0 0 x ro ro O .,1 A A o .° 0 tT N m a -I A 'U x 0 -ri )`1 a) -J -ri tw 0 L' ro H i4 N Z W O Ei m '/Zi 4J •raj 44 4J Ca 9 9 In r: a) -rl Ei > L: 04 W •n-ri 'o P4 3 g E-1 V ON) N W N � N 0 0 ''i k# O a U p N ,� 0 0 W .O '0 L� �J O .r♦ U N N O W 0 'd 'O �-I O b O 40' z '0 N b ,...1 .� Oro000 0A00a0Z700)•( 00PQ0w -rg4g 9044 0''MM roL~•,�Lyrom U�UA)a EnP4ro4J(9mro0N134 +I9-toM(U0.404Jro OUro Uq30-PU4J,�A0 H W a a H Ea F, a c� 0 W, . r-f 0) A H -0 LO -P N -P P4 a o W Zf O U O N ' w 0 0) 4-4U a) O O ro O N p F''_ _. m N H 4J N Z N� tn4) a) _ > to 0 Q o z° a) k -0ro0 - U x L: 9 .0 H MO to m ro ' t H U o f (1 b to •� m 1 U W O to to O ... y 3 U > . O U . 4J O $4 ' x[ N N 4° O .7 CA -� P, >, N N r-i • I~ W >y 44 $4 >:4 X4 N r l fi- Id 4J I~ )-I k , O) CO 0N(0--11U:Ad°O�0°-q�i°•Ir�d.4.HOWOEdd 04 )~U0W �O a)r-1 N'ig14 -i�00 00'O A r-I >, is -r� a) O 0 O N In W 0" Id -r1 (d N O 4J rd 4J a) rd -0 •r1 .4" N N N _ �44 �+0 H �J 0 ° >+O�to O+I(a4JJ N�UA O ,U 0 O =...�a U$4 g U 0 �AW� OA O !y O O .L: r-I •,� •� .r-1 �rj N O O U (1) 0 ,'7 rdr-f a) N A, ull p U a) b 0 P to 0 O '-I 0 a'M 4J � � r-I a) a) r.0 AOAO>Ua)+Iu b,w��oa)A0p x O S 0) 44 O O� 0 M4JJ N 0 WA �.� 0 4-) -P fd _ 4O� N Idop O$44J0rl N,�M'N Q'44 4J 4J A IdaJ+J �dwb.�0►A'4J EO ObNUA'�9v]V�AO r7 0) -r1 r-I t) G .>~ O $4 r-1 4J •r1 O N a) 3 1~ 0 O U� � a) N � 4-1 M rt is s ?+ 0 1~ 0 }� r-1 4J 4) a) CD 0ro till U N •rtil0'I N N O U '� .0 N !;'00. 9 O ri7 r-i O aR • ro Cl +OJT O N ttO N� Q N �HIAU MU }4 N� O N r. W N Id aJ +� 4a W 0 N (d A -rq O 0 a) 'd Ill -H 0 r-I -) O -0' f-I �". U .C", X: 4J � r-I N r N a) Id I~ A b aJ "A 4 k 041 N a.) N 0 td 040 3 0 -IJ 4 O N A - r 4 04-1 Rf aJ U U 0 1-I p,1't30)0 Im 44a)00Id 44JUrd000-Hka)i4O i9a)to tp4.JO�w3 .O a)'„1 M0Aa) w 0 m 10 44 Zf ld a-► U M o tO 14 0 r-I b 0 � f.1 � � 0 0 -rl aJ a) >, ~ 4-) 44 44 V A A H N f01 AO 04 44440 O b .t: p to� r0-i ri. N bi 43 (0 V� N O b . 0 N O A 4J k :ori d 0 0r. a)0 fd toO 04 ;4N 0 -rN1 .� 0 V r r 3 A f~ N •> O U A' (d 0 r -1 4-)04 44 O CV aJ •ri r-Ito r-1 •rl b O -ri r. -I .0 r1 0 O Cl 0 NOt+� Ob01d0 N0.w-H Cl N 1d to A N 0 k --I to 4a to N '''1 a) CV N S A to ttard Id4.1 0 k� O f-I N O O N 0 0 a)Hr�i 0 -r01 N 'Cf a) 0 Id p W N a) •r 1 A+ !~ �0raf`Iro ,� tr,aNa�NNbN90 to LO4�-IUNi a) }J°+J OU4)Aa)(0 �Aalrld�-P 4 •f.1 .A 9 a1 44 •r1 O A $4 )-I M�4 O k r-I O A k k A b O 4J A 4-)Id A O r-I M 1d . 4 J 04 CO V to 0 rt 04 N ai +J Id A a.J -•� rid } I p .a) a) a) -4-) 01 1 41 .O r-1 W A -.-I N J a) 3�40 a! }, $4 N (d -,I 4J 4-) .0 b, a) -r-I t l r-01 a) :d td r-I O +J A N r0 10 td � ,O A b� � O 0) ri Q 'U � > N (d r� .� O' a) C -rCI 9 = b1 V U 0 O 0 U a) A I N rb tT .b' u --1 ffi b r� r0 N 3 f 4 b ; � a) _,�1 �1 'C a) b 'O 004 J-INV�� •rUIO A0� 'O 44 N �rtf� Ord'WUC Aa�-r1040 4-) 0 4� '0 0) A0� �''�0g 0 a) aJ '� 0) gi a) 41 O cd VI a A A g = " N r1 res �, U cd � 4J P� 0 >, d �O 4-1 p�j a O N (a 4.) N4J 0 � p (1) }�j tr'0 '3 uj ° O, Oh o w(a14 N 1~•• OAS•` H N_ _ N.�.4 '44� U O a) 44 -rl ,-I A N - 04 N 0 O O ?: • O !4 a) -ri N 9 .,..I •r4 -ri $4 � -'lN0k1� 0.3l: go COk-> >, O+> :3r-I0 4J td V -11 N O Id Id A O >~ p +' U Id ul 41 0 - r. a) 10 U 0. r-f & 0 >, N 3 t°o 'o w .� :s 4 4-I r-1 aJ I -I 'cl Ea r q m to ri ® it, W 4400 ° a) a) p, w° � - -r' a) a) ri ON r N a) a fa EH r 1 r-I } I 'b .� r -I N - i )�I U A. I = 0 C 1Uj H -1to r' Id u �O � Ip4j -INO'"1 O td �A4.°�A'O W 9 N� it ba)A 0- NA? oto O N rU :4J fi a) a �a�b; CaiN~�0aix >,� 4XO.10 4J -P O . ato U N 0 M acd A IL V O a) 0) V EaO U rcl •� a) A+ to U , A _ N A .0 to � a) a ° 3 ,� a) Id � 4J a) Z >' N dJ a) to N rti N N Oaj 0 (1)0HI09: A zNU r-q4J 00 U O 'r4 aJ 4J $4 O 34 U) F-i U 0 -r1-,1r-i fa 0 aJ W •� 0 x 0 4j� 3 n� of '-t ^41 rl N ra U -r-I al 10 r1 � O N ►+1 'r� A - r-I U r-I 4J 04 }4 N aJ r-1 ••i Vl O aJ 0 4J Id �' H )~ N rd A •9i fa!N.' O D U A U ttO 44 4-4-I U 0 0' U 4-4 to b' r-I k0 U 44 '44 � 0 IE oH>( +9mO N w Ori>,Nri b"OONOi414O +).,..Ifu 4a)g 0s: OJ4A'ro+iAro �C-9A>0ro4J ONf�saOOs� ANON NO>C�.�� AWN dN��?1 .�'OO m ro •ra m O 0 +) }.I P A 0 -r1 ro V O -r� -� N N -ri -rl '�f-(NNV rori0N O44 Nm O b roma(u � O�.rlu� NA r•i9A r-1 A v -N v +i, V a-) f-( 'O ro a b+ > N U ro ro -0 O N •ri N-P � O -•� O O N O 4J +> > N >, (a ro N U ro O D U 4a a ro N N O N fa A U >r r—a � O m U.[ 09Om 4jaPb+i-IUa U$4AroN+�OO U (0roO f•( Aa'O O >a�N -'� roUO rosawmN m 3 'd m N -r a N A -ri O w A( ro N p A 'O -n O k )a v C7 O A N N +� a 0 a' O __4 d) 44 � -ri N .O a O >� > N ro N sr 'd A 940 N Al V U r-i N .O , m •r•a A ri . ro ro •. 0 ro ro 'O x O -,q T °O, N m >,•� b► b' +� 'O O O O 'd N a ro A A A O .O ro '•+i O. a.N •11 N> w N�(d U a .� O O w �ro0� }Ili-rIN a>(U� pp UOro NON 'ONUU A0 �> Of_( p(Dm!>afa Nr� c� r N+I •'� p N N N >a -'�4J ro ro N U U ro >�w > ;+ N s� 3V ° N N'�4 0 r-1 to o CJ oV U a 4-) N NA(ap>0r. •��, �, Oro°O m Nror�rl0_1 m U �Nao •�Lo tor:m w �4 Cl. m 0� N '� k m 4-) 0 � $4 90 a P> rQ O ro ro }+ 3 N � N .4 -r ( U > 0 V 04 � N� +� m 'Cf V o A�>�>� �mU a) w r♦wm •,I-r-I rya'(a� a UUb' _rlV A 00 rortJ U roro m�ro m NU m -P ,~ .� ro b � O a ro ,.a o tr+-r•a •r� $4 - �, ,-� 3 f•( - 'd N O U.,�.,�ri+lA E) ��rom 'I fas:NNNNCo N O ri4-)Om +.X O>a f� � m � aJ O ro N N ri �• a > N ,O N y a N -rj 0 1) �' r%4 U o r-i V a A Ufa 0 o +� .a N -r I rd V U r+ o 4 k 3 ro r-� A o 0 -� m ,-� •rl +, a r-a M 4J r� 0 N ro m U O V� ro •r•a a x a>i ro o b � •� W -° roU ao+'.ri.r�,N °' >~ -r♦,�� a)Xa)14 0 N N$af1�V0 ,o �ro c�s.a• � ��+o� mm� N0N .O•ra 044,0$4 a)H s�04A0 OWANO�N % .Oro rdN9 44M PH(0 }.).0�tV 4J.,,,I 040NN r-IMId� ro0 o N� ro'riri o��4 v-� •�p 3 o a `� $Ip +J a o 0 w° 3 0 >,' N a n uw a o z mtoNroU ro1~ro 4Jroto'dro U 0NNb bO-Am 3 4� ro.�0 O4J0�f+4+ p ��H ktr�N-ri-.-1�.� +N N NAlO'� +gO NO Nm faO O •m�N O O !; }��� 0pri >~�c� OUftm+� 1~O 03 o +► � -ra O R O O .,� m A 'd � 0 r-I Q' O ro to > H a) 4—) rO 0 s~ N tr+ � C>! '� � O -'� O � Ufu O � � 4-4 3 ° � - 43 a.) t3 -r•I m O N 'O 4J Ufa tr1 ro -ri 'O O 'O N ro O a >, a) O r-4 4j g> 3 �' O A N N '� O M X t11 .,� C :1 r-I A > -ra +l •ra -ri O N -N W -� N Cl!-I 1~ '�� ° ro N •') a (C ro O p +J f-1 +1 �+ r-i f� N w m m m U a m ON HN3 k 4-1 roO a N 'O4)N ,�'.�(0 4J •�"r-IF( OOAO roU-m © V'0 ro roU O k A) 0)4m�, E•(UriroUaoA�• r-(>9(0N 0 �, A• r-a j~+ �. O .r� m p -0 a. 