Loading...
HomeMy WebLinkAboutNCC211381_NOT Closeout Documents_20220321North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Surry Project: Fisher River Bank Stabilization - EWP River basin: Yadkin-PeeDee Person financially responsible: North State Environmental, Inc. - Stephanie C Project #: SURRY-2021-009 Westmoreland Address: 2889 Lowery Street, Winston-Salem, NC 27101 1. Project Location: 2485 Prison Camp Rd., Dobson Pictures: Yes - Digital 2. Weather and soil conditions: Cloudy, Wet Soils Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Brandon Spaugh Inspection report: Sent Report 9. Corrective action needed: Title: Project Manager Date given/sent: March 21, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Tyler Pearson Others present: Date of inspection: March 09, 2022 Time arriving on site: 8:30 AM Time leaving site: 9:00 AM cc: