HomeMy WebLinkAboutSW3220305_Construction Sequence_20220325FA 3 1 4 0 0 1 CONSTRUCTION SEQUENCE 1. THE CONSTRUCTION OF THE STABILIZATION MEASURES FOR THE PROJECT WILL BE COMPLETED BY PHASE TO REDUCE THE AMOUNT OF LAND DISTURBANCE AT ANY GIVEN TIME. THE WORK WILL BE SEQUENCED SUCH THAT ALL DISTURBED AREAS ARE SEEDED, STABILIZED, AND MATTED PRIOR TO PROCEEDING TO THE NEXT PHASE. 2. PHASING OF WORK SHALL BE AS FOLLOWS: A. AERATION BASIN NO. 6 B. EQUALIZATION TANK NO. 1 AND NITRIFICATION ENHANCEMENT FACILITY (NEF) D D. MAINTENANCE CANOPY E. BLOWER BUILDING F. METER VAULTS AND JUNCTION BOXES 3. PRIOR TO ANY CONSTRUCTION ACTIVITY, SECURE ALL REQUIRED PERMITS FROM NC DEMLR AND CABARRUS COUNTY. 4. PRIOR TO BEGINNING CONSTRUCTION, CALL THE NC DEMLR MOORSVILLE REGIONAL OFFICE AT 704.663.1699 TO SCHEDULE AN ON -SITE PRE -CONSTRUCTION MEETING. 5. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. 6. FOR EACH PHASE OF WORK, THE GENERAL CONSTRUCTION SEQUENCE SHALL BE AS FOLLOWS: 6.1. THE DESIGN -BUILDER SHALL CALL '811' 72 HOURS PRIOR TO ANY EXCAVATION WORK. 6.5. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED, IF NEEDED, AT LEAST ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. 6.6. STAKE IMPROVEMENTS FOR EACH PHASE AS NEEDED AND REQUIRED ON THE DRAWINGS AND IN THE SPECIFICATIONS. AFTER STAKING, DESIGN -BUILDER AND DESIGN -ENGINEER SHALL REVIEW STAKING AND MAKE ANY NECESSARY ADJUSTMENTS BEFORE COMMENCING EARTHWORKS. 6.7. INSTALL NECESSARY DEWATERING AND EROSION CONTROL MEASURES FOR SITE. THE PUMPLINE AND ALL ASSOCIATED DEVICES SHOULD BE CONTAINED WITHIN THE LIMITS OF DISTURBANCE AT ALL TIMES DURING CONSTRUCTION. 6.8. FOR SANITARY SEWER PIPE EXCAVATION AND INSTALLATION, DESIGN -BUILDER SHALL LIMIT THE LINEAR LENGTH OF TRENCH TO BE EXPOSED AND BACKFILLED AT ONE TIME TO REDUCE EXPOSURE TO EROSION AND SEDIMENTATION. ENTIRE EXPOSURE OF A GIVEN PIPE EXCAVATION AND INSTALLATION SHALL NOT BE PERMITTED. 6.9. LIMIT DISTURBANCES TO THE LENGTH THAT CAN BE STABILIZED AT THE END OF THE WORKING DAY. AS SECTIONS OF DISTURBED STREAM AREAS ARE BROUGHT TO FINAL GRADES WITHIN A PHASE, PERMANENTLY STABILIZE THESE AREAS BY APPLYING TEMPORARY SEED MIX, PERMANENT NATIVE SEED MIX, STRAW MULCH, AND STABILIZATION MATTING ACCORDING TO THE DETAILS AND SPECIFICATIONS. STABILIZATION IS REQUIRED WITHIN 7 CALENDAR DAYS FOR ANY AREAS STEEPER THAN 4H:1V AND 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON THE PROJECT SITE. 6.10. SITE STABILIZATION IS REQUIRED FOR ALL PHASES OF WORK PRIOR TO FINAL APPROVAL OF GRADING PERMIT. GRASS UTILIZED AS PERMANENT GROUND COVER MUST BE AT A MOWABLE HEIGHT THAT GENERALLY PROVIDES AT LEAST 80% COVERAGE THROUGHOUT THE SITE, WITH NO LARGE BARE PATCHES OR EVIDENCE OF EROSION. 6.2. AFTER STAKING/FLAGGING, DESIGN -BUILDER AND DESIGN -ENGINEER SHALL REVIEW AND MAKE ANY NECESSARY ADJUSTMENTS. 6.11. PERIMETER MEASURES MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL 6.3. INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. LIMIT TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING C CLEARING AND LAND DISTURBING ACTIVITY TO ONLY THE AREA NECESSARY TO INSTALL WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT THE PERMITTED MEASURES. ADEQUATE. SEDIMENT TRAPS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPs UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. 