'd � 'O m -rl a r-� N ro +, o O• 1 O> >, A is C4 a -P 3 O o m ro ro p w 3 u° N w 't3 'd s.: 4J • • V. 4J m b 4a b f-( U O P -ra N p :~ , `� p a o ,� +' O' •'q N A a 1+ +1 o !~' w +� m .rl .O N m U A •,� ...rj �' 'a f N .�" 'O r� ro m a S`( ro ri N 4a ri -r a + �, N N +r N N 0,4 ;w '� •r a r-I m ,� N U P N ro �� ro m N .-� .�, 0 4a N U N m. N. IZ (0 CU w -14 �" N (0 !'. m A O H O N O •,� > .rl 0O m .�" A a O m N O to •,i M N + +'O s; +) � to • .p 4..( z7 O 3 .� ~ � N g � r-I O0 r t -r♦ ,O � U N +� N +� S i QM ro N -ra N ri r1 O 3 .�" ri Ul �'" N rn SZ m V m 43 -rl 4� O V 0 4J O O '� ro U 0' '� ,...I 'd ! 'd ro r, f„I O r i fy N O N }a a m 44 ro A H 'a -ra 'O 9i 0 m ro -H H� '� A ?, O+ �" � m N ''� >( ..r- -U O U 04 V >' w .r� _rl N U !~ w o 3 O r-t a 0 ro 03 N M N m r. rob' s: 4 r. o .rl .,, � g —P 0 o •� 'o o 044 N+ a +� s., •rl o m f•a tr'r� �, 4-) N N> N ro sa N N s: U 0,419 O > O o •• U N 3 M 4J � ra N r-I N LL(3 N > ,r l > it O mW O a •ri U 'd 0 H N V b+ o O O N V a -r•Io Ucad gON ,,,I V0 >(0 p roV>Y�,idmroN 0aO .4) roQ)> NNk'drof.( w9.rlN _-PUl4 41 o ro N p b 4-)4 0b �� t11 0.0+�► aGUITJ O -Ij4J 0.0 0 ro,� O }m•I 4J'I N (Dro O �� fa era p Q((04J $4 0 0) 0 0 sz -� a a o m .9 4J $4 �' tr' s: k U -r•) ><a m u, b N o E-1 � N +, 0 �' ��, .�-� fa .0 .J ro .0 ro -r1 � ro a $4 _j 3 0 � , r'I 4-(.o S wm w +�+�roo� ro NmN to g) > >� ra 0M0+0�i•aN� IdV M$443-ri rig^ -a a' 00 +a •�'� 0) ° v NA�°I om. o``�roUN O flm mOm oNma 9 aO"U•rIN A O mrH m(D rH-(F0a V'd •raU !•( �O ro °�r� tQ U m N f�a A •n s Q -r� U N A H `i9 f� 'd +� p N (D p 'd f•( ro N N •0 0 a a 43 r V -f•( 0 0 p f0j ' I 43 m .� o 0 .o k 0 .r.l ro m '�"+ '� ,O Q 't7 N a O U O m m ri -ra m )~ •rq •ra b� r-a m O Ol �! N a•, a x U w -rl 4 a .,r m> m Oro 'd O f.l 0 -ra >`( 0 s~ 0 ri !( 4J ro 'd ro N (0 N • ro 'd is , N N ° ro c0 U A >~ O O 4J N r N m Q b m ..� ra •rl w f-a N ..'�' � o 4J 4-1 'd �-+ > � N '� b 3 K to o� o 4 �, +) m r� �' a� m a p m o A Q g 4 U C m> O a s 't7 ,�I ro Sa .� +J -r 1 m •rl . m a ,� O m m N rd >( !y •rl U o V �- .� V r I O NO' !~ co N OmNro�+ +)0N•O�0k 1F>N N0ri 0 �w IAmN aU cam, n N+ p •� N ro ro $4 m m �, N '� • +) fX4 3 •r+ A +3 4.1 ° f�+ o m rd +) A4,0 o' N r-{ m ro Q � 'd V m N a Nf� rob UroNN +m aN to s: ONa U3 ro +�+� O ro o(tf>� DNfa b$4 a'd !� O N b� r♦ O m O a 4 N m 'd m m %+ m 4a .r♦ ro p f•( r 4 rd •ra N ,..I 44 to •''I b+ N O O 0 -A O 'H � U A O ro m •rl m ro Q U U w ro +� •r♦ N N �, ,� o m .� o .. N ,� tr' a N o> ro o m +) O a N p V 14 -r� +' 3 .� a H •� .� o m o o U •r a. w rt b m b• m >~ o 'd .� 'd > -� o m N o ro(d N 1 ri +.� .O V a >' R V a 4J N. � m N -r•a Q+ f� ro A as k (0 k -r•a N N N .,.I .N � +' � H ro > N N ri m Ei •. N N +) � ° �° � 0 ° N .� � � •ri -r-1 .Q O Oro > 4 a.,� � U a m O D U 4J NA4J.,I u a0 0� 1a g G4 o N 3> -rt U O p U N H P o 'd U -n s, 4J 0 %1 •rt -.� .[", m r♦ a-H 0)U 4.) N �>( N(�o�a,s:0-� (a a- s ro�•rlaNb b�><a 0)rt'droU as ri�rop909(a(3 ,�,'riroa3Oa ri•rlo?�NP+►N ¢+434JU-r-aro NfaMA NN�NJaa�•rI N•H U 'Ori�fa ro •� a ro N •rl > a ro 0 U C•( w U 44� m ro•I 41 o .r-1 -ri -rl to 3 a 43 N ro N � •r-Io 'ram w o> b •� f•(, -� . ro +� 'd 3 'd N U N t- w° 0 wco ax i ao u0 a h ^� Ir z i 0 00 rA z �J a3 ti I rO V a a V a s W a CHA CAA -.4 0 a a41 0)V4J P En a -Ha a a a •C )•( U a)•1aa4-)0 WA r-t A -r•I 44 W H 1: -,1 0 0 -..A 0 4-) a a ,0 ro r� V) n_- M J V 0) � 0) RA O OC 0>a0(0°a 0 r co 4-).0 A-► U 444 O� ra a) C) CV >(O ` 0 M C)g 44 CV1 i)4 ro O 4J V -r O O U U U,� W 4Ja4-1 C > a -r1 to 1~ a $4 1.1 -r10a�44Wa U V .- -- - a to a ,1 07 4JaWN0roara•IG 4 a O dJ -r1 •r1 o 4J 4 ����.U�.r,aa 3 ,0 V 4-44 U ,C 0 0 a •,al 't•V W ''U1 a a TI Qv 9 4J N p -,40° p H W 001Uto owo m o N '0WUaOa''-IPOa --I. a4-)V V U > C -•� U w tatoo N� ( >t U0>1A4)00¢(a O •r•1 A 4-1 'd V •r'I ro •r•1 >1 CO a(W a s 0-0 a'0'0 0 +) a o aW o a 04J (d a rI 1~4 O 4J4VNV a C a� a4•a,A 04J.C4J a o a p N '0 a s tTaW 91 'ova -`�A bV aV A (� a U° U0a+Js404U�4O .,�.1�>�Oa PC 44 0� rU U 44 a 0 a •� >1 N a rd W a�� � W a •rl 0 4J 4-) C •r1 4-) 0 -r1 V .0 O -•1 O UaC -rI O0 a3a�,4j•�(a to .tra z3(}044 � 030rd bO � tow�tr� k tdV > '° 3 (a.0Z >iMV to 0 4� a a 4J O .N N 0 to to 1 44 O H +J -r1 0 a C rn Cal $4 -H O N .Q NOW a -,4 oa `9 ,�Ca>, maw a H�0Ai •fro .O C a)0!4WrO}-1>�1 ���. 0 Q40'0 Caa aaaC A,�A1.a C�+[� O-r1Sa O9: •''�W1~U >kO� rt 100tDr-1r-) 4J -4 +P a a ,0 rL' 14 0 -J 1. � O a U N W r-1 a Q -P (D '� O 0 ,a a 0 4a 0 U .0 pl ..-1• � '"r 0 +J av93 -,�° 'rf°a°ao •r�>�"�� >atoa A ,� 0zy,�3 a0 °�lyw> r-I a'rlaro O +� +�0t1]traaOA a O Pr ,> C) q M 9 ��.0 r l Id 0 W A 4 U 4j p� }.(� td U 0 ;4 � .a }O.t r-} O° p ro C) a� tT r-I . a ro a ro ,� a ro O .� z a >+ 34 >( C tr U >a b a b a H O a p +J ., 1 r0 to o C b a .q " r-I -r1 V '0 43 A A a 14 N a ro 0 aEJ Q0)M i�ri034a) N0'[xl0trr-1a0�.� AtOQA - y04J (Hai O N br0-1 •�i�abN +�-.��il� .� a >4 •r-I � U a (d O> In $4 a s >1 to 0 0 W U N +� {.) 0 N a 14 r-1 _� N > b a) 0'0 V a •r1 Q X: _° f 1 't3 -r 1 U N � O -H a (d -P >, rl .0 • to H (d b UV!~ro A3a�'C3�a1•�rdi2, 0a r+a�aro0 rtfC .00 O,�-r++� -rI� >,+IO+ja as 0 3 C A a A' a a A a '� 0 r4 C O a C •,i 4J K •• a -.� .� 14 `o'er +�azsrda 4Ja a'°b' s.t�, C�� boa o a -a V 1-t r-1 �) ri U ro -•-t V� p 'i10A4a9;1y�a 3'rqHa�-�� a ''�9to '�U�+1Urd0� a0 3 i-IW b!•t a rd ,� tT a Al W 0 r1 a s •r1 a 13, a o rd �, ro" a .,� art >� Z7 PQ U •0 -r-I >r a O_ O 4j a ro N U a a V 14 a 3 -.� � � I t •rl a rr J4 )-1 ,q >' 1„( U (d •r 1 1 a z o j.(k a A U >.(a a .O +1 0 O a w � a aVau aka �° >~3b 14,0wa.�,.,� a° -> roams �40) �,(a a a to a�4 �aa a�abAA'�+�a °�'wto �oaai�k u 4J vo000aa ->'k 2saao-� '(a04 �s U to A l O U � 19 1.a a a - ra W +� }, > 0 0 (d i�- ro p-rlCV o -Pa-PW,, o(aal cgV00V 1~ .Ca 4 a"�(� ° °�'m �a°faU )•.(� 44 td sa ri a o a V 3 4 U 0' O >1 a"r1 )~ .0 � a •rq p o M 4j r- 4J E) -' � $4� 04 C a o a rt CO �-1 � V k , i +� k 4J 0+ ro ro id -• t a b .0 O V al " W +� a 4a 0 A 0 •U U Z >� a s )•1 p a a 4 )-1 a 4J x� r-► a V t)+ •r 1 ° a Z •rl � C�° .X N a O -g 4J 0 0 ra r-I .0 O +� >~ r-1 to >1 . a U a 4-4 a 0� A v a 0 (d > 4J 0 P4 >1 a ro V H(4 ° U a W a 0 s~ Ztil W r•I tr 'U a A O p Oa(d TJ +�O'aR'0�aato 111.10�`aU as C-rt rlfu> ZO�� a '-ar-+��rtf �,040 b'aa a s11Ua ri0 3.0) rd m� U}a(p�>~ W-rii(�'d Va> a � a � yr°•'l0) p+1 N aa) 0 a) p .0 tT A •ri N( U b O, w 0 ro -r1 H p ° V r-t � •ri 1.I a s .r.1 1403 a s 3 b b 0toa)g kAi1�-rC1>�taAab 4 rp1OW'tSw ro aM baaJbi1,� p 0)Htd�O ra a(11 r.4JEn W �Ia A U a{uQ ��+ a^ +� a) Ca°' a Aaa ,ga +�.. al "I rq >~ O O C C o (d ru r'u U 3 r•i fi"i C3, C -1 �) a r1 ro � 0 >••+ p > > b %� ro r-1 C ° ,9 W J�•1 ro A ,0 }� - 10 q4) 'r♦ � ��O.ritao�W0 O'"'IaNfala �° �'NW 4 roo 00'dNto° ri°'-'roO � n as�(Ar�a 0,f�p oa.,�°A Z .'uro(d>403(a 0w aC aa. a> �ri ro oA,A +) .,1 s~ A to a �+ o a ro ro a '� W A s~ a. a 3 U a a x r♦ b .� A )~ ° W 'C1 a C A a {.1 -r1 r0 A O .0 - 4 a 4� A 0 a b>a a C3 N �C3 +�•.� as o - riaa 0 ,�aa°� tJTOa Ei ,ajo°alnm -r1r a.,CjO rorog,--1ib+go �Uto ��U1 -rii (43 '�d+°�° oo°tin-ra1��-�1C V 10,�> P4Wtr E-1'a0 +10Aa .�a0a 4) 14 �a w•r1� _axe W>("rq4a U�00•'� �� +�� C0,04 to �''�'.ta p.�O•�tA a�A T3 (d _ i1 a -r1 a 44 a ° -P 9 .o 0) 0 .0 a � a +1 '0 A - � O W Z '� +� � 't7 � ri ri ^ (0 0 � ° a a a .� b to tr b v-r1 O (d ., rj rj ro a, o tT ° a a "�4 r >' !a rl a s '. 3 a a �+ .0 a 't) r I ' +� rO C 0 ri 1n ' .r 1 fa p A v a ,-I 0 A >~ a g o_ ^ 44 O � L1 a .,� p A a ° ,i a ' 0 !~ 0 a a $4 ro ,� .r1 W L) ,� +J .� tr+ •O 0 0 � •rp1 A 4) o , .. p O a 0 >(4) ro ta �� a�A 0 V > A 3 ri O U ro a U )~ !�, %. W A tr�.( W }a a (d cd C 'r♦ a U p ,rq A a +l b is +10 (1 a (a-� •r I a f~ O r-1 H4J'ria) roA4-4kaaaa -faro 4JPak� 0O0 roC CC pto >3r-tQ)a 0Vr-1 )•1 .0 U1 'r•1 ri ° V S4 4 0 a 0� Q O -r1 a.1 V p 0 -H a (d a k C a 4J 0 a a 1 -ri b. r1 : -ri 0 0� % 1 �I )-t -rir1 O CO $4 �> k 0 U a �4 � to A 0 A S 4 0 a A .-4 to 4 U A F+ •b+,-°1 (A 3 Wri .AU-4OUroW•a)U WN. W M, Q, a4J-rt aU01)f31CQsb0r4>r as r000ari oa>~p•,�Z ) ;�o Iwo A -r 1 4.1 H A '0 .r 1 U V1 a U )•I a p 04 a V U 0 .0 r-I :] WK DICKSON July 10, 1998 Ms. Linda Lewis N.C. Department of Environment, MOM - Health, and Natural Resources Division of Water Quality Section Engineers 127 Cardinal Drive Extension Planners Wilmington, NC 28405 Surveyors Re: Greenbriar South Subdivision New Hanover County Project No. W9701.80 NCDWQ Project No. 931105 Dear Ms. Lewis: In response to your letter dated July 1, 1998, the following is provided: 1) A thins column has been added to page 2 of 4 listing the statistics for the curb outlet system area. These numbers demonstrate compliance with the low density option for this section. 2) The inlet and outlet elevations of the swales have been previously provided on Sheet C-1. 3) A vegetative filter detail has been added to sheet C-16 to be used as a flow spreader mechanism. Enclosed please find the following items: - the revised stormwater application for the referenced project. A third column has been added to page 2 of 4. - two copies of the following sheets C-16 MISCELLANEOUS DETAILS, dated 4/3/98, revised 7/9/98 If you need additional information please feel free to call. Very truly yours, WK DICKSON & CO., INC. Mark N. Hargrove, P.E. Encl.: As noted above. cc: Greenbdar South Partnership 3177 Wrightsville Avenue Other Offices: Atlanta, GA Hickory, NC Wilmington, North Carolina 28403 Asheville, NC Raleigh, NC 910.762.4200 Charlotte, NC Columbia, SC Fax 910.762.4201 www.wkdickson.com From: "Mark N. Hargrove, PE" <mhargrove@wkdickson.com> To: "Linda Lewis" <N1 EW456@wiro.ehnr.state.nc.us> Subject: Greenbriar South Subdivision Date sent: Mon, a Jul 1998 09:09:59 -0400 Linda, I received your letter about Greenbriar. For item No. 2, 1 had previously provided a table on the right side of Sheet C-1, dated 3/25!98 and revised c b 5l22/9Q,mIV ±h grass sv:uic Ili fvi; ;aiiv'i. T"e table had lengths, invert in, invert out, and slope for each of the three swales. I was wondering if you happened to overlook this? Also, you mentioned in your letter that you enclosed a vegetated filter detail. One was not attached with your letter. You can fax me a copy of the detail at 762-4201. Linda, I was also wondering if there was any way we could get the permit applications on a computer file such as Microsoft Word, it would make it much easier to complete the applications. Thanks.... Mark Hargrove Alida Lewis -- 1 -- Wed, 8 Jul 1998 08:10:12 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality July 1, 1998 Mr. Mark Hargrove, P.E. W.K. Dickson 3177 Wrightsville Avenue Wilmington, NC 28403 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 931105 Modification Greenbriar Subdivision New Hanover County Dear Mr. Hargrove: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for Greenbriar Subdivision on May 26, 1998. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please add a third column to the application listing the statistics for the curb outlet system area, demonstrating compliance with the low density option for that section. Feel free to redraw lines as needed to add this column. 2. The inlet and outlet elevations of the swales have not been provided. 3. A Flared End Section does not qualify as a flow spreader mechanism. Please see the enclosed vegetated filter detail for an appropriate flow spreader mechanism. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 1, 1998, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, 4'Y . Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\931105.JUL cc: Linda Lewis Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper MIA .. • ���lj i ,f,�1�G111r��s� State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as "an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Greenbriar South Partnership 2. Print Owner/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): Mauri C_P G _ E mar+ Tr 3. Mailing Address for person listed in item 2 above: 99 Aqua Vista Drive City: Wilmincrton Stater`_ NC Zip: 28409 TelephoneNumber. ( 910 '791-171 3 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on. plans, specifications, letters, operation and maintenance agreements, etc.): Greenbriar South 5. Location of Facility (street address): _ Located between Greenbr .ar Subc]ivision `off NC 132 and Rartan nabs C1fy Wi 1 mi ngtr Co�miy New Hanrn7PY 6. Directions to facility (from nearest major intersection): t 2 mile north of intersection of NC 132 and Cero ; a uAac r Rrnrl 7. 340 08' 30" Longitude 77° 52' 45" of facility 8. Contact person who can answer questions about the facility: Name Maurice S . art . Jr. Telephone Number: ( 91 0.—) 791-1713 II. PERMIT INFORMATION: 1. Specify whether project is (check one): ------yew Renewal X Modification 2. If this application is bein g331105' submitted as the result of a renewal or modification to an existingpermit, list the existingpemutnumber and its issue date (if knownR999_Mber 20, 1293 Form SW-101 January 1998 Page 1 of 4 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): LAMA Major X Sedimentation/Erosion Control 404 Permit III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated with the use of two stormwater ponds Sized to achieve a 90% reduction in total suspended solids. Anr1 a r-lirb outlet system. 2. Stormwater runoff from this project drains to the Cate Fear River basin. 3. Total Project Area: 46.04 acres 5. How many drainage basins does the project have. .3 4. Project Built Upon Area: 32.9 % 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. Draina a basin No 3 is a curb outlets stem. NO.W .. 1 Pt Receiving Stream Name tad tdbibny to Notts C3-'edc Ikrm-ea to Notts C mek Receiving Stream Class CW Drainage Basin Area 52.07 ac 8 ac Existing Impervious" Area Pro osed Im ervious'Area 17.13 ac 3.27 ac % Impervious* Area (total) 33.7% : lea Draa:ge Brut � Dz��age B On -site Buildings 340,375 sf 77,950 On -site Streets 178,499 sf 42,725 sf On -site Parkin N/A On -site Sidewalks N/A N/A Other on -site KA N/A Off -site 2Z7 165 N/A Total: E=746,039 sf= 17.13 ac 7-=142F 375 sf= 3.27 ac * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parKIng areas, sidewalks, gravel areas, etc. 7. How was the off -site impervious area listed above a m draining to po rCl % .1 kiCx $ 66OW& IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Form SVdU-101 January 1998 Page 2 of 4 E MAY 2 6 1998 WK DICKS' May 26, 1998 �• Ms. Linda Lewis N.C. Department of Environment, Health, and Natural Resources Engineers Division of Water Quality Section Planners Surveyors 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Greenbriar South Subdivision New Hanover County Project No. W9701.80 NCDWQ Project No. 931105 Dear Ms. Lewis: In response to your letter dated May 18, 1998, the following is provided: 1) A check for $160.00 is enclosed. The initial check for $225.00 and this one now brings the total to $385.00. 2) The number of drainage basins on page 2 of 4 of the application has been changed to 3. 3) The ponds and swales are located in drainage easements that will be recorded once platted. 4) The 14.9 acres of off -site area draining into the existing pond is still correct. 5) The impervious number totals for No. 6 of Section III have been corrected. The corrected sheet is attached to this letter. -6) A copy of the recorded deed restrictions for lots 1-19 is provided. After reviewing the "Declaration of Covenants, Conditions and Restrictions of Greenbrier South, Section 2," it was discovered that the restriction on impervious cover is 5,500 square feet for each lot and not 5,775 square feet as stated in the deed restrictions originally submitted in 1993 by Andrew & Kuske. Note, all the calculations are based on 5,775 sq ft per lot, therefore the pond and grass swales will have additional imperviousness available than what we are allowing. A copy of pages 1,6,7 & 8 of the covenants is provided. See Article VI, Section 3., (0 for the deed restrictions. 7) A note has been added its sheet C-1 that states that " Lots 40-50 shall be graded and/or gutter shall be used such that the surface water runoff shall be directed to the streets to be conveyed to the stormwater retention pond." 3177 Wrightsville Avenue Other Offices: Atlanta, GA Hickory, NC Wilmington, North Carolina 28403 Asheville, NC Raleigh, NC 910.762.4200 Charlotte, NC Columbia, SC Fax 910.762.4201 www.wkdickson.com 8) Calculations are provided for the 1-inch storm event and for the 10-year storm event for the grassed swales. The 5:1 slope extends across the entire bottom width of the channel. The velocity for the 1-inch storm and for the 10-year storm are non -erosive ME as shown in the calculations. W 9) The swale details shown on sheet C-16 have been revised to show the location of the Engineers 5:1 sideslo a The sideslo es will be grassed as per the seeding specifications Planners P P 9 P 9 P Surveyors shown on the plans. Each culvert has a flared end section at the outlet for a flow spreader. 10) A revised Operation and Maintenance Plan is provided with the enclosed revisions. 11) Each 100' curb outlet swale has been labeled. A table is provided on sheet C-1 showing the swale number, length, invert in, invert out and slope. Enclosed please find the following items: the revised stormwater application for the referenced project. The number of drainage basins has been changed to 3. The impervious areas have been corrected. - additional $160.00 application fee for modification - two (2) copies of the revised calculations - two (2) copies of following revised plans: C-1 EROSION CONTROL & EXISTING TOPOGRAPHY, dated 4/3/98, revised 5/22/98 C-16 MISCELLANEOUS DETAILS, dated 4/3/98, revised 5/22/98 - Revised Operation & Maintenance Agreement for both ponds and the grassed swales If you need additional information please feel free to call. Very truly yours, WK DICKSON & CO., INC. Mark N. Hargrove, P.E. Encl.: As noted above. cc: Greenbriar South Partnership STORMWATER CALCULATIONS FOR GREENBRIAR SOUTH SUBDIVISION WILMINGTON, NORTH CAROLINA STORMWATER E C E I V E MAY 2 61998 D D E M PROJ # PREPARED BY WK DICKSON 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 February 4,1998 (Revised 5/25/98) GREENBRIAR SOUTH 1-INCH STORM SWALE #1 (left side of Coronada Drive at Sta. 3+11) AVERAGE SLOPE = 0.3% n = 0.03 grass lined channel m= 5 c = 0.4 1 = 1 in/hr A = 3.83 ac Q = 1.53 cfs Zreq = Qn/1.49(sgrt (s)) Zreq = 0.56 B Y A P R Zav 0 0.53 1.40 5.40 0.26 0.57 DEPTH = 0.53 ft V =Q/A V = 1.09 fps Velocity less than 4.0 fps ... no liner required SWALE #2 (left side of Coronada Drive at Sta. 6+50) AVERAGE SLOPE = 0.3% n = 0.03 grass lined channel M = 5 c = 0.4 1 = 1 in/hr A = 4.99 ac Q = 2.00 cfs Zreq = Qn/1.49(sgrt (s)) Zreq = 0.73 B Y A P R Zav 0 0.58 1.68 5.91 0.26 0.73 DEPTH = 0.58 ft V =Q/A V = 1.19 fps Velocity less than 4.0 fps ... no liner required WK DICKSON 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 7824200 Page 1 GREENBRIAR SOUTH 1-INCH STORM SWALE #3 (existing Swale between lots 3 & 4 on Coronada Drive) AVERAGE SLOPE _ n= m= c= A= 0.1 % 0.03 grass lined channel 5 0.4 1 in/hr 3.54 ac Q = 1.42 cfs Zreq = Qn/1.49(sgrt (s)) Zreq = 0.90 B Y A P R Zav 0 0.63 1.98 6.42 0.31 0.91 DEPTH = 0.63 ft V =Q/A V = 0.71 fps Velocity less than 4.0 fps ... no liner required WK DICKSON 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 Page 2 GREENBRIAR SOUTH 10-YEAR STORM SWALE #1 (left side of Coronada Drive at Sta. 3+11) AVERAGE SLOPE = 0.3% n = 0.03 grass lined channel m= 5 c = 0.4 1 = 6.3 in/hr A = 3.83 ac Q = 9.65 cfs - 10 yr storm Zreq = Qn/1.49(sgrt (s)) Zreq = 3.55 B Y A P R Zav 0 1.05 5.51 10.71 0.51 3.54 DEPTH = 1.05 ft V =Q/A V = 1.75 fps Velocity less than 4.0 fps ... no liner required SWALE #2 (left side of Coronada Drive at Sta. 6+50) AVERAGE SLOPE = 0.3% n = 0.03 grass lined channel m= 5 c = 0.4 1= 6.3 in/hr A = 4.99 ac Q = 12.57 cfs -10 yr storm Zreq = Qn/1.49(sgrt (s)) Zreq = 4.62 B Y A P R Zav 0 1.16 6.73 11.83 0.57 4.62 DEPTH = 1.16 ft V =Q/A V = 1.87 fps Velocity less than 4.0 fps ... no liner required WK DICKSON 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 Page 1 GREENBRIAR SOUTH 10-YEAR STORM SWALE #3 (existing Swale between lots 3 & 4 on Coronada Drive) AVERAGE SLOPE = 0.1 % n = 0.03 grass lined channel m= 5 c = 0.4 I = 6.3 in/hr A = 3.54 ac Q = 8.92 cfs -10 yr storm Zreq = Qn/1.49(sgrt (s)) Zreq = 5.68 B Y A P R Zav 0 1.25 7.81 12.75 0.61 5.64 DEPTH = 1.25 ft V =Q/A V = 1.14 fps Velocity less than 4.0 fps ... no liner required WK DICKSON 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910)762-4200 Page 2 ,Sta*e of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality May 18, 1998 Mr. Mark Hargrove, P.E. W.K. Dickson 3177 Wrightsville Avenue Wilmington, NC 28403 AT4te• �rMIL . NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 931105 Modification Greenbriar Subdivision Phase III New Hanover County Dear Mr. Hargrove: The Wilmington Regional Office received a modification to the Stormwater Management Permit Application for Greenbriar Subdivision Phase M on April 9, 1998. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: `f 1. The fee for modifications to detention ponds is $385.00. Please submit an additional $160.00. 2 2. The modification must address all aspects of the project. This project was previously approved as a low density subdivision with a collection system, which required a detention pond. Now, a part of the subdivision is proposed as low density with a curb outlet system, a part is high density with a pond, and a part remains as low density with a collection system. Each of these BMP's must be included on the application, resulting in three drainage basins, not two. V13. Locate the ponds and curb outlet swales in recorded access/drainage easements. v% 4. The 1993 approval did not request a map of the offsite area. It was assumed that the 14.9 acres was existing low density residential development @35 %. Do you still concur with this assessment, or does it need to be further refined? Z5. Section III, #6 of the application is confusing me. The impervious number totals in the breakdown section do not match up with the Proposed Impervious area total in the boxes above it. Please check. /6. Provide a copy of the recorded deed restrictions for Lots 1-19. 127 Cardinal Dr. Ext., Wilmington, North Carolina 29405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper a w a Mr. Hargrove May 18, 1998 Stormwater Project No. SW8 931105 Modification ---------------------------------------------- 7. You must provide a way to get the runoff from all impervious area on lots 40-150 into the pond. Lot grading, guttering, and swale grading are all options that will be available in the permit. L '/ 8. Please provide calculations for the 3 curb outlet swales, indicating compliance with the velocity and slope requirements for curb outlet systems. 1 _ 9. Both of the swale details on sheet C-16 show 3:1 slopes. Provide a detail of the curb outlet y swale that show the 5:1 required slopes type o vege t1on, flow sprea er mec --- vey,W-10. The Operation and Maintenance Plan needs to cover the curb outlet swales as well as the p ponds. Please add swale maintenance requirements. 11. Label each of the 100' curb outlet swales, and provide inlet and outlet elevations r sloe verification. p Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 18, 1998, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\931105.MAY cc: Linda Lewis Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper 7"Yi—LL z eE� c� .z£ c -cy a M3m0R.I.Ng�z q(2--2- /qS " E W H_ NO VE R COUNTY E&QI&332I- S DE2�R3&L3: =142533�\QT3�3T QTO&,NOR7-c— C LIEN'. A 2 3 ! Z 329E*3(912 A7*Z29 TO: -LZNDA £Zw-3 g£M - FROM: ales Z�SIz3 EROSION CONTROr 32'cz&also R3: C � l��q w �72 zROSZON CONTROL y 2 7 �. 2lease =57±e¥ t5e att=r��w �__�. :Z yo2 Gaye asy ===5ti cRs, 9£ease contact tR±s SEZaj Attacxme2t ENGINEERING a FACIunES APPLICATION FOR PERMIT FOR A YE�C� LAND -DISTURBING ACTIVITY File Num�be� � UNDER THE CONDITIONS SET FORTH BY ' ° * THE NEW HANOVER COUNTY Fee Pal SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE Date Applicant:. Greenbriar Subdivison Applicant's Agent: W.K. DkkEm Address: 99 Aqm Vista Ltiw 3177 •vi]1e . Address: WilndrYatai. 1VC 28409WLhdngbm, rZ 28403' Telephone Number: (910) 791-1713 Telephone Number: (910) 762-4200'. Total Acres of Land Disturbance: 16.0 Purpose of Development: Vida—t Location and Description of Land Disturbance: 1cmted in amer riar Saith aJa divisicn, 4iid is 1ccatrsd bets Bartm 03ks' and Gmak iar near 1 aiw Jurctim. See vicinity nW m Flaris. STATEMENT OF FINANCIAL RESPONSIBILITY Land owner(s) of Record Person or firm(s) financially responsible for the land -disturbing activity. If not a North Carolina resident you must have a N.C. agent (List Below) i Name: Grea>briar Subdivisim PawtErsjI n Name: Mizice S. Hnnart, Jr. Address:99 Agm Vista Drive Address: 99 Agm Vista Iriive --Wilmgnt m. NC 2.8409 Wiln ingbm, 1C 28409 Telephone Number: (910) 791-1713 Telephone Number: (910) 791-1713 Location of deed(s) or instrument(s): County NEw flarrOvEr Book1213 page 0258 The above information is true and correct to the best of. my knowledge and belief and was provided by me while under oath. (This form must be signed by the financially responsible person. ifan individual'acid by an officer, director, partner, attorney -in - fact, or other person of authoriti to execute instruments for the financially responsible person if not an Individual.) I agree to provide corrected information should there be any change in the information provided herein. Date: - 3/25/98 Name (Type or Print) MmKim S-' art.