Loading...
HomeMy WebLinkAboutGW1-2022-03551_Well Construction - GW1_20220322 WELL CONSTRUCTION RECORD(GW-1), For Internal Use Only: 1.Well Contractor Information: Landon Phillips 14.WATER ZONES Well Contractor Name FROM TO I DESCRIPTION 3441 A 110 ft. ft. ft. ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased r'vells OR LINER if a licable NW Poole Well and Pump Company FROM TO DtAIETER THtCK1VESS MATERIAL rr 11. ! in. J� J Company Name //t t • C' 16.INNER CASING.Oft TUBING eothermal closed-loo i 2.Well Construction Permit#: FROM To 1 DIAMETER I THICKNESS I MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) ft. ft. in. 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS M1IATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Healing/Cooling Supply) ❑Residential Water Supply(single) ft. ft. in. ❑industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irrl atlon ❑Wells>100,000 GPD FROM TO MATERIAL EMPL EMENT METHOD&AMOUNT Non-Water Supply Well: O ft. rt. v ❑Monitoring ❑Recovery ft. ft. Injection Well: ❑Aquifer Recharge ❑Ground%iater Remediation ft. ft. ❑Aquifer Storage and Recovery ❑Salinity Barrier 19.SAND/GRAVEL PACK if alicableFROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessa ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION color,hardness sontrock type,grain sin etc. ] G ft. 2 rr. 4.Date Well(s)Completed: / Z 7`Z WeII 1D# ft. J, ft. 1 }/ 5a.fell Location: ft. ft. LLLT rt. ft. Facility/Owner Name Facility ID#(if applicable) ft. ft. 9�G 1 z .5t`',g d- (.4.1:1 Wit / ty,116 .SPrr M ft. ft. r, . NLY City, p ft. fL Physical Address, and Zip (f .130-5 21 REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) ��. ((�� �y,a` 22.Certificat' t�..��, N W _ 6.Is(are)the well(s): ®Permanent or ❑Temporary Signature of Certified Well Contractor Date `,? _ By signing this form,I hereby certify that the irell(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or MNo 15A NCAC 02C.0100 or 15A NCAC 02C.0100 Nell Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the ofthis record has been provided to the ivellowner. repair under#21 remarks section or on the back ofthis form. 23.Site diagram or additional well details: 8.For Gcoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over in Remarks Box).You may also attach additional pages if necessary. drilled: t Z ( 24.SUBMITTAL INSTRUCTIONS' 9.Total well depth below land surface: ) ((I,) For multiple wells list all depths ifdoerent(example-3 2000'and 1@100') Submit this GW-1 within 30 days of,-.veil completion per the following: 10.Static water level below top of casing:_(/�� (ft) 24a. For All Wells: Original form;to Division of Water Resources (DWR), Ifu•ater level is above casing,use"+^ Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 11.Borehole diameter: (in,) 24b.For Injection Wells:Copy to DWR, Underground Injection Control(IUC) Rotary Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: (i.e.auger,rotary,cable,direct 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the t push etc.) county environmental health department of the county where installed FOR WATER SUPPLY ELLS ONLY: 24d.For Water Wells producing over 100 000 GPD• Copy to DWR,CCPCUA g 13a.field m BIOW Permit Program,1611 MSC,Raleih,NC 27699-16I t (gP ) Method of test: 13b.Disinfection type: HTH Amount 1 lb. Form G W-l North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018 i 1 i