HomeMy WebLinkAboutSW6220301_Design Calculations_20220325Sform water Mohagement Reporf March 14, 2022 Long Point Subdivision Long Point -Road Vass, Moore County, NC Prepared for: Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 (919) 553-6570 FIRM# F-1445 1 _a SEAL 051571 rr�i AA • Q `l�ti. TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY —WET POND #1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE —DEVELOPMENT HYDROGRAPHS POST —DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION —VOLUME —FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY— WET POND #2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE —DEVELOPMENT HYDROGRAPHS POST —DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION —VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY —INFILTRATION BASIN #3 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE —DEVELOPMENT HYDROGRAPHS POST —DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION —VOLUME —FLOW SUMMARY SCM SUMMARY ttmr ._fs1,..ffT1�CENik`A t�fP� OVERVIEW This report contains the storm water management overview for the residential development Long Point Subdivision on Long Point Road in Moore County. The majority of the project site is currently undeveloped. The proposed site consists of 34.14 acres and approximately 8.16 acres will be disturbed as part of this project for the construction of the site improvements. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710951400J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are existing stream or wetland features on the proposed property. There are three proposed storm water management facilities (two wet ponds and one infiltration basin) outlined in this report that have been designed for post —development peak attenuation to treat the impervious areas of the development. Wet Pond #1 is designed to capture a drainage area of 8.83 ac with an impervious area of 3.21 ac. Wet Pond #2 is designed to capture a drainage area of 2.62 ac with an impervious area of 1.09 ac. This drainage area consists of 9,318sf of existing impervious area to be removed. There is 1,999 sf of impervious roadway area that will bypass Wet Pond #2. Infiltration Basin #3 is designed to capture a drainage area of 9.74 ac with an impervious area of 3.40 ac. The balance of the site is open space and will by—pass the proposed SCM. The SCM are designed to treat a 1.0" storm event. Im ervious Area Summary— Wet Pond # 1 Roadway 35,536 0.82 Lots 104,000 2.39 Total IA to Pond 139,536 3.21 Impervious Area Summary — Wet Pond #2 Roadway 12137 0.28 Lots 26 000 0.60 Sidewalk 1766 0.04 Pool/Building 7,354 0.17 Total IA to Pond 47,257 1.09 Impervious Area mma — Infiltration Basin #3 Roadway 35,943 0.83 Lots 112A0 2.57 Total IA to Pond 191,943 3.40 Soils The County Soils Survey indicates that Ailey Loamy Sand, Gilead Loamy Sand, Vaucluse Loamy Sand, and Wehadkee Loam soils are present on the site. FIGURES 35° 14 36" N 35° 14' 6" N Hydrologic Soil Group —Moore County, North Carolina 3 S35° 14'36N 65660D 6%7W 65M 657000 M7100 � 3 Map Scale: 1:4,450 Y printed on A portr& (8.5' x 11') gxnt Meters N 0 50 100 20D 30D - —Fea 0 200 400 000 1200 Map projection: Web Menator Comer coordinabes: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 1/17/2022 Conservation Service National Cooperative Soil Survey Page 1 of 4 35' AWN O N 0C ( 0D 0 or (D 0 O N = Z' O � c O .< D N V1 O CAa 131313El� t_ d❑ I_❑C'C1C1N c .. 7 CD m D CO `o Z 0 n A m CO D U2 Z v W D to D (� v o S v o v ° v o v c N m N N f0 a a o � r, p ^ N 01 N N Ol O' (D Q (D m G l fr t} a o � d ma o ' 0 cn ° o v 0 n m (cn d 0 0 C � y 0 N 2 N CDN N = 7 cl O O � � f N N 0 m N N O N 0 m 0 m �3 0 o� Ot Mtn CT Q. tncn c 2. o m ya-0 K 00 Q N O D) n�cn O N O 3 v_ (D (D N 3 m W N O 7' N (D �. 0 3 D CD N O N d (D 0 O N 9 7 (0 7 C, co fd 00aI v n� o� c D2 m$ D� mnCDoo CD m79. °o c (D C �(Dmm O o- l< Q O N v O_ fp C N N n OCC N (D '0 N O 27. n 0 CD l< 2 (D (O O n (D N N N a) (D �• N N� G -0 (D l< N 3 _ N s _. 6 0 N O ID N (D 7 v (D O (D 7 O D (D 6 3 C Z :0 41 Q 7- d 41 (D O, - d c EP_q m m o ' o o m o ��� u o v �Q < 0 (73 D CD m a �-^-m �a av(^o�U) CD �(�no� n 3 d (p Q N (D 3 Q (D O 3 w 7 n O n 6 0 .Ni �, 0 N c N (D �• a z '� N W O n (D 7 4) O �. a 6 t!• N p) < 3 O (n W c W 3 0 7 < W O C 7 < 7 N O C—) (D O N n N U O (0 ^'^ =< N (D S O 0 N '� N ((�D N A 07 Q N 3 In O D N 7 U fn N CD p ° N j o N 01 D N (3 O N D N C N a m 3 N 7 < (U (� Q :2 O n D) C- O N n (n N U 3 O O (D (o — S N F (D C 3 7' -- O Z (� Q Z O G) W 2 cn S 3 U1 j 3 n O 7 S �"O~ .N $ i0 n 0 N d 7 mcmm� W W �' (D �» 3 Q N �'°-' D) co � D N O n m 3 O N(n 3 N n C Q (D V �, W— j' m N ED 7 3. N N n CD 3 C CO 3 O 0 N Cl- 7 O CD C W O_ N O O 2 (D N G n7 M (D O 0 N 7 a (D (n fD .� fP N m (p 0 c W a w N rap a O. Hydrologic Soil Group —Moore County, North Carolina Hydrologic Soil Group Map unit -symbol Map unit name Rating Acres in ACI Percent of AOI AeB Ailey loamy sand, 2 to 8 B 5.6 15.1 % percent slopes GhB Gilead loamy sand, 2 to C 4.8 13.0% {' 8 percent slopes VaB Vaucluse loamy sand, 2 C 14.9 40.1% to 8 percent slopes VaD Vaucluse loamy sand, 8 C 7.0 18.9% to 15 percent slopes We Wehadkee loam, 0 to 2 B/D 4.8 13.0% percent slopes, frequently flooded Totals for Area of Interest 37.21 100.0% usDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1 /17/2022 Page 3 of 4 7C,E�c I St k— a ej $ v d14' •a � � �� C � b r S o C U a G Q N A � O � E 7 S p� C �- A Y A �� ra p a■ m r a � 'Sjy it t m 5e a a Q 0 1.0 3 cod �u dr9 d a rW v G Um a u o x a Y° apgnz E��� Ea HIM p � 6 x r Q Q 0-Eg co E dCk en r' W a, n ei E O rs, a� 1CN w wU N � y r ° s - � 2 4 c Z G O 03 12 G E 6 .- O ME udu A 7 47 r-. r r r i �a r ry x 110t 1117/22, 10:43 AM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Vass, North Carolina, USA*+ ' Latitude: 35.2377°, Longitude:-79.2779° Elevation: 257.72 ft** source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekla, and D- Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF gra hp ical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 duration Average recurrence interval(years) 1 ������ 2 5 10 25 50 100 200 500 1000 0,440 0.519 0.604 0.666 033-8 0.788 0.835 0.877 0,928 0.966 5-min (0-399-0.498) (0-472-0-577} (0.548-0.671) (0.$03-Q.737) (0.664.0-815) (0-708-0-870) 00.746-0921 0.780-0.9681 f0.S17-1.02} (0.845-1-07] 0. 10-min [0 0 779) (0: 55.0 92?} (0 878--1707] (0-965-1.18} (1.061183oy (1- 32 -39) (1- 93346j 1 4395d 1.29 �62) (1 33-51?68) 15-min 0-797---0973 (0.949-14.16L(1,111 -2236 1.z?3549 (1.344965) 1.43-51975 1. 0-61885 1.561694 (163204) (1.672..11 1.20 1.44 1.74 1.95 2.21 2.39 2.57 2.73 2.94 3.09 30-min 1.09-1,34 1,31-1.60) 1.58.1.93) (1.77-2.16) 1 (1.99.2.44) 1 (2.15-2.64) I (2.30.2-83 2A3-3.02 259-3,24} (2.70-3.41 -17 4.51 60-min (1. 6---1.66) (1 65-82A1) (2.0 2A7) (2-; 4 2481 [2.65525) (2. 2 3458) l (3.163490) (3.41.4323) (3.724 65] [3.54 98) 2-hr (1.59 1698) 1 (1.93-2.39) 1 (2-40 2.99) 1 (2. 6.3.43) 1 (3.214 02) I (3-57 4A7) 1 (3-97 4293) 1 (4-4.6-39) (4.68-6.00){5.01 6�48} 1.87 2.27 2.84 3.29 3.91 4.40 4.90 5.42 6.14 -6 72 3-hr (1.69-2.09] 2.05-2.54) 2-57-3-14S) 97.3.68 (3.504.36) 3-91-4.90 (4,33-5.45) (4.75-6-03) j[(5.32-6.84)jj(5.76-7A9 6-hr F--2.23---Jl (7-03-2-48) 2.70 1 (2.45.2.99) 3.39 (3-09-3-75 3.93 (3.54i 4.35}1 4.68 14.21-5.17) 5.29 {432.5.83 F 5,92 (5.23-6.51) 6.57 516-7.22 7.48 (6.47-8.22 8.21 (7-0?-9.03) 2. 12-hr 2, 9-62392 (2.89 3 54) (3,64446 4: 3-5-19] (5.03 F321) (S.W7..04) 6.33 7-91 7.01 8584 17 94-21II2 (8.65. 1.2 24 hr 2,860935 3.46.405 4.355 10 5,04 5?92) (5-90--7.06) 6,75 7596 7:5 -8.09 8,31 9.8t 9.3&1312) (10 2 2.7 2-day 7. 3.35 3088 .04-4 S8 50453$$ 5,83 6.79) (6- y 870.5) 1 {73 9.06) 1 (8. 93 0.1 (9,47- 111.21 10 2.7} 11 6-13.8 . 3-day S-4.10) (3•14.4) (4,20494; (5.3376.14) (6. 4-67.09) [7. 58339] (3. 2443) (A.0110.5) [9.9 -181.6] 012-13.1] (1213 4-day (3.784.32) {4. 55619y (5,62 6A2) (.S. 6---7339) (7.61-874) (8-50998o) (9.43.10,9) {i0la• 2.1} (113z 3.6 (12 7-14.9) 7-day (4.364699J 5.21 5796] (6 388128) 1 (7.26-8.33 8A9 9477) 9,48 10;9) 10 5 2.1 11 5-13,3) 12.19-5.0 (1410.16-4) 5.32 6.34 7.64 8.66 10.0 11.1 12.2 13.3 14.8 16.0 10-day {5.Oi•5.66J (5.97-6.74] (7,18-8.11) (8.1.3-9.20) (9.40-10.6y (10.4-11.$) 1 (11.4-13.0] 1 (12.4.14.2) (117-15.8) (14.8-17.1 20-day 7--1$7 2 67.61) (8 flag 99 (6-.4) (9.46.10-6 (10 6 111-9 12.11-13 7) (13.3-15 1 ) (14 5-16.5 15 9) 17.19 9-9 (1825- 30-day 8,42 9.44) (9 92--15.1 11 6-13.0 12.18--14A) j 114 5- 6-3) {157G17.7) (16.9-19.2) 1 tl8.12--20.6 19 8-22.6 (21 0- 4.1 11,3 13.2 15.2 16.7 18.6 20.0 21.5 22.9 24.7 26.1 45-day 107-11.9 12.5-14.0] I (14,4-16.0) (17.5-19.6) (18.9-21.2) 1 (20.2-22.7 21.5-24,2. (23.1-26,2 24,447.7 60-day 1219--14.3) (1510-16.7) (17.t08.9) (18.r, 0-6) i205,22.8} (22?)-24.5} (23-4.26.1) (248627.7) (2625-'5-81 (278-31-4) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are hot checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 documanl for more information. Back to Tap PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?lat=35.2377&Ion=-79.2779&data=depth&units=english&series=pds 1/4 Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 Double D Engineering, PLLC Atlas: Mr. Lee Humphrey 150 S. Page Street Southern Pines, NC 28387 December 6, 2021 Re: Seasonal High -Water Table Identification and Soil Infiltration Rates: Long Point Road. Moore County, NC (PIN 00031445) Soil conditions and infiltration rates were evaluated and measured on the above -referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C- 1 of the North Carolina Department of Environnlental Quality Stormwater Design Manual. SoiI samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with a chroma of 2 or less (in Munsell color notation) in mottles or the horizon matrix. Colors of chroma 2 or less (file to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table (SHWT). SATURATED HYDRAULIC CONDUCTIVITY (K_._t) Soils within the proposed sormwater BMP device typical of those within the Candor Sand series. Candor Sands are very deep and excessively drained soils with moderately high rates of permeability. Infiltration rates were measured to determine the suitability for installation of a stormwater infiltration BMP. Infiltration rates were measured using a Johnson Constant Head Permeameter. Measurements were recorded at varying intervals until equilibrium was reached. A summary of observations within the proposed Stormwater BMP Device is shown in the table below. SHWT D feet below round surface 4.5' SHWT j elevation: BMP Device Site #1 Zunsell Color Ksat #1 Ksat #2 Ksat O Ksat 4 Notation 5Y 8/1 N/A N/A N/A N/A 2.5Y 7/1 Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 BMP Device Site #2 SHWT Munsell Color Ksat 91 Ksat #2 feet below Notation round surface 10, SY 8/1 N/A N/A SHWT MY 711 elevation: 243' BMW neviicp citp iel Ksat #3 Ksat #4 N/A N/A SHWT Munsell Color Ksat #1 Ksat #2 Ksat #3 Ksat #4 (feet below Notation round surface) I 7.3' SY 8/1 040" 40-50" 50-88" N/A SHINT MY 7/1 LS/SL Perched SL elevation: 241' ' 22" / hour Water 8" / hour Not Measured CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both of these factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on -site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you, &CO Cole North Carolina Licensed Soil Scientist BMP Site #1 SHWT: 66" (4.6') bgs SHWT Elevation: 261.6' Kest: Not evaluated R aw—MARAMIM BMP Site 92 SHWP. 120" (10') bgs SHWT Elevation: 243' Ksat: Not evaluated ,N\Nl I � \ NA 0,\kKfAIa 2hz BMP Slte #3 I SHW76 88" (7.3') bgs SHWT Elevation: 241' Ksat 0-40" (3.31 LS/SL: 22" 1 hour Kest 40-W' SCL with mottles: perched water NOT Measured Kant 50.88" (4.2'-121 SL: 8" / hour 240 WATER QUANTITY -WET POND # 1 SUPPLEMENT-EZ COVER PAGE FORMS LCADt PROJECT INFORMATION J 1 Project Name Long Point Subdivision 2 Project Area ac 34.14 3 Coastal Wetland Area (ac 4 Surface Water Area (ac 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 j Width of vegetated setbacks provided feet). N/A 8 Will the vegetated setback remain ve etated? NIA 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? No 10 Is Weambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland _ 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo. PE 28 Organization: Bowman North Carolina, Ltd. 29 Street address: 4006 Barrett Drive, Suite 104 30 _ City, State, Zip: Raleigh. NC 27609 31 Phone number(s) Email; 919-553-6570 32 cpardo@bowman.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 01�1 tl�ailf!/11�1 tip aR� ..... OL/,� !. S51D,=�. q SEAL _ 051571 £ R ' --�/N/0- Date DRAINAGE AREAS 1 IIs this a hiqh density project? Yes 2 If so, number of drainage areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 Type of SCM Wet Pond Wet Pond Infiltration Basin 5 Total drainage area (sq ft) 1487139 sf 384558 113843 424106 6 Onsite drainage area (sq ft 1487139 sf 384558 113843 424106 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft) 336735 sf 139536 sf 47257 sf 147943 sf 9 New BUA on subdivided lots (subject to permitting) s ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 1766 sf 1766 sf Roofsq ft 242000 sf 104000 sf 26000 sf 112000 sf Roadway (sq ft) 85615 sf 35536 sf 12137 sf 35943 sf Future (sq ft) 7354 sf Other, please specify in the comment box below (sq ft) _ 7354 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq it 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft) 9318 sf 9318 sf 18 Percent BUA 22.64% 36.3% 42% 35% 19 Design storm (inches) 1.0 in 1.0 in 1.0 in 20 Design volume of SCM (cu ft) 12068 cf 4029 cf 12863 cf 21 Calculation method for design volume Simple Method Simple Method J Sim le Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Entire Site: Existing 9,318 sf Impervious Area to be removed from DA2 Other: Pool & Building from DA2 There is 1,999 sf of impervious roadway area that will bypass Wet Pond 2 WET POND Drainage area number 1 it 2 IGENER(LL MDC FROM 02H .1050 *7 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H: ? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes Yes 9 What is the method for clewatering the SCM for maintenance? Pump ( referred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes 12 Does the drainage easement comply with General MDC 9 ? Yes Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC (10)? NIA N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes Yes 16 Does the SCM follow the devicespecific MDC? Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes 18 Sizing method used SAIDA SAIDA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) ((fmsl) 250.00 247.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 251,00 248.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 258.50 252.50� 23 Elevation of the permanent pool (fmsl) 259.00 253.00 24 Elevation of the top of the vegetated shelf (fmsl) 259.50 253.50 _ _ 25 Elevation of the temporary pool (fmsl) 259.80 253.80 26 Surface area of the main permanent pool (square feet) 11690 2850 27 Volume of the main permanent pool (cubic feet) 42894 cf 6423 cf 28 Average depth of the main pool (feet) 4.47 ft 3.02 It 29 Average depth euation used Equation 3 Equation 3 30 If usin a uation 3, main pool perimeter feet 747.0 ft 274.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 32 Volume of the foreba (cubic feet) 8120 cf 1024 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes 34 Clean -out depth for foreba (inches) 18 in 18 in 35 Desi n volume of SCM cu ft) 12068 cf 4029 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 1.75 in 1.00 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the tempora ool (days) 2.52 2.40 Are the inlet(s) and outlet located in a manner that avoids short- 41 circuitin ? Yes Yes 42 Are berms or baffles provided to improve the flow path? Yes Yes 43 Depth offorebay at entrance inches 30 in 30 in 44 Depth of forebay at exit (inches) 24 in 24 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H: 6:1 6:1 Does the orifice drawdown from below the top surface of the 48 permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y. please provide documentation that MDC 9 is met_) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Hasa planting plan been erovided for the vegetated shelf? Yes Yes AGEMONAL414MM WE R. Please use this space to provide any additional Information about 55 the wet pond(s): Entire Site: Existing 9,318 sf Impervious Area to be removed from DA2 There is 1,999 sf of impervious roadway area that will bypass Wet Pond 2 Wet Pond ] 1:21 PM 3/14/2022 Bowman North Carolina, Ltd. Long Point Subdivision, Moore County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage .4rere8.83 Existing Soil Grdetps Soil GroUv Map Symbol Soil Description Acres Percent of DA C GhB Blaney Loamy Sand 0.63 7% C VaB Blaney Loamy Sand 4.72 53% B AeB Blaney Loamy Sand 3.03 34% B/D We Blaney Loamy Sand 0.45 5% Existins Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand B 1.08 55 6.7 Wooded - Good Stand C 0.85 70 6.7 Open Space - Good Stand B 2.64 61 18.2 Open Space - Good Stand C 4.26 74 35.7 Cumulative Curve # = 67.4 Bowman North Carolina, Ltd. Long Point Subdivision, Moore County, NC Curve Number Calculation (CN) Post -Developed Conditions Drainage Area (acres]: 8.83 Existing Soil Groups: Sod Grouv Map Svmbol Soil Description Acres Percent of DA C GhB Blaney Loamy Sand 0.63 7% C VaB Blaney Loamy Sand 4.72 54% B AeB Blaney Loamy Sand 3.03 34% B/D We Blaney Loamy Sand 0.45 5% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Wei lited CN Open Space - Good Condition B 1.57 61 10.8 Open Space - Good Condition C 4.05 74 33,9 Impervious Area B & C 3.21 98 35.6 Cumulative Curve # = 80.4 Proposed Wet Pond #1 Project Information Project Name: Long Point Subdivision Project #: Designed by: CEP Date: 1/21/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 8.83 Acres 384,558 sf Impervious Area (IA) = 3.21 Acres 139,536 sf Percent Impervious (1) = % 36.28 % Required Surface Area Permament Pool Depth: 4.47 ft SA/DA = 1.1 Min Req'd Surface Area = 4,230 sf at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.377 in/in Storage Volume Required = 12,068 cf above Permanent Pool Elevations Top of Pond Elevation = 263.50 ft Temporary Pool Elevation = 259.80 ft Permanent Pool Elevation = 259.00 ft Shelf Begining Elevation = 259.50 ft Forebay Weir = 258.00 ft Shelf Ending Elevation = 258.50 ft Bottom Elevation = 251.