Loading...
HomeMy WebLinkAbout20131001 Ver 3_Modifications_20140409ENVIRnNMFNTAI, SFRVICF.S, INC. 524 SOUTH NEW HOPE ROAD RALEIGH, NORTH CAROLINA 27610 (919) 212 -1760 April 7, 2014 M Ms. Karen Higgins N.C. Division of Water Resources 1650 Mail Service Center Raleigh, NC 27699 -1650 Re: Parkside at Bella Casa Phases l0A & 11 Modification Request for DWR# 13- 1001v2 Ms. Higgins: APR 9 2014 The permittee for the above referenced project is respectfully requesting a minor modification to the 401 certification that was issued for this project on January 13, 2014. Subsequent to the issuance of the 401 permit, the permittee modified the site plan to include three driveway crossings that incur an additional 0.04- are of wetland impact. This brings the total wetland impact for this project to 0.08 acre. The Corps of Engineers issued their 404 permit with this extra impact already accounted for. Enclosed please find the revised impact page from the PCN along with the revised drawings and the $240 application fee. Contact me if you have any questions or comments. Thank you for your assistance. Sincerely, Environment Services, Inc. r+ C!e H arbour nior Manager C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Headwater Wetland Yes Corps 0.04 W2 P Fill Headwater Wetland Yes Corps 0.04 W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 - Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 0.08 2h. Comments: W2 consists of three (3) driveway crossings that will include fill and a culvert. All three total 0.04 ac 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT to Beaver Creek INT Corps 3 108 S2 T utility crossing UT to Beaver Creek INT Corps 2 20 S3 T utility crossing UT to Beaver Creek PER Corps 3 20 S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 148 3i. Comments: D W u V L9 APR 4 9 201 Page 4 of 10 PCN Form — Version 1.4 January 2009