Loading...
HomeMy WebLinkAboutSite Inspection 3.24.22 Br 29 WhiteoakWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190178 NCDOT - Replace Bridge 29 on SR 1475 Macon NCDOT - Replace Bridge 29 on SR 1475 NC DOT Division 14 - Sylva 3/24/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 36' 55''+35° 13' 16'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on March 24, 2022. No one was present on the job. The following are items that need attention: - Station L 10+92 LT - Repair silt fence above headwall. - Station L 13+30 LT - Repair silt fence adjacent to stream. Needs to be trenched in. NPDES records were up to date. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190178 3/24/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2