6.4. DESIGN -BUILDER SHALL LIMIT AMOUNT OF CLEARING TO THE EXTENT PRACTICABLE IN ORDER TO PERFORM NECESSARY ACTIVITIES FOR CONSTRUCTION. THE PROJECT MAY 6.12. BEGIN WORK IN THE NEXT PHASE, IF APPLICABLE, BY STARTING AT NUMBER 6 OF THE ONLY BE CLEARED ONE PHASE AT A TIME. ANY ADDITIONAL SITE PREPARATION SHALL CONSTRUCTION SEQUENCE. BE APPROVED BY THE ENGINEER. 0 J B W z Q Q � 6 af J U) U 0 3: U Q N O N N O N 00 N u.i H Q 0 O J 0 N T 0 O O eo O LO w A Q z W J U_ O CID 0 U m_ U co D_ SOIL TYPES WITHIN LIMITS OF DISTURBANCE SOIL SURVEY OF DURHAM COUNTY AND THE CITY OF DURHAM , NORTH CAROLINA MAP UNIT SOIL NAME HYDROLOGIC CODE SLOPES (%) INFILTRATION RATE (IN/HR) DEPTH (IN) Ur URBAN LAND D* -- -- -- ChA CHEWACLA SANDY LOAM B/D 0-2 0.57-1.98 >80 EnD ENON SANDY LOAM C 8-15 0.06-.020 >80 *NO SOIL GROUP IS GIVEN IN THE SOIL SURVEY REPORT, BUT URBAN LANDSCAPES HAVE BEEN NOTED TO TYPICALLY HAVE A HYDRAULIC SOIL GROUP CLASSIFICATION OF D. PoD EnD XChA VC) MeB ChA cKy-River� (� pIMITS OF 3•��� :. EnB WeA * Y' Aa- Me6 Ur ,, �ChA N/ PoF CcD2 ChA ' EnD ra �a� ChA ChA � W PaF EnD SOIL SURVEY MAP NO SCALE 7. INSPECT AND MAINTAIN EROSION CONTROL MEASURES FOR THE DURATION OF THE PROJECT. 8. REPAIR ANY DAMAGES TO ITEMS THAT ARE NOT IDENTIFIED AS PART OF THIS CONSTRUCTION AT NO ADDITIONAL COST TO OWNER. 9. REMOVE TREE PROTECTION AND SAFETY FENCE AS ALLOWED BY NC DEMLR, WSACC, AND THE DESIGN -ENGINEER. 10. NOTIFY WSACC TO SCHEDULE A SUBSTANTIAL COMPLETION INSPECTION AT THE CONSTRUCTION SITE. PREPARE A PUNCHLIST OF ITEMS TO BE ADDRESSED AS A RESULT OF THE SUBSTANTIAL COMPLETION INSPECTION. 11. WHEN THE PROJECT IS COMPLETE, THE PERM ITTEE SHALL CONTACT DEMLR TO CLOSEOUT THE E&SC PLAN. `uV�VU.S, DEPARTMENT OF THE INTERIOR lM Nelian lMep COCANCORD SE QUADRANGLE x1Lnceso' r p p ne U.S. GEOLOGICAL SURVEY US Topo NORTH ROLINA - CABARRUS COUNTY 7.5-MINUTE SERIES 35.3)50° M�.5i59 ,a9o- '35°"'E 36 37 38 39 40 41 42 43 44 45 ao.35.3— E° sw av74momN l \i � S I� `. z 3. (. J .I � po � 0 po.O�� �� 00 � ��� � 14 � ��.6`✓ :� `� �\� _ Y 1 �r� f k ���� ) �W'�e\��-,\\ - '�I t � ��N �/ 0 : \ L +ra r U O 13 b a ir, 12 CONCORD 11 -..� o t 12 m PROJECT �I o 10 c _ _ � �( Rod o a f; LOCATION o o �� _ Mill 10 09 e l C V oHARRISBL RC 09 O �I O8 J �o l } f OB I, >J 0 07 a � w a 07 U a�I f 0 05 ,.o os 04 r �� OA �o<, �D° —�. 03 02 E sm 02 01 1 � i O - 35.o' 250 saszsa° 35 36 37 38 39 40 41 4t 47 44 '41-1 sasom�3s.zsoo QUADRANGLE TOPO MAP NO SCALE vI vwIIII IIII AND . ENVIRONMENTAL ENGINEERING AND CONSULTING 309 East Morehead Street, Suite 160, Charlotte, NC 28202 (704) 358-7204 North Carolina Board of Examiners for Engineers and Survevors License No. F-0785 •.••`"1 144664000000 CA R p''% ,. SEAL Z 365 02/20/22 9:43 AM FINAL DRAWINGS - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION WSACC 1S41100124 # NC b P41Ie $ toy + H SAS 18 ME. ROCKY RIVER REGIONAL WASTEWATER TREATMENT PLANT PHASE 3 EXPANSION REVISIONS REV DATE •• DESCRIPTION LINE IS 2 INCHES r_TA211»06yrFA2 DESIGNED: D. WRIGHT DRAWN: R. JAMES CHECKED: K. DEVENDORF CHECKED: D. VARJABEDIAN APPROVED: K. DEVENDORF FILENAME 154689-C-000-612 . D WG BC PROJECT NUMBER 156673 C�I�I���r�:Z�aJx�r�l�J►ll 1�:7 CIVIL EROSION & SEDIMENTATION CONTROL NOTES 2 DRAWING NUMBER C-000-612 Xx SHEET NUMBER OF ❑P C i 0 1 1 2 1 3 V� 0