HomeMy WebLinkAbout20140372 Ver 1_401 Application_20140414" Version 1 4
January 9, 2009
ii
401 Oversight/Express Permitting PCN Submittal Checklist
® The application fee (Checks may be made out to "N C Division of Water Resources"
240 00 for 401 Water Quality Certification with minor impacts
- $570 00 for 401 Water Quality Certification with major impacts
- Express Review Fee (Amount requested on Acceptance Letter)
® Five (5) complete and collated copies of the PCN Application and supporting
documentation (instead of providing 5 copies of,the full size plans you may provide two
copies of,full size plans along with three copies of 11 X 17 plans)
❑ Stormwater Management Plan (if applicable —see PCN Form Help File Section E)
1) Please provide three (3) copies of the stormwater management plans along with all
supporting information pertaining to this project including the following
a Entire site development/layout plans delineating all drainage areas,,
b Design calculation sheets for all proposed BMP(s) sized for both on -site and
off -site drainage,
c BMP supplements for each proposed BMP and Required Items Check List
(http //portal ncdenr orq /web /Ir /bmp- manual) along with all required items,
A A Notarized Operation & Maintenance Agreement,for each stormwater
management facility,
e Detailed construction drawing sheets shall include
(i) Erosion and sediment control plans-,
(n) Installation and planting schedules for the proposed BMPs,
(iii) Appropriately scaled plan views and cross sectional details of,all
BMPs and associated components — inlet and outlet structures;
forebay, respective zones and pertinent elevations
❑ If your project is located within a State implemented Riparian Buffer Rule Area, submit the
following along with site plans and PCN form
1) Three (3) copies of the details for on -site diffuse flow provisions, (refer to
http //portal ncdenr orq /web /lr /bmp - manual)
❑ DWR Stream Determination Forms for streams on property and DWR determination
letter for wetlands or streams (if applicable)
The following is the most critical of all the information that you must provide The quality and
detail of the information will often determine the expeditiousness of the review The following is
a checklist of the types of pertinent information required at a minimum-
Maps and Plans:
Z The most recent version of the 1 24,000 USGS Topographic Map - Please cleanly draw or
delineate the site boundaries on the topographic map
® The most recent version of the bound and published County NRCS Soil Survey Map -
(required for projects within the ;Neuse River Basin, Tar - Pamlico River ,Basin, Randleman
Lake Watershed and the Catawba 'River Basin, also ;recommended for all projects) -
Please clearly delineate the site boundaries, etc on the, map 'If ithe delineation obscures
any of the features, it is recommended that, a clean copy be provided Copies of the
Version 1.4
January 9, 2009
current soil survey and /or soil survey map sheets can be obtained from the local NRCS
County Office (http: / /www.nc.nres.usda.gov /). GIS soil layers are not acceptable.
® Vicinity map - Please clearly mark the location and approximate boundaries of the property
and project on the map. Please indicate north arrow and scale. Please include applicable
road names or State Road numbers. (See cover sheet of drawings.)
® The Site Plan - The most critical map to be provided is the site plan. You must provide full
sized plans. The following is the minimum list of plans that are typically needed.
® Pre - construction /Pre- existing conditions - This sheet (or sheets) must include:
• All jurisdictional and non - jurisdictional wetland, stream, water features, State regulated
buffers (delineated into Zones 1 and 2)
• Topographic contours with elevations
• Any existing structures and impervious areas
• Existing utility lines and easements
• Existing roads, culverts, and other pertinent features
• North arrow and the scale (1 ":50' scale is recommended).
® Proposed conditions - This sheet (or sheets) must include:
• All jurisdictional and non - jurisdictional wetland, stream, water features, State regulated
buffers (delineated into Zones 1 and 2)
• Lot layout (if a subdivision or commercial development is proposed) - lots must be
developable without further impacts to jurisdictional and non - jurisdictional wetlands,
streams, water features, and State regulated buffers. Building envelopes must be
provided when streams, wetlands, riparian buffers, or water features exist on a lot
• All built -out structures and impervious cover
• Final grading contours with elevations
• All utilities and easements (including septic fields on all lots within 100 feet of stream,
wetland, or water features - if applicable)
• Impacted areas — these should correspond with the Impact numbers listed on your PCN
form.
❑ Drainage Plans - Final drainage plans must include the following:
• Locations and pertinent elevations and sizes of the stormwater collection system and
drainage ways
• All inlets and outlets must also be shown with pertinent elevations (All outlets to
wetlands must be at a non - erosive velocity, generally less than 2 ft /sec during the peak
flow from the 10 -yr storm)
• Scaled stormwater BMPs must also be indicated as required by DWR rules and policies
• In certain cases (see Section E of PCN form), final stormwater management plans must
also be provided (see Stormwater Management Plan Checklist)
® Proposed Impacts - All impacts to jurisdictional and non - jurisdictional wetland, stream,
water features, and State regulated buffers must be shown and labeled on the site plans at
a scale no smaller than 1" = 50'. All excavation, fill, flooding, stabilization, and other impacts
that will be conducted in or near jurisdictional and non - jurisdictional wetland, stream, water
features, and State regulated buffers must be indicated. Please provide cross sectional
details showing the provisions for aquatic life passage (burial of culvert 20% for culverts <_ 48
inches, and 1 -foot for culverts > 48 inches).
Version 14
January,9, 2009
Wetland 'Impacts:
❑ Precise grading and final elevation contours must be provided Existing
vegetation and any clearing must be specified
❑ All subsurface utility fines must indicate the location of anti -seep collars
Construction detail for anti -seep collars must be provided
❑ Roadway or other crossings of riparian wetlands may require floodway culverts, to
maintain existing hydrological conditions
❑ Plans should show that the hydrology of remaining wetlands on the site will be
maintained-
Stream Impacts:
® Stream impacts must be clearly shown on the plans The centerline as well as
the banks of the ,stream must be surveyed or located by GPS for the portion of
the stream to be impacted
❑ The inlet and the outlet of all culverts should be aligned with the stream as
much as possible Inlet and outlet elevations and streambed elevations should
be indicated Any, inlet or outlet protection must be shown and enumerated on
the impact map(s)
❑ For bottomles& culvert's or other spans, a, vertical cross section should be
provided'that shows the minimum distance from each,span to each stream bank,
the stream cross "section, the height of the span above the stream and the
minimum distance from the edge of each footer to,each stream bank
Additionally, please provide a signed and sealed geotechnical report,of
subsurface soils at the proposed bottomless culvert location The report must
comply with the Division of Highways — .Guidelines for Drainage Studies and
Hydraulic Design, prepared by A L Hankins, Jr, State Hydraulics Engineer -
1999
❑ Multiple culverts or, sectioned box culverts typically require the use of sills, off-
setting or other means to match the cross section of the existing stream (in order
to maintain stream stability and provide aquatic life passage) A vertical cross
section of the culverts should be shown overlain with the up and downstream
stream cross section including the stream flood -prone area
❑ Impacts associated with dam construction must indicate and enumerate all fill
associated with the dam footprint, spillway and any bank stream bank
stabilization The length of stream impounded must also be indicated "arid
enumerated
OOF W A t! 99
201 40372
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑ Section 404 Permit Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number:
1 c.
Has the NWP or GP number been verified by the Corps?
❑ Yes No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑] Yes ❑ No
For the record only for Corps Permit:
El Yes ❑ No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes 0 No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes 0 No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑ No
2.
Project Information
2a.
Name of project:
Southbrook Sewer Outfall Upsizing
2b.
County:
Cabarrus
2c.
Nearest municipality / town:
City of Concord
2d.
Subdivision name:
N/A -- ---}
2e.
NC DOT only, T.I.P. or state project no:
Q
i
3.
Owner Information
3a.
Name(s) on Recorded Deed:
City of Concord
APR 1
3b.
Deed Book and Page No.
Bk 65 Pg 14 -15
WATER
3c.
Responsible Party (for LLC if
applicable):
w 9 rwwL.,' ararJ
3d.
Street address:
26 Union St., South
3e.
City, state, zip:
Concord, NC 28025 r
3f.
Telephone no.:
704- 920 -5215
3g.
Fax no.:
(704) 786 -7068
3h.
Email address:
hiattb @concordnc.gov
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent ❑ Other, specify
4b
Name
4c
Business name
(if applicable)
4d .Street address
4e
City, state„ zip
4f
Telephone no
4g
Fax no
4h
Email address
S.
Agent/Corisultant Information (if applicable)
5a
Name
Enrique Alberto Blat
5b
Business name,
(if applicable)
City of Concord
5c
Street address
850 Warren C Coleman Blvd
5d
City, state, zip
Concord, ,NC 28025
5e
Telephone no
704- 920 -5409
5f
Fax no
(704) 786 -4521
5g
Email address
blatr @concordnc,gov
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a _Property identification no (tax PIN or'parcel ID)_
5538598419
1 b
Site coordinates (in decimal degrees)
Latitude 35 361699 Longitude -80 557538
1 c
Property size
4642 acres
2:
Surface Waters
2a
Name of,nearest body of water to proposed,prolect
Irish, Buffalo Creelk
2b
Water Quality,Classiflcation of�nearest receiving water
C
2c River basin
[Yadkin Pee -Dee
3.
Project 'Description
3a Describe the existing conditions on the site and''the general land ,use in the vicinityof'the�project,at the time of °this
application
ExistingJnbutary to Irlsh`Buffalo�Creek located within the Whitehurst mobileihome park, Area,around'streamAributa_y is residential single family
property ^and roadways
3b
List the total estimated acreage of all existing wetlands on the property Zero
3c_
List the total estimated hnear'feet of all existing streams (intermittent an' perennial) on the'property" 409
3d' Explain the, purpose ofthe proposed project-
Proposed gravity sewer,maimup -size and relocation °projeot,wdhrn the Whitehurst mobile,home park,to address existing sewer capacity issues
3e Descnbe'the overall project in detail, including the type of equipmentto be used
Proposed.installation of 62 lineanfeet of'12 -inch restrained pusK -on point ductile iron carrier pipe sleeved into,a,24" steel casing pipehto be,installed by,open cut
excavation, with in the stream�chanriel
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations bythe
CorpsBorfState been requested or obtained for this property /
'project (including all prior phases ).'in the past?
❑ Yes ❑ No 0 Unknown
Comments
4b
If,the•Corps mad&the jurisdictional determination,, what type,
of -determination, made?
❑ preliminary ❑ Final
4c
If yes, who delineated the jurisdictional' areas?
Name (if known)
Agency /Consultant Company
Other
4d
If yes, list °the dates,of the Corps jurisdictional ,determinations or State determinations,and - attach documentation
S.
Project History
,5a
Haveapermits or certifications been requested or obtained °for
this project (including,all prior phases) in the past ?'
❑'Yes El No ❑� Unknown
5b
If 'yes; explain in detail according to "help file" instructions
6.
Future Project.P-lans
6a
Is °this a phased project?
❑ Yes E No
6b
If,yes, explain
Page�3' of 10
PCN Form — `Version 1 4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ❑l Streams-tributaries ❑ 'Buffers ❑ -Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site; then complete this question for each wetland area Impacted
2a
Wetland Impact
number
Permanent (P) or
Temporary T
2b
Type of Impact
2c
Type of wetland
2d
Forested
2e
Type of jurisdiction
Corps (404;10) or
DWQ (401„ other)
2f
Area of
Impact
(acres)
W1
Choose one
Choose�one
Yes /No
W2
Choose one
Choose.one
Yes /No
W3 -
Choose one
Choose one
Yes /No
-
W4 -
Choose one
Choose,one
Yes /No
-
W5 -
Choose one
Choose one
Yes /No
-
W6 -
Choose one
Choose=e
Yes /No
=
2g Total Wetland Impacts:
2h Comments
3. Stream Impacts
If there are perennial or Intermittent stream Impacts (Including temporary Impacts) proposed on the site, then complete this
question for,all stream sites Impacted
3a
Stream Impact
number
Permanent (P) or
Temporary (T)
3b
Type of Impact
3c
Stream name
3d
Perennial (PER) or
Intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1 T
Excavation
Trib of Irish Buffalo Crk
INT
DWQ
6Z
62
S2 -
Choose one,
S3 -
Choose one
-
-
S4 -
Choose one
-
�S5 -
Choose one,
-
-
S6 -
Choose one
-
3h Total stream and tri buta ry'im pacts
62,
31 Comments
Proposed installation of�62 linear feet of 12 -inch restrained push -on joint ductile iron carrier pipe sleeved into a 24 "`steel casing pipe to be installed by
open cut excavation, within the steam channel
Page 4 of 110
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
,If there,are proposed impacts,to lakes, ponds, estuanes,,,tnbutan_es, sounds; the Atlantic Ocean, or any other,open,water of
eh, o en, %Water im acts below
the US then individuall` list op
4a
Qpen1water
impact number
P,ermanent.(P) or°
Terri ora ;' , T
4b
Name$of waterbody
(if applicable)
4c
Type of`impact
4d
Waterbody
type
4e
Area of impact (acres)
01 =
Choose one
Choose
02 -
Choose�one
Choose
03 -
Choosesone
Choose
,04 -
Choose one
Choose
4f Total openwater impacts
4g Comments
;5. Pond or Lake Construction
If pond or lake construction ro osed, then complete the chart,below
,6a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded,
Filled
Ezcavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f- Total:
5g Comments
5h Is,a'dam high hazard permit regwred?
❑ Yes ❑ No If yes, permit ID no
151 Expected pond surface area (acres)
5j, Size of pond watershed (acres)
5k Method of construction
6. Buffer lmpacts�(for DWQ)
If,projectwdl impact'al protected riparian buffer„ then complete the.,chart below If yes, then individually list +all buffer impacts
below If any impacts require, mite ation, then ou MUST fill out Section D of thi's form
6a. Prolect.is in which, protected, basin?
❑ ^Nauss '❑ Tar - Pamlico] ❑ Catawba ❑ Randleman ; ❑,Others
6b
Bufferlmpact
number —
Permanent (P) or
Tem ora . T
''6c
.Reason for impact
6d
Stream name
6e
Buffer
mifigation
required?
6f
Zone 1
impact
(square'
feet
6g,
'Zone,2
impact
(square
feet
'1311
Yes %Nb
132
Yes/No
"B3,
Yes /No,
B4
Yes /No
B5 -
Yes /No
B6, -
Yes /No
'6h Total Buffer Impacts:
61 Comments
Page 5 of 10
b.
Impact Justification and Mitigation
1.,
Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The proposed sewer main crossing was,designed to cross closely perpendicular to the,channel, as possible and still interconnect with the existing
sewer mains located within eastern Pheasant Drive,shoulder, located west of the proposed channel crossing
lb Specifically describe measures taken to'avoid or ninimize the proposed impacts through construction techniques
The proposed sewer main crossing will be constructed in low or no flow conditions and the channel banks will be reestablished to grade and
immediately stabilized after the sewer main installation Immediately'after sewer, mstaIlation within the foot pant of the chin nel,A6,Con_ tractor will take
additional measures as specified by the City to ensure the channel banks are permanently stabilized with a permanent ground cover
2.
Compensatory Mitigation for Impacts to Waters' of the U.S. or Waters, of the State
2a
Does the project require Compensatory Mitigation for
Impacts to Waters of the U S or Waters of the State?
❑ Yes 0 No
2b
If yes, mitigation Is required by (check all that apply)
❑ DWQ ❑ Corps
2c
If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3.
Complete if Using a Mitigation Bank
36
Name of Mitigation Bank
3b
Credits Purchased (attach receipt and letter)
Type Choose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4.
Complete if Making a Payment to, In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes
4b
Stream mitigation requested
linear feet
4c
If using stream mitigation, stream temperature
Choose,one
4d
Buffer'mitigation requested (DWQ only) '
square feet
4e
Riparian wetland mitigation requested
acres
4f
Non - riparian wetland mitigation requested
acres
4g
Coastal' (tidal) wetland mitigation requested
aces
4h
Comments
5.
Complete,if Using a Permittee Responsible Mitigation Plan
5a
If using a permittee responsible mitigation plan, provide a description of'the proposed mitigation plan
,Page 6 of 10
PCN Form — Version 1 4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a WII the project result in an impact within a protected riparian buffer that requires
buffer mitigation
1:1 Yes ❑� No
6b, If yes, thernidentify the square feet of 'impact'to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square1eet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 forTCatawba)
Zone 2
1 5
6f' Total buffer mitigation required:
6g If'buffer mitigation is;required, discuss what type of mitigation is proposed (egg', payment to pnvateemitigation bank, -
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
r
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1 a
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes N No
within one of the NC Riparian Buffer Protection Rules?
lb
If yes, then is a diffuse flow plan included? If no, explain why
❑ Yes ❑ No
2.
Stormwat6eMAna ement Plan
2a
What is the overall percent imperviousness, of this project?
0
2b
Does this project-require a Stormwater Management Plan?
❑ Yes ❑9 No
2c
If this project DOES NOT require a Stormwater Management Plan, explain why
Sewer utility installation
2d
If,this project DOES require a Stormwater Management Plan, then provide a brief, narrative
description of the plan
2e
Who will be responsible,for,the review of the Stormwater Management Plan?
1
Certified Local Government Stormwater Review
3a
In which local government's jurisdiction is this project?
❑ Phase II
❑ NSW
3b
Which of'the,following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c
Has,fhe approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a
Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply)
E] Session Law 2006 -246
[_]Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5.
DWQ,401 Unit Stormwater Review
�5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F. ,Supplementary Information
1.
Environmental Documentation (DWQ-Requirement)
la
Does the project'inv_olve an expenditure of public (federal /state /local) funds or the
O'Yes
El No
use of`public (federal /state) land?
lb
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
E No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter )
Comments
2.
Violations (DWQ Requirement)
,2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A.NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
❑Yes
D No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after - the- facYpermit,application?
El Yes
❑l No
2c
If you answered "yes " °to one or both of the above questions, provide an explanation of -the violation(s),
3.
Cumulative Impacts (_DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑Yes
D,No
additional development, which could impact nearby downstream water quality?
3b
If'you answered "yes" to the above, submit a�qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ,policy If you answered "no," provide a short narrative description
The
proposed protect consists of a gravity sanitary,sewer main relocation and upsize to serve the,sewer basin build -out
4.
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
The proposed,sanitary�sewer main relocation and up -size, a non - discharge protect, will address the sewer service basins's wastewater discharge
future needs with ample reserve, capacity
Page 9 of 1'0
PCN Form — Version 1'4 January 2009
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
❑ Yes [g 'No
habitat?
5b Have you checked with the USFWS concerning Endangered Species,Act
❑,Yes Q No
impacts?
5c If yes;, Indicate,the, USFWS Field Office you have contacted
-
5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical
Habitat?
6. Essential'Fish Habitat (Corps Requirement)
6a Will this project occur In or near�jan area,.designated as,essential fish habitat?
❑ Yes No
6b What data sources did' you use to determine whether your site would'impact Essential Fish, Habitat?
T. Historic or Peehistoric,Cultu`ral Resources (Corps Requirement)
7a WIII this;project occur, In or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ❑ No
status (e g , National Historic'Trust`designation or properties significant In
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would Impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain?
