Loading...
HomeMy WebLinkAbout20220142 Ver 1_Updated Impacts Table_20220321C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Buffers ❑ Open Waters ❑ Pond Construction X Wetlands X Streams — tributaries 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 1 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Culvert/Retaining Wall Bottomland Hardwood Forest Yes Corps 0.065 W2 T Construction Access Bottomland Hardwood Forest Yes Corps 0.007 W3 T Construction Access Bottomland Hardwood Forest Yes Corps 0.001 W4 T Construction Access Bottomland Hardwood Forest Yes Corps 0.015 W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.088 2h. Comments: Impacts W2-W4 are associated with access for retaining wall construction. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT Fourmile Branch PER Corps 5 71 S2 T Construction Access UT Fourmile Branch PER Corps 5 20 S3 P Culvert Fourmile Branch PER Corps 4 16 S4 T Construction Access Fourmile Branch PER Corps 6 20 S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 162 3i. Comments: Streambed Impacts: S1 = 0.009 Ac (71 If); S2 = 0.003 Ac (20 If); S3 = 0.001 Ac (16 If); S4 = 0.004 Ac (20 If) Total Permanent Streambed Impacts = 0.010 Ac; Total Temporary Streambed Impacts = 0.007 Ac. Page 4 of 10 PCN Form — Version 1.4 January 2009