• Jr. Title: Gmsal. PardEr � . Signature: a Notary Public of the County of NpW Al n e Je r Carolina, hereby certify at S ' �„� State of North Ing duly sworn acknowledged that the above form was executed by him, appeared personally before me this day and be - Witness my h d and notarial seal, this. rx J _ day of ,19� Seal Notary My commission expires �d WK DICKSON April 9, 1998 Ms. Linda Lewis APR 0 9 1998 N.C. Department of Environ nt, Health, and Natural Reso Division of Water Quality Section Engineers 127 Cardinal Drive Extension Planners Wilmington, NC 28405 Surveyors Re: Modification to NCDWQ Permit for Greenbriar South Subdivision New Hanover County Project No. W9701.80 NCDWQ Project No. 931105 Dear Ms. Lewis: Enclosed please find the following items: - original completed stormwater application for the referenced project - $225.00 application fee for modification - two (2) copies of the Calculations - two (2) copies of plans: C-1 EROSION CONTROL & EXISTING TOPOGRAPHY, dated 4/3/98 C-2 DRAINAGE LAYOUT, dated 4/3/98 C-3 CORONADA DRIVE, PLAN/PROFILE, STA. 0+00—11+00, dated 4/3/98 C-4 CORONADA DRIVE, PLAN/PROFILE, STA. 11+00—19+50, dated 4/3/98 C-5 CORONADA DRIVE, PLAN/PROFILE, STA. 19+50 — 27.41.94, dated 4/3/98 C-6 GRAY SQUIRREL DRIVE, PLAN/PROFILE, STA. 0+00—11+00, dated 4/3/98 C-7 GRAY SQUIRREL DRIVE, PLAN/PROFILE, STA. 11+00—14+42.57, dated 413/98 C-8 WEST GROVE DRIVE, PLAN/PROFILE, STA. 0+00 — 9+49.65, dated 4/3/98 C-9 CONTENDER LANE, PLAN/PROFILE, STA. 0+00 — 8+33.59, dated 4/3/98 C-10 MARSH WOOD DRIVE, PLAN/PROFILE, STA. 0+00 — 8+75.16, dated 4/3/98 C-11 LONE EAGLE COURT, PLAN/PROFILE, STA. 0+00 — 3+54.76, dated 4/3198 C-12 LONE EAGLE LANE, PLAN/PROFILE, STA. 0+00 — 2+07.58, dated 4/3/98 C-13 BURNING TREE, PLAN/PROFILE, STA. 0+00 — 2+019.15, dated 4/3/98 C-14 POND DETAIL W/ MISCELLANEOUS DETAILS_ dated 4/3/98 C-15 MISCELLANEOUS DETAILS, dated 4/3/98 C-16 MISCELLANEOUS DETAILS, dated 4/3/98 C-18 DRAINAGE BOUNDARY LAYOUT, dated 413/98 - Operation & Maintenance Agreement for both ponds Also included is a stormwater narrative detailing how the surface runoff for the 1-inch storm will be treated for the entire subdivision. An "Attachment A" is provided along with a 3177 Wrightsville Avenue Wilmington, North Carolina 28403 910 762-4200 Fax 910 762-4201 www.wkdickson.com Other Offices: Atlanta, GA Hickory, NC Asheville, NC Raleigh, NC Charlotte, NC Columbia, SC table breaking down each lot size in the low -density portion of the subdivision and the allowable % imperviousness for each. A narrative is also included detailing the impervious area per lot for the "high density" portion of the subdivision. We request NCDWQ certification of compliance of this project with stormwater �- regulations. Thank you for your consideration of this request. If you need additional information please call. Engineers Planners Very truly yours, Surveyors WK DICKSON /k fl Mark N. Hargrove, P.E. Encl.: As noted above. cc: Greenbriar South Partnership STORMWATER NARRATIVE Stormwater management for the Greenbriar South Project will consist of utilizing the existing detention pond, constructing one additional detention pond, and utilizing 100-foot long grass swales at three locations. Each of the two ponds is sized to achieve a 90% reduction in Total Suspended Solids. The existing detention pond has a 52.07 acre drainage area. There are 37.17 acres of on - site runoff being directed to the pond and 14.9 acres of off -site runoff being directed to the pond. Note the previous permit No. 931105 included the 14.9 acres of offsite drainage entering the pond. See sheet C-18 for the on -site drainage area for the existing pond. Stormwater being directed to this pond will be collected via curb & gutter and a piped system before it either enters the large ditch on'the south side of the property or the pond directly. The large ditch on the south side of the property conveys stormwater runoff to the existing pond. The new pond has a drainage area of 8.87 acres. See sheet C-18 for the on -site drainage area for Pond No. 2. Stormwater being directed to this pond will be collected via curb & gutter and a piped system. There are three locations where grass swales are being used to treat stormwater runoff in areas considered "low density". Surface runoff for lots 2 through 9, which have been previously recorded and permitted under low density, is directed to a 100-foot long grass swale. Surface water runoff for lots 20 through 39 is being directed to two different grass swales. Each swale has a typical cross section with a 5:1 slope on the bottom of the swale for the 1-inch runoff depth. See sheet C-16 for typical cross section details. STORMWATER CALCULATIONS FOR GREENBRIAR SOUTH SUBDIVISION WILMINGTON, NORTH CAROLINA _ SEAL � % 6 e IaI l!�OAAi�� " LAS PREPARED BY WK DICKSON 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 TORMWATER April 9,1998 E C E ! V APR 0 81888 D D E M PROJ # WK DICKSON Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910) 762-4200 TOTAL AREA DRAINING TO EXISTING POND = 52.07 ACRES TOTAL AREA DRAINING TO POND: OFF SITE AREA = 14.9 ACRES (previous permit) ON SITE AREA = 37.17 ACRES TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO POND: ASSUME 35% IMP FOR OFF SITE AREA EXISTING AND PROPOSED ROADS EXISTING RECORDED LOTS AT 5775 SF/LOT FOR 11 LOTS 53 1/2 LOTS AT 3,500 SF/LOT ALLOWED 28 LOTS AT 3,200 SF/LOT ALLOWED % IMPERVIOUS=17.13/52.07 = 32.9% = 227,165 SF (previous permit) = 178,499 SF = 63,525 SF = 187,250 SF = 89,600 = 746,039 SF =17.13 ACRES REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR POND: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(32.9) = 0.346 =(1")(0.346)(1/12)(52.07)(43,560) = 65,399 CF (94,150 CF PROVIDED, SEE ATTACHED CALCULATIONS) PERCENT IMPERVIOUS DRAINAGE AREA FOR POND: = 32.9 % POND DEPTH SA/DA % (FT) 7.5 0.89 POND SURFACE AREA OUN.) (SF) IF POND DEPTH = 7.5 FT, MINIMUM SURFACE AREA = 20,187 SF USED 90% TSS CHART TO SIZE POND AREA @ ELEVATION 19.00 = 