Loading...
HomeMy WebLinkAboutNC0032077_PAR checksheet_20220328Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send an v other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative /1 YES ❑ NO ❑ NA /1 YES ❑ NO ❑ NA PPS Form a YES ❑ NO /1 YES ❑ NO SNCR /1 YES ❑ NO /1 YES ❑ NO IDSF a YES ❑ NO /1 YES ❑ NO Allocation Table a YES ❑ NO /1 YES ❑ NO Compliance Schedules ❑ YES ❑ NO // NA ❑ YES ❑ NO // NA Public Notice ❑ YES ❑ NO A/ NA ❑ YES ❑ NO r NA Program Information /1 YES ❑ NO /1 YES ❑ NO ❑ YES /1 NO Historical SNC a YES ❑ NO ❑ NA /1 YES ❑ NO ❑ NA ❑ YES /1 NO ❑ NA Regional Office: Washington POTW: Contentnea Metropolitan Sewerage District NPDES Permit No. NC0032077 Report Period:1/1/2021 to 12/31/2021 ❑ Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) /1 Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in SNC, including those causing pass -through or interference? (See Narrative and SNCR Form) ❑ Yes ❑ No A/ NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No /1 NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: The allocation table that was submitted with the Pretreatment Annual Report states that the SIU's permits expired on September 30, 2021. I talked with Renee on March 28, 2022 and she verified that the SIU permits were issued with an effective date of October 1, 2021. Renee stated that when the headworks analysis is approved the new dates will be updated in the allocation table. Reviewed By: A5,41 ci Date: 3/28/2022 Regional Pretreatment Annual Report Review CMSD PAR 202116