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 11,690 sf Volume of Temporary Storage = 12,587 cf Is Permenant Pool Surface Area Sufficient (yes/no)? ( 11690 > 4230) sf Volume of Storage for Design Storm = 12,587 f 12587 > 12068 cf Incremental Drawdown Time STORMWATER POND #1 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Long Point Subdivision Project #: asigned by: CEP Date: 1/21/2022 iecked by: Date: Water Quality Orifice ' Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 Cp - DZ (Z-D/24-Ei)^"/2) Q2 = 0.372 Co ' D'(Z-Ei)^(3"2) Q,=0 Orifice Diameter (D) = 1.75 in Cd = 0.6 Ei = 259 Orifice Inv. Zone 1 Range = 0.00 to 259 Zone 2 Range = 259 to 259.1 Zone 3 Range = 259.1 to 260 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 259.00 13,835 0 0.00 2.00 0.000 — 259.50 16365 7,550 0.50 3.00 0.052 2.398 259.80 17215 5,037 0.30 3.00 0.068 1.226 Total 12.687 -- — — 3,624 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 12,687 cf Total Time = 3,624 min Total Time = 2.52 days 1/26/2022 Prop Wet Pond- new design-#1 1 of 1 Project: Pond #1 Date: 1/26/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 259 11,690 5,291 42,894 A2 (Perm -Pool) 258.5 9,475 4,578 37,603 Al (Bottom_Shelf) 258 8,835 8,205 33,025 257 7,575 6,960 24,820 256 6,345 5,460 17,860 255 4,575 4,185 12,400 254 3,795 3,433 8,215 253 3,070 2,725 4,783 252 2,380 2,058 2,058 251 1,735 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 259 1,840 4,920 6,760 3,226 8,120 258.5 1,500 4,645 6,145 2,926 4,894 258 1,180 4,380 5,560 1,968 1,968 257.5 700 1,610 2,310 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom -Shelf): 18.9% *Between 15% & 20% 3.97 *At least 3' average depth 42,894 747 3 9,475 Average Depth = 4.47 Proposed Wet Pond #1 Project Information Project Name: Long Point Subdivision Project #: Designed by: CEP Date: _ Revised by: Date: _ Checked by: Date: Site Information Sub Area Location: Drainage Area (DA) _ Impervious Area (IA) _ Percent Impervious (1) _ Orifice Sizing Orifice Size = Drawdown Time = 1 /21 /2022 _Dra_ina2e to Proposed Pond 8.83 Acres 3.21 Acres 36.28 % (Drainage Area) 1.75 in (Diameter) 2.52 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 200.0 cf Weight: 12480 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 14,976 Ibs Volume of Concrete Req'd: 99.8 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 109.5 cf (4'x4' riser x 4.5' = 72sf, 5'x5' footing x 1.5'=37.5cf) 1� 1 Z Q J w STORMWATER MANAGEMENT DESIGN WET DETENTION POND #1: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES: POND DESIGN SUMMARY CAPE FEAR LITTLE RIVER (LOWER LITTLE RIVER) 18-23-(10.7) WS-III; HQW 0303000403 35.237786'N,-79.278200'W DRAINAGE AREA TO POND: 8.83 ACRES SITE IMPERVIOUS AREA TO POND: 3.21 ACRES OFF- SI E DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 3.21 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 8.83 AC 8.83 AC CURVE NUMBER: 67.4 80.4 TIME OF CONCENTRATION: 18.1 MIN 5 MIN 1.0" STORM EVENT: 0.335 CFS 0.024 CFS 1-YEAR STORM EVENT: 5.511 CFS 19.74 CFS 0.147 CFS 2-YEAR STORM EVENT: 9.270 CFS 27.01 CFS 0.621 CFS 10-YEAR STORM EVENT: 21.30 CFS 48.07 CFS 4.952 CFS 100-YEAR STORM EVENT: 43.51 CFS 82.01 CFS 25.92 CFS STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA STORAGE FL) TOTAL( STORAGE 0.0 259.0 13835 0 0 0.5 259.5 16365 7550 7550 0.8 259.8 17215 5037 12587 (WQV) 1.0 260.0 17785 3500 16087 2.0 261.0 20665 19225 35312 3.0 262.0 23895 22280 57592 4.0 263.0 26330 25113 82705 4.5 263.5 27570 13475 96180 /W§ oM \ ° d2 2�§ x yam CD ( m n � {� \I M � :3 § � 0- C> § t a= § ui s 7 b F u T -r f i� �x € T5 ioog a If r w o� � cn m� -�g q§gl *_ wo w w U_ Fm W U_ 0 a vrCEl �� 9 TOP OF STRUCTURE NOT SHOWN FOR CLARITY (REMOVABLE TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. RIJCR JIRUI.IURC_ - {� 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4"x4" PVC TEE PERM. POND ELEV.=259.0 12" MIN. r lrDIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: S. N.T. Pond Report s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 01 126 / 2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 259.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft) 0.00 259.00 13,835 0 0 0.50 259.50 16,365 7,550 7,550 0.80 259.80 17,215 5,037 12,587 1.00 260.00 17,785 3,500 16,087 2.00 261.00 20,665 19,225 35,312 3.00 262.00 23,895 22,280 57,592 4.00 263.00 26,330 25,113 82,705 4.50 263.50 27,570 13,475 96,180 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 1.75 Inactive Inactive Crest Len (ft) = 2.00 14.00 Inactive Inactive Span (in) = 24.00 1.75 0.00 0.00 Crest El. (ft) = 261.00 261.90 0.00 0.00 No. Barrels = 1 1 0 0 WeirCoeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 259.00 259.00 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 26.00 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 3.85 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 } 0.00 3.00 Total Q Note: Culvert/Orifioe outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 6.00 9.00 Stage / Discharge Elev (ft) 264.00 263.00 262.00 261.00 260.00 ' ' ' 1' 259.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) 2 Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description Pre -Developed -Overall Site 1 SCS Runoff 5.557 726 20,749 - - - 2 SCS Runoff 20.11 2 718 40,378 ------ ------ ------ Post Developed to Pond 3 Reservoir 0.147 2 1442 27,802 2 261.02 35,706 Post Through Pond 5 SCS Runoff 0.319 2 152 2,674 ------ ---- ----- 1.0 Post -Developed to Pond 6 Reservoir 0.024 2 366 2,361 5 259.17 2,514 1.0inPost Through Pond i Wet_pond#1.gpw Return Period: 1 Year Wednesday, 01 / 26 / 2022 Hydrograph Report z Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.09 in Distribution Storm duration = 24 hrs Shape factor Pre -Developed -Overall Site Q (cfs) Hyd. No. 1 -- 1 Year Wednesday, 01 / 2612022 = 5.557 cfs = 726 min = 20,749 cuft = 67.4 = 0 ft = 18.10 min = Type II = 484 Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 1 0.00 1320 1440 1560 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.09 in Distribution Storm duration = 24 hrs Shape factor Q (cfs 21.00 18.00 15.00 12.00 • M . 11 3.00 Post Developed to Pond Hyd. No. 2 -- 1 Year Wednesday, 01 / 26 / 2022 = 20.11 cfs = 718 min = 40,378 cuft = 80.4 = Oft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 • ti M M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1326 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 01 / 26 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.147 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 27,802 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 261.02 ft Reservoir name = Wet Pond Max. Storage = 35,706 cult Storage Indication method used Q (cfs) 21.00 18.00 15.00 12.00 • e� 3.00 0.00 -4— = 0 600 - Hyd No. 3 Post Through Pond Hyd. No. 3 -- 1 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 3.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 1 Total storage used = 35,706 cult C. Hydrograph Report Hydraflow Hydrographs Extension For Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 8.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Wednesday, 01 / 26 / 2022 Peak discharge = 0.319 cfs Time to peak = 152 min Hyd. volume = 2,674 cuft Curve number = 80.4 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 5 - 1.0 Post -Developed to Pond Aax. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. 1.0inPost Throu h Pond Wednesday, 01 / 26 / 2022 = 0.024 cfs = 366 min = 2,361 cuft = 259.17 ft = 2,514 cuft . . ONO 1 .11 11 :11 �11 111 .11 11 •:11 �11 .111 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D0 by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) 9.398 Time interval (min) 2 Time to Peak (min) Hyd. volume (cult) 32,191 Inflow hyd(s) Maximum elevation (it) Total strge used (cult) Hydrograph Description 1 SCS Runoff 726 -- - Pre -Developed -Overall Site 2 SCS Runoff 27.54 2 716 55,618 — --- Post Developed to Pond 3 Reservoir 0.621 2 942 42,511 2 261.18 39,276 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ---- 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 259.00 0.000 1.0inPost Through Pond Wet_pond#1.gpw Return Period: 2 Year Wednesday, 01 / 26 / 2022 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.73 in Distribution Storm duration = 24 hrs Shape factor M . Me 4.00 2.00 0.00 0 120 240 Hyd No. 1 Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year 360 480 600 720 840 Wednesday, 01126 / 2022 = 9.398 cfs = 726 min = 32,191 cuft = 67.4 = Oft = 18.10 min = Type II = 484 Q (cfs) 10.00 we LOOM 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.73 in Distribution Storm duration = 24 hrs Shape factor Post Developed to Pond Q (Cfs) Hyd. No. 2 -- 2 Year 28.00 11 Wednesday, 01 / 26 / 2022 = 27.54 cfs = 716 min = 55,618 cuft = 80.4 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0 120 240 Hyd No. 2 360 480 600 720 840 960 1080 1200 0, 00 1320 1440 1560 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Q (cfs) 28.00 - 24.00 20.00 16.00 12.00 : M 4.00 0.00 0 600 — Hyd No. 3 Post Through Pond Hyd. No. 3 -- 2 Year Wednesday, 01 / 26 / 2022 = 0.621 cfs = 942 min = 42,511 cuft = 261.18ft = 39,276 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 m 4.00 0.00 1200 1800 2400 3000 3600 4200 4800 6400 6000 Time (min) Hyd No. 2 Total storage used = 39,276 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description Pre -Developed -Overall Site 1 SCS Runoff 21.71 2 726 69,579 2 SCS Runoff 49.16 2 716 100,532 -- --- ------ Post Developed to Pond 3 Reservoir 4.952 2 742 87,234 2 261.81 53,322 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ----- 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 259.00 0.000 1.0inPost Through Pond Wet_pond#1.gpw Return Period: 10 Year Wednesday, 01 / 26 / 2022 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.47 in Distribution Storm duration = 24 hrs Shape factor Pre -Developed -Overall Site Q (cfs) Hyd. No. 1 -- 10 Year Wednesday, 01 / 26 / 2022 = 21.71 cfs = 726 min = 69,579 cuft = 67.4 = 0 ft = 18.10 min = Type II = 484 Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 1 0.00 1320 1440 1564 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Q (cfs) 50.00 - 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 2 Wednesday, 01 / 26 / 2022 Peak discharge = 49.16 cfs Time to peak = 716 min Hyd. volume = 100,532 cuft Curve number = 80.4 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 10 Year 360- 480 600 720 -840 Q (cfs) 50.00 40.00 30.00 20.00 10.00 l- - 0.00 96.0 1080 1200 1320 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 600- Hyd No. 3 Post Through Pond Hyd. No. 3 -- 10 Year 1200- 1800 2400 Hyd No. 2 18 Wednesday, 01 / 26 / 2022 = 4.952 cfs = 742 min = 87,234 cuft = 261.81 ft = 53,322 cuft 30.00- -3600 4200 480C 5400 1 Total storage used = 53,322 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 1 0.00 6000 Time (min) 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 44.48 2 724 139,192 ---- ---- Pre -Developed -Overall Site 2 SCS Runoff 84.04 2 716 176,377 ------ --- ----- Post Developed to Pond 3 Reservoir 25.92 2 724 162,910 2 263.03 83,489 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ - ------ 1.0 Post -Developed to Pond 6 Reservoir 0,000 2 n/a 0 5 259.00 0.000 1.OinPost Through Pond Wet_pond#1.gpw Return Period: 100 Year Wednesday, 01 / 26 / 2022 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 8.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 50.00 - 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year Wednesday, 01 / 26 / 2022 = 44.48 cfs = 724 min = 139,192 tuft = 67.4 = Oft = 18.10 min = Type II = 484 Q (Cfs) 50.00 40.00 30.00 20.00 10.00 0.00 -1 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 8.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Wednesday, 01 / 26 / 2022 Peak discharge = 84.04 cfs Time to peak = 716 min Hyd. volume = 176,377 cuft Curve number = 80.4 Hydraulic length = 0 ft Time of cons. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 366 480 600 720 840 990 1080 1200 1320' Time (min) — Hyd No. 2 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Wednesday, 01 / 26 / 2022 = 25.92 cfs = 724 min = 162,910 cuft = 263.03 ft = 83,489 cuft ■� �� Oq y ��■ ���I 1 1 �1 •1 �:1 •11 1 :�1 ••1 1:1 11 1 ��1 •1 •:1 =f ; {$ | a! {� ! If ! 2 t� !� f | |£ | � !!_ £§ � k} ! i! ( » 2 ■ / 2 2/ $\� E (| ■ K }! k §, � �§- §!§ WATER QUANTITY- WET POND #2 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION __I_.Project Name Long Point Subdivision 2 Project Area ac 34.14 3 Coastal Wetland Area (ac) - 4 Surface Water Area ac - 5 Is this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 ITreatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo, PE 28 Or anization: Bowman North Carolina, Ltd. 29 Street address: 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement I certify, under penalty of law that thls Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 17 ,'30it?1er CA Rol �.��,��0� �� �5 SIB ' I'�'q r'�•. SEAL _ 051571 rrrfrfl� ,AIL �U..saA Signature of i]esigner Date DRAINAGE AREAS 1 Is this a high densit ro ect? Yes 2 If so, number of drainage areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 Type of SCM Wet Pond Wet Pond Infiltration Basin 5 Total drainage area (sq ft 1487139 sf 384558 113843 424106 6 Onsite drainage area (sq ft 1487139 sf 384558 113843 424106 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft) 336735 sf 139536 sf 47257 sf 147943 sf 9 New BUA on subdivided lots (subject to permitting) 1 (sq ft 10 New BUA not on subdivided lots (subject to ermittin s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parkin (sq ft Sidewalk (sq ft 1766 sf 1766 sf Roof (sq ft 242000 sf 104000 sf 26000 sf 112000 sf Roadway (sq ft) 85615 sf 35536 sf 12137 sf 35943 sf Future (sq ft Other, please specify in the comment box below (sq ft 7354 sf 7354 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq it)_ 9318 sf 9318 sf 18 Percent BUA 22.64% 36.3% 42% 35% 19 Design storm inches 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 12068 cf 4029 cf 12863 cf 21 Calculation method for design volume Simple Method I Simple Method Sim le Method ADDITIONAL INFORMATION _ Please use this space to provide any additional information about the 22 drainage area(s): Entire Site: Existing 9,318 sf Impervious Area to be removed from DA2 Other: Pool & Building from DA2 There is 1,999 sf of impervious roadway area that will bypass Wet Pond 2 WET POND 1 Draina a area number 1 2 2 Minimum required treatment volume (cu ft) 12068 cf 4029 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 1 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM H: ? 3:1 3:1 Does the SCM have retaining walls, gabion walls or other 6 engineer d side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? Yes Yes 9 What is the method for clewaterin2 the SCM for maintenance? Pump ( referred) Pump referred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? 1 Yes Yes 16 Does the SCM follow the devicespecific MDC? Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes 18 1 Sizing method used SA✓DA S/VDA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal fmsl 250.00 247.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 251.00 248.00 22 Elevation of the bottom of the vegetated shelf fmsl 258.50 252.50 23 Elevation of the permanent pool fmsl 259.00 253.00 24 Elevation of the top of the ve etated shelf fmsl) 25 Elevation of the temporary pool (fmsl) 259.50 253.50 259.80 253.80 26 Surface area of the main permanent pool (square feet) 11690 2850 27 Volume of the main permanent pool cubic feet 42894 cf 6423 cf 28 Average depth of the main pool (feet) 4.47 ft 3.02 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 747.0 ft 274.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 32 Volume of the foreba (cubic feet) 8120 cf 1024 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes 34 Clean -out depth for foreba inches 18 in 18 in 35 Design volume of SCM (cu ft) 12068 cf 4029 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 1.75 in 1.00 in 38 If weir, weir height inches 39 If weir, weir length inches 40 Drawdown time for the temporary pool (days) 2.52 2.40 41 Are the inlet(s) and outlet located in a manner that avoids short- circuitin ? Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes 43 Depth of forebay at entrance inches 30 in 30 in 44 Depth of forebay at exit (inches) 24 in 24 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1-1Yes r 24-hr storm? Yes Are fountains proposed? (If Y, please provide documentation that 50 MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 1 Hasa plantina vlan been rovided for the vegetated shelf? Yes Yes I lease use this space to provide any additional information about 55 the wet pond(s): Entire Site: Existing 9,318 sf Impervious Area to be removed from DA2 There is 1.999 sf of impervious roadway area that will bypass Wet Pond 2 Wet Pond 1 1:21 PM 3/14/2022 �1 ..� [1• ly ��ti.:.*���'�, `} f / T jr � `� _�� I�r.1/ 1 .� + !]1 I^L� iJ �� )y 7 �r `�� �.ti �� , � 1 1 7 � +1 .� � �'�,J• I 1`�'^ �i�i}rll t �� �1 �r'���L DOA r r.; � ;r fir' V � i � t i''II � � 11 �: J � /�S 1 1 `-- � j • - �` . ... =....�- f ... � - ��-:��-- �• �- VF Ll r r. l ° ;�, f� � • t LK� � - r .��• �� � r j r i .v � I� Bowman North Carolina, Ltd. Long Point Subdivision, Moore County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage Area (acres 2.62 Existing Soil Groups: Soil G "U Map Symbol Soil Description Acres Percent of DA C VaB Blaney Loamy Sand 1.34 51% C Val) Blaney Loamy Sand 1.28 49% Existing Land Uses: Land Use Description Existing Soil Grozrp Acres Curve # Weighted C!W Wooded - Good Stand C 0.70 70 18.7 Open Space - Good Stand C 1.71 74 48.3 Impervious C 0.21 98 7,9 Cumulative Curve # = 74.9 Bowman North Carolina, Ltd. Long Point Subdivision, Moore County, NC Curve Number Calculation (CN) Post -Developed Conditions Drainage Area (acres 2.62 Existing Soil Groups: soil Grouo Man Symbol Soil Description Acres Percent of DA C VaB Blaney Loamy Sand 1.34 51% C VaD Blaney Loamy Sand 1.28 49% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition C 1.53 74 43.2 Impervious Area -Proposed C 1.09 98 40.8 Cumulative Curve # = 84.0 Proposed Wet Pond #2 Project Information Project Name: Long Point Subdivision Project #: Designed by: CEP Date: 3/14/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 2.62 Acres 113,843 sf Impervious Area (IA) = 1.09 Acres 47,257 sf Percent Impervious I = % 41.51 % Required Surface Area Permament Pool Depth: 3.02 ft SA/DA = 1.55 Min Re 'd Surface Area = 1,769 sf at Permanent Pool Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.424 in/in Storage Volume Required = 4,029 cf (above Permanent Pool) Elevations Top of Pond Elevation = 257.00 ft Temporary Pool Elevation = 253.80 ft Permanent Pool Elevation = 253.00 ft Shelf Begining Elevation = 253.50 ft Forebay Weir = 252.00 ft Shelf Ending Elevation = 252.50 ft Bottom Elevation = 248.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 2,850 sf Volume of Temporary Storage = 4,054 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 2850 > 1769 ) sf Volume of Storage for Design Storm = 4,054 Yes ( 4054 > 4029 ) cf Incremental Drawdown Time STORMWATER POND #2 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Long Point Subdivision Project #: asigned by: CEP Date: 3/14/2022 iecked by: Date: Water Quality Orifice ` Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 CD * D2 (Z-D/24-Ei)^(112) Q2 = 0.372 CD " D•(Z-Ei)1(3"23 Q,=0 1 In 0.6 253 Orifice Inv. 0.00 to 253 253 to 253.1 253.1 to 254 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 253.00 4,180 0 0.00 2.00 0.000 253.50 5360 2.385 0.50 3.00 0.018 2.239 253.80 5765 1,661 0.30 3.00 0.023 1,218 Total -- 4,054 — 3.458 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 4,064 cf Total Time = 3,458 min Total Time = 2.40 days 3/14/2022 Prop Wet Pond- new design-#2 1 of 1 Project: Pond #1 Date: 1/26/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 256 2,850 1,228 6,423 A2 (Perm —Pool) 255.5 2,060 975 5,195 Al (Bottom_Shelf) 255 1,840 1,633 4,220 254 1,425 1,230 2,588 253 1,035 848 1,358 252 660 510 510 A3(Bottom_Pond) 251 360 0 0 A3 (Bottom —Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 256 1,175 1,175 513 1,024 255.5 875 875 341 511 255 490 490 170 170 254.5 190 190 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom —Shelf): 15.9% *Between 15% & 20% 2.52 *At least 3' average depth 6,423 274 3 2,060 Average Depth = 3.02 Project Information Site Information Proposed Wet Pond #2 Project Name: Long Point Subdivision Project #: Designed by: CEP Date: 3/14/2022 Revised by: Date: Checked by: Date: Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 2.62 Acres Impervious Area (IA) = 1.09 Acres Percent Impervious (1) = 41.51 % (Drainage Area) Orifice Sizing Orifice Size = 1.00 in Drawdown Time = 2.84 days less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 144.0 cf Weight: 8986 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 10,783 Ibs Volume of Concrete Req'd: 71.9 cf (Diameter) (Incremental Draw Down Method) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 101.5 cf (4'x4' riser x 4.0' = 64sf, 5'x5' footing x 1.5'=37.5cf) I I fi Ct'FV'-- I T LLJ d 1 lieyf �y1. t i rLlin < '.-ILI - L.L.]_�!__ CD STORMWATER MANAGEMENT DESIGN WET DETENTION POND #2: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES: POND DESIGN SUMMARY CAPE FEAR LITTLE RIVER (LOWER LITTLE RIVER) 18-23-(10.7) WS-III; HQW 0303000403 35.237786°N,-79.278200°W DRAINAGE AREA TO POND: 2.62 ACRES SITE IMPERVIOUS AREA TO POND: 1.09 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 1.09 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 2.62 AC 2.62 AC CURVE NUMBER: 74.9 84.0 TIME OF CONCENTRATION: 10 MIN 5 MIN 1.0" STORM EVENT: 0.413 CFS 0.012 CFS 1-YEAR STORM EVENT: 3.729 CFS 7.925 CFS 0.038 CFS 2-YEAR STORM EVENT: 5.452 CFS 10.33 CFS 0.247 CFS 10-YEAR STORM EVENT: 10.69 CFS 16.91 CFS 4.484 CFS 100-YEAR STORM EVENT; 19.60 CFS 27.19 CFS 20.56 CFS STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 253.0 4180 0 0 0.5 253.5 5360 2385 2385 0.8 253.8 5765 1669 4054 (WOV) 1.0 254.0 6040 1181 5234 2.0 255.0 6760 6400 11634 3.0 256.0 8165 7463 19097 4.0 257.0 9590 8878 27974 s Y! DID N N E M v � F 3 G p � g e � m � N3 �, ki cFi s � b 1 I: Old i I d H z W �o fizz �� bl ° sae o -1' LL 0 0 u1 o� } Q m ui CD L1 mX rno nr STRUCTURE NOT SHOWN FOR CLARITY BLE TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. RISER STRUCTURE _ 4" PVC SCREW CAP -_ FOR CLEANING ACCESS �.. 12" MIN. EXTEND 4" P vC THROUGH RISER STRUCTURE 4"x4" PVC TEE --__ PERM. POND ELEV.=253.0 12" MIN. 1"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. Pond Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 / 2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 253.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 253.00 4,180 0 0 0.50 253.50 5,360 2,385 2,385 0.80 253.80 5,765 1,669 4,054 1.00 254.00 6,040 1,181 5,234 2.00 255.00 6,760 6,400 11,634 3.00 256.00 8.165 7,463 19,097 4.00 257.00 9,590 8,878 27,974 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (in) = 24.00 1.00 Inactive Inactive Crest Len (ft) = 4.00 12.00 Inactive Inactive Span (in) = 24.00 1.00 0.00 0.00 Crest El. (ft) = 255.20 255.70 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 253.00 253.00 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 73.00 0.50 0.00 0.00 Multistage = Yes Yes No No Slope (%) = 4.11 1.00 0.00 n/a N•Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multistage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 . 2.00 1.00 Note: Culvertl0rifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge Elev (ft) 257.00 256.00 lKiNIUM] 254.00 253 00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 Total Q Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D0 by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow WS) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total I strge used (cuft) Hydrograph Description 1 SCS Runoff 3.729 2 722 9,951 -- -- -- Pre -Developed -Overall Site 2 SCS Runoff 7.017 2 716 14,183 - -- ------ ------ Post Developed to Pond 3 Reservoir 0.038 2 1444 9,603 2 255.13 12,579 Post Through Pond 5 SCS Runoff 0.250 2 152 1,354 ------ -- ------ 1.0 Post -Developed to Pond 6 Reservoir 0.012 2 366 1,262 5 253.26 1,240 1.0inPost Through Pond Wet_pond#2.gpw Return Period: 1 Year Monday, 03 / 14 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.09 in Distribution Storm duration = 24 hrs Shape factor z Monday, 03 / 14 / 2022 = 3.729 cfs = 722 min = 9,951 cuft = 74.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 4.00 Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year Q (cfs) 4.00 3.00 2.00 3.00 2.00 1.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 1 l' - 0.00 1320 1440 1560 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 / 2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 7.017 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 14,183 cuft Drainage area = 2.620 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.09 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 - Post Developed to Pond Q (Cfs) Hyd. No. 2 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 - 2.00 2.00 0.00 - - = 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 -Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Q (cfs) 8.00 . MI 4.00 2.00 W Post Through Pond Hyd. No. 3 -- 1 Year Monday, 03 / 14 / 2022 = 0.038 cfs = 1444 min = 9,603 cuft = 255.13 ft = 12,579 cuft Q (cfs) 8.00 4.00 2.00 Now 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 3 Hyd No. 2 1 Total storage used = 12,579 cult Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 2.620 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 Monday, 03 / 14 / 2022 Peak discharge = 0.250 cfs Time to peak = 152 min Hyd. volume = 1,354 cuft Curve number = 84 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 5 - 1.0 Post -Developed to Pond/lax. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Q (cfs) 1.0inPost Through Pond Hyd. No. 6 -- 1 Year Monday, 03 / 14 / 2022 = 0.012 cfs = 366 min = 1,262 cuft = 253.26 ft = 1,240 cuft Q (cfs) 0 480 960 1440 1920 2400 2880 3360 3840 Hyd No. 6 Hyd No. 5 - _- -1 Total storage used = 1,240 cuft 4320 Time (min) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D0 by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.452 2 722 14,323 — - Pre -Developed -Overall Site 2 SCS Runoff 9.366 2 716 19,035 ------ --- Post Developed to Pond 3 Reservoir 0.247 2 886 14,069 2 255.25 13,498 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 - --- - ------ 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 253.00 0,000 1.0inPost Through Pond Wet_pond#2.gpw Return Period: 2 Year Monday, 03 / 14 / 2022 Hydrograph Report 10 Hydraflow Hydrographs Extension for Aulodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 ! 2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge = 5.452 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 14,323 cuft Drainage area = 2.620 ac Curve number = 74.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre -Developed -Overall Site Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.[)r1 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) • Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.620 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.73 in Storm duration = 24 hrs Monday, 03 / 14 / 2022 Peak discharge = 9.366 cfs Time to peak = 716 min Hyd. volume = 19,035 cuft Curve number = 84 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 10.00 8.00 6.00 4.00 2.00 0 00 10.00 8.00 6.00 4.00 2.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3[)@ by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used WE MIX 4.00 2.00 0.00 0 600 Hyd No. 3 Post Through Pond Hyd. No. 3 -- 2 Year Monday, 03 / 14 / 2022 = 0.247 cfs = 886 min = 14,069 cuft = 255.25 ft = 13,498 cult Q (cfs) 10.00 M MIX 4.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 2 1 Total storage used = 13,498 cult Time (min) 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 10.69 2 720 27,721 Pre -Developed -Overall Site 2 SCS Runoff 15.91 2 716 33,017 - — — Post Developed to Pond 3 Reservoir 4.484 2 724 28,031 2 255.68 16,713 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 --- — - ---- 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 253.00 0.000 1.0inPost Through Pond Wet pond#2.gpw Return Period: 10 Year Monday, 03 / 14 / 2022 16 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.47 in Distribution Storm duration = 24 hrs Shape factor 10.00 e . 11 4.00 2.00 n nn 0 Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year Monday, 03 / 14 / 2022 = 10.69 cfs = 720 min = 27,721 cuft = 74.9 = Oft 10.00 min = Type II = 484 Q (cfs) 12.00 10.00 KIR .W 4.00 2.00 o.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 2.620 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs 15.00 12.00 M . IX 3.00 0.00 0 Monday, 03 / 14 / 2022 Peak discharge = 15.91 cfs Time to peak = 716 min Hyd. volume = 33,017 cuft Curve number = 84 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 10 Year - 120 240 360 480 600 720 Hyd No. 2 Q (cfs) 18.00 15.00 12.00 we] 3.00 0-00 840 960 1080 1200 1320 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. 15.00 12.00 H. We 3.00 Monday, 03 / 14 / 2022 = 4.484 cfs = 724 min = 28,031 cuft = 255.68 ft = 16,713 cuft Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 18.00 15.00 12.00 ME 6.00 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 — - Hyd No. 2 1 Total storage used = 16,713 cult Time (min) 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D® by Autodesk, Inc. v2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 2.620 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs 22 Monday, 03 / 14 / 2022 Peak discharge = 19.60 cfs Time to peak = 720 min Hyd. volume = 51,195 cuft Curve number = 74.9 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 000 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 QO 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Monday, 03 / 14 / 2022 = 26.26 cfs = 716 min = 56,145 cuft = 84 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 Post Developed to Pond Hyd. No. 2 -- 100 Year Q (cfs) 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0 120 Hyd No. 2 240 360 0.00 480 600 720 840 960 1080 1200 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = .100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Monday, 03 / 14 / 2022 = 20.56 cfs = 720 min = 51,140 cuft = 256.20 ft = 20,912 cuft Post Through Pond Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 OM 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 i Total storage used = 20,912 cult �( ! |° a k ƒt ! !. |� !& | | f® {` |r | \ }\!\ §§(k{|) of ! !k � � |} ! § K | 2 k k §( \| m( //@ ■ � # !y � ! � k �|\ /i! § (| k § k LSl |!> f§k! , ■ � � WATER QUANTITY -INFILTRATION BASIN #3 SUPPLEMENT-EZ COVER PAGE f FORMS LOADED PROJECT 1NFORMATION 1 Project Name Long Point Subdivision 2 Project Area ac 34.14 3 Coastal Wetland Area (ac) - 4 Surface Water Area ac 5 Is this 2roject High or Low Density? Hi h 6 Does this project use an off -site SCM? No COMPLIANCE WITH 021-1.1003 4 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter Filterra 0 26 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: 28 Organization: 29 Street address: 30 City. State Zip: 31 Phone number(s): Email: 32 - - — - - --1 Carlo Pardo. PE an North Carolina, Ltd. 3arrett Drive, Suite 104 aleiyh. NC 27609 _ 919-553-6570 irdo0bowman.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the Information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 01� flllll11)ill, , C A R0�I��''�f 9<1 SEAL 05157 rr��rrir'q 0..E p ASP' N //ItbwA I It I% " Signat of Designer Date DRAINAGE AREAS 1 Is this a hi h density roiect? Yes 2 If so, number of draina a areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? Nd FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Wet Pond Wet Pond Infiltration Basin 5 Total drainage area (sq ft 1487139 sf 384558 113843 424106 6 Onsite draina a area (sq ft 1487139 sf 384558 113843 424106 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft) 336735 sf 139536 sf 47257 sf 147943 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking Lsq ft Sidewalk (sq ft 1766 sf 1766 sf Roof (sq ft) 242000 sf 104000 sf 26000 sf 112000 sf Roadway (sq ft) 85615 sf 35536 sf 12137 sf 35943 sf Future (sq ft) Other, please specify in the comment box below (sq ft 7354 sf 7354 sf _ 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15 Existing BUA that will remain (not subject to ermittin s ft 16 Existing BUA that is already permitted (sq ft 17 Existina BUA that will be removed s ft 9318 sf 9318 sf 18 Percent BUA 22.64% 36.3% 42% 35% 19 Design storm inches 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 12068 cf 4029 cf 12863 cf 21 Calculation method for design volume Simple Method Simple Method 1 Simple Method OVAL 1NFORWh4TION I(Please use this space to provide any additional information about the 22 drainage area(s): Entire Site: Existing 9,318 sf Impervious Area to be removed from DA2 Other: Pool & Building from DA2 There is 1,999 sf of impervious roadway area that will bypass Wet Pond 2 INFILTRATION SYSTEM 1 Drains a area number 3 2 Minimum required treatment volume (cu ft) 12863 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes What are the side slopes of the SCM (H:V or enter "Vertical" for 5 trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 1 Is there an O&M Plan that complies with General MDC 12)? Yes 16 jDoes the SCM follow the device specific MDC? Yes 17 lWas the SCM designed by an NC licensed professional? Yes 18 1 Proposed slope of the subgrade surface (%) 0% 19 jAre terraces or baffles provided? No 20 ITyee ofpretreatment: Forebay c. n. n..m 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (fmsl) 241.00 23 Depth to SHWT per soils report (in) 87.60 24 Ground elevation at borin2 in soils report (fmsl) 248.30 a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A [265Is 2 Soil infiltration rate (in/hr) 11.00 27 Factor of safety (FS) (2 is recommended): 2.00 Elevations Bottomelevation (fmsl) 246 ft U Stora a elevation (fmsl) 247.1 ft B pass elevation (fmsl) 249.9 ft For Basins Only 32 Bottom surface area (ft) 11195 ft 33 1 Storage elevation surface area (ft2 13240. ft Fnr Trenches Only 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (% 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? votumes/Drawdown 44 Design volume of SCM (cu ft) 12863 cf 45 Time to draw down (hours) •5 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s); Infiltration 1 3:02 PM 3/14/2022 Bowman North Carolina, Ltd. Long Point Subdivision, Moore County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage Area (acres): 9.74 Existing Soil Groups: soil Grouo Man Symbol Soil Description Acres Percent of DA C GhB Blaney Loamy Sand 0.33 3% C VaD Blaney Loamy Sand 2.69 28% C VaB Blaney Loamy Sand 6.54 67% B/D We Blaney Loamy Sand 0.18 2% ft sed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighled CN Wooded - Good Stand B 0.10 55 0.6 Wooded - Good Stand C 0.52 70 3.7 Open Space - Good Stand B 0.08 61 0.5 Open Space - Good Stand C 9.04 74 68.7 Cumulative Curve # = 73.5 Bowman North Carolina, Ltd. Long Point Subdivision, Moore County, NC Curve Number Calculation (CN) Post -Developed Conditions Drainage Area (acres): 9.74 Existing Soil Groups. Soil Grouo Map Symbol Soil Description Acres Percent of DA C GhB Blaney Loamy Sand 0.33 3% C VaD Blaney Loamy Sand 2.69 28% C VaB Blaney Loamy Sand 6.54 67% B/D We Blaney Loamy Sand 0.18 2% Existing Lar d_Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Stand B 0.18 61 1.1 Open Space - Good Stand C 6.16 74 46.8 Impervious C 3.40 98 34.2 Cumulative Curve # = 82.1 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin Drainage Area (DA) = 9.74 Acres 424106 sf Impervious Area (IA) = 3.40 Acres 147943 sf Percent Impervious /l = 34.9 % Required Water Quality Volume Design Storm = t inch Determine Rv Value = 0.05 + .009 (1) = 0.36 in/in Water Quality Volume = 0.295 ac-ft Water Quality Volume = 12,863 cf Water Quality Volume = 0.364 inches of runoff NOAA 1- ear. 24-hour event = 3.09 inches Minimum Surface Area SA = (12-FS"DV)/(K"T) Factor of Safety (FS) = 2 Design Volume (DV) = 12862.8 cf Hydraulic Conductivity of Soil = 11.00 in/hr Max Dewatering Time = 72 hours SA = 389.8 sf Drawdown Time T = FS - (DV"12)/(K*SA) Factor of Safety (FS) = 2 Design Volume (DV) = 12862.8 cf Hydraulic Conductivity of Soil = 11.00 in/hr Surface Area Provided = 11195 sf Drawdown Time = 2.5 hours 4i 4 4 (1) C)- Ga A 4 m Lil T 4 .i. -.i STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 246.0 11195 0 0 1.0 247.0 12725 11960 11960 1.1 247.1 12880 1280 13240 (WQV) 2.0 248.0 14310 12236 25476 3.0 249.0 15950 15130 40606 4.0 250.0 17650 16800 57406 5.0 251.0 19405 18528 75933 6.0 252.0 21215 20310 96243 STORMWATER MANAGEMENT DESIGN INFILTRATION SYSTEM #3: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES: POND DESIGN SUMMARY CAPE FEAR LITTLE RIVER (LOWER LITTLE RIVER) 18-23-(10.7) WS-III; HQW 0303000403 35.237786°N,-79.278200°W DRAINAGE AREA TO POND: 9.74 ACRES SITE IMPERVIOUS AREA TO POND: 3.40 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 3.40 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 9.74 AC 9.74 AC CURVE NUMBER: 73.5 82.1 TIME OF CONCENTRATION: 18.8 MIN 5 MIN 1.0" STORM EVENT: 1.038 CFS 0.000 CFS 1-YEAR STORM EVENT: 9.970 CFS 26.78 CFS 0.000 CFS 2-YEAR STORM EVENT: 14.97 CFS 35.56 CFS 0.000 CFS 10-YEAR STORM EVENT: 30.41 CFS 59.93 CFS 0.000 CFS 100-YEAR STORM EVENT:. 57.06 CFS 98.37 CFS 35.50 CFS o9 m W a NH R C'l � Lil IFJ � 2W o Z�Za� Kw Z O�JS G 6 4 z O a LLJ J LLJ C j N Q J J_ CL V) Z IJ Y Z Z Q � O m Q N Lil LLJ N L. J O LU a_ 0 c-D Q O z z O J LLJ Z \ J W = Z X Z Q � Q U LLJ elf � O () ( V) (/) M C-1 CV m O O N 0 zLLJ O CL O M M J J M N V) L L- 3�: p U O O �Lq O CY �f 1 �7 r Z O_ Q F J Q c EL J J J U � L L- Iz Z C/") Z J Z d � W Z p w o w C) 0 z aQ w Or m Or LLJ J J CM ¢ W (n p LD Of Z W ¢ Ck-- m p r J N w Zp O o N p LLJ�o UN ¢o Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc, v2022 Monday, 03 / 14 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 35.50 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 44,749 cuft Inflow hyd. No. = 2 - SCM Post-Develop`&&ervoir name = BMP Pond Max. Elevation = 251.13 ft Max. Storage = 78,579 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values - 1-00% of Qp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.93 95.10 << 250.15 ----- -- - - - -- 3.343 ----- ----- - 4.562 3.343 11.97 92.00 250.66 ----- ----- ----- - -- 17.29 ----- ----- ----- 4.790 17.29 12.00 72.20 251.01 30.27 ----- --- - -- 4.944 30.27 12.03 45.37 251.13 << ----- ---- -- - 35.50 - --- - - 5.001 35.50 12.07 24.96 251.10 - -- ---- -- 34.28 4.988 34.28 12.10 15.49 251.00 ---- ---- - ----- 30.09 ----- --- - - 4.942 30.09 12.13 12.74 250.88 ---- - ---- ----- 25.34 ----- ----- - -- 4.889 25.34 12.17 12.20 250.78 -- - 21.49 -- -- - - -- 4.843 21.49 12.20 11.69 250.70 ---- ---- - - - 18.50 - - 4.806 18.50 12.23 11.18 250.63 --- -- - ---- 16.16 ----- ----- ----- 4.775 16.16 12.27 10.66 250.57 ----- ----- ----- .... 14.25 --- - -- --- 4.748 14.25 12.30 10.15 250.52 - - - 12.67 - --- - 4.726 12.67 12.33 9.629 250.47 ----- ---- ---- -- 11.34 - - --- - 4.706 11.34 12.37 9.111 250.43 ---- ---- ----- ----- 10.20 ----- ----- ----- 4.688 10.20 12.40 8.592 250.40 ----- ---- ----- --- 9.168 ---- -- ---- 4.673 9.169 12.43 8.070 250.37 -- --- --- 8.309 - - ----- ---- 4.658 8.309 12.47 7.546 250.34 --- - -- ----- ----- 7,505 ---- ----- ----- 4.644 7.505 12.50 7.022 250.31 ----- ---- -- - 6.746 - - 4.631 6.746 12.53 6.539 250.28 --- -- - _ 6.090 ----- - 4.619 6.090 12.57 6.177 250.25 ---- ----- ----- - -- 5.486 - -- ----_ ---- 4.607 5.486 Continues on next page... 12 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.60 5.950 250.23 ----- - ---- ----- ----- 4.927 ___ ----- 4.596 4.927 12.63 5.804 250.21 ----- ----- 4.421 - - ----- ---- 4.586 4.421 12.67 5.686 250.19 ----- - - - 4.013 - - - - 4.578 4.013 12.70 5.568 250.17 ----- - - - 3.662 ---- - - 4.570 3.662 12.73 5.449 250.15 ----- -- - - 3.339 --- -- - - 4.562 3.339- 12.77 5.331 250.14 ----- ----- ----- ----- 3.042 - - - 4.555 3.042 12.80 5.212 250.12 ----- 2.766 -- ----- 4.549 2.766 12.83 5.093 250.11 ----- ....... -- 2.510 ----- ----- 4.543 2.510 12.87 4.974 250.10 ----- - ----- 2.283 -- - - - 4.538 2.283 12.90 4.855 250.09 ----- - -- - ----- 2.106 - - - - 4.532 2.106 12.93 4.735 250.07 ----- ----- ----- 1.935 ----- - - - 4.527 1.935 12.97 4.615 250.06 ----- -- - 1.769 -- - - - 4.522 1.769 13.00 4.495 250.05 ----- ----- ----- - 1.608 -- - -- ----- 4.518 1.608 13.03 4.381 250.04 ----- - - - - 1.452 -- -- -- 4.513 1.452 13.07 4.284 250.03 ----- - 1.301 --- - 4.508 1.300 13.10 4.205 250.02 ----- - -- -- 1.155 - -- 4.504 1.155 13.13 4.137 250.01 ----- - - ----- 1.017 - - 4.500 1.017 13.17 4.073 250.00 ----- ....... ----- 0.886 - - - 4.496 0.886 13.20 4.008 250.00 ----- - - 0.785 - 4.492 0.785 13.23 3.944 249.99 ----- - - 0.711 --- -- 4.488 0.711 13.27 3.879 249.98 ----- - -- -- ----- 0.638 ----- -- -- 4.484 0.638 13.30 3.815 249.97 ----- - - -- - ----- 0.565 --- - -- _ _- 4.481 0.565 13.33 3.750 249.96 ----- ---- -- - - 0.493 --- -- - -- 4.477 0.493 13.37 3.686 249.95 ----- - --- -- -- -- - 0.422 - -- - - 4.473 0.422 End l] ' C" 13.19 - 10'7 = 1.Y Y lie- .., crzc "q h ruoRni AMERICAtd GREEN' SPILLWAY ANALYSIS > > > Grass Channel North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Name Grass Channel Discharge 35.5 Peak Flow Period 2 Channel Slope 0.3333 Channel Bottom Width 10 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety ] Staple Phase Reach Discharge Velocity Mannings N Remarks �Depth Shear Stress Shear Stress I Factor Pattern Shoremax w/ Straight 35.5 cfs 13.61 ft/s 0.26 ft 0.025 8.5 Ibs/ft2 5.42 Ibs/ft2 1.57 STABLE F P300 Unvegetated Underlying Straight 35.5 cfs 13.61 ft/s 0.26 ft 0.025 5.68 Ibs/ft2 5.15 Ibs/ft2 1.1 STABLE F Substrate Shoremax w/ Straight 35.5 cfs 13.75 ft/s 0.26 ft 0.024 14 Ibs/ft2 5.36 Ibs/ft2 2.61 STABLE F P300 Reinforced Vegetation Underlying Straight 35.5 cfs 13.75 ft/s 0.26 ft 0.024 8.5 Ibs/ft2 5.1 Ibs/ft2 1.67 STABLE F Substrate Pond Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 246.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 246.00 11,195 0 0 1.00 247.00 12,725 11,960 11,960 1.10 247.10 12,880 1,280 13,240 2.00 248.00 14,310 12,236 25,476 3.00 249.00 15,950 15,130 40,606 4.00 250.00 17,650 16,800 57,406 5.00 251.00 19,405 18,528 75,933 6.00 252.00 21,215 20,310 96,243 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) Inactive Inactive Inactive Inactive Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 1 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 . Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multistage = n/a No Yes No Weir Structures Monday, 03 / 14 / 2022 [A] [B] [C] [D] Crest Len (ft) = 10.00 0.00 0.00 0.00 Crest El. (ft) = 249.90 0.00 0.00 0.00 Weir Coeff. = 2.60 3.33 3.33 3.33 Weir Type = Broad --- --- --- Multi-Stage = No No No No Exfil.(in/hr) = 11.000(by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifioe outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 6.00 - - 252.00 5.00 Y 251.00 4.00 250.00 3.00 249.00 2.00 248.00 1.00 247.00 0.00 246.00 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 88.00 Total Q Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 9.970 2 726 33,210 — — SCM Pre -Developed 2 SCS Runoff 23.93 2 718 48,294 ------ SCM Post -Developed 3 Reservoir 0.000 2 856 0 2 247.50 18,712 Post Through SCM 5 SCS Runoff 0.608 2 152 3,840 ------ - — 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 204 0 5 246.08 959 1.0inPost Through SCM Infiltration#3.gpw Return Period: 1 Year Monday, 03 / 14 / 2022 FA Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.740 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.09 in Distribution Storm duration = 24 hrs Shape factor M we] 4.00 2.00 0.00 0 SCM Pre -Developed Hyd. No. 1 -- 1 Year Monday, 03 / 14 / 2022 = 9.970 cfs = 726 min = 33,210 cuft = 73.5 = Oft 18.80 min = Type II 484 Q (Cfs) 10.00 We 4.00 2.00 nW 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.740 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.09 in Distribution Storm duration = 24 hrs Shape factor Q (cfs 24.00 16.00 12.00 : M 4.00 SCM Post -Developed Hyd. No. 2 -- 1 Year Monday, 03 / 14 / 2022 = 23.93 cfs = 718 min = 48,294 tuft = 82.1 = Oft = 5.00 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 =_ - - — - - - i 0.0.0 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) �- _- Hyd No. 2 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 856 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 247.50 ft Reservoir name = BMP Pond Max. Storage = 18,712 cuft Storage Indication method used. Exflltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 24.00 - 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No. 2 _ __ ) Total storage used = 18,712 cult 6 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 9.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 U.U) 0 Monday, 03 / 14 / 2022 Peak discharge = 0.608 cfs Time to peak = 152 min Hyd. volume = 3,840 cuft Curve number = 82.1 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to SCM Hyd. No. 5 -- 1 Year 60 120 180 240 300 360 Hyd No. 5 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.GO 420 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 / 2022 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 204 min Time interval = 2 min Hyd. volume = 0 cult Inflow hyd. No. = 5 - 1.0 Post -Developed to SCWax. Elevation = 246.08 ft Reservoir name = BMP Pond Max. Storage = 959 cuft Storage Indication method used. EAltration extracted from Outflow 1.0irl Through SCM Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 OM 0 60 120 180 240 300 360 420 480 540 Time (min) Hyd No. 6 Hyd No. 5 1 Total storage used = 959 cult Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3D0 by Autodesk, Inc. v2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 9.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.73 in Storm duration = 24 hrs 12.00 . w 3.00 10 Monday, 03 / 14 / 2022 = 14.97 cfs = 726 min = 48,395 cuft = 73.5 = Oft = 18.80 min = Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 2 Year Q (cfs) 15.00 12.00 M . We 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 9.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.73 in Storm duration = 24 hrs Q (cfs 35.00 it 11 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Hyd. No. 2 -- 2 Year Monday, 03 / 14 / 2022 = 32.47 cfs = 716 min = 65,697 cult = 82.1 = Oft = 5.00 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 o:oa IsUO 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. ExFltration extracted from Outflow. 30.00 25.00 20.00 15.00 10.00 5.00 000 0 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Post Through SCM Hyd. No. 3 -- 2 Year Monday, 03 / 14 / 2022 = 0.000 cfs = 934 min = 0 cuft = 248.12 ft = 27,249 cuft Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 4 11 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 3 Hyd No. 2 Total storage used = 27,249 cult Time (min) 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 30.41 2 724 95,442 --- —•• SCM Pre -Developed 2 SCS Runoff 56.58 2 716 116,430 — — SCM Post -Developed 3 Reservoir 0.000 2 660 0 2 249.78 53,763 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 --- - --- 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 246.00 0.000 1.0inPost Through SCM Infiltration#3.gpw Return Period: 10 Year Monday, 03 / 14 / 2022 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Monday, 03 / 14 / 2022 Peak discharge = 30.41 cfs Time to peak = 724 min Hyd. volume = 95,442 cuft Curve number = 73.5 Hydraulic length = 0 ft Time of conc. (Tc) = 18.80 min Distribution = Type II Shape factor = 484 SCM Pre -Developed Q MS) Hyd. No. 1 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 000 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Monday, 03 / 14 / 2022 Peak discharge = 56.58 cfs Time to peak = 716 min Hyd. volume = 116,430 cuft Curve number = 82.1 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 60.00 - 60.00 50.00 50.00 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 660 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 249.78 ft Reservoir name = BMP Pond Max. Storage = 53,763 cuft Storage Indication method used. Exfiltration extracted from Outflow. 50.00 40.00 20.00 10.00 Post Through SCM Hyd. No. 3 -- 10 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No. 2 1 Total storage used = 53,763 cult 21 Hydrograph Summary Report Hyd. Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. Hydrograph Peak Time Time to Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) SCS Runoff (cfs) (min) (min) (cuft) (ft) (cuft) 1 57.06 2 724 178,731 -- — - SCM Pre -Developed 2 SCS Runoff 95.10 2 716 201,239 --- — SCM Post -Developed 3 Reservoir 35.50 2 722 44,749 2 251.13 78,579 Post Through SCM 5 SCS Runoff 0.000 2 nla 0 — ---- 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 nla 0 5 246.00 0.000 1.0inPost Through SCM Infiltration#3.gpw Return Period: 100 Year Monday, 03 / 14 / 2022 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs. Time interval = 2 min Drainage area = 9.740 a Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs 50.00 40.00 30.00 20.00 10.00 r7.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 100 Year Monday, 03 / 14 / 2022 = 57.06 cfs = 724 min = 178,731 tuft = 73.5 = Oft = 18.80 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 9.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0100 0 120 Hyd No. 2 Monday, 03 / 14 / 2022 Peak discharge = 95.10 cfs Time to peak = 716 min Hyd. volume = 201,239 cuft Curve number = 82.1 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 100 Year 240 360 480 600 720 840 960 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1080 1200 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 03 / 14 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 35.50 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 44,749 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 251.13 ft Reservoir name = BMP Pond Max. Storage = 78,579 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) •1 '1 11 11 :1 11 :1 11 111 111 .1 11 .1 11 111 111 1 11 1 11 � i � 111 111 1 0 120 Hyd No. 3 240 360 Hyd No. 2 480 600 720 -- - .1 Total storage used = 78,579 cuft 840 Time (min) ( {{ § /k ( �# /» �# ! 2 (© | �, � `2!2 } ()777 |§);�)! �����&/ f � £k k� ! a/ . !! § � | k k /§ 2 |. | , 27 /�® ■ $$i � i|; !i� � �» k \� k ) � � 'z; § m, - � k| !|{ \ ! �°�a ,! � , . �K!§ ! .