Loading...
HomeMy WebLinkAboutNC0000272_Updated Ash Basin Compliance Boundary 2-10-2021_20220401DUKE ‘, ENERGY® February 10, 2021 Director of Water Resources North Carolina Department of Environmental Quality 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Attention: Mr. S. Daniel Smith 526 South Church Street Charlotte, NC 28202 Mailing Address: PO Box 1006 Mail Code EC13K Charlotte, NC 28201-1006 980 373 6636 Subject: Duke Energy Progress, LLC. Updated Ash Basin Compliance Boundary for the Asheville Steam Electric Plant, Buncombe County, North Carolina, NPDES Permit No. NC0000396 Dear Mr. Smith: Duke Energy completed a property acquisition nearby to the Asheville Steam Electric Plant on January 25, 2021. Per 15A NCAC 02L .0107 (c), this letter serves as notification of the change to the ash basin compliance boundary due to this land acquisition. Attached you will find an updated compliance boundary to reflect the new property boundary. This information is also being provided to the Asheville Regional Office. If you have any questions or need any clarification regarding the information provided, feel free to contact me at bryson.allison@duke-energy.com or at 980-373-6636 at your convenience. Respectfully submitted, L. Bryson S. Allison Bryson Allison, P.E. Duke Energy Environmental Services Waste & Groundwater Programs Digitally signed by L. Bryson S. Allison Date: 2021.02.10 10:22:34-05'00' Attachments: Figure - Site Layout Map cc: Rick Bolich, Eric Smith and Steve Lanter - NCDEQ Central Office Ted Campbell and Landon Davidson — NCDEQ Asheville Regional Office Ed Sullivan, Tyler Hardin, John Toepfer, Matt Hanchey, Robert Wylie, Teresa Williams — Duke Energy NPDES OUTFALL 001 10. ALI 01. HOYT RD +_ , POWELL CREEK , r FORMER FGD r cWETLANDS\\ x 051 VVk R% FORMER DUCK POND 1964 ASH BASIN . 1 - RETIRED ASHEVILLE STEAM ELECTRIC PLANT ~ • FORMER COAL PILE FORMER RIM DITCH ASHEVILLE COMBINED ` h. LINED CYCLE STATION SETTLING POND e FORMER 1982 ASH BASIN r400 LAKE JULIAN NPDES OUTFALL 002 E ERGY PROGRESS C, synTerra DRAWN BY: C. CURRIER REVISED BY: C. WYATT CHECKED BY: H. CARTER APPROVED BY: G. BARRIER PROJECT MANAGER: G. BARRIER DATE: 03/24/2020 DATE: 02/04/2021 DATE: 02/04/2021 DATE: 02/04/2021 www.s nterracor•.com .:i LEGEND A NPDES OUTFALL LOCATION (APPROXIMATE) 1964 ASH BASIN WASTE BOUNDARY FORMER 1982 ASH BASIN WASTE BOUNDARY COMPLIANCE BOUNDARY - DUKE ENERGY PROGRESS PROPERTY LINE ) STREAM AND FLOW DIRECTION (TWT 2016) WETLAND (TWT 2016) FORMER FLUE GAS DESULFURIZATION (FGD) WETLANDS SURFACE WATER FLOW DIRECTION NOTES: 1. THE DEPICTED STREAMS AND WETLANDS DATA WERE APPROVED BY THE US ARMY CORPS OF ENGINEERS (USACE) ON MAY 19, 2016 - JURISDICTIONAL DETERMINATION SAW-2014-00189. TAYLOR WISEMAN AND TAYLOR (TWT) PERFORMED THE SURVEY OF THE FEATURES. 2. ALL BOUNDARIES ARE APPROXIMATE. 3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS, LLC. 4. AERIAL PHOTOGRAPHY OBTAINED FROM NORTH CAROLINA ONE MAP ON FEBRUARY 20, 2020. AERIAL DATED JANUARY 1, 2019. 5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 1 SITE LAYOUT MAP ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA