HomeMy WebLinkAbout20131001 Ver 3_Modifications_20140409ENVIRnNMFNTAI, SFRVICF.S, INC.
524 SOUTH NEW HOPE ROAD
RALEIGH, NORTH CAROLINA 27610
(919) 212 -1760
April 7, 2014 M
Ms. Karen Higgins
N.C. Division of Water Resources
1650 Mail Service Center
Raleigh, NC 27699 -1650
Re: Parkside at Bella Casa Phases l0A & 11
Modification Request for DWR# 13- 1001v2
Ms. Higgins:
APR 9 2014
The permittee for the above referenced project is respectfully requesting a minor modification to the 401
certification that was issued for this project on January 13, 2014. Subsequent to the issuance of the 401
permit, the permittee modified the site plan to include three driveway crossings that incur an additional
0.04- are of wetland impact. This brings the total wetland impact for this project to 0.08 acre. The Corps
of Engineers issued their 404 permit with this extra impact already accounted for.
Enclosed please find the revised impact page from the PCN along with the revised drawings and the $240
application fee. Contact me if you have any questions or comments. Thank you for your assistance.
Sincerely,
Environment Services, Inc.
r+
C!e H arbour
nior Manager
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑X Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 P
Fill
Headwater Wetland
Yes
Corps
0.04
W2 P
Fill
Headwater Wetland
Yes
Corps
0.04
W3
Choose one
Choose one
Yes /No
W4
Choose one
Choose one
Yes /No
W5 -
Choose one
Choose one
Yes /No
W6
Choose one
Choose one
Yes /No
2g. Total Wetland Impacts:
0.08
2h. Comments:
W2 consists of three (3) driveway crossings that will include fill and a culvert. All three total 0.04 ac
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P
Culvert
UT to Beaver Creek
INT
Corps
3
108
S2 T
utility crossing
UT to Beaver Creek
INT
Corps
2
20
S3 T
utility crossing
UT to Beaver Creek
PER
Corps
3
20
S4
Choose one
S5
Choose one
S6
Choose one
3h. Total stream and tributary impacts
148
3i. Comments:
D
W u V L9
APR 4
9 201
Page 4 of 10
PCN Form — Version 1.4 January 2009