Loading...
HomeMy WebLinkAbout20050732 Ver 44_Briar Chapel Phase 12 Pond 39.COC.2022.01.30-SIGNED NCDE WR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary DWR Project No: 05-0732v44 County: Chatham Applicant: NNP- Briar Chapel LLC Project Name: Briar Chapel Phase 12 - Pond #39 401 Water Quality Certification Issued Date: 11/08/2018 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications,the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, Gareth Avant. PE, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically the post-construction activities of the project,for the Permittee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the post- construction activities such that this construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. 0%11t1r111+ry11//�Ir, Signature: Date: -,�6> SEAL 036348 Division of Water Resources—401&Buffer Permitting Unit :G� 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 Location:512 N Salisbury St,Raleigh,North Carolina 27604 'rif��' Phone:919-807-63001 FAX:919-807-6492 �,���Ny�ltrt Internet:www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer—Made in part by recycled paper