23,655 SF > 20,187 SF 20,187 PROJECT: GREENBRIAR SOUTH SUBJECT: POND CALCULATIONS JOB NO.: 9701 PREPARED BY: InYl' DATE: ,/ e CHECKED BY: DATE: PAGE NO OF WK DICKSON Engineering 3177 Wrightsville Avenue Land Planning Surveying Wilmington, NC 28403 (910) 762-4200 STAGE -AREA -STORAGE FOR 1-INCH RUNOFF ELEV. AREA STORAGE TOT. STORAGE (M) (SFJ (CF) (CF) NORMAL 19.00 23,655 - POOL 24,567 20.00 25,479 24,567 26,409 21.00 27,3381 50,976 28,298 22.00 29,258 79,274 14,876 ?" RUNOFF 22.50 30,245 94,150 POND RELEASE TIME FOR CONTROL PIPE: AREA 2 - POND #1 ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (M) (CF) (CF) (CFS) (HOURS) 22.50 94150 6.9 14876 _ 0.602 22.00 79274 28307 0.557 14.1 21.00 50967 26500 0.455 16.2 20.00 24467 24467 0.322 21.1 19.00 0 TOTAL HOURS 58.3 DAYS 2.4 CONTROL PIPE : 3.5 JINCH PROJECT: GREENBRIAR SOUTH SUBJECT: POND CALCULATIONS JOB NO.: 9701 PREPARED BY: MNAY DATE: y CHECKED BY: DATE: PAGE NO OF WK DICKSON Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910) 762-4200 TOTAL SITE AREA THREE = 8.87 ACRES TOTAL AREA DRAINING TO NEW POND = 386,174 SF = 8.87 ACRES TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO POND: ROADS = 42,725 SF REMAINING IMPERVIOUS AREA = 19 LOTS AT 3,200 SF/LOT ALLOWED = 60,800 SF 1 LOT AT 4,900 SF/LOT = 4,000 SF 3 1/2 LOTS AT 3,500 SF/LOT ALLOWED = 12,250 SF POOL HOUSE AREA (ASSUME 50%) = 21,700 SF TOTALS = 141,025 SF = 3.24 ACRES % IMPERVIOUS = 3.24/8.87 = 36.5% REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR POND: (use Schueler Method) = 0.05 + 0.009 (1) = 0.05 + 0.009(36.5) = 0.379 = (1")(0.379)(1/12)(8.87)(43,560) =12,203 CF (12,781 CF PROVIDED) REQUIRED STORAGE FOR FOREBAY: 20% OF FIRST 1-INCH RUNOFF = (0.2)(12,203) = 2,441 CF (5,809 CF PROVIDED) PERCENT IMPERVIOUS DRAINAGE AREA FOR POND: = 36.5 % POND DEPTH SA/DA % (FT)/ 4.0 3.10 POND SURFACE AREA (MIN.) (SF) IF POND DEPTH = 4.0 FT, MITOMUM SURFACE AREA = 11,971 SF USED 90% TSS CHART TO SIZE POND AREA @ ELEVATION 21.50 = 16,396 SF > 11,971 SF 11,971 PROJECT: GREENBRIAR SOUTH SUBJECT: POND CALCULATIONS JOB NO.: 9701 PREPARED BY: ON,# DATE: _t4Af CHECKED BY: DATE: PAGE NO_ OF — WK DICKSON Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying STAGE -AREA - STORAGE FOR 1-INCH RUNOFF ELEV. AREA STORAGE TOT. STORAGE (F7) (SF) (CF) (CF) NORMAL 21.50 16,396 - POOL 4,996 21.80 16,911 4,996 3,417 22.00 17,257 8,413 3,486 22.20 17,605 11,899 882 1" RUNOFF 22.25 17,693 12,781 STAGE - AREA - STORAGE FOR FOREBAY ELEV. AREA STORAGE TOT. STORAGE (FT) (S19 (C19 (CF) FOREBAY INV 17.50 507 - 295 18.00 673 295 866 19.00 1058 1,161 1,293 20.00 1527 2,454 1,993 21.00 2459 4,447 1,362 BERM ELEV 21.50 2990 5,809 (910)762-4200 PROJECT: GREENBRIAR SOUTH SUBJECT: POND CALCULATIONS JOB NO.: 9701 PREPARED BY: InvW DATE: tZf,'L#Z CHECKED BY: DATE: PAGE NO OF Engineering Land Planning Surveying WK DICKSON 3177 Wrightsville Avenue Wilmington, NC 28403 (910) 762-4200 POND RELEASE TIME FOR CONTROL PIPE: AREA 3 - POND #2 ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (F7) (CF) (CF) (CFS) (HOURS) 22.25 12781 882 0.091 2.7 22.20 11899 3486 0.088 11.0 22.00 8413 3417 0.074 12.8 21.80 4996 4996 0.058 24.1 21.50 0 TOTAL HOURS 50.6 DAYS 2.1 CONTROL PIPE 2 INCH USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q = Cd*A*(2gh)"1/2 PROJECT: GREENBRIAR SOUTH SUBJECT: POND CALCULATIONS JOB NO.: 9701 PREPARED BY: /27/0 DATE: 9 Ord' CHECKED BY: DATE: PAGE NO OF GREENBRIAR SOUTH LOW DENSITY LOT SIZES ALLOWABLE LOT NUMBER LOT SIZE IMPERVIOUSNESS (SF) (SF) 20 16,099 4,900 21 13,381 4,900 22 12,203 4,900 23 11,575 4,900 24 11,698 4,900 25 16,049 4,900 26 20,723 4,900 27 28,608 4,900 28 29,563 4,900 29 19,516 4,900 30 14,992 4,900 31 15,097 4,900 32 13,758 4,900 33 17,636 4,900 34 18,422 4,900 35 37,090 4,900 36 39,832 4,900 37 25,682 4,900 38 18,390 4,900 39 17,723 4,960 TOTAL = 398,037 98,000 AVERAGE LOT SIZE = 19,902 % IMP/LOT = 24.6% STORMWATER E C E I V E D APR 0 91998 PROD # sl.� 31/O5 NOTE: TOTAL DRAINAGE AREA FOR LOTS 2-9, AND 20-39 IS 14.60 ACRES TOTAL ROAD ACREAGE IS 1.05 ACRES TOTAL ACREAGE FOR LOTS 2-9 TOTALS 3.35 ACRES ROAD ACREAGE TOTALS 0.28 ACRES ALLOWABLE IMPERVIOUSNESS PER LOT FOR LOTS 2-9 IS 5,775 SF (14.60 * 0.3) - 1.05 - 0 = 0.119 ACRES/LOT = 5180 SF/LOT 28 28 LOTS * 5180 SF = 145,040 SF IMPERVIOUS ALLOWED FOR LOTS CURRENT IMPERVIOUS AREA TOTALS 144,200 SF (8 * 5,775 SF + 20 * 4,900 SF) = 144,200 SF 144,200 SF + 1.05 AC(45,738 SF) = 189,938 SF = 4.36 AC 4.36 AC / 14.60 AC = 0.299 = 29.9% IMP From: Self <NR0AR02/N1 EW456> To: <bradley@dem.ehnr.state.nc.us> Subject: Greenbriar Date sent: Tue, 17 Mar 1998 14:47:15 -0500 Dear Bradley: I may have just solved our problem in Greenbriar. The subdivision meets low density from a built -upon standpoint, they just wanted a collection system, so they put in the pond. That should have a bearing in how we make this decision. From your 3/10/98 email - -Yes, the 8 lots can meet low density by themselves. I can't remember if an extensive collection system is used for this runoff. I think only catch basins and a little bit of pipe into the swale are all. -Yes, the pond is sized for the entire drainage area, including some offsite residential areas. There are the usual problems with stabilization, but, the pond is in and functioning. -Yes the engineer sent in the PE Certification on 1-20-98. 1 think that not enough weight is afforded by the engineer to the review needed to certify a project. Certain engineers take it more seriously than others. Perhaps a checklist of required items is needed? A copy of the recorded deed restrictions has not been submitted yet. -The same developer would get the permit. Since the subdivision is low density with a collection system, I think simply noting in the permit that there are 8 uncollected lots would be OK, but a modification to the permit is required. -1 think that there needs to be an automatic fine for failing to build in accordance with the approved plan and subsequently not submitting for a modification for approval before building the modification, based on the severity of the offense. Overbuilding the impervious area and undersizing or not constructing of the stormwater treatment device should receive the stiffest fines.. I think I can handle this one from here, now that I know it is low density. From my last meeting with Mark Hargrove, they will propose to increase the density to the pond. Apparently, those big lots aren't selling as well. I think we can split out the old, low density portion of the project from the revised, higher density part. Does this sound OK to you? I_L Date sent: Tue, 10 Mar 1998 08:40:21 +0000 From: "Bradley Bennett" <brad ley_be n n ett@h2o.en r.state. n c. us> Send reply to: bradley_bennett@h2o.enr.state.nc.us Organization: N.C. Division of Water Quality To: Alida Lewis <linda_lewis@wiro.enr.state.nc.us> Subject: Greenbriar Linda, I agree with you that we don't need to get in the habit of allowing developers to built what they want and come back and say oh, by the way I had do..... If they are going to make changes then they need to come back to us and modify the permit. I guess the questions I have on this one are: • Will the eight lot areas meet low density by itself? • Is there any problem with the pond? Is it sized appropriately for the remaining area? • Did the engineer previously send in the engineer's certification? If they did then they obviously didn't review anything because this one ended up being a lot different than the approved project. • Who would we propose issuing the approval to for the low density portion or are we just planning to modify the original permit to include both the low and high density portions? This may be another area where we need to look at potential enforcement on people that don't built in accordance with the approved plans. BB From: Self <NROAR02/N1 EW456> To: Bennett Bradley Subject: Greenbriar South Copies to: Moore Bill Date sent: Thu, 5 Feb 1998 10:59:55 -0500 Bradley: I have a subdivision, permitted in 1993 as high density with a detention pond, called Greenbriar. Well, the developers had a problem with the grading of 8 of the lots and the road in front of those lots, and created a low area that could not be collected to the pond. The developer put in a 5:1 swale to treat the runoff. I only found this out about a week ago because the developer wants to revise the remaining subdivision area. Since that 8 lot area cannot be collected to the pond, is it possible to permit it as a low density area within a high density subdivision? I don't like doing it, but I see no reasonable alternative, since rerouting the drainage will cost the developer about $25,000. I told the engineer I didn't like being the one to come up with a solution to a problem I didn't create. I find it very difficult to have this situation trrust on me. I mean, they modified the system and didn't file any revisions with our Office, in direct conflict with the Certification. My gut reaction is, it's not my fault your engineer messed up and I don't care how much it costs, fix it the way it was approved, but I know that may be perceived as unreasonable. My fear is that if we permit this, we'll start to see other projects like this because the developer feels that it costs too much to construct the project so that all the BUA is directed to the pond, as required. If they don't like the way we require it to be built, they will just build it the way they want to and then come back later with a sob story about why they couldn't build it as approved, and we'll have to accomodate them. I find this very unfair. The engineer is going to the County TRC next Thursday, the 12th. If I could have your opinion on this by then, I would appreciate it. Thanks, LL 0 [R—EC JAId 2 0 1998 TRIPP ENGINEERMG, P.C. 507 Chestnut Street Wilmington, North Carolina 28401 910/763-5100 Fax 910/763-5631 LETTER OF TRANSMITTAL Job No. To: ADL)C R A (Z Date: 01 11,0v I I �1z1 eri'bit10krC- 3110� Attention: l�l ��1C I�t; W 15 �IQF�$EK RooFNJCs� - Subject: 0f►od a ►3 F-IN-p- F A-f Af-f-5 9 4 ► 017 UILT9AF0 rA 91�ILZZ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDES COVER I am sending you: (V)"ATTACHED ( ) UNDER SEPERATE COVER ( ) Prints ( ) Tracings ( ) Copy of letter ( ) Specifications ( ) Other These are transmitted as checked below: ( ) For Approval (For Your Use () Sign & Return () Review Remarks: cc• Signed• PAJI. h, State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary Regional Manager July 11, 1995 Mr. Maurice S. Emmart, Jr. 99 Aqua Vista Drive Wilmington, North Carolina 28409 Subject: REQUEST FOR ENGINEER'S CERTIFICATION Stormwater Project No. 931105 Greenbriar Subdivision New Hanover County Dear Mr. Emmart: On December 20, 1993, the Division of Environmental Management issued a Certification of Compliance with Stormwater Regulations for Greenbriar Subdivision. Stormwater Regulation 15A NCAC 2H.1003(k)(3) stipulates the following: Upon completion of construction, a registered professional appropriate for the type of Stormwater system designed must certify that the system was inspected during construction and was constructed in substantial conformity with plans and specifications reviewed by the Division and complies with the requirements of this rule. Additionally, the Certification of Compliance stated the following: A professional engineer must certify that the stormwater system has been installed in accordance with the approved plans and specifications upon completion of construction. The attached certification should be received by this Office within 30 days of completion of construction. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 0 Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Emmart July 11, 1995 Stormwater Project No. 931105 As of this date, our records indicate the required engineer's certification has not been received. Operation of the stormwater system prior to submission of the required certification is in violation of NCAC 2H.1003(1) in accordance with NCGS 143-215.6. Since the facility has been constructed and placed in operation, please submit the required certification (attached) immediately. Construction is considered complete at the time the project is occupied by an owner or tenant for its intended use. 3900. If you have any questions concerning this matter, please call Ms. Linda Lewis or me at (910) 395- Sincerely, Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\PEREQ\931105.JLTL cc: Mr. Phil Norris, P.E. Mr. Alan Golden, New Hanover County Inspections (2) Linda Lewis Central Files