Loading...
HomeMy WebLinkAboutNCC200943_Notice of Termination_20220324Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/24/2022 12:24:20 PM (NOT Submittal) Approve by Morman, Alaina 3/29/2022 8:37:22 AM (NOT Request Review - NCC200943) * Duplicate COC -- verified documentation with NCC205045. • The task was assigned to Morman, Alaina. The due date is: March 29, 2022 5:00 PM 3/24/2022 12:24 PM NORTH CAROLINA Rrf OmFkm&tral Qualrly Certificate of NCC200943 Coverage (COC) No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status PAID May be blank (if not yet billed). 2022 Annual Fee OPEN Status May be blank (if not yet billed). Information associated with this permit: Project Name Fairfax Meter Lab/Trans-Mobile Transformer Storage Shelter Address Fairfax Road, Greensboro, NC County Guilford Latitude 36.0385 Longitude -79.8748 Permittee Listed Duke Energy Progress Legally Responsible Mark Dalton Individual NC Reference No. NCG01-2020-0943 E&SC Plan ID GUILF-2020-023 Original NOI Tracking 22900 No. Date COC Issued 3/12/2020 Prior Rescission Date Date populates only if COC was already rescinded at time of submittal. Reason for Rescission/Termination Request: Reason for Project Closed -Out Termination of Sale (Another Owner/Operator obtained new COC) Coverage* Mistake or Invalid Coverage • Other Duplicate COC Additional More information about the basis of this request, if needed. Explanation COC (NCC200943) is a duplicate of COC (NCC205045) which has been closed out Supporting Upload Supporting Documentation if applicable. Documentation EOI.pdf Must be PDF format Project Close-out Information: Final Close-out Inspection Approval Project Close-out Must be PDF format Approval Documentation North Carolina General Statute 143-215.613 (i) provides that: 918.54KB Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. "This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Zach Huett Title* Real Estate Portfolio Manager - Carolinas East Organization* Duke Energy Carolinas LLC Date * 03/24/2022 Email for zach.huett@duke-energy.com Confirmation* Contact Telephone* (252)220-9417 NOT Certification 2022-03-24 NCG01-eNOT-Certification-Form- Form 20210514-DEMLR-SW. SIGNEDpdf.pdf Must be PDF Format Is this COC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) allred@mcadamsco.com Original Permittee CC'd on Notification Emails Email MarkS.Dalton@am.jll.com 921.31 KB Original Site Contact cc'd on Notificaiton Emails Email MarkS.Dalton@am.jll.com