Yes ❑ No
8b If yes, explain how project meets FEMA requirements
The proposed sanitary sewer main relocation and up -size project will not impact the 100 -year floodplain
8c What source(s) did you use to make the floodplain determination
FEMA 100 -year Flood plain Panel Map # 3710553900J Date Nov 5, 2008
W Brian Hiatt, City Manager
Applicant/Agent's Printed, Name
Applicant/Agent's•Signature,
Date
(Agent's signature is valid only if an authorization
letter from,the applicant is provided
Page 10 of 10
/
USGS Map Name: Concord SE, NC Map MRC: 3508005
Map Center: N35.37063° W80.55189° Datum: NAD83 Zoom: 4m /pixel
Copyright (C) 2008 -2013 Ryon Niemi ... All Rights Reserved
.:1
r
z
a
OSEME
M d7Z ££ o0B gg
r'S
0
m
m
2(o
m
U�
0o
O N
Z a
m
2�
O Z
U �
N [n
7
Z
a U
m 0
0
O
—U
r9i
8
a
M.ZE£E d18
OZEE16E 06ZE16E 09Z£T6E OEZ£16E OOZE16£
N
OLT£76E IT M
z
e
M AZ £E 008 N O
(D
R O)
m
CL
0
Z
o
�
Zcn
d
�
c')w
0
o m
� a
3
co
o
m
Z
�
Fn
c6
Sov�O
55
x
g
9i
d
'-o
�
O
U) o
C
w
ZQ
2U
M.ZE £E
008
z
�i
N
ci
z�
2
�m
Z
O
.Q
I�f
0
Z
a
Z
W
W
J
IL
c
Of
C
a N
N
�zjp"
U O m
2:2
ai am,E5
E �,m�
E° �y
m nm
s3 �Em
fl;
m
o
E
.v i
i o,C I _
C m° E�
W E ar°n
m O O N C
O m 12 COO C 7G�
:J�M C m Ui O C7tr7 3
ti L
N N V G Z ESN
E y
p
N Ci O' L
co 0
�`��'O
�m N�a a
a3EQc� $� Cc
�...
m • m-. 3 C C :3 C Tm 7 Lhn Cm N.-.
C m a Z E �j
RQ _ �C gg m
a E 'S C) n v F S co co th $ O N -6
fA y 1
�HU.
g 3
> > > $ � g
.. in I i ii N a �' k g g N
a �
k
a co
�04
N
tr p
73
2
N
g�
m
z
aZ
N
O
20
A r,
Soil Map �--Cabarrus County, North Carolina
Map Unit Legend
Southbrook Soil Survey Map
2011-065
u5DA Natural Resources Web Soil Survey 417/2014
201 Conservation,Service National Cooperative Sod,Survey Page 3 of,3
North Carollif at
RRi "OF-I'M 'I&
IN
V
K
y, �4,(NCO25)) - X , w, K
WapUniCN
MKIN& tss"'IRV l"jA-M,,1W
Z"R""l, 9 1"1""0 R` 2241
ChA
Chewacla sandy loam, Oto 2
47
491%
percent slopes, frequently
flooded
CuB2
Cullen clay loam, 2 to 8 percent
26
269%
slopes, moderately eroded
MeD
Mecklenburg loam, 8 to 15
23
240%
percent slopes
Totals for Area of Interest
9.6
100.0%
u5DA Natural Resources Web Soil Survey 417/2014
201 Conservation,Service National Cooperative Sod,Survey Page 3 of,3
CONSTRUCTION SEQUENCE
1. CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS HAVE BEEN RECEIVED AND THAT THOSE REQUIRED
TO BE DISPLAYED ON-SITE ARE AVAILABLE
2. CONTRACTOR SHALL HOLD PRE -CONSTRUCTION MEETING AT LEAST 48 HOURS BEFORE THE -=ACTUAL
START OF CONSTRUCTION.
3. CONTRACTOR .SHALL CONTACT CAROLINA ;ONE CALL AND ALL ENTITIES HAVING BURIED UTILITIES AT LEAST 72
HOURS PRIOR TO DIGGING OR AS DIRECTED AT THE PRE -CONSTRUCTION MEETING.
4. CONTRACTOR SHALL MAINTAIN TRAFFIC AND SAFETY CONTROL MEASURES AT ALL TiMES ON THE PROJECT. (SEE
TRAFFIC CONTROL.)
5. CONTRACTOR SHALL INSTALL TEMPORARY; CONSTRUCTION ENTRANCES (IF ANY) AT EACH POINT OF ACCESS TO
STORAGE AND CONSTRUCTION AREAS.
6. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH PUNS AND BEFORE
STARTING WORK.
7. CONTRACTOR SHALL CLEAR RIGHT-OF-WAY IF NECESSARY.
8. STOCKPILE RIP -RAP ON SITE AND INSTALL ALL OTHER EROSION CONTROL MEASURES WHERE. THE WORK IS
OCCURRING. THE CONTRACTOR SHALL NOT INSTALL EROSION CONTROL MEASURES IN AREAS MERE THE WORK WILL
NOT OCCUR FOR SOME TIME. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY `7HE CITY/PROJECT
ENGINEER OR UPON RECOMMENDATION OF NC DENR PERSONNEL AS CONDITIONS WARRANT.
9. IN AREAS WHERE IT IS NOT FEASIBLE TO INSTALL EROSION CONTROL DEVICES, ALL DISTURBED AREAS MUST BE
SEEDED AND MULCHED BY THE CONTRACTOR WITHIN THREE DAYS OF INITIAL DISTURBANCE. TEMPORARY SEEDING
SHALL BE REQUIRED ON ALL OTHER. AREAS TO BE DISTURBED FOR A PERIOD OF 10 DAYS OR 'LONGER._
10. CONTRACTOR SHALL COORDINATE ALL BLOW -OFFS. AND TESTING WITH THE CITY ENGINEERING DEPARTMENT'S
CONSTRUCTION ADMINISTRATOR AT LEAST 24. HOURS IN ADVANCE OF SUCH WORK.. NOTIFY THE RESPONSE AREA
FIRE DEPARTMENT IF EXISTING SYSTEM VALVES NEED TO BE SHUT OFF IN THE COURSE OF THE: WORK.
11. UPON COMPLETION OF. THE INSTALLA11ON AND WITH APPROVAL OF NC DENR-DLR, ALL EROSION 'CONTROL
DEVICES EXCEPT FOR CREEK/STREAM BANK' STABiUZAnON SHALL BE REMOVED AND DISPOSED' OF IN . AN
ACCEPTABLE MANNER. EACH SECTION SHALL BE SEEDED AT EARLIEST POSSIBLE DATE AFTER hsSTALLATION OF
PIPE, STRUCTURE, OR ACCESS.
12. ONCE GROUND COVER IS FIRMLY ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SHALL. BE
REMOVED WITH THE APPROVAL OF NC DENR=DLR.
13. CONTRACTOR SHALL REFERENCE SPECIAL CONDITIONS FOR JOB SEQUENCE AND OTHER DIRECTIONS, IF ANY.
CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITY WITH THE CITY ENGINEERING DEPARTMENT.
GENERAL NOTES
1. ALL MATERIALS, EQUIPMENT, LABOR, AND WORKMANSHIP IS TO BE IN ACCORDANCE WITH AhD SUBJECT TO THE
WATER AND SEWER AUTHORITY OF CABARRUS COUNTY'S STANDARD SPECIFICATIONS; THE CITY OF CONCORD'S
ORDINANCES, POLICIES, AND STANDARD SPECIFICATIONS, AND NCDOT STANDARD SPECIFICATIOK , AND THE NORTH
CAROLINA ADMINISTRATIVE CODE FOR WASTEWATER COLLECTION AND WATER DISTRIBUTION SYS. -EMS. IN THE EVENT
OF CONFLICT BETWEEN THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY'S STANDAR SPECIFICATION; THE
CiTY OF CONCORD'S ORDINANCES, POLICIES,! AND STANDARD SPECiFICATiONS,AND= NCDOT STANDARD SPECIFICATIONS,
OR THE NORTH . CAROUNA ADMINISTRATIVE CODE, THE MORE. RESTRICTIVE REQUIREMENTS' SHALIL, APPLY.
2. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL CONFORM TO THE LATEST STANDARDS OF THE N.C.
SEDIMENTA11ON POLLUTION CONTROL ACT AND APPLICABLE LOCAL AND FEDERAL REQUIREMENTS.
3. CONTRACTOR SHALL NOTIFY THE CONSTRUCTION ADMINISTRATOR OF THE CITY OF CONCOR ENGINEERING
DEPARTMENT AT LEAST 48 HOURS IN ADVANCE OF BEGINNING WORK.
4. INDIVIDUAL WATER, GAS, SEWER, TELEPHONE, AND CABLE SERVICES MAY OR MAY NOT BE SHOWN ON THE
PLANS. CONTRACTOR TO CONTACT APPROPRIATE AGENCY FOR FIELD LOCATIONS.
5. CITY OF CONCORD ELECTRIC, WATER, AND SEWER DEPARTMENT PERSONNEL WILL ASSIST TiiE CONTRACTOR IN
LOCATING ALL CITY OF CONCORD UTILITY SERVICES AND LINES.
6. IF MAlL30X PULL -OFF AREAS ARE DISTURBED, CRUSHED STONE STABILIZER SHALL BE PLACED WITH SUFFICIENT
LENGTH TO ACCOMMODATE VEHICULAR 'TRAFFIC. THESE AREAS SHALL BE MAINTAINED FOR THE'ONE-YEAR
WARRANTY PERIOD. THE COST OF THESE; ITEMS SHALL BE INCLUDED IN THE COST OF .LAYING POPE.
7. THIS PROJECT IS SUBJECT TO 100 YEAR FLOOD PER FIRM MAP 3710553900J, NOVEMBER 5 2008.
8. FIRE HYDRANT EXTENSIONS, IF NEEDED,' SHALL BE INCLUDED IN THE COST OF THE HYDRAl i INSTALLATION.
9. GATE OR BUTTERFLY VALVES, BLOW -OFFS, AND FIRE HYDRANTS MAY BE F1ELD ADJUSTED 50 FEET IN EITHER
DIRECTION WITH THE PERMISSION OF THE ENGINEERING AND WATER RESOURCES DEPARTMENTS.
RIGHT-OF-WAY NOTES
1. RIGHT-OF-WAY LINES AND PROPERTY LINES ARE SHOWN ON THE DESIGN DRAWINGS AND ARE FOR
REFERENCE ONLY. FOR EXACT LOCATIONS REFER TO THE SURVEY PLATS BY THE CITY OF =ICORD'S
CONSULTING REGISTERED LAND SURVEYOR OR BY THE CITY SURVEYOR.
2. REFER TO STANDARDS AND SPECIFICATIONS FOR WATER AND SEWER CONSTRUCTION FOR FURTHER DETAILS
CONCERNING THE RIGHT-OF-WAY.
TRAFFIC CONTROL
1. THE CONTRACTOR SHALL BE RESPONSIBLE AT ALL TiMES FOR WORK ZONE TRAFFIC SAFETY AND CONTROL
2. ALL WORK ZONE TRAFFIC CONTROL DEVICES AND OPERATIONS USED ON STREET AND HIGH TAY CONSTRUCTION,
MAINTENANCE, UTILITY OR INCIDENT MANAGEMENT SHALL CONFORM TO THE APPLICABLE SPE-FICATIONS IN THE
LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND : IGHWAYS (MUTCD).
3. ALL TRAFFIC/SAFETY CONTROL DEVICES ;SHALL BE IN GOOD REPAIR AND SHALL BE POSITIVMED AT ALL TIMES iN
THE APPROPRIATE LOCATIONS FOR THE WORK OPERATION. THE CONTRACTOR SHALL CAREFULLY MONITOR SITE
CONDITIONS SUCH AS LIGHT, WEATHER, TRAFFIC VOLUME, ETC. TO ENSURE THAT ALL TRAFFIC/SAFETY CONTROL
MEASURES ARE OPERATING EFFECTIVELY.
4. THE CONTRACTOR SHALL PREPARE A PROPOSAL ON THE TRAFFIC CONTROL OPERATIONS ANO PRESENT THEM TO
THE CITY OF CONCORD'S ENGINEERING DEPARTMENT CONSTRUCTION ADMINISTRATOR : (PHILLIP ±!INGSLAND)
920-5404 AT LEAST 48 HOURS BEFORE BEGINNING .WORK.
UTILITY NOTE
THERE WILL BE A MINIMUM 10 -FOOT HORIZONTAL SEPARATION BETWEEN THE SEWER UNE AN_ THE WATER MAIN.
WHEN THE 10 -FOOT MINIMUM -HORIZONTAL ;SEPARATION CANNOT BE MAINTAINED, AND WHEN -iE WATER MAIN IS.
ABOVE THE SEWER, BUT .NTH LESS THAN 24 INCHES OF CLEARANCE, OR WHEN THE SEWER 'S ABOVE THE WATER
MAIN, BOTH THE WATER MAIN AND THE SEWER UNE SHALL BE CONSTRUCTED OF FERROUS MATERIALS WITH JOINTS
EQUIVALENT TO WATER MAIN STANDARDS FOR A MINIMUM LATERAL DISTANCE, MEASURED AT: BIGHT ANGLES. TO
THE SEWER, OF 10 FEET ON EACH SIDE OF THE CROSSING. (SEE DETAIL BELOW)
I T T=1 11=i T 1=1 11=11=1
WATER MAIN OR 24" MIN. STORM SEWER 24" MIN
SANITARY SEWER
STORM SEWER:�kj) WATER MAIN OR
SANITARY SEWER
- _r ED
NORTH CAROLINA
SOUTH.B,ROOK SEWER OUTFALI-
UP-SIZING
p ROJ ECT # :2011 -01o5
/ 000
��� G SR 2321
8 � 2322
ry
ti
V
O
0
N
AI0NIA6 DTX' A? �
AEIISH/RE CT.
�', MalOIil`
G�•
SITE LOCATION
VICINITY MAP
SCALE: N.T.S.
NARRATIVE DESCRIPTION
THIS PROJECT CONSISTS OI- THE INSTALLATION OF APPROXIMATELY 1561± LINEAR FEET OF 12" GRAVITY SEWER ALONG WITH
APPURTENANCES AND OTHEIR ASSOCIATED .PROJECT WORK, FOR THE PURPOSE OF PROVIDING SEWER TO THE SURROUNDING
AREAS.
THE .PROJECTED AMOUNT OF GROUND DISTURBANCE IS 1.08 f ACRES. THiS IS BASED UPON A DISTURBANCE OF 1561 LF
AND UPON AN AVERAGE C(VNSTRUCTION WIDTH OF 30 FEET DISTURBED BY THE INSTALLATION ION OF THE GRAVITY SEWER.
WORK SHALL PROCEED IN :SUCH A MANNER SO AS TO LIMIT THE AMOUNT OF GROUND DISTURBANCE BY HAVING ONLY ONE
SECTION OF THE DITCH OPEN AT A TIME THEREBY REDUCING THE POTENTIAL FOR LARGE. QUANTITIES OF SEDIMENT TO BE
TRANSPORTED OFF SITE.
SEEDING OF DENUDED AREAS SHALL BE DONE AS SOON AS POSSIBLE, BUT IN NO CASE LONGER THAN 10 DAYS AND IN
ACCORDANCE WITH . THE SPECIFICATIONS GIVEN IN THE PLANS. REMOVAL OF ALL SEDIMENTATION AND EROSION CONTROL
DEVICES SHALL ONLY BE 010NE AFTER APPROVAL HAS BEEN COORDINATED WITH THE DEPARTMENT OF ENVIRONMENTAL
HEALTH AND NATURAL RESOURCES, THE CITY OF CONCORD, AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION.
LOCATION AND PROTECTION: OF ALL UTILITIES IN THE WORK AREA SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR
(SEE "PROTECTION OF EXIti" TING UTILITIES') PLEASE NOTICE THAT THIS PROJECT CROSSES SEVERAL UNDERGROUND UTILITIES
ALONG THE ROUTE OF WOiRK. MINIMUM SEPARATIONS BETWEEN THE NEW SEWER LINES AND THESE UTILITIES SHALL BE HELD
AT ALL TIMES. IN THE EV04T OF AN UNFORESEEN CONFLICT, THE CONTRACTOR SHALL NOTIFY THE CITY OF CONCORD
ENGINEERING DEPARTMENT 2MMEDIATELY. ALL TRAFFIC CONTROL AND SAFETY SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL LE CONDUCTED IN STRICT ACCORDANCE WITH THE LATEST REVISION OF PART IV OF THE M.U.T.C.D.,
NCDOT, OSHA AND ALL OTHER LOCAL, STATE AND FEDERAL REGULATIONS.
COMPLETION OF THIS PRO��'ECT IS ANTICIPATED TO TAKE 60 DAYS AFTER NOTICE BY THE CITY OF CONCORD TO PROCEED.
FINAL COMPLETION AND ACCEPTANCE OF THE WORK iS ANTICIPATED TO BE SUMMER 2014.
N'OR.TA C.AA.0t1N;A
HighPerf®rmance Lrv6r;ig
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
LEGEND P.O. BOX 308
CONCORD N.C. 28026
(704)920-5425
as $ ssPROPOSED SEWER LiNE, MANHOLE & CLEAN-OUT
i -co
w w w PROPOSED WATER LINE �jN'CA'"lf,
PROPOSED FiRE HYDRANT ,�' S�I0 Q 2
. SEAL
PROPOSED WATER VALE e tr 17577
® PROPOSED BLOW -OFF
--0-f ■ �- SEDIMENT FENCING
t + *
DA-GLO ORANGE PERSONNEL FENCING
Engineer's Seal
PROPOSED ENCASEMENT
l�
ss ss ss
\5
J
EXISTING SEWER FORCE MAIN
-- -• -• -• -• -• --
1
EXISTING WATER UNE
_G -G -G -G -G
-
Ij
UT GT
EXISTING TELEPHONE (OVERHEAD OR UNDERGROUND)
N'OR.TA C.AA.0t1N;A
HighPerf®rmance Lrv6r;ig
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
LEGEND P.O. BOX 308
CONCORD N.C. 28026
(704)920-5425
as $ ssPROPOSED SEWER LiNE, MANHOLE & CLEAN-OUT
i -co
w w w PROPOSED WATER LINE �jN'CA'"lf,
PROPOSED FiRE HYDRANT ,�' S�I0 Q 2
. SEAL
PROPOSED WATER VALE e tr 17577
® PROPOSED BLOW -OFF
--0-f ■ �- SEDIMENT FENCING
t + *
DA-GLO ORANGE PERSONNEL FENCING
Engineer's Seal
PROPOSED ENCASEMENT
-
ss ss ss
EXISTING SEWER AND MANHOLE
FM
EXISTING SEWER FORCE MAIN
-- -• -• -• -• -• --
-
EXISTING WATER UNE
_G -G -G -G -G
-
EXISTING GAS LINE
UT GT
EXISTING TELEPHONE (OVERHEAD OR UNDERGROUND)
Surveyor's Seal
UE of
EXISTING ELECTRIC (OVERHEAD OR UNDERGROUND)
EIP
PROPERTY UNE AND IRON PIN
-- ��
i
- - - - - - - - - -
TEMPORARY CONSTRUCTION EASEMENT
APR 1 0 201,14
RIGHT OF WAY/PERMANENT EASEMENT
s 4
- ... • • •
WATERWAY/DITCH LINE
0,140372
X X
EXISTING BARBED WIRE FENCE
-0-0
EXISTING WOVEN WIRE FENCE
0 0
EXISTING CHAIN LINK FENCE
TREE/WOODS LINE
EXISTING FIRE HYDRANT
XWV
EXISTING WATER VALVE.
0 W
EXISTING WATER METER
EXISTING WELL
®
EXISTING TELEPHONE/POWER RISER
#LID
EXISTING- LIGHT POLE
GPP
EXISTING POWER POLE/!GUY WIRE
--�-
EXISTING STREET OR LOCATION SIGN
CONC. MON.
®
EXISTING CONCRETE R�'JU MONUMENT
BENCHMARK/TEMPORARY BENCHMARK
EXISTING RCP OR CMP
11meEXISTING
MAILBOX
m
DRAWING INDEX.
SHEET
1 PROJECT NARRATIVE, NOTES, LEGEND,
SITE MAP
Z
O
SHEET
2-3 EXISTING - PLAN/PROFILE
a
SHEET
4-5 DESIGN - PLAN/PROFILE
m
(n
SHEET
6 EROSION CONTROL - PLAN
SHEET
7 DETAILS- SEWER
SHEET
8 DETAILS - PUMP AROUND '
SHEET
9 DETAILS - EROSION CONTROL
—0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3-50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00
e
PROFILE r
HORZ: 1" = 40' L.J C>
SCALE:VERT: 199 — 4' z
J. 11IM&M
%
100 YEAR.I OOD `tel 1 \\ ff „� \ \ / 06
�-•••
,... \ _ ` „141 ; 1 \ \ I \ `\ y ! '`\ '� U
�.�
/ PLAIN'PEiFEMA ®®�~,I J1f \\, \\ , \ \ I \ \ / / \
PANEL MAP MBER' i
TBM: 3710553900JtaTED
IRON ROD FOUND NOV. 5,
ELEV. 549.63 \ I
W
EX WSACC MH /' - I - -� i t } �o ♦\\�4 \ \ \ i \ \ - EX MH D
\ y �"
STA* 0+0
I C'1
'
\,p� TO BE REPLACED)
i \ :' \\ \ \
RIM.556.44 / . '. , . •' \ � STA. -
I
• RiM• 569 99
30' STREAM BUFFER ♦ :, �i' \ �♦ �\♦ ; �\ `\ V \ \ `\
/ ' _ 557 _ : / _��� \` \�\\�.♦�\\`\ \ \ i \ \
/ �GJ� / \� s ---- 3p.s ! tl \ �\;. �\�\ `\\; ♦� \ \ \
'A
r
P -P
! \ `\ ` ` �\ ♦\� \ \ \ / i /// i _ - - ss -
/ / / 7 C' 1 _ : 1. ! .. =� ��\\`� ;p♦♦ \ ♦ \ \ \ / NK 65 _
WHITEHUR 80NTRYVIEW
/'\'',�\`\ \�S \ / MOBLE H ME PARK 7-
EX SH® EXp� i \`-�,�\ .''! S N- '\1 �o ` ss 6sr. `s6+ �\ \ / ` LLC. u+ n i.��/ LQ
/ \ �♦ �\ \`._\ ®n \�..:♦ d;\ ♦ — >� \\ % PIN: '- -_-I�
❑ \\ n \ \ v\ \\ ♦ \ . \
/• � :/ �,a. / , . � ' \ • \•. .\-•. 1 i •: � " �� ♦\•♦\\ \ \ ` ` ` � DB 7208. PG 154 ®� -•' -_,
/ EX. SEWER CLEANOUT ` \' \ \ \ \:♦\ ` \ ♦ ` TBM'
h \:'` RAIL ROAD SPIKE
PAD \ / �'�\ ` ♦ j\\`� \� \��\\��\\\ `\ �� `�: ` IN ROADWAY
\ 0 �. EI{E c�'AD ~~�\ ♦>- \\. ,� '' � \\\\\\\ \ � \ . ` El EV. 565.36 � � \ /'- N
I` 20. ` --- S 2 . ��\ \ \ \ s,`���"`��\` \\ ♦ \ ♦ \ �S s+OD �/' y6g „� �" _ qi' - 564' ®/
/ Oe / yy xt� _ {��v \� \ \ \ \\\h, `,\ n :` . `�\\ \� \ \ ` \ i\ \ \ EX BLDG\. 10• J P.P. -.��
. •'
�S - ". '' _-" / �.\ ` \ \ ®\W \ ::\ ®\ ,\♦ \\♦ \ \ ♦ V~ �.y6 �\c \\ 6Q• 1 / p\
54'.1`. ♦d \\ `' i �,r ..i / r•"' �A
! `ki ! \ \ \ to �`� �\ / /
h� EX PADS \ \� ! ?®\1\�\ ?� `: `�\ \� \�\ ♦ �\ y P.P. \ t`� \ ED \ i rCEV�
100 FLOOD d d . w An i \. \.. \ -qa
PLAIN PER FEMA d ®� -, \'\ \ `\ 1 \ w 565- �'�c ~ \ y / �r - 570'x- / MARYANNE M.
! PAN MAP NUMBER _ { �� { \ ♦ �tiy \... \\ \ ..t\ , \ \ \ S \ `~ �c ,y68 l l '
x s '°°� ' ` \\\ \` I \ r ` it;*---` \ SIVERS & irusband
371 53900J.DATED \ I _ ,.. 5TODD J.
/ f / EX MH� A ', �'� . \ y6. \ PIN: 5539-50-0140
E / NOV. 5.2008 0 STA 1+81.Q5 `' \a \ \\\\\\ \` t . t. j i } t� `\ T --- \V 5
m i/ %�'� C RIM:553.5q `l Ef
E \. \\\\ \\l \ \. `.564'.0? /. \ �__ _ y6 \ DB 2114, PG 219
"`, , / �` 1 �\ S _� \ \\�\ \\�\ \ Ili i 6 ss— �� ♦ - Z
.Q •-� 1 9 . ` LELEa'~ \ S
-•.\` N/A \ F -
o PAI , ': ' . \ ;;t \ \ ...j.F t i. 00 ' 563 \ \ \ \ JOSE JULIO ADAME
w . 1 E} SHE \ ., 1 \ I1 „ / �- _
\ \ \ \ \A`' ! /. S // / - `� \ ` _ SAENZOf
MH F Of
562 - \ PIN: 5539-50-1165 RI .70.00
/ ./ / / ! ®� `�a -� .rr� 1` \ \ \\\\� r / v \ ` \ \ \ DB 7386. PG 268
l 1 / \ j oe ® \\. \ \ •y S s \ mss• 1 \ / \ w
�:' / g0' STREAM BUFF E / - \ \ %
♦ \_.\ ��' \ ♦ r `- r ♦ ss' \ SSO, - \ \ , \ \ ` Q
t
o l / /! / ® t \ \ { { I �• ��.� p) EX MHC ,\\ \' \ \ PROTECTION OF EXISTING UTILITIES
m I \ { N/ s `� { (TO BE REPLACED) \ Q `�` �` \ t \ 1 ` THE CONTRACTOR SHALL CONTACT THE APPROPRIATE . GENCY FOR THE EXACT FIELD
WHITEHURST/LUN EW `� �TA:5+58.50 --� . 1a�\ \B \ 1 1 , , N/A \ LOCATIONS OF ALL WATER, SEWER, ELECTRIC, TELEPHOSIE, TELEVISION AND ANY OTHER
R / MOBLE HO E P K { c RIM:562.06 �'' .i } \ ���i \ ~\ } f JOSE JULIO ADAME \ UNDERGROUND AND OVERHEAD UTILITY BEFORE STARTIii�; CONSTRUCTION. THE
® \ �( \ 1 I m { \ / t } , SEANZ / �` OMISSION FROM OR THE INCLUSION OF UTILITY LOCAiiCO3S ON THE CONTRACT DRAWINGS
t /
PIN:5538- 9- ! x a. !fi/o/�/ \ i \ IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF OR A DEFINITE LOCATION OF
D8 7208, PG 154 y X _ `\ �" . r�lv' �o i� \ \ ! , N/A ` PIN: 5539-50-12 85 \
I - m ` Ss \I r. J ",may / \ ,MARTIN J. MORLEY DB 7386, PG 26 / \ T}!E LOCATIONTIAND DEPTH OF BALL UNDERGROUND UT1U SEES ALONG THE CONTRACTOR
OF
IFY
& SHIRLEY J MORLEY` \ WORK
Pi. 5539-50-2383 , \
o / \ THE FOLLOWING LISTING OF UTILITY COMPANIES (WHIG! MAY OR MAY NOT BE COMPLETE)
N/A D 2743, PG 282 ` \ MAY HAVE EXISTING UNDERGROUND OR OVERHEAD UTIURES IN THE CONTRACT VICINITY.
a r ! !�, MARTI J. MORLEY \ COMPANY NAME OFF3:EAFTER HOURS EMERGENCY W
` U
/ d { \ \ r r l 1 P P J. i Amtrak N/A1.800.331.0008 I-
/. BLDG ��; \� �/ . /Q, r �� ,,� rs�
P.P. . & MORLEY d
Amtr 1.67,,.627.53351.800.2521133 '
\ \ \ { \ s PIN: 5539-50-387 \ Cabarrus County Emergency Mgmt 704.,320.2143-704.920.300 p
DB 2743, PG 282 Carolina Water - Utilities Inc. (Zemoso A--)_704425.7990 704525.7990
--559'., yA�! j 9 , City of Concord Electric Systems 704.:320.5315 704S20.5555
� J, I t co I t ! \� ! 11-11 ` City of Concord Emergency Mgmt 704:220.5528 704.920.5555
I » MH B _ ` 1t CSX RDuke ailrColonial oad
Pipeline Company 1.80 769 3766 _1.800. 693766 LA•i
r„s ..=- / �•` \ \\ / I (W BE ABANDONED) ` NC Dept. of Transportati----704.382.0104 - 704:9863700Stm*CoComm
NC One Cali Center Area Re 1 3vn' 855.5760_1800.632A949
I RIM 0.60 DESIGNED BY: EAB
` Norfolk Southern Railway p N/6_ t.800A53.2530
, North Carolina Railroad Company 4.7601—NIA
\ \ \ !� h6 \\ I \ ` Piedmont Natural Gas (fka NCNG) 704•,'J64.3120_-1.800.752.7504 DRAWN BY: BCC
S STRUCTURE - (10) 1 ` Plantation Pipeline N/� 1.800.5105678
\ ' ,' \ , PSNC Energy Concord 704.,723.4310 x.877.776.2427 CHECKED BY: EAB
\
STA.,?" --- -._ — — — — — — — — — — — — — — � \ ! / I t Sprint Embarq N/� 1.888.723.8010
a
RIM: 558.01 ` \ — — — — — — — - - \ / I \ 1 Time Warner Cable Concord 704.378.2856 704 378 2626 Option 5, 2, i
union Power N/� 18009226840 SCALE: AS. SHOWN
UtOiQuest Locator Concord 704.:864.8333_1.800.632A949 NC One Call
_ FLAN ! \ \ Water & Sewer Authority of Cabarrus co 70478s1783 704.788A164RRWWT•P, DATE: 03/25/14
\ \ / �- — — — - — — — T — — — — — - — — — — — — s I \ ` Wtndstream 704.7222000_1.800.800.6609
1 ` ," i NOTE: SOME OF THE ABOVE COMPANIES DO NOT SUBSCRIBE TO CAROLINA ONE CALL
\ r SCALE: 1"=;Z-46
:,� 4 � \ (FORMERLY ULoco) PROJECT NUMBER: 2011-065
w NORTH CAROLINA ONE CALL 1-800-632-4949
o SHEET: 2 OF: 9
■■■INMEME■
■■■EEE
ME
No
o■��■■■■N■■■■■■MEMEN
No
■EISM■M■■EEE
®�M
�EE�■1,■r■r�■■■®�■■■��■■
■■■■■■■■■■M■■s■E■■■EM■EMEMMEMMEM■■■■mmmmm■■■mo■M
_ ..
-
ME■EM■
=
STA: 5+58.50
NV IN: 556.86 8" PVC SERVI
� ME■EM■■■■■■■■r■■■�■■EE�EE�■ENE�
MNr�rE■E®ME.�I■EME�E■
■�
ommmmmo
MISMISEMIN
=ME
®rsommissisommississmismMEMEEM
.,
:...
'.
- -
mmm
ommomom
N
No
IN
..
■■MO■■
MNE■■■■■■rO■■rMEMO
■ENMENE■
ISM
NoMN
ISM
MEM■M■M■
MEM■M■
■■EI■■I��.E
Bmmmm■■m■m■■■mmmm
ME
■■■
�■�■■■■�■MMS■
:.
■■■M�■■■■■■■o
I■■■ISM■M■■■■
OMEN
®■■MM■■
■■■■■■�
■r■r■■■■■■■■■■■■■■eEE■a■�n�■r■■■■■■r■■r■■�er■■�r■■■r■ii�M■r■■
■■■
�EEME
■
au ..
. _ : - '
- ,..
. -
�■EE�o
■■■
MMM■■■M�■
u■AMM■■■
�M■M�■®■��■M��■■
ME
MENON
®Em■MESE■...
MMM
■Mi�EEo
EEE�EI■■■EM■■MN�NM■■■
ISM
■
-
■■■EM■IM
�M
ME■�
■■MSE■■■M■NE�
■MEN■EMMM■t
■■■■EEI■NEM■
■
190�W�MEM�■
IS■E■IS■EMr�E■■■■M■MMUM
■M■■EN
MM�ii�EE■■■EN■■NNEE■■MMMNMEE■■rEE
snow
II
_
M■�
:.:
•mawMM■■NEM■■■■
■■■■E■EEM®E■■■MMEN�■
■■■■N�■m■■■■®m■
no
�MEM■E�■u
ARM
®■■MNEMoNo�EM
■E®MEN■■■®■■
MMOMMMEN�
ISMM■■■EMN■■EEE■�■s
ENEEM■Mr
M®NEEEEE�NMam
M.EMNOO-I
■■Rm■■■■■®■mmr■rr■■■■■■■MEMM�
E■!�E■EEEs�ME®■M�■■■�NNE�NEE■MEE■M���r
■E
MM�Nr��■M:
;EMM���r��E���MEMNI■ME■MEENEO■M�ENM�N����d�iE�.E■fIMEE�E�ENEMMM■EEM■■■EEM�■E■iMEEE���M
MEMEMEM��oEE�MEEIN■�E�MMEEM�M■MND■■E��E■Ns�E�E��E�MEErMN`�Mo��■M■��EE®�■NE■MEMEMMMEEMNMEE�i�■NE
ME■■E
■■MI■r
#trSEE■�MEMMME�I■�E�
1�EE■Ir�ME��
go
Adi"/■M�■E■r�M�MM�■I■MMEEEMEM��I��I/.1�EMEl►i■E�eEME■EMME�E®EMMEEEEMEMM�EEEMMN�E
MEEOC
i
•
5����i�M����EE�EEEEN■M■NE®EEE�MEM�E■■��EEME�E
■■■■mmmom■■■t■
■■m
NNEEMEMORNEam
MEMM■■E■■M■EMIMMMMEMs!
®O■■MMMM■■■■■m■■■■■■■
ISM
■■
MEN
MMM■1■■MINM■MEN
■
IOM
on
MEMO
■®■E■■■MMEM■MIMEMIMMINEMnMM■■■E�■■■■■■■�E■MEMEME■EME
M
■M■■rlmmmm®■mo■■m�
MMMOIiiM■M■M■N�N■EMN■■r�■E■N■■M■■■NEMm■■■■■mmo■■■■■■■■■■mMMM■N■E■■E■■■om■o■■t
■■AMM■IE■®EMM
'!
MENE■=MEMN■■=EM
EEEMMMEMO■�EM��EEM■EEEE■■■EMEEE®MMEEMMEEEM■�EMEEMEEE
MEMO
MM_0E'=M
M■■NEN■MM■■■EEEM■oISM
MEMEMEMNONEr■■MENo
ISM
■■M■■MEME■�m■■■■■�■■0■■E■rrs■
MEMO
■1m
-Iffli
�■
■M�■M■MOM■■■■M■■■■M
ISM
NoME■E■■ME■MEM■■■MME®■M■aME■■■■■■E■■■■■■■omm■m■
MEN
■■■■Mm■■■■■M■t■■■E
■®■Ms■■■MMEM■MMS
MIMMMMISM■■■■■M■■■EME
ONE
EEE■EMM�MEME�MMEEEEE�EE���NE��EM■IMEN■■E■N■E
ISM
ME!
ISM
MEMO
ME■■■■■■
ME
•
■�■■II■■MM
EM�vE■MEED■M�M�EM�MMEMEEO
■�ISM
ME
ISM
■■
MEN
■MM■■MOM
MEMO
M■■EM®
ISM
ISM
■E
ISM
ISM
MENEM
EEM
,
m■E
ISM
MMM■■MI■IrM
ISM
N■
ISM
No
ME
■�
ME
EM
ISM
■E■NE■■■■■■■■■MEME■E
ISM
MENOMONEE
MEN
Mm■E
ISM
0
ISM
M
ISM
0
■E■EMMEM■
ME■N■E■■■m■■■■■■■■■■o■■■mm■E
■■
■MENNAMM■
■EME■EE
■NM
NMom■■■■■■■■■■mME
N■■
ISM
■■MEMS■■■■■■M■■■■■
ISM
MEN
m■■■N■■MEM■■■EM■■■■■E■EM■
M■■NSHEMEM■
M■■■M
M
■■■mm■■■o■■■m■■■■■o■
M■■■mmo■■■■■■■■■■■■■
ISM
■■M■■■E■■mm■■m
ISM
■■ME■E
ISM
NONE
H■■
MEMORIAM
ISM
ISM
momv■■m■■mmmo
ME
ISM
■EM■■■M■EM
ISM
EMEMEM
ISM
Nw■M
ISM
ME
MEEM
No
ME
MEMOISM
ME
ISM
ME
■®■I■
no
ISM
ME
MEMO
ISM
m■MMM■■M
M■
ISM
NoMEISM
MI
MEM■MEMM■■■E■■■■EME■■EM■■®M■■rEM®■E■MEM
ME
ISM
ISM
MEISM
M
MENEM
MEN
■EOE■E■■EEME■E■■EME■MEM■■■EN
EEEEEEEEEN�E�MEEEEME���MENE�EMEMEEEEEME■t■EMM■I�■EEN■NE
MISM■0E■■■
■Mmomm
■E�EEEENEEMEEM�MM■EE
ISM
■■
ISM
■■■■■■■■■■
ISM
M■■M■I■M■■M■■■■■EM■M■■■EM■■■■■■ME■■oE
■■■■MMEME
M■
MIN
EMEMN■
ISM
MEMM■■MMENISM
M■ME■■E■M■■■
ISM
NONE
M■M■
■ommomm■■
■■■E■■ME■E■EM■■MEE
■E®EEEE■EEEEMMEEI■����E�ME�MM�EEE�EE�E■E■E■EE■�■t■i■■M
•
—0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3-50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00
e
PROFILE r
HORZ: 1" = 40' L.J C>
SCALE:VERT: 199 — 4' z
J. 11IM&M
%
100 YEAR.I OOD `tel 1 \\ ff „� \ \ / 06
�-•••
,... \ _ ` „141 ; 1 \ \ I \ `\ y ! '`\ '� U
�.�
/ PLAIN'PEiFEMA ®®�~,I J1f \\, \\ , \ \ I \ \ / / \
PANEL MAP MBER' i
TBM: 3710553900JtaTED
IRON ROD FOUND NOV. 5,
ELEV. 549.63 \ I
W
EX WSACC MH /' - I - -� i t } �o ♦\\�4 \ \ \ i \ \ - EX MH D
\ y �"
STA* 0+0
I C'1
'
\,p� TO BE REPLACED)
i \ :' \\ \ \
RIM.556.44 / . '. , . •' \ � STA. -
I
• RiM• 569 99
30' STREAM BUFFER ♦ :, �i' \ �♦ �\♦ ; �\ `\ V \ \ `\
/ ' _ 557 _ : / _��� \` \�\\�.♦�\\`\ \ \ i \ \
/ �GJ� / \� s ---- 3p.s ! tl \ �\;. �\�\ `\\; ♦� \ \ \
'A
r
P -P
! \ `\ ` ` �\ ♦\� \ \ \ / i /// i _ - - ss -
/ / / 7 C' 1 _ : 1. ! .. =� ��\\`� ;p♦♦ \ ♦ \ \ \ / NK 65 _
WHITEHUR 80NTRYVIEW
/'\'',�\`\ \�S \ / MOBLE H ME PARK 7-
EX SH® EXp� i \`-�,�\ .''! S N- '\1 �o ` ss 6sr. `s6+ �\ \ / ` LLC. u+ n i.��/ LQ
/ \ �♦ �\ \`._\ ®n \�..:♦ d;\ ♦ — >� \\ % PIN: '- -_-I�
❑ \\ n \ \ v\ \\ ♦ \ . \
/• � :/ �,a. / , . � ' \ • \•. .\-•. 1 i •: � " �� ♦\•♦\\ \ \ ` ` ` � DB 7208. PG 154 ®� -•' -_,
/ EX. SEWER CLEANOUT ` \' \ \ \ \:♦\ ` \ ♦ ` TBM'
h \:'` RAIL ROAD SPIKE
PAD \ / �'�\ ` ♦ j\\`� \� \��\\��\\\ `\ �� `�: ` IN ROADWAY
\ 0 �. EI{E c�'AD ~~�\ ♦>- \\. ,� '' � \\\\\\\ \ � \ . ` El EV. 565.36 � � \ /'- N
I` 20. ` --- S 2 . ��\ \ \ \ s,`���"`��\` \\ ♦ \ ♦ \ �S s+OD �/' y6g „� �" _ qi' - 564' ®/
/ Oe / yy xt� _ {��v \� \ \ \ \\\h, `,\ n :` . `�\\ \� \ \ ` \ i\ \ \ EX BLDG\. 10• J P.P. -.��
. •'
�S - ". '' _-" / �.\ ` \ \ ®\W \ ::\ ®\ ,\♦ \\♦ \ \ ♦ V~ �.y6 �\c \\ 6Q• 1 / p\
54'.1`. ♦d \\ `' i �,r ..i / r•"' �A
! `ki ! \ \ \ to �`� �\ / /
h� EX PADS \ \� ! ?®\1\�\ ?� `: `�\ \� \�\ ♦ �\ y P.P. \ t`� \ ED \ i rCEV�
100 FLOOD d d . w An i \. \.. \ -qa
PLAIN PER FEMA d ®� -, \'\ \ `\ 1 \ w 565- �'�c ~ \ y / �r - 570'x- / MARYANNE M.
! PAN MAP NUMBER _ { �� { \ ♦ �tiy \... \\ \ ..t\ , \ \ \ S \ `~ �c ,y68 l l '
x s '°°� ' ` \\\ \` I \ r ` it;*---` \ SIVERS & irusband
371 53900J.DATED \ I _ ,.. 5TODD J.
/ f / EX MH� A ', �'� . \ y6. \ PIN: 5539-50-0140
E / NOV. 5.2008 0 STA 1+81.Q5 `' \a \ \\\\\\ \` t . t. j i } t� `\ T --- \V 5
m i/ %�'� C RIM:553.5q `l Ef
E \. \\\\ \\l \ \. `.564'.0? /. \ �__ _ y6 \ DB 2114, PG 219
"`, , / �` 1 �\ S _� \ \\�\ \\�\ \ Ili i 6 ss— �� ♦ - Z
.Q •-� 1 9 . ` LELEa'~ \ S
-•.\` N/A \ F -
o PAI , ': ' . \ ;;t \ \ ...j.F t i. 00 ' 563 \ \ \ \ JOSE JULIO ADAME
w . 1 E} SHE \ ., 1 \ I1 „ / �- _
\ \ \ \ \A`' ! /. S // / - `� \ ` _ SAENZOf
MH F Of
562 - \ PIN: 5539-50-1165 RI .70.00
/ ./ / / ! ®� `�a -� .rr� 1` \ \ \\\\� r / v \ ` \ \ \ DB 7386. PG 268
l 1 / \ j oe ® \\. \ \ •y S s \ mss• 1 \ / \ w
�:' / g0' STREAM BUFF E / - \ \ %
♦ \_.\ ��' \ ♦ r `- r ♦ ss' \ SSO, - \ \ , \ \ ` Q
t
o l / /! / ® t \ \ { { I �• ��.� p) EX MHC ,\\ \' \ \ PROTECTION OF EXISTING UTILITIES
m I \ { N/ s `� { (TO BE REPLACED) \ Q `�` �` \ t \ 1 ` THE CONTRACTOR SHALL CONTACT THE APPROPRIATE . GENCY FOR THE EXACT FIELD
WHITEHURST/LUN EW `� �TA:5+58.50 --� . 1a�\ \B \ 1 1 , , N/A \ LOCATIONS OF ALL WATER, SEWER, ELECTRIC, TELEPHOSIE, TELEVISION AND ANY OTHER
R / MOBLE HO E P K { c RIM:562.06 �'' .i } \ ���i \ ~\ } f JOSE JULIO ADAME \ UNDERGROUND AND OVERHEAD UTILITY BEFORE STARTIii�; CONSTRUCTION. THE
® \ �( \ 1 I m { \ / t } , SEANZ / �` OMISSION FROM OR THE INCLUSION OF UTILITY LOCAiiCO3S ON THE CONTRACT DRAWINGS
t /
PIN:5538- 9- ! x a. !fi/o/�/ \ i \ IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF OR A DEFINITE LOCATION OF
D8 7208, PG 154 y X _ `\ �" . r�lv' �o i� \ \ ! , N/A ` PIN: 5539-50-12 85 \
I - m ` Ss \I r. J ",may / \ ,MARTIN J. MORLEY DB 7386, PG 26 / \ T}!E LOCATIONTIAND DEPTH OF BALL UNDERGROUND UT1U SEES ALONG THE CONTRACTOR
OF
IFY
& SHIRLEY J MORLEY` \ WORK
Pi. 5539-50-2383 , \
o / \ THE FOLLOWING LISTING OF UTILITY COMPANIES (WHIG! MAY OR MAY NOT BE COMPLETE)
N/A D 2743, PG 282 ` \ MAY HAVE EXISTING UNDERGROUND OR OVERHEAD UTIURES IN THE CONTRACT VICINITY.
a r ! !�, MARTI J. MORLEY \ COMPANY NAME OFF3:EAFTER HOURS EMERGENCY W
` U
/ d { \ \ r r l 1 P P J. i Amtrak N/A1.800.331.0008 I-
/. BLDG ��; \� �/ . /Q, r �� ,,� rs�
P.P. . & MORLEY d
Amtr 1.67,,.627.53351.800.2521133 '
\ \ \ { \ s PIN: 5539-50-387 \ Cabarrus County Emergency Mgmt 704.,320.2143-704.920.300 p
DB 2743, PG 282 Carolina Water - Utilities Inc. (Zemoso A--)_704425.7990 704525.7990
--559'., yA�! j 9 , City of Concord Electric Systems 704.:320.5315 704S20.5555
� J, I t co I t ! \� ! 11-11 ` City of Concord Emergency Mgmt 704:220.5528 704.920.5555
I » MH B _ ` 1t CSX RDuke ailrColonial oad
Pipeline Company 1.80 769 3766 _1.800. 693766 LA•i
r„s ..=- / �•` \ \\ / I (W BE ABANDONED) ` NC Dept. of Transportati----704.382.0104 - 704:9863700Stm*CoComm
NC One Cali Center Area Re 1 3vn' 855.5760_1800.632A949
I RIM 0.60 DESIGNED BY: EAB
` Norfolk Southern Railway p N/6_ t.800A53.2530
, North Carolina Railroad Company 4.7601—NIA
\ \ \ !� h6 \\ I \ ` Piedmont Natural Gas (fka NCNG) 704•,'J64.3120_-1.800.752.7504 DRAWN BY: BCC
S STRUCTURE - (10) 1 ` Plantation Pipeline N/� 1.800.5105678
\ ' ,' \ , PSNC Energy Concord 704.,723.4310 x.877.776.2427 CHECKED BY: EAB
\
STA.,?" --- -._ — — — — — — — — — — — — — — � \ ! / I t Sprint Embarq N/� 1.888.723.8010
a
RIM: 558.01 ` \ — — — — — — — - - \ / I \ 1 Time Warner Cable Concord 704.378.2856 704 378 2626 Option 5, 2, i
union Power N/� 18009226840 SCALE: AS. SHOWN
UtOiQuest Locator Concord 704.:864.8333_1.800.632A949 NC One Call
_ FLAN ! \ \ Water & Sewer Authority of Cabarrus co 70478s1783 704.788A164RRWWT•P, DATE: 03/25/14
\ \ / �- — — — - — — — T — — — — — - — — — — — — s I \ ` Wtndstream 704.7222000_1.800.800.6609
1 ` ," i NOTE: SOME OF THE ABOVE COMPANIES DO NOT SUBSCRIBE TO CAROLINA ONE CALL
\ r SCALE: 1"=;Z-46
:,� 4 � \ (FORMERLY ULoco) PROJECT NUMBER: 2011-065
w NORTH CAROLINA ONE CALL 1-800-632-4949
o SHEET: 2 OF: 9
® _e
-0+50 0+00 50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 U
/ /- , l \ \ \ y / /� \ NOTE: �GCITRACTOR TO FIELD VERIFY EXISTING SEWER
100 YEAR LOOD-.:., t tr t t l \ o
�` l t \ \ \ / \ SERVICES A'N NSTALL NEW SEWER SERVICES AND CLEANOUTS o
PLAIN"PEfFEMA ®®�`�I 1t ` / \ \ /
/ PANEL MAP N�IMBER WITHIN THE SIDE EDGE OF THE PROPOSED SEWER EASEMENT
IBM: 3710553960J Dt6TED , t
IRON ROD FO NOV. 5, 2018`\ PROPOSED MFi#2 ,��.�- ` t r I \ \ / \ \ \ AND TIE E),9STING SERVICES OVER. M �-
' -, \\ � \ � t \ \ / \ / LLI
ELEV. 549.63 \ 4,
\ /
/ ® \ . STA:1+50.02 \ �\
/ / \ R RIIvI:552.08 t. \ ' \ / RECEIv1NG!IT, / \U.
Ao I:. \ \ \ \ \ \ \
15'x15 I \ \ PROPOSED MH#4 \
/`' ® ►�R, s :.\ \�\ \ s� NOTE:2° OF RESTRAINED 12" DIP WITH \ \ / STA:9+13.43 -• y Q
® ! ��% �. \ O' Q-.� \ \ \ 82' OF 24 ASING PIPE \ \ / -�
ser 24 5s•w ! q, i - \ , :�•. , \ RIM:569.99
PICOPOS 12"PVC t04• / \ t\ \ C �\ `\ \ \ CONTRACT TO OPEN CUT CREEK \ \
STA- 9+44.79
IXSTA.0+C o 00 / - - 90 99' ---- \ \ �\�� . \ / SEE PUMP ARO D DETAIL \ vEX MH D
TO BE REPLACED
RIM:558.44 ( )
4P `\\�\\ \ / / RIM:569.99
TRACTOR TO OPEN CUT EXISTING / �� �' // / s• �/ ,
/ qtr / '��� / � / •. \ ;, � �•. \\`_ \\ .``::... �\`�\�'.. \ � s t \ RO AY 10 WIDTH EACH SIDE OF \
30 STREAM BUFFER � : .. �. _ . � `. \. \\ SEWER L N€ LOCATION. CONTRACTOR�-
v0 / . f.- i s9 a�'K •- 44 ® ♦ k- '' \' . \ TO USE UTILITY PATCH AND REPAIR
�- - _ y
i - O 5ROPZSSEL3 - f
DETAIL SEE SHE�T� - - -
\ '
`' � ! /', •.\. - `� \\`•\\\\ \ \
/ ® RVICE/CI�ANOUTS
`�`Z` / �' ---_ 30• ?'. ♦ !. rl \ �'" ����\\\� \ \ , \ BORE PIT, 15X30'
♦ N m
oC '
CONTRACTOR TO CONFIRM EXISTANCE / s� �3 S5 N,l�►
h 2'r \ tel` --- AO j• `• \ \ \ \rte ; �:��.` \\� \\ \ \ WHITEHURsWceUN1RYVIEW
OF SEWER SERVICE. IF THE SERVICE IS / . . / ,D \ , yc•�� ♦ \ MOBLE HOME PARK
3, } \ EX SHfB EX o �.♦ \\ \ .\ S \• \~",\ \ S \ \
NOT ACTIVE THE SERVICE IS TO BE : / o / -- -- -t- - I 1 / 1 , + '. 1 \ ! �. \ °'A . \� O• ` ss sA. \ \ / \ U.C.
PAD 2 . . \ 3• �S- \ 1^ o
ABANDONED WITHIN THE WSACC �,. r ss \ ----
. / . ❑ ♦ [� \ ♦ \ \ \ / PIN:5538-59-8419
EASEMENT BY REMOVAL AND THE EX SEWER C Qlt" a • -
\. \ \ \ ` isM' \ % DB 7208, PG 154
PLUGGING THE END. IF THE EXISTING �¢� / . 'ss �� ` `\ ..\. \ \\�\\ ���� ` \ \ -
' . ..\ \ \ \ \ RAIL ROAD SPIKE \ / -"'�^ s 2a
SERVICE IS STILL ACTIVE, THE SEWER / �. '� / / �s EE, PAD \\ ` > • \ �' .� . `� \ \� \� \ \ \� \ \ 9Nti 55 >i 3d -
SERVICE IS TO BE RECONNECTED TO �c ,,� _ _ \ -- -1- `� \ \ n .,''.� ® " \� \ \ . \ / Q'M•.�
�•,� _ ,, -_ � \ � � \ .n � L \�\ \ � \\ IN ROADWAY 3� o /" , C 3gs.
/ 0 \ ca tAD '- \moo ♦.. \ Q. n \.. ��\ E{.' 'oo //y��-`' i
THE NEW SEWER MAIN LOCATED ~� l --- S �� ® 1 \ \ \� .- .�\ •\ \\ �` .` El EV. 565.36 \ �` \ r""g` �,�t' �/' YpSED 9
h PROPOSED MH#1 s ,_ \ \ ., ®s \ ..\ \ s �a6*'�� R
A EASEMENT ;;\ ♦ \ \ `\` \ \ �'� � ,. EX. BLI)G\. 0. J P.P. Y O� i � � ,5n5 5�1,.. �� �� r � `564��
OUTSIDE OF THE WS CC , - - - \ : ' \ \\ ` \ \` \ \ . ` �, e S t
STA:0+59.02 X ' a� - _ _ ® '•� .56 ` \ sp. ��. / .rsr''� /�-. /. -^� `•ye �� -- - ' �\, /
RIM:554:06
_% ! ,s�,a. � �•--- ® \ \ ,.\ \\� \�\ " �\ � P.P. \
/ 10Q Y FLOOD 1 ` O w l \ !' \ \ \ \ \\�\ \ Q .> ^ !� . p�lG a� /' - \
PLAN PER FEMA 1 \ \ \. \ \ \ `. E "3J11� `� . -
9 ms> � � �� \ �` \\\\. \'� i\t1 t \ \\ y. �-...-.�- ��fiJ' �\ � y / \ "i.. �.r moi- s.•� ' o' i/ � � MARYANNE M. �
PAN MAP NUMBER ` - + s �� ( \ . ` , , .� \\ . \.. '®\ . I \ k ,"' �. . -� ,56 \ SIVERS & husband i=
> / / 71 5 390UJ DATED `'S5 X �� S ` \.\� \ \ - \ <v_ �„ �\ .•565 ` - / \ TODD J.
r 3 5 EX MH� A S `' \ .\ 1 \i \. \ \ t i _ 00 N '`�..'� �\ - _ ..56'!" ' „
/ / ./• / ! �..- . �e _\.. � \ i \ y �'�- ...� ♦ %" -- � "" �\ PIN: 5539-50-0140
NOV. 5, 2008 C STA 1+8t. \3 \\�\ `1 h - - ` e m \ \- - . '
SH 1 - \ \\\ \ S% ' f t V �` �� oI ` .�� \ -� X566 DB 2114, PG 219
qq55 1` E�, ct _
/ / RIM:553.5p cs I 1' \ \ \11 \.•j t 56 F-� ` �--- \ V
Q y "•-.,,..- ? c s dry` \ \\'\\ it :. -�\ / �� -- ' \ S V)
iD _� �I �� ♦ e +ELEC PAS%.•:' t .\\\\\`\ l.. :( t. 11. \ i�� -__ ! 1+ .c \ \\` \\ �1�_, \ \ �
/43 _
PROPOSED - ,� I,\��� (. ii by 47• �" - \ \ __- �` N/A
' - ELI:C:''P4 \ 1. \ ♦ i -t . 0 ®-e ~ 563' ` \ ♦ \ JOSE JULIO ADAMS
� r -. ERVICE/CLEANOUTS w � -• � _ -
, l�} I � -�.. \ � e> � � � � SHE \\�•• \\ `\\\\ ! 7y 7 t 1I is tiO�o � ....� ar1'`` -.° ` .,� � \ ♦ \ .-� $AENZ
> / , ` SHALLOW DR�AI GE
_\�` `� ! y l P /! , t o / \ - ` \� ° 56� -- �\ \` �� P1N:5539 50-ti65. PROTECTION OF ta0Si1NG UTILITIES
`� \ \ \ �\t \� o ` t DITCH TO BE \ DB 7386, PG 268
a0 1' \ \\:\\\\` f1 t� t` / \ 1 S S&! \ `\ ♦` �S• t \ THE CONTRACTOR SHALL CONTACT THE. APPROPRIATE AGENCY FOR THE EXACT `FIELD
STREAM BUFFS 9F ® �..\\..� �\ :\ :�s,� \ RE-ESTABLISHED BY \ / LOCATIONS OF ALL WATER. SEWER, ELECTRIC, TELEPHQ4F. TELEVISION AND ANY OTHER
` / t / / \ \ ? ' ! S . O \ \ \ ` . UNDERGROUND AND OVERHEAD UTILITY BEFORE START G CONSTRUCTION. THE
/ 0 \ ' I I R'►'O , \ \ \ \ \ s� ` \ } \ CONTRACTOR \
, \ OMISSION FROM OR THE INCLUSION OF UTILITY LOCATi ON JHE CONTRACT DRAWINGS
EX MH C\ PROPOSED SEWER IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF OR A DEFINITE LOCA71ON OF
N/ - \ S�' \� I (TO JE REPLACED) \ ' 2 ����/ � \ S1=RVICEtCLEANOUTS \ \ / EXISTING UTILITIES. IT SMALL HE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
I
WHITEHURST/UN EW _ `� STA 5+58.50 --- y . i ♦� rOe PROPOSED MFi#3 �! THE LOCATION AND DEPTH OF ALL UNDERGROUND 1TIES ALONG THE ROUTE OF
MOBLE HO E P K RIM:56206 :o' i �\ /�/` STA:5+27.13 , JOSE JULIO ADAMS \ WORK
LI I \ /' m /i i SEANZ / THE FOLLOWING US71NG OF U71UTY COMPANIES (WHIG ;f MAY OR MAY NOT BE COMPLETE)
PIN: 5538- 9-8412--j(r m , ad_ ! �/. m ��/ PJM:5C2.07 _ \ MAY HAVE EXISTING UNDERGROUND OR OVERHEAD UTUTIES IN THE CONTRACT VICINITY
OB 7208, PG 154 X - \ � }/ 1 �o /
(, -�► �_ SS �%!'1 ! !. \ , MARTIN NJ MORLEY ` DB 73 6, PG 268 / \ COMPANY NAME OF"+CEAFTER HOURS EMERGENCY W
/'.... / ! ® \ • �58ii \ ! ,. �.� ` & SHIRLEY J. ` \ Amtrak N/R 1.800331.1138 F-
�.. \ 1 \ ! \ MORLEYAT&T 1.673.627.5335____1.8002M.1133 Q
PiN
5539-50-2383 , \ \ Caborrus County Emergency Mgmt 704-920.2143 704.9203000 2743, PG 282 \ Carolina Water - Utilities Inc. (Zemosa Aeras) 704;525.7990 704.525.7990
N/A ` City of Concord Electric Systems 704;920.5315 704.92o5S55
),/ MARTI J. MORLEY , \ City of Concord Emergency gmt 704.920.5528 704920.5555
�C BLDG '��; % / ( tQ 11 j:h� i �P.P: & SHI J Colonial Pipeline Company 704;392.8610 704392.8610
MORLEY CSX Railroad 1800232.0744 W
y ss
PIN: 5539-5 387 ( \ Duke Energy 1X0.789.3766_1.80/.769.3766 '�
1 �' DB' 2743. PG Zi3Z NC Dept. of Transportation 704;982.0104 7049863700 Ste* Co Comm
r ✓ NC One Call Center Area Rep 1. •855.5760_1.800.632A949
\ \� `'559. Norfolk Southam Raiiwa Nle, 1 o1As3210 DESIGNED BY EAB
North Carolina Railroad Com any a194154.7601,_N/A.
MH B �, •�. , Piedmont Natural Gas (fka Company
704.364.3120 1.86.752.7504 DRAWN BY: BCC
HE ABANDONED) , Plantation Pipeline N/k 1.800.510.5678
I / ' ST 4+70.88. PSNC Ener Concora 704:.723.431a 1.577.7762427
\ ' \ Energy CHECKED BY: EAB
\ t t / / �z `a / RIM: 0.60 , Sprint Embarg N/k. ,.886.723.8010
i / t \ \ 1 Y I Time Warner Cable Concord 704,378.2856 704378.2626 Option 5,2,1
Union Pawar N/s` 1.86922.6840 SCALE: AS SHOWN
UtillQuest Locator Concord 704:.864.8333_ r ,_ 1.800.632.4949 NC One CsU
A STRUCTURE - (10) l / \ \ \ \ ALAN ./ ! 11 �\ water &Sewer Authority of Cabanvs Co 704;786.17R; 7oa:788A16417RWWTP DATE: 03/25/1.4
\ STTA: 8:01 / \ Windstream 704,722.2000__1.800.800.6609
RIM:- - - - - T - - - _ _ - - - - - - - 3 SCALE.- n �� \ , NOTE: SOME OF THE ABOVE COMPANIES DO NOT SUBSCRIBE TO CAROLINA' ONE CALL
/ (FORMERLY ULQCO) PROJECT NUMBER: 2011-065
NORTH CAROLINA ONE CALL 1-800-632-4949
SHEET: 4 OF: 9
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
P.O. BOX 308
CONCORD N.C. 28026
(704) 920-5425
EAL _
17577 ;
QGINS- X
�
Engineer's Seal
Surveyor's Seal
,J
J
Q
` -
LL
W
Z
0
JW LO
LL '
TO-
z 3: 0
WNU)
® W -W 04
W
CL
-0+50 0+00 50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 U
/ /- , l \ \ \ y / /� \ NOTE: �GCITRACTOR TO FIELD VERIFY EXISTING SEWER
100 YEAR LOOD-.:., t tr t t l \ o
�` l t \ \ \ / \ SERVICES A'N NSTALL NEW SEWER SERVICES AND CLEANOUTS o
PLAIN"PEfFEMA ®®�`�I 1t ` / \ \ /
/ PANEL MAP N�IMBER WITHIN THE SIDE EDGE OF THE PROPOSED SEWER EASEMENT
IBM: 3710553960J Dt6TED , t
IRON ROD FO NOV. 5, 2018`\ PROPOSED MFi#2 ,��.�- ` t r I \ \ / \ \ \ AND TIE E),9STING SERVICES OVER. M �-
' -, \\ � \ � t \ \ / \ / LLI
ELEV. 549.63 \ 4,
\ /
/ ® \ . STA:1+50.02 \ �\
/ / \ R RIIvI:552.08 t. \ ' \ / RECEIv1NG!IT, / \U.
Ao I:. \ \ \ \ \ \ \
15'x15 I \ \ PROPOSED MH#4 \
/`' ® ►�R, s :.\ \�\ \ s� NOTE:2° OF RESTRAINED 12" DIP WITH \ \ / STA:9+13.43 -• y Q
® ! ��% �. \ O' Q-.� \ \ \ 82' OF 24 ASING PIPE \ \ / -�
ser 24 5s•w ! q, i - \ , :�•. , \ RIM:569.99
PICOPOS 12"PVC t04• / \ t\ \ C �\ `\ \ \ CONTRACT TO OPEN CUT CREEK \ \
STA- 9+44.79
IXSTA.0+C o 00 / - - 90 99' ---- \ \ �\�� . \ / SEE PUMP ARO D DETAIL \ vEX MH D
TO BE REPLACED
RIM:558.44 ( )
4P `\\�\\ \ / / RIM:569.99
TRACTOR TO OPEN CUT EXISTING / �� �' // / s• �/ ,
/ qtr / '��� / � / •. \ ;, � �•. \\`_ \\ .``::... �\`�\�'.. \ � s t \ RO AY 10 WIDTH EACH SIDE OF \
30 STREAM BUFFER � : .. �. _ . � `. \. \\ SEWER L N€ LOCATION. CONTRACTOR�-
v0 / . f.- i s9 a�'K •- 44 ® ♦ k- '' \' . \ TO USE UTILITY PATCH AND REPAIR
�- - _ y
i - O 5ROPZSSEL3 - f
DETAIL SEE SHE�T� - - -
\ '
`' � ! /', •.\. - `� \\`•\\\\ \ \
/ ® RVICE/CI�ANOUTS
`�`Z` / �' ---_ 30• ?'. ♦ !. rl \ �'" ����\\\� \ \ , \ BORE PIT, 15X30'
♦ N m
oC '
CONTRACTOR TO CONFIRM EXISTANCE / s� �3 S5 N,l�►
h 2'r \ tel` --- AO j• `• \ \ \ \rte ; �:��.` \\� \\ \ \ WHITEHURsWceUN1RYVIEW
OF SEWER SERVICE. IF THE SERVICE IS / . . / ,D \ , yc•�� ♦ \ MOBLE HOME PARK
3, } \ EX SHfB EX o �.♦ \\ \ .\ S \• \~",\ \ S \ \
NOT ACTIVE THE SERVICE IS TO BE : / o / -- -- -t- - I 1 / 1 , + '. 1 \ ! �. \ °'A . \� O• ` ss sA. \ \ / \ U.C.
PAD 2 . . \ 3• �S- \ 1^ o
ABANDONED WITHIN THE WSACC �,. r ss \ ----
. / . ❑ ♦ [� \ ♦ \ \ \ / PIN:5538-59-8419
EASEMENT BY REMOVAL AND THE EX SEWER C Qlt" a • -
\. \ \ \ ` isM' \ % DB 7208, PG 154
PLUGGING THE END. IF THE EXISTING �¢� / . 'ss �� ` `\ ..\. \ \\�\\ ���� ` \ \ -
' . ..\ \ \ \ \ RAIL ROAD SPIKE \ / -"'�^ s 2a
SERVICE IS STILL ACTIVE, THE SEWER / �. '� / / �s EE, PAD \\ ` > • \ �' .� . `� \ \� \� \ \ \� \ \ 9Nti 55 >i 3d -
SERVICE IS TO BE RECONNECTED TO �c ,,� _ _ \ -- -1- `� \ \ n .,''.� ® " \� \ \ . \ / Q'M•.�
�•,� _ ,, -_ � \ � � \ .n � L \�\ \ � \\ IN ROADWAY 3� o /" , C 3gs.
/ 0 \ ca tAD '- \moo ♦.. \ Q. n \.. ��\ E{.' 'oo //y��-`' i
THE NEW SEWER MAIN LOCATED ~� l --- S �� ® 1 \ \ \� .- .�\ •\ \\ �` .` El EV. 565.36 \ �` \ r""g` �,�t' �/' YpSED 9
h PROPOSED MH#1 s ,_ \ \ ., ®s \ ..\ \ s �a6*'�� R
A EASEMENT ;;\ ♦ \ \ `\` \ \ �'� � ,. EX. BLI)G\. 0. J P.P. Y O� i � � ,5n5 5�1,.. �� �� r � `564��
OUTSIDE OF THE WS CC , - - - \ : ' \ \\ ` \ \` \ \ . ` �, e S t
STA:0+59.02 X ' a� - _ _ ® '•� .56 ` \ sp. ��. / .rsr''� /�-. /. -^� `•ye �� -- - ' �\, /
RIM:554:06
_% ! ,s�,a. � �•--- ® \ \ ,.\ \\� \�\ " �\ � P.P. \
/ 10Q Y FLOOD 1 ` O w l \ !' \ \ \ \ \\�\ \ Q .> ^ !� . p�lG a� /' - \
PLAN PER FEMA 1 \ \ \. \ \ \ `. E "3J11� `� . -
9 ms> � � �� \ �` \\\\. \'� i\t1 t \ \\ y. �-...-.�- ��fiJ' �\ � y / \ "i.. �.r moi- s.•� ' o' i/ � � MARYANNE M. �
PAN MAP NUMBER ` - + s �� ( \ . ` , , .� \\ . \.. '®\ . I \ k ,"' �. . -� ,56 \ SIVERS & husband i=
> / / 71 5 390UJ DATED `'S5 X �� S ` \.\� \ \ - \ <v_ �„ �\ .•565 ` - / \ TODD J.
r 3 5 EX MH� A S `' \ .\ 1 \i \. \ \ t i _ 00 N '`�..'� �\ - _ ..56'!" ' „
/ / ./• / ! �..- . �e _\.. � \ i \ y �'�- ...� ♦ %" -- � "" �\ PIN: 5539-50-0140
NOV. 5, 2008 C STA 1+8t. \3 \\�\ `1 h - - ` e m \ \- - . '
SH 1 - \ \\\ \ S% ' f t V �` �� oI ` .�� \ -� X566 DB 2114, PG 219
qq55 1` E�, ct _
/ / RIM:553.5p cs I 1' \ \ \11 \.•j t 56 F-� ` �--- \ V
Q y "•-.,,..- ? c s dry` \ \\'\\ it :. -�\ / �� -- ' \ S V)
iD _� �I �� ♦ e +ELEC PAS%.•:' t .\\\\\`\ l.. :( t. 11. \ i�� -__ ! 1+ .c \ \\` \\ �1�_, \ \ �
/43 _
PROPOSED - ,� I,\��� (. ii by 47• �" - \ \ __- �` N/A
' - ELI:C:''P4 \ 1. \ ♦ i -t . 0 ®-e ~ 563' ` \ ♦ \ JOSE JULIO ADAMS
� r -. ERVICE/CLEANOUTS w � -• � _ -
, l�} I � -�.. \ � e> � � � � SHE \\�•• \\ `\\\\ ! 7y 7 t 1I is tiO�o � ....� ar1'`` -.° ` .,� � \ ♦ \ .-� $AENZ
> / , ` SHALLOW DR�AI GE
_\�` `� ! y l P /! , t o / \ - ` \� ° 56� -- �\ \` �� P1N:5539 50-ti65. PROTECTION OF ta0Si1NG UTILITIES
`� \ \ \ �\t \� o ` t DITCH TO BE \ DB 7386, PG 268
a0 1' \ \\:\\\\` f1 t� t` / \ 1 S S&! \ `\ ♦` �S• t \ THE CONTRACTOR SHALL CONTACT THE. APPROPRIATE AGENCY FOR THE EXACT `FIELD
STREAM BUFFS 9F ® �..\\..� �\ :\ :�s,� \ RE-ESTABLISHED BY \ / LOCATIONS OF ALL WATER. SEWER, ELECTRIC, TELEPHQ4F. TELEVISION AND ANY OTHER
` / t / / \ \ ? ' ! S . O \ \ \ ` . UNDERGROUND AND OVERHEAD UTILITY BEFORE START G CONSTRUCTION. THE
/ 0 \ ' I I R'►'O , \ \ \ \ \ s� ` \ } \ CONTRACTOR \
, \ OMISSION FROM OR THE INCLUSION OF UTILITY LOCATi ON JHE CONTRACT DRAWINGS
EX MH C\ PROPOSED SEWER IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF OR A DEFINITE LOCA71ON OF
N/ - \ S�' \� I (TO JE REPLACED) \ ' 2 ����/ � \ S1=RVICEtCLEANOUTS \ \ / EXISTING UTILITIES. IT SMALL HE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
I
WHITEHURST/UN EW _ `� STA 5+58.50 --- y . i ♦� rOe PROPOSED MFi#3 �! THE LOCATION AND DEPTH OF ALL UNDERGROUND 1TIES ALONG THE ROUTE OF
MOBLE HO E P K RIM:56206 :o' i �\ /�/` STA:5+27.13 , JOSE JULIO ADAMS \ WORK
LI I \ /' m /i i SEANZ / THE FOLLOWING US71NG OF U71UTY COMPANIES (WHIG ;f MAY OR MAY NOT BE COMPLETE)
PIN: 5538- 9-8412--j(r m , ad_ ! �/. m ��/ PJM:5C2.07 _ \ MAY HAVE EXISTING UNDERGROUND OR OVERHEAD UTUTIES IN THE CONTRACT VICINITY
OB 7208, PG 154 X - \ � }/ 1 �o /
(, -�► �_ SS �%!'1 ! !. \ , MARTIN NJ MORLEY ` DB 73 6, PG 268 / \ COMPANY NAME OF"+CEAFTER HOURS EMERGENCY W
/'.... / ! ® \ • �58ii \ ! ,. �.� ` & SHIRLEY J. ` \ Amtrak N/R 1.800331.1138 F-
�.. \ 1 \ ! \ MORLEYAT&T 1.673.627.5335____1.8002M.1133 Q
PiN
5539-50-2383 , \ \ Caborrus County Emergency Mgmt 704-920.2143 704.9203000 2743, PG 282 \ Carolina Water - Utilities Inc. (Zemosa Aeras) 704;525.7990 704.525.7990
N/A ` City of Concord Electric Systems 704;920.5315 704.92o5S55
),/ MARTI J. MORLEY , \ City of Concord Emergency gmt 704.920.5528 704920.5555
�C BLDG '��; % / ( tQ 11 j:h� i �P.P: & SHI J Colonial Pipeline Company 704;392.8610 704392.8610
MORLEY CSX Railroad 1800232.0744 W
y ss
PIN: 5539-5 387 ( \ Duke Energy 1X0.789.3766_1.80/.769.3766 '�
1 �' DB' 2743. PG Zi3Z NC Dept. of Transportation 704;982.0104 7049863700 Ste* Co Comm
r ✓ NC One Call Center Area Rep 1. •855.5760_1.800.632A949
\ \� `'559. Norfolk Southam Raiiwa Nle, 1 o1As3210 DESIGNED BY EAB
North Carolina Railroad Com any a194154.7601,_N/A.
MH B �, •�. , Piedmont Natural Gas (fka Company
704.364.3120 1.86.752.7504 DRAWN BY: BCC
HE ABANDONED) , Plantation Pipeline N/k 1.800.510.5678
I / ' ST 4+70.88. PSNC Ener Concora 704:.723.431a 1.577.7762427
\ ' \ Energy CHECKED BY: EAB
\ t t / / �z `a / RIM: 0.60 , Sprint Embarg N/k. ,.886.723.8010
i / t \ \ 1 Y I Time Warner Cable Concord 704,378.2856 704378.2626 Option 5,2,1
Union Pawar N/s` 1.86922.6840 SCALE: AS SHOWN
UtillQuest Locator Concord 704:.864.8333_ r ,_ 1.800.632.4949 NC One CsU
A STRUCTURE - (10) l / \ \ \ \ ALAN ./ ! 11 �\ water &Sewer Authority of Cabanvs Co 704;786.17R; 7oa:788A16417RWWTP DATE: 03/25/1.4
\ STTA: 8:01 / \ Windstream 704,722.2000__1.800.800.6609
RIM:- - - - - T - - - _ _ - - - - - - - 3 SCALE.- n �� \ , NOTE: SOME OF THE ABOVE COMPANIES DO NOT SUBSCRIBE TO CAROLINA' ONE CALL
/ (FORMERLY ULQCO) PROJECT NUMBER: 2011-065
NORTH CAROLINA ONE CALL 1-800-632-4949
SHEET: 4 OF: 9
\ \ A t
t .
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
P.O. BOX 308
♦ ! 1 I CONCORD N.C. 28026
(704) 920.5425
i t \
S AL
AL
—
\ • \ I <. \ � � ® ! 1 � J I ® O . roti •.�1." 'aC
�® - 17577
Z GINy
,n I ^ 559' -- \ � O�j� — ,, .� ••••.� -- ® i �� ! 1 ````
1 /Ilittl
Engineers Seal
4.11
\ �'• � i ';err ®°-•�`; -;`� SS54:-
op
_ / ,\ ` \\\ g S59' ii rij�y i,'yi.. \���� \ \ _ /..T -..,,,. � _.. �s�vs,� � ..,'''- f'• -. / l J . '�
\ ! _ _ \ \ JB1'., ___/ \ �®' \` it \ \"\ ®+�' _• /^.7..-•^ 1
•565•_— .._ �/ 6 ' / \ \ \ \ ® X... S \ `?• ` 011�_ .� /
_ /
171
ors Seal
Surve
/ _'' , i'i ". ./ '. _ - yC `' -. � \ ` S \`s8 :jam•\ \ \ ` . _ `�\ � � y
\ •. .`.�,,,.\ / = ". ``- ,-� - `4,66 \\, Sg4s`3 ��:.� ^^':,\.`\\ ` ' � �f. , \ _ �_ � •�` _
\ •�'^i( I £g6 ti tip J
i/moi/,/ / / j - `` `\ $•\ \ �\��� \ _' i�..,`\ :'` .t
Cj66 / , ' / ,j 5j,tib%' \ \ \ ��\� ���\ • ` .� J J
V 11
LL
(�
1 ' LU CLLLJ1
ry -
' iii'' %! 'i'// ..• ' 1 ' .. _ � ` 1 \ r 0 i W
E J e;l •1 ` � �
-� LIMITS OF / ! / I �✓
h / / •�' �il;� r�` ' / , / 1 DISTURBANCE / — , W U
TO_11:1-Vt�I'PI]3V — ` / l —
/EASEMENT AREAS _ J -� / / JJ 1 ♦ ;1 Z)
—
ry
7
_
( ' ' NOTES \
1: CONTRACTOR IS TO PLACE ALL PROPOSED EROSION CONTROL
( ' ( ROCK OULTLETS AND SED. TRAPS IN FIELD VERIFIED LOW POINTS
( TO MINIMIZE THE NEED FOR DIVERSION DITCHES.
1 SEDIMENTATION AND EROSION CONTROL LEGEND \ \\ o
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT TECTION OF EXISTING UTILITIES \ \ \
\\
ONTRACTOR SHALL CONTACT THE APPROPR;/ a� A CY FOR TIE EXACT FIELD
I 1
—TD— DIVERSION (TEMPORARY) L A DNS OF ALL WATER. SEWER. ELECTRIC. LHON 7SION #WD ANY OTHER
1 UN OUND AND OVERHEAD UTILITY BEFORE zdTING C NSTRUCTIO . THE
OMI FROM OR THE INCLUSION OF UTILITY DATIONS THE CONTACT DRAWINGS
Is NO BE CONSIDERED AS THE NONEXISTENCE, OF OR A QEFINITE LOsrATION OF
SEDIMENT TRAP EXIST? 71LI7IES. IT SHAD. BE THE RESPONSIKITY OF THE ONTRACT0'2 SO VERIFY
j THE LO N AND DEPTH OF ALL UNDERGROUND 1 �\WTIES AL G THE ROTE OF
1 K \
SO THE FO LLO LISTING OF UTILITY COMPANIES (We 6Cf{ MAY .OR
'M:Y NOT BE\COMPLETE)
STONE OUTLET
(SO) MAY HAVE TING UNDERGROUND OR OVERHEAD 11116 ES IN THE CONTRACT VICINITY.
COMPANY N E 9FF"FtER HOURS ERGENCY
t ' trak/A_ % 800331.000000Obbdbbd888888 I—
[ i--►�---• SEDIMENT FENCE (SILT FENCE) AT 5.678.6 _335 .800.255.1133\ Q
i a County ergency Mgmt
704.920.2143-7#4420.3M p
Carotin oter - t sties Inc. (Zemosa Acres)�704.525.7990 7 525.7990 \
City of cord EI c c Systems 704.920.53}\5 7 20_555
11 City of cord Em ncy Mgmt 704.920.552 704 .5555 \
1 Colonial PI Ina y 7043928617043 610
CSX Rotlroa NI/A \ IA00=0144 Ltj
�\ Duke Energy -- 1' 800.769.3766' 1800.76 766 \
NO Dept of nsporta o 704.9820104704.9863 OSmalyCoC\omm
NO One Cali ter Area R 4.336.855.5760 1.800.632.4 9 \�
Norfolk Southam alwoy c9/A — \ 1.800.453 0 \ DESIGNED BY: EAB
North Carolina R road Co p ny 9!9:954.7601 A \
1 Piedmont Natural s (fka G) 704.364.3120 752.7504 \ DRAWN BY: -BCC
PI ntotion Pipeline !/A 1800_10_678 \
IC
PSNC Energy Cancor 704723.4310_1.776.2427\ CHECKED BY: EAB
Sprint Embar /A—::1.723.8010 \
— — Time Warner Cable C rd 704.378.2856 7043*6260p8on\S,2,i \
— — — — — — — — — — — , Union Power 1/A 18009 6840 SCALE: AS SHOWN
A
UtillQuest Locotor _ Conco -__704.8644.8333 1.800.631A%9 NC Onean
PLAN Water & Sewer Authority f Cuba Co 704786.178; 7047.18A RRWWTP \ DATE: 03/25/14Windstream 704.722200Q_1.800 800 \
® �� 6O' NOTE: SOME OF THE ABO COMPAN DO NOT SUBSCRIBE TO CAROLINA ONE ALL
SCALE: \
(FORMERLY ULOCO)
\ PROJECT. NUMBER: 2011-065
NORTH CAROLINA ONE CALL 1-800-632-4949
SHEET. 6 OF: 9
r-
WATER
MAIN
SANITARY SEWER
SANITAjY
S UNDER)
MAFWA R (OVER)
N
c
z
5- SEE WA1
NOTE MAII
SANITARY I
SEWER I
SANITARY I
SEWER
C4
II
1 1 N&04.22
IliiZ SANITARY
2 SEE NOTE
Vp
SEWER (OVER)
WATER A
A
MAIN s�
WATERMIRO
AINN
SANITARY
SEWER
NOTE:
WHEN THE WATER MAIN IS ABOVE THE, SANITARY SEWER, BUT WITH LESS THAN 24" CLEARANCE,
OR WHEN THE SANITARY SEWER IS ABOVE THE WATER MAIN, BOTH THE WATER MAIN AND
THE SANITARY SEWER LINE SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE WITH JOINTS
EQUIVALENT TO WATER MAIN STANDARDS. FOR A MINIMUM LATERAL DISTANCE, MEASURED AT
RIGHT ANGLES TO THE SEWER, OF 10 FEET ON EACH SIDE .OF THE CROSSING.
RELATION OF 'WATER MAINS TO SANITARY SEWEP, MAINS
NOT TO SCALE
BOLTS ON MH FRAME AND COVER
PROVIDE BOLTS ONLY. WHERE. SPECIFIED
'LACE MAS11C BETWEEN - GRADE RINGS-
- GRADE
INGS--GRADE RINGS AS REQUIRED
WIDTH OF PAY LIMITS FOR
CASING PIPE
HIGHWAY RAILROAD
Ale.
I MANHOLE STEPS
PAVEMENT REMOVAL AND REPAIR
L
15O.C.
(TYPICAL)
CONCRETE
O. D. WALL
3/4" PIPE
/-EX'STiNG
a
AMETER
4" DIAMETER
TACK EDGES
(Note 5)
PP
SECTION
3#
1.5
MIL�YEMENT
.o To
1 114"
61
81.
(TYP-)
SURFACE
WIDTH OF PAY LIMITS FOR
CASING PIPE
HIGHWAY RAILROAD
Ale.
SPIDER DIMENSIONS
PAVEMENT REMOVAL AND REPAIR
0. D.
O. D.
CONCRETE
O. D. WALL
A
/-EX'STiNG
a
MATCH EXISTING
TACK EDGES
(Note 5)
PP
SECTION
3#
1.5
MIL�YEMENT
.o To
1 114"
51811
81.
(TYP-)
SURFACE
A
C&JRSE DEPTH
16 112"
CLEAN, n i
2114"
V,
12"
SUITABLE BACKFILL
24"
-\-SURFACE COURSE
0.250"
COMPACT TO 98% OF IL
22112"
1.5 TO Z25" S 9. X
31,
MAX. DRY DENSITY AS
161,
17A0"
3
V)
.OBTAINED IN DT W
0.312"
30" 0.5001,
-28 1/2"
STANDARD PROCTOR
2
INTERMEDIATE "OURSE
24""
(ASTM D-698) DT.
36"
jRSE
2.25 TO 4.0" 19. X
0.375"
361, 0.5626
341/2"
BASE COURSE
PLACE
2"i
3.0 TO 5.5 B 25. X
CORRECT FILL
PIPE SUPPORT ASSEMBLY MARK NUMISER
GENERAL NOTES:
LETTER PER
EMBEDMENT
1. 4" AND 6" SEWER LATERAL - MINIMUM GRADE 1.07c
In
7 z
0
DESIGN PLAN
cn
(SEE SPECIFICATIONS
3
DEPTH OF SEWER MAIN WILL NOT PERMIT.
FOR TYPE, COMPACTION. IT.
ui
811 X 211 X 114111
PL
AND BLOCKING IF NEEDED
6" X 11/2" X 114'- PL
>
u-
3/8" !NUT & BOLT
81,
w
w
SEINER LATERAL SHALL USE CLASS C BEDDING.
X -o
477
a.
Ui Lu
ch
a
12"
Ui
PL
6. WHERE THE DEPTH OF THE WYE BRANCH IS MORE THAN 10', A STANDPIPE SHALL BE
W, x 3 6/8" X 318-1 PL
f,318"
NOTES:
1/2"INUT&SOLT
1. NEW PAVEMENT SHALL HAVE SECTION THICKNESS DESIGNED TO
NCDOT SUPERPAVE
PL
STANDARDS AS PROVIDED BY ENGINEER OR MATCH EXISTING CONSTRUCTION, WHICk EVER
W'X 4 3/4" X 3/8"; PL
IS GREATER OR AS SPECIFIED BY THE CONTRACT DOCUMENTS.
PL
2. TRENCH IS TO BE BACKFILLED IN COMPACTED 6" LAYERS BEFORE PAVEMENT REPAIRS ARE MADE.
t-24--
3. REFER TO EARTHWORK SPECIFICATIONS FOR EMBEDMENT AND FILL REQUIREMENTS.
PL
4. THIS DETAIL SHOWS ASPHALT PAVEMENT REPLACEMENT. THE WIDTH OF PAY LIMITS SHALL
6" X 5 112" X 3/8"! PL
APPLY TO STONE AND CONCRETE PAVEMENT AS WELL
PL
5. 18" MIN. AROUND PATCHES AND 36" MIN. AT CURB CUTS.
POOLING STORMWATER.
UTILITY CUT REPLACEMENT DETAIL
9. SEWER LATERALS SHOULD TIE TO THE SEWER MAIN, BUT WHEN INDICATED ON THE
SCALE NONE
DRAWINGS, THE SEWER LATERAL CAN BE INSTALLED INTO A MANHOLE. A MAXIMUM OF 3
U11UTY NOTE
WHEN A WATER MAIN OR SANITARY SEWER MAIN CROSSES OVER OR UNDER A STORM SEWER AND CONDITIONS
PREVENT THE REQUIRED 24" MIN VERTICAL SEPARATION, THE WATER MAIN OR SANITARY SEWER MAIN SHALL BE
CONSTRUCTED OF DUCTILE IRON PIPE WITH .JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A MINIMUM
DISTANCE OF 10. FEET ON EACH SIDE OF THE POINT OF CROSSING. (SEE DETAIL BELOW)
.. -94 [=11
1-m--1 11=1 -=4 -11=Ral � -1r_-, I'
U
WATER MAIN OR -1"e 24" MIN. STORM SEWER 24" MIN.
SANITARY SEWER
STORM SEWER� WATER MAIN OR
SANITARY SEWER
I
CONE SEC11ON
VARIES 0" MIN.
12" MAX.
FLAT SLAB UPPER SECTION
ALLOWED ONLY WHERE DEPTHS WILL
NOT. PERMIT CONE SECTIONS
NOTES:
1. MANHOLE RISERS AND CONE SECTIONS SHALL CONFORM TO
ASTM C-478, LATEST RE'ASION.
2. TRANSITION RINGS SHALL HAVE A MINIMUM CLEARANCE OF 2'-0'
ABOVE THE EFFLUENT OVERT ELEVATION.
3. SEE FIGURE 23 FOR DROP' MANHOLE.
4. FLEXIBLE, WATERTIGHT, SYNTHETIC RUBBER SLEEVES, WITH
STAINLESS STEEL CLAMP; DRAW BOLT AND NUT, OR CAST -IN
SLEEVE; OR "A" LOCK CONNECTION SHALL BE FURNISHED FOR
EACH PIPE TO MANHOLE CONNECTION.
5. SEE SPECIFICATIONS FOR MANIHOLE DIAMETER.
STANDARD PRECAST CONCRETE MANHL,)LE
NOT TO SCALE
SIDE VIEW
7
C)
CARRIER PIPE
it 6'
LEGS ROTATED OUT OF POSITION FOR CLARITY
I
END MEW
CARRIER PIPE
CASING PIPE
HIGHWAY RAILROAD
Ale.
SPIDER DIMENSIONS
NOMINAL.
DIA.
0. D.
O. D.
WALL
O. D. WALL
A
0
a
C
61,
.6.901,
3
1.51
3#
1.5
Nin
1 114"
51811
81.
9.06.1
Is"
0.260"
181, 0.312"
16 112"
2114"
V,
12"
13.20"
24"
0.250"
24%' 0.406"
22112"
W
0
31,
4
161,
17A0"
3
0.312"
30" 0.5001,
-28 1/2"
2' MIN. SEPARATION
2
1
1/2
24""
36"
0.375"
361, 0.5626
341/2"
4"
2"i
_�6:8:0:-:±
C)
CARRIER PIPE
it 6'
LEGS ROTATED OUT OF POSITION FOR CLARITY
I
END MEW
CARRIER PIPE
CASING PIPE
HIGHWAY RAILROAD
Ale.
SPIDER DIMENSIONS
NOMINAL.
DIA.
0. D.
O. D.
WALL
O. D. WALL
A
0
a
C
61,
.6.901,
12.76"
0.1881,
12.75" 0.250"
LL
(/)
1 114"
51811
81.
9.06.1
Is"
0.260"
181, 0.312"
16 112"
2114"
V,
12"
13.20"
24"
0.250"
24%' 0.406"
22112"
W
0
31,
1
114"
161,
17A0"
301,
0.312"
30" 0.5001,
-28 1/2"
2' MIN. SEPARATION
3 112"
1
1/2
24""
36"
0.375"
361, 0.5626
341/2"
4"
2"i
_�6:8:0:-:±
PIPE SUPPORT ASSEMBLY MARK NUMISER
GENERAL NOTES:
NOMINAL
DIA I
1. 4" AND 6" SEWER LATERAL - MINIMUM GRADE 1.07c
1
It
It
2. THE LATERAL SHALL BE A MINIMUM OF 5' BELOW THE EGE OF PAVEMENT, EXCEPT WHERE
2
3
DEPTH OF SEWER MAIN WILL NOT PERMIT.
4
6"
811 X 211 X 114111
PL
THAN 18" OF COVER IS MAINTAINED OVER THE SEWER LATERAL OR WHERE THE LATERAL
6" X 11/2" X 114'- PL
6"X 11W'
PL
3/8" !NUT & BOLT
81,
8" X 3" X 1/4";
PL
SEINER LATERAL SHALL USE CLASS C BEDDING.
6" X 3114" X 114' PL
r,X 1/4"
-
PL
1/2"'!NUT & BOLT
12"
8" X 4" X 114"i
PL
6. WHERE THE DEPTH OF THE WYE BRANCH IS MORE THAN 10', A STANDPIPE SHALL BE
W, x 3 6/8" X 318-1 PL
f,318"
' PL
1/2"INUT&SOLT
16"
8".X 4" X 3/8"
PL
7. SEWER LATERAL CLEANOUTS SHALL BE LOCATED AT THE LEDGE OF THE RIGHT-OF-WAY OR
W'X 4 3/4" X 3/8"; PL
�X31r�
PL
Li
t-24--
8" X 4" X 3/8" 1
PL
INDICATED ON THE APPROVED DESIGN DRAWINGS.
6" X 5 112" X 3/8"! PL
S",X 3/8"1
PL
112-1. NUT & BOLT
NOTES:
1. CARRIER PIPE IS RESTRAINED. PUSH -ON JOINT DIP, PROVIDE TWO SPIDERS PER
JOINT OF CARRIER PIPE
2. SPIDERS, NUTS, BOLTS & WASHERS SHALL BE STAINI =SS STEEL.
3. ADJUST HEIGHT OF SPIDERS AS NECESSARY TO MAINTAIN SPEci nED SLOPE.
4. CASING PIPE MATERIAL IS STEEL.
WSACC CASING SPIDER
1 11/09 SVM TAB WATER AND SEWER AUTHORITY
REVISION DATE BY CHKD OF CABARRUS COUNTY
NO. I FILE 'NAME: M2.0 DATE: 07/08
ELEVATION
E HOLE FOR INFLUENT
WITH CORING MACHINE
INSTALL FLEXIBLE
BER COUPLING.
:.NOTE #5)
R=1 /2 O.D.
PIPE BARREL
1/4- X 2- --Z
STAINLESS STEEL
STRAP WITH
2 ANCHOR BOLTS
SECTION B -B
4!' MIN CLEAR
FROM JOINT
(ABOVE OR
BELOW)
CUT
TO FIT
1/2 PIPE I.D.
16 0,
mxa
z
1/4- X 2-
STAINLESS STEEL
STRAP WITH
2 ANCHOR BOLTS
SECTION A -A DETAIL
NOTES:
1. PIPE FOR INSIDE DROP SHALL BE 35 PVC CONFORMING TO
ASTM SPECIFICATION D3034.
2. BOTTOM BEND TO BE 90* SHORT BEND, BELLSPIGOT,
OF SDR 35 PVC. SPIGOT OF BEND TO REST DIRECTLY ON
EXISTING SHELF. CONSTRUCT MASONRY TROUGH FROM DROP
EFFLUENT TO MAIN CHANNEL
3. NOTCH BELL OF PVC DROP TO ACCEPT DIP SPIGOT AS SHOWN.
4. LOCATE STRAPS AT PIPE BELL AND ABOVE BELL OF 90* BEND
AS SHOWN. ADD EXTRA STRAPS AS NECESSARY TO MAINTAIN MAXIMUM
SPACING OF FOUR FEET.
5. HOLE IN MANHOLE WALL TO BE MADE WITH A CORING MACHINE.
INSTALL FLEXIBLE RUBBER COUPLING.
6. CORE HOLE SHALL NOT ENTER CONE SECTION.
7. STEPS SHALL BE RELOCATED IF THEY CONFLICT
WITH INSIDE DROP.
TYPICAL INSIDEOTTO DROP MANHOLE
NSCALE
WORK ZONE
Ix
OL:
R
(WIDTH VARIES)
BORE PIT 10' (MIN)(MINI. RECEIVING
SEE PLANS - _10 PIT 0"
I-SEE PLANS
o --"*'Lu Lu 71-q
'END WALL x x
3- (MIN) COVER END WALL
=P -----------
\-COATED STEA- ENCASEMENT, REFERENCE
WSACC DETAIL M2.0 'CASING SPIDER"
RESTRAINED PUSH -ON ANCHOR BLOCK TYPICAL ANCHOR
JOINT DUC71LE IRON
CARRIER PIPE STREAM/CREEK CROSSINGS
(NTS)
12- (MIN) V (MIN) WIDTH ir (m) CASING PI 12' (MIN) MIN CLEAR SPACE BETWEEN
TRENCH ANCHOR AND CASING PIPE
1r (MIN) WALL
WIDTH
Ir (MIN)
CASING PIPE•
OONCREIE _,--CARRIER
CASIN
PIPE Dv- i i r
CAM
PIPE
ULM EMBEDMENT
24' (MIN)
ZC (MIN)
CONCRETE (PLACE
AGAINST UNDISTURBED
SOL OR ROCK)
5 1ror
WAY
UNDISTURBED SOIL OR ROCK
12" (MN) SIDE ELEVATION
7
FRONT ELEVATION OF 'TRENCH. T EACH SIDE
KEYED IN UNDISTURBED
SOIL OR ROCK.
CONIC. ANCHOR BLOCK
GENERAL NOTES
1. SEE DRAWINGS FOR LOCATION, SIZE AND LENGTH OF STEEL
8. D 8"1_ PIPE CASINGS.
2. INSTALL TWO (2) 1 -INCH DRAINS EACH SIDE OF CARRIER PIPE
IN DOWNHILL END WALL.
3. THE Prr/TRENCH EXCAVATION SHALL IN NO CASE BE CLOSER
CASING PIPE flD THAN 10 -FEET FROM THE TOP OF STREAM AND/OR CREEK
BANK
4. RESTRAINED PUSH -ON JOINT DUCTILE IRON CARRIER PIPE
CARFMR PIPE- SHALL IDMD THROUGH CASING PIPE ASSEMBLY.
5. SEE WSACC DETAIL M2.0 "CASING SPIDER" FOR CASING PIPE
lip A 1 %01 AND SPIDER REQUIREMENTS.
WEEP HOLES COMMON BRICK MORTAR
SEE NOTE 2 1 PART PORTLAND CEMENT
2 FARM SAND
D - Dtk OF CASING PIPE
END WALL SECTION
(INTS)
m
BRASS CAP WITH GLUED
81 THREADED COUPLINGS
GROUND
SCH 40 PVC
WATER TIGHT
SCH 40 PVC 4" PLUG
ADAPTOR AS
REQUIRED 12' NIPPLE
ROMAC STYLE "CS' 4" X 4' X 4" WYE
SEWER11 SADDLE
ASSEMBLY OR EQUAL
SCH, 40 PVC AS REQUIRED
2' MIN. SEPARATION
FROM PIPE JOINT
OF 0
EXISTING GRAVITY SEWER MAIN
GENERAL NOTES:
1. 4" AND 6" SEWER LATERAL - MINIMUM GRADE 1.0%
2. THE LATERAL SHALL BE A MINIMUM OF 5' BELOW THE EDGE OF PAVEMENT,
EXCEPT WHERE DEPTH OF SEWER MAIN WILL NOT PERMIT.
3. DUCTILE IRON PIPE (DIP) MATERIAL SHALL BE USED WHERE LESS THAN 3'
BUT NOT LESS THAN 18" OF COVER IS MAINTAINED OVER THE SEWER
LATERAL OR WHERE THE LATERAL HAS 18' OR MORE GROUND COVER OVER.
THE LATERAL
5. ALL SCHEDULE 40 PVC LATERALS SMALL BE INSTALLED USING CLASS B
BEDDING. DIP SERVICE LATERAL SHALL USE CLASS C BEDDING *
6. A ROMAC STYLE "C80 SEWER SADDLE OR EQUAL WITH STAINLESS STEEL
STRAP, BOLTS, NUTS, AND WASHERS SHALL BE INSTALLED ACCORDING TO
MANUFACTURES RECOMMENDATION ON EXISTING .SEWER MAINS. IMPORTANT,
THE STRAP IS TO BE TIGHTENED EVENLY TO ENSURE THE SADDLE REMAINS
ON CENTER WITH THE SEWER SERVICE HOLE CUT OUT.
7. THE SEWER SADDLE TAP SHALL BE LOCATED ABOVE THE FLOW LINE OF THE
SEWER MAIN SUCH THAT THE BRANCH PIPE AXIS FORMS AN ANGLE OF
30 -DEGREES WITH THE HORIZONTAL.
8. WHERE THE DEPTH OF THE WYE BRANCH IS MORE THAN 10', A STANDPIPE
SHALL BE INSTALLED TO BRING CONNECTIONS WITHIN 8' OF THE GROUND
SURFACE, UNLESS A GREATER DEPTH THAN 8' IS REQUIRED TO PROVIDE
THE MINIMUM SLOPE IN THE SERMCE.
9. SEWER SERVICE CLEANOUTS SHALL BE LOCATED AT THE EDGE OF THE
RIGHT-OF-WAY OR PUBLIC UTILITY EASEMENT. SEWER SERVICES THAT
EXTEND FROM SEWER MAINS LOCATED WITHIN THE ROAD RIGHTS-OF-WAY
SHALL BE LOCATED AT THE CENTER OF THE LOT OR AS INDICATED ON THE
APPROVED DESIGN DRAWINGS.
10. SEWER SERVICE CLEANOUTS SHALL NOT BE LOCATED WITHIN ANY FEATURE
CONVEYING OR POOLING STORMWAMER.
SANITARY SEWER LATERAL ON AN EXISTING SEWER LINE
NOT TO SCALE
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
P.O. BOX 308
CONCORD N.C. 28026
(704) 920-5425.
\A CA
'3.o r
I- 15�
0 l
!tA Ir
_ f
SEAL S 1
7
757
"VG I NO"'* �v.`Y
1111111110,10
Engineees.Seal
Surveyor's Seal
0
LL
SHEET: 7 OF: 9
Ale.
D D -0 U)
BRASS CAP WITH GLUED
0 0
BI THREADED COUPLINGS
J
0
GROUND
All 0%
Z
<
SCH 40 PVC
0
LL
(/)
W
04c)
0
ADAPTOR AS WATER TIGHT
REQUIRED 46 PLUG
.j
SCH 40 PVC
W
F-
0
OR DUCTILE IRON
Li.
L2
3:
W
0
12' NIPPLE
SHEET: 7 OF: 9
Ale.
D D -0 U)
BRASS CAP WITH GLUED
0 0
BI THREADED COUPLINGS
U)
GROUND
_TIL III
SCH 40 PVC
OR DUCTILE IRON
ADAPTOR AS WATER TIGHT
REQUIRED 46 PLUG
SCH 40 PVC
OR DUCTILE IRON
WYE ASSEMBLY
12' NIPPLE
4" X 4' X 4" WYE
2' MIN. SEPARATION
FROM PIPE JOINT
PR` POSED GRAVITY SEWER MAIN
z
DR 35 PVC SHOWN
0
F:
GENERAL NOTES:
1. 4" AND 6" SEWER LATERAL - MINIMUM GRADE 1.07c
It
It
2. THE LATERAL SHALL BE A MINIMUM OF 5' BELOW THE EGE OF PAVEMENT, EXCEPT WHERE
DEPTH OF SEWER MAIN WILL NOT PERMIT.
Ld
Ld
3. DUCTILE IRON PIPE (DIP) MATERIAL SHALL BE USED WHERE LESS THAN 3' BUT NOT LESS
THAN 18" OF COVER IS MAINTAINED OVER THE SEWER LATERAL OR WHERE THE LATERAL
HAS 18' OR MORE GROUND COVER OVER THE LATERAL
4. ALL SCHEDULE 40 PVC LATERALS SHALL BE INSTALLED USING CLASS B BEDDING. DIP
SEINER LATERAL SHALL USE CLASS C BEDDING.
5. THE SEWER LATERAL WYE SHALL BE LOCATED SUCH THAT. THE BRANCH PIPE AXIS FORMS
AN ANGLE OF 30 -DEGREES WITH THE HORIZONTAL
6. WHERE THE DEPTH OF THE WYE BRANCH IS MORE THAN 10', A STANDPIPE SHALL BE
INSTALLED TO BRING CONNECTIONS WITHIN 8' OF THE GROUND SURFACE, UNLESS A
GREATER DEPTH THAN 8' IS REQUIRED TO PROVIDE THE MINIMUM SLOPE IN THE SERVICE.
7. SEWER LATERAL CLEANOUTS SHALL BE LOCATED AT THE LEDGE OF THE RIGHT-OF-WAY OR
PUBLIC UTILITY EASEMENT. SEWER LATAERALS THAT EXTEND FROM SEWER MAINS LOCATED
Li
WITHIN THE ROAD RIGHTS-OF-WAY SHALL BE LOCATED A7 THE CENTER OF THE LOT OR AS
INDICATED ON THE APPROVED DESIGN DRAWINGS.
8. SEWER LATERAL CLEANOUTS SHALL NOT BE LOCATED WITHIN ANY FEATURE CONVEYING OR
POOLING STORMWATER.
9. SEWER LATERALS SHOULD TIE TO THE SEWER MAIN, BUT WHEN INDICATED ON THE
DRAWINGS, THE SEWER LATERAL CAN BE INSTALLED INTO A MANHOLE. A MAXIMUM OF 3
Lu
LATERALS TO A DEADEND MANHOLE AND A MAXIMUM OF 2 LATERALS TO AN IN-LINE
MANHOLE.
DESIGNED BY. EAB
10. THE SEWER LATERAL MUST NOT EXTEND MORE THAN 6" BEYOND THE MANHOLE WALL AND
THE LATERAL INVERT SHALL BE LEVEL WITH THE MANHOLE SHELF AND A CHANNEL SHALL
DRAWN BY: BCC
BE BUILT TO PROVIDE SMOOTH FLOW FROM THE LATERAL TO THE MAN LINE INVERT.
CHECKED BY: EAB
SCALE: AS SHOWN
SANITARY SEWER LATERAL ON A PROPOSED SEWER LINE
DATE: 03/25/14
NOT TO SCALE
PROJECT NUMBER: 2011-065
SHEET: 7 OF: 9
EXAMPLE OF PUMP -AROUND OPERATION
SPECIAL STILLING E
(SEE PROJECT SPECIAL F
(SEE NCDOT ;STANDARD DRA
Utilize a Stabilized Outlet
a Special Stilling Basin
Clean Water.
IMPERVIOUS DIKE
(SEE PROJECT SPECIAL PROVIS
TEMPORA
FLEXIBLE F
NOTES:
1) All excavation shall be performed in
sections of channel.
2) Impervious dikes are .:to be used to
stream flow when necessary.
3) All graded areas shall be stabilized
4 Maintenance of stream flow operatic
to the work. This includes polyethyle
sheeting, diversion pipes, pumps an(
5) Pumps and hoses shall be of suffici
the work area.
SEQUENCE OF CONSTRUCTION FOR TYPICAL WORK AREA
1. INSTALL SPECIAL STILLING BASIN(S)..
2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE.
3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING
OPERATIONS FOR STREAM DIVERSION.
AND PUMPING
=A. AREA TO BE DEWATERED
IN ACCORDANCE WITH THE
DEWATER BEFORE REMOVAL
SUS DIKES, PUMPS, AND
'REAM IMPERVIOUS DIKES FIRST).
BE COMPLETED IN ONE DAY
+EEN THE IMPERVIOUS DIKES.
TOWN ON THIS SHEET ONLY
JF WORK FOR EACH STREAM
JSIBLE FOR DETERMINING
(S) FOR EACH DAY'S WORK.
ND BACKFILL. STABILIZE
,H.
NORTH CAROLINA
High Performance Living
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
P.O. BOX 308
CONCORD N.C. 28026
(704) 920-5425
N CA�j
i�
SALE',
1 577
Engineer's Seal
Surveyor's Seal
us
Uj
11J
N
r
CL .r1
N
o
}—
J
_j'0 WU
m
QW
_
LL
0
F—
— 0.
W
c
m
z
0
Q
rr
U
to
irJ
w
a
0
W
DESIGNED BY: EAB
DRAWN BY:
BCC
CHECKED BY: EAB
SCALE: AS SHOWN
DATE:
03/25/14
PROJECT NUMBER: 2011--065
TEMPORARY DIVERSION DITCH
CONSTRUCTION AND MAINTENANCE
1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS,
AND OTHER OBJECTIONABLE MATERIAL
2. ENSURE THAT THE MINIMUM CROSS SECTION MEETS ALL DESIGN
REQUIREMENTS.
3. ENSURE THAT THE TOP; OF THE DIKE IS NOT LOWER AT ANY
POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED
SETTLEMENT.
.4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT
MACHINE REGRADING AND CLEANOUT.
5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION,
UNLESS IT WILL REMAIN; IN PLACE LESS THAN 30 WORKING
DAYS.
6. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER
EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM
THE FLOW AREA AND REPAIR ANY DAMAGE. WHEN
CONSTRUCTION AREA IS PERMANENTLY STABILIZED, REMOVE
RIDGE AND CHANNEL AND BLEND TO NATURAL GROUND LEVEL
AND APPROPRIATELY STABILIZE.
REFERENCE . DETAIL BELOW
2:1 SLOPE (OR FLATTER)
COMPACTED SOIL
SLOPE TO
SENSITIVE AREA
�---- '6' TYPICAL -----I MAINTAIN POSITIVE GRADE
IN DITCH
(1.09 GRADE MAX.
TEMPORARY EARTHEN DIVERSION DIKE WITH TRAPEZOIDAL DITCH
GRADES OF TEMPORARY DIVERSION DITCHES TO FOLLOW NATURAL SLOPE OF GROUND.
* PLANTED VEGETATIVE COVER SHALL BE WET AREAS SPECIES.
CHECK DAM (TEMPORARY)
CONSTRUCTION AND MAINTENANCE
1. PLACE STONES (2" TO 15") ON FILTER FABRIC WHERE SPECIFIED ON THE
CONTRACT DRAWINGS.
2. CONSTRUCT TEMPORARY CHECK DAM AS SHOWN IN THE DETAIL
3. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TCP OF
THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM,
4. ENSURE PROTECTION OF THE CHANNEL BELOW THE LOWEST DAM FROM OVERFLOW.
5. ENSURE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE.
6. CHECK FOR STONE BLOCKAGE AFTER EVENTS OF RAIN AT CULVERTS AND STORM
DRAIN ENTRANCES.
7. INSPECT CHANNELS AND DAMS AFTER EACH RUNOFF EVENT. CLEANOUT AND
SPREAD SEDIMENT IF DIRECTED BY INSPECTOR.
1.5" A
MIN.
FILTER
FABRIC A
CLASS A -OR B
EROSION CONTRO 12' WASH STON_
STONE ON UPSTREAM FACE
24" MAX.
0 CENTER FLOW
FILTER
FABRIC
SECTION "A - A"
6" L
WAST
HALF -RING INLET PROTECTION
INLET
FLOW
PLAN VIEW
PROFILE .VIEW
TEMPORARY STONE INLET PROTECTION CONSTRUCTED FROM
3" RIP -RAP WITH 2:1 SIDE SLOPES AT A DEPTH OF 1.5'
WITH A 6" LAYER OF x57 WASHED STONE ON THE SIDE
AWAY FROM THE INLET.!'
DUST 'CONTROL
I. CONTRACTOR SHALL CONTROL DUST FROM EQUIPMENT USE
OF UNPAVED ROADS BY SPRINKLING WITH WATER UNTIL
THE SURFACE IS WET.
2. DUST CONTROL MEASURE(S) SHALL BE USED THROUGH DRY
WEATHER UNTIL ALL DISTURBED AREAS HAVE BEEN
STABILIZED.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE f EXIT
USE ABC STONE
6" THICK
LI (
50' LONG (MIN.)
PUB�,G ROP
S.
ABC
STON
M\N-
12
SEDIMENT FENCE
CONSTRUCTION AND MAINTENANCE
1. CONSTRUCT THE SEDIMENT BARRIER USING A SYNTHETIC FILTER FABRIC OF AT LEAST
95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE
MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461.
SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND
STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS .OF EXPECTED USABLE
CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 F.
2- ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LF STEEL WITH MINIMUM
LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO
FACILITATE FASTENING THE FABRIC.
3. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES
ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER
SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.]
4. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF
THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN
THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO
THE NEXT POST.
5. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY
TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE
BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE
UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A
MIMIMUM 50 POUND TENSILE STRENGTH.
6. WHEN A WIRE MESH SUPPORT POST IS USED, SPACE POSTS AT A MAXIMUM OF 8
FEET APART. SUPPORT POST SHOULD BE DRIVEN SECURELY INTO THE GROUND TO A
MINIMUM OF 24 INCHES.
7. EXTRA -STRENGTH FILTER FABRIC WITH 6 -FOOT POST SPACING DOES NOT REQUIRE A
WIRE MESH SUPPORT FENCE. WIRE THE FILTER FABRIC DIRECTLY TO THE POSTS.
8. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE
PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. PLACE 12 INCHES OF
THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. BACKFILL THE TRENCH
WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION
OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE.
9. STEEL POSTS TO BE USED ONLY. WOODEN POSTS NOT ALLOWED.
10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
11- INSPECT STRUCTURE EACH WEEK AND AFTER SIGNIFICANT RAINFALL. MAKE REPAIRS
IMMEDIATELY, REPLACE BURLAP EVERY 60 DAYS. SEDIMENT IS TO BE DISPOSED OF
PROPERLY. WHEN CONSTRUCTION AREA HAS BEEN PERMANENTLY STABILIZED, REMOVE
STRUCTURE :AND UNSTABLE SEDIMENT. SMOOTH, BLEND, AND STABILIZE AREA.
ECOMPACTED
FILL
-RE
u=sem=a, nr-•at. ;..-.
EXTEND FABRI
INTO THE TRENCH
=1C :<ff.=1tT
--
18" MAX.
'OMPACTED
FILL
STEEL POST
CHECK DAM (TEMPORARY)
W/ TEMPORARY IN -DITCH S�rnMFNT SR -DETAIL
1.5' A
MIN.
I I k V MIN WEIR J
FILTER
FABRIC
CLASS A OR 11--\
EROSION CONTROL
12' WASH STONE STONE
ON UPSTREAM FACE----,.�.
Flow 24• MAX
® CENTER
`- FILTER
FABRIC
SECTION 'A - A'
IN -DITCH TEMP
SEDIMENT TRAP
261X10'WX2'0
I. PLACE STONES (2' TO 15') ON FILTER FABRIC WHERE SPECIFIED ON THE
CONTRACT DRAWINGS.
2. CONSTRUCTION CHECK DAM W/ TEMPORARY IN -DITCH SEDIMENT TRAP
AS SHOWN IN THE DETAIL. EXCAVATE THE BASIN PER SPECIFIED
DIMENSIONS WITHIN THE EXISTING DITCH.
3. FORM AT LEAST A 2' WEIR WITHIN CENTER OF CHECK DAM SUCH THAT
THE STORM WATER FLOW PASSES OVER THE WEIR.
4. PROVIDE AT LEAST 12' OF WASHED STONE ON THE UPSTREAM FACE OF
THE STONE CHECK DAM.
- ENSURE PROTECTION OF THE CHANNEL BELOW THE LOWEST DAM FROM
OVERFLOW.
6. ENSURE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE
7. CHECK FOR STONE BLOCKAGE AFTER EVENTS OF RAIN AT CULVERTS
AND STORM DRAIN ENTRANCES.
8. INSPECT CHANNELS AND BASINS AFTER EACH RUNOFF EVENT.
CLEANOUT AND DISPOSE OF THE SEDIMENT AND DEBRIS PROPERLY.
NOTE:
STRUCTURAL STONE SHALL BE CLASS 'B'
FOR EROSION CONTROL PURPOSES,
SEDIMENT CONTROL STONE SHALL BE
NO. 57 OR NO. 57 STONE.
STONE OUTLET
AT SEDIMENT FENCE
31
SILT FENCE
POST
CEDIMENT
CONTIR
STONE MIN.
MAX
• 'ie�+'•3.
SECTION 'A -A'
TOP VIEW
FRONT VIEW
ENVIRONMENTAL PROTECTION
SEDIMENTATION AND EROSION CONTROL
ALL EXISTING SENSITIVE LAND FEATURES AND STRUCTURES SHALL BE PROTECTED FROM
EROSION AND SEDIMENTATION. ITEMS TO BE PROTECTED SHALL INCLUDE, BUT ARE NOT
LIMITED TO, ALL DOWNSTREAM PROPERTY, NATURAL WATERWAYS, STREAMS, WETLANDS,
YARDS, .LAKES AND PONDS, CATCH BASINS, DRAINAGE DITCHES, ROADS, GUTTERS, AND
NATURAL AREAS.
SOIL EROSION AND SEDIMENTATION CONTROL SHALL BE PROVIDED AND MAINTAINED BY THE
CONTRACTOR, AT HIS EXPENSE, THROUGHOUT THE LIFE OF THE CONTRACT AND DURING THE
CONTRACT WARRANTY PERIOD, FOR ALL AREAS THAT ARE GRADED OR DISTURBED AS A RESULT
OF THE CONTRACTOR'S WORK ACTIVITY. CONTROL MEASURES SHALL .CONSIST OF APPROVED
PRACTICES FOUND IN THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
AND AS SHOWN ON THE CONSTRUCTION .DRAWINGS AS APPROVED BY THE N.C. DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES AND INSTALLED AS SUCH.
IN THE EVENT THAT. LOCAL CONDITIONS CHANGE TO RENDER DESIGNED SEDIMENTATION AND
EROSION CONTROL INEFFECTIVE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DIRECTOR
OF ENGINEERING FOR A FIELD CHANGE DISPOSITION.
AFTER DISTURBED AREAS ARE STABILIZED AND ALL TEMPORARY MEASURES REMOVED, THE
SEDIMENT SHALL BE SPREAD IN A MANNER NOT TO ADVERSELY AFFECT PROTECTION
PROCEDURES AND THEN THE AREA SHALL BE SEEDED AND MULCHED. OTHERWISE, SEDIMENT IS
TO BE DISPOSED OF BY HAULING AND SPREADING AS DETAILED .ON THE DIVISION .OF LAND
RESOURCES' APPROVED SEDIMENTATION AND EROSION CONTROL DRAWINGS.
PROTECTION OF WETLANDS
ALL AREAS SHOWN AS WETLANDS ON THE CONSTRUCTION DRAWINGS SHALL BE PROTECTED BY
DIRECTIONS GIVEN ON THE PLANS AND ALL WORK WITHIN THESE AREAS SHALL BE IN
ACCORDANCE WITH PROVISIONS AS SET FORTH IN THE ARMY CORPS OF ENGINEERS 404 PERMIT,
THE N.C. DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 401 PERMIT/CERTIFICATION,
AND THE DIVISION OF LAND RESOURCES' LETTER OF APPROVAL.
SEEDING, GROUND COVERS, AND MULCHING
AREAS DAMAGED BY CONSTRUCTION WORK SHALL BE RESTORED TO A CONDITION APPROVED BY
THE DIRECTOR OF ENGINEERING BY WORKING, FERTILIZING, SEEDING, AND MULCHING.
SEEDING SHALL' BE DONE WITHINFIVE (5) DAYS AFTER THE INITIAL GROUND DISTURBANCE.
THE BED SHALL BE PREPARED BY PULVERIZING THE SOIL TO A DEPTH OF THREE INCHES.
TILLAGE SHALL CONTINUE UNTIL A WEATHER -PULVERIZED, FIRM, AND UNIFORM SITE IS PREPARED
CONFORMING TO ADJACENT PROPERTY. THE SOIL MUST BE LOOSE ENOUGH FOR WATER
INFILTRATION AND ROOT PENETRATION. GOOD DRAINAGE MUST. BE PROVIDED AND VISIBLE
PONDING WILL NOT BE ALLOWED. ALL STONES, . ROCKS, STICKS, RUBBISH, AND OTHER
OBJECTIONABLE MATERIAL SHALL BE REMOVED PRIOR TO FEP TILIZATION. THE pH OF THE
SOIL SHALL BE NON-TOXIC TO THE SEED MIXTURE. PLANT SMALL GRAINS NO DEEPER THAN
1 INCH AND GRASSES/LEGUMES NO DEEPER THAN 1/2 INCH. PLANTING IS TO BE UNIFORM
IN SCATTER PATTERN.
A. BURY THE TOP OF THE MATTING
IN A TRENCH 5 INCHES OR MORE
IN DEPTH
B. TAMP THE TRENCH FULL OF SOIL + W W + W
SECURE ROW OF STAPLES, 10 INCHjI ;'••'•'•'
SPACING, 4 INCHES DOWN FROM "
THE TRENCH .;..�. W
((. W
C 0"dERLAP THE MATTING AT UPPER END E. OVERFALL� �-•�
07 LOWER STRIP AS IN 'A' AND 'B',
0":0ERLAP END AND STAPLE.
D CHIECK SLOT-- FOLD OF MATTING BURRI®
IN _':,LIT OF TRENCH .AND TAMPED, DOUBLE-
ROW OF STAPLES
•' �•' /'•' _ :'::::' : •' r
PLACE STAPLES 3 FEET APART
r� AS REQUIRED TO KEEP THE
:� ::'•::•;.::• MATTING FIRMLY PRESSED
INTO THE SOIL
10"
TYPICAL STAPLES F. PRESS ENDS OF MATTING 4 INCHES INTO THE SOIL
#8 GAUGE WIRE AROUND STRUCTURES, AND STAPLE SECURELY.
NOTES:
9 1/2'--� �- 1. MATTING FOR EROSION CONTROL SHALL BE JUTE MATTING OR
EXCELSIOR MATTING.
2 MATTING . SHALL BE INSTALLED WHERE REQUIRED TO STABILIZE
CHANNELS AND SLOPES.
DETAIL FOR STABIL17INr CHANNELS AND SLOPS WITH ROSION CONTROL (MATTING
NO SCALE
SILTSA-K®
SPECIFICATIONS
NOTE: THE SILTSACK WILL BE MANUFACTURED FROM
A- WOVEN
POLYPROPYLENE
.7 -AERIC THAT MEETS OR EXCEEDS THE FOLLOWING
SPECIFICATIONS.
REGULAR FLOW SILTSACK a.
(FOR AREAS OF LOW TO MODERATE PRECIPITATION AND
RUN-OFF)
PROPEDES TBr METHOD
UNITS
GRAB TENSILE STRENGTH ASTM
D-4632
300 LBS
GRAB TENSILE ELONGATION ASTM
D-4632
20 %
PUNCTURE ASTM
D-4833
120 LBS
MULLEN BURST ASTM
TRAPEZOID TEAR
D-3786
800 PSI
ASTM
UV RESISTANCE ASTM
D-4533
D-4355
120 LBS
80 %
APPARENT OPENING SIZE . ASTM
D-4751
40 US SIEVE
FLOW. RATE ASTM
PERMITTIVITY
D-4491
40 GAL/MIN/SQ FT
ASTM
D-4491
0.55 SEC -1
H1 -FLOW SILTSACK
(FOR AREAS OF MODERATE TO HEAVY PRECIPITATION AND
RUN-OFF)
GRAB TENSILE STRENGTH ASTM
D-4632
265 LBS
GRAB TENSILE ELONGATION ASTM
D-4632
20 %
PUNCTURE ASTM
MUH EN BURST
D-4833
135 LBS
ASTM
TRAPEZOID TEAR ASTM
D-3786
D-4533
420 PSI
45 LBS
UV RESISTANCE ASTM
D-4355
90 %
APPARENT OPENING SIZE ASTM
D-4751
20 US SIEVE
(FLOW RATE ASTM
PERMITTIVITY
D-4491
200 GAL/MIN/SQ FT
R ASTM
D-4491
1.5 SEC -1
(FOR AREAS WHERE THERE IS A CONCERN FOR OIL RUN-OFF
OR
SPILLS)
DEPENDING ON YOUR PARTICULAR APPLICATION, THE
SILTSACK
CAN BE MADE FROM
EITHER ONE OF THE ABOVE FABRICS WITH AN OIL-ABSORBANT PILLOW INSERT OR,
MADE COMPLETELY FROM AN OIL-ASSORBANT SILTSACK , WITH A WOVEN PILLOW INSERT.
THE FOLLOWING SCHEDULES SHALL BE USED FOR RESEEDING DISTURBED AREAS:
OU ALS
J -CED
STEEP SLOPES OR POOR SOILS AND LOW MAINTENANCE
**** MIXTURE ******max************* RATE (LB/ACRE)*********************************s*****
TALL FESCUE 100
SERICEA LESPEDEZA 30
KOBE LESPEDEZA 10
SEEDING DATES BEST POSSIBLE
FALL AUG. 25 - SEPT. 15 AUG. 20 - OCT. 25
LATE WINTER FEB. 15 - MAR. 21 FEB. 1 - APR. 15
SEEDING NOTES
1- FALL IS THE BEST FOR TALL FESCUE AND LATE WINTER FOR LESPEDEZAS. OVERSEEDING
OF. KOBE LESPEDEZA OVER FALL SEEDED TALLFESCUEIS VERY EFFECTIVE.
2. AFTER AUG. 15, USE UNSCARIFIED SERICEA SEED.
3. WHERE A NEAT APPEARANCE IS SPECIFIED, OMIT SERICEA AND SUBSTITUTE
BERMUDAGRASS AT 15 LB/ACRE. USE ONLY WHERE BERMUDAGRASS WILL NOT BECOME
A PEST AND ONLY UPON THE APPROVAL OF THE DIRECTOR OF ENGINEERING.
4. BETWEEN MAY 1 AND AUG. 15 ADD 10 LS/ACRE GERMAN MILLET OR 15 LB/ACRE
SUDANGRASS. PRIOR TO MAY .1 AND AFTER AUG. 15, ADD 40 LB/ACRE RYE GRAIN.
FERTILIZER
APPLY LIME AND FERTILIZER AS REQUIRED BY SOIL TESTING RESULTS OR APPLY 75 LBS. PER
1000 SQ. FT. GROUND ,AGRICULTURAL LIMESTONE & 40 LBS PER 1000 SQ. FM 5-10-10 FERTILIZER.
NO FERTILt7FR SNAI 1 RF pl ACEU WITHIN -EN (10) FEET OF STR ORAS
MULCH
APPLY 4,000 LB/ACRE GRAIN STRAW, OR EQUIVILENT COVER OF SUITABLE MULCHING
MATERIAL TACK BY USING 0AEROSPRAY OR EQUAL, ROVING OR NETTING. NETTING IS TO BE
USED ON STEEP SLOPES AS DIRECTED BY THE CONSTRUCTION DRAWINGS. NOTE: LESSER AMOUNTS
OF STRAW MAY BE USED WITH MECHANICAL SPREADERS.
MAINTENANCE
RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. REFERTILIZE AT END OF
WARRANTY PERIOD IF GROWTH IS NOT SATISFACTORY TO THE DIRECTOR OF ENGINEERING.
2 -CED
GENTLE SLOPES, AVERAGE/GOOD MOISTURE RETEN11ON AND LOW MAINTENANCE
****** MIXTURE **********s**** RATE (LB/ACRE)
TALL FESCUE 80
SERICEA LESPEDEZA 20
KOBE LESPEDEZA 10
SEEDING DATES BEST POSSIBLE
FALL AUG. 25 - SEPT. 15 AUG. 20 OCT. 25
LATE WINTER FEB. 15 - MAR. 21 FEB. 1 - APR. 15
SEEDING NOTES
1. FALL IS BEST FOR TALL FESCUE AND LATE WINTER FOR LESPEDEZAS. OVERSEEDING OF
KOBE LESPEDEZA OVER FALL SEEDED TALL FESCUE IS VERY EFFECTIVE
2. AFTER AUG. 15, USE UNSCARIFIED SERICEA SEED.
3 -WHERE A NEAT APPEARANCE IS SPECIFIED, OMIT SERICEA AND INCREASE KOBE
LESPEDEZA TO 40 LB/ACRE.
NORTjH CAROLINA
High Performance Living
.,��tI�E9�SIE��1���®1l lltl
PREPARED BY
ENGINEERING DEPARTMENT
CITY OF CONCORD
P.O. BOX 308
CONCORD N.C. 28026
(704)920-5425
A�Ovl
01
,
r , •
SEAL
17577
;�/Q • GINB� ����
Engineer's Seal
Surveyor's Seal
4- BETWEEN MAY 1 AND AUG. 15 ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE
SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD. 40
5. !N WETLAND A LB/ACRE RYE GRAIN. [DEFINITIONREAS, RESEEDING/REPLANTING SHALL INCLUDE ENDEMIC PLANT SPECIESSUCH AS SMARTWEED, FALSE NETTLE,- CATTAIL SEDGE, SEDGES AND OTHER PLANTINGS AS sediment control barrier formed a
. RESOURCES COMMISSION AND THE N.C. DEPARTMENT round a storm drain inlet by the use of
RECOMMENDED BY THE N.C. WILDLIFE
OF ENVIRONMENT AND NATURAL RESOURCES. PERENNIALS SUCH AS FESCUE ARE standard concrete block &gravel.
PROHIBITED. TOP 6" TO 12 OF TRENCH TO BE BACKFILLED W/ ORIGINAL TOPSOIL FROM TRENCH, PURPOSE
FERTILIZER To help prevent sediment from entering storm drains before stabilizing the
CONSTRUCTION
contributing watershed. This practice allows early use of the storm drain system.
APPLY LIME AND FERTILIZER AS REQUIRED BY SOIL TESTING RESULTS OR APPLY 75 LBS PER
1000 SQ.FT, GROUND AGRICULTURAL LIMESTONE & 40 LBS PER 1000 SQ. FT. 5-10-10 FERTILIZER.No EERMUZER SHAU. BE PLACED WITHIN (10) T OF STREAMS, SPECIFICATIONS
MULCH. 1 �..
Loy one block on each side of the structure on its side in the bottom row to Z
0 Lo
APPLY 4,000 LB/ACRE GRAIN' STRAW, OR EQWVILENT COVER OF SUITABLE MULCHING the crest drainage.
stofthe foundation should be excavated at least
storm droirrPlace 2 inches below
the bottom row of blocks against the edge of LL. 0
MATERIAL TACK BY USING ®AEROSPRAY OR EQUAL, ROVING OR NETTING. NETTING IS TO BE the storm drain for lateral support and to ovoid washouts when overflow' occurs.
USED ON STEEP SLOPES AS DIRECTED BY THE CONSTRUCTION DRAWINGS. NOTE- LESSER AMOUNTS If needed, give lateral support to subsequent rows by placing 2X4 wood studs
OF STRAW MAY BE USED WITH MECHANICAL SPREADERS. through block openings. v, �/'�
MAINTENANCE Z r'
2 Carefully fit hardware cloth. or comparable wire mesh with 1/2 inch openings V )
RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. REFERTIUZE AT END OF over all block openings to hotc3 grovel in place. o J Cil
WARRANTY PERIOD IF GROWTH IS NOT SATISFACTORY TO THE DIRECTOR OF ENGINEERING. e ,
3 Use clean gravel, 3/4 •to 1/2 inch in diameter, placed 2 inches below the top
of the block on a 2:1 slope or flatter and smooth. it to an even grade. dot 57
ROADSIDES washed stone is recommended. J
3 -CED 4 If only stone and grovel ore used, kee the slope a tow Z
GRASS PULLOVERS SIDE DITCHES,P P and the.inlet no steeper LTL W `
AND HIGH MAINTENANCE than 3:1. Leave a minimum 1I ft. wide levet stone area between the structure J
around the i and O
inlet to prevent gravel from entering inlet. On the slope toward the �• 0 W
MIXTURE ********************* RATE LB ACRE ******************************** inlet, use stone 3 inches in f5ameter orlar. er. On `
( / ) use 1 9 the slope away from the inlet. �
TALL FESCUE 200 (4-5 LB/1000 SQ. FT) use 1 /2 - 3/4 inch gravel (rrdot #57 washed stone) at a minimum thift.ckness '+ �+ /
SEEDING DATES REST PO 0
OSSIBLE MAINTENANCE
FALL AUG.I15 -OCT. of
Inspect the barrier after each rain and make repairs as needed. f'�'�
WINTER AVOID SEEDING NOV. TO JAN. FEB. 15 -APR. 15 V
SEEDING Remove sedimenta W
ED NG NOTES (SEE NOTE 1.) s necessary to provide adequate storage volume for subsequent rains.
1. IF SEEDING MUST BE ACCOMPLISHED DURING WINTER, ADD 40 LB/ACRE RYE GRAIN AND When the contributing drainage area has been ad
USE A CHANNEL LINING THAT OFFERS MAXIMUM PROTECTION. adequately istabilized, remove all materials
and any unstable soil, and either savage or dispose of i property. Bring disturbed
area to proper grade, then smooth and compact it. Appropriately stabilize all bare areas
FERTILIZER around the inlet
APPLY LIME AND FERTILIZER AS REQUIRED BY SOIL TESTING RESULTS OR APP
1000 SQ. FT. GROUND AGRICULTURAL LIMESTONE & 40 LBS PER 10 LY 75 LBS PER
00 SQ. FT. 5-10-10 FERTILIZER.
OPERATE 11LLAGE EQUIPMENT ACROSS SIDE DITCHES. NO FERTI 17ER SHALL BE PI ACEQ
WITHIN TEN (10) FEET OF STR AM
WIRE SCREEN
MULCH DEWATERING
MATTING MATERIAL (JUTE/EXCELSIOR .MATTING) SHALL BE USED TO COVER THE SIDE DITCH TEI"Po' SEDIMENT POOL
CHANNEL UP TO THE HIGHEST LEVEL OF CHANNEL .FLOW. SECURE AGAINST WASHING. IN SEDIMENT ;
OTHER AREAS USE 4,000 LB/ACRE GRAIN STRAW AND ANCHOR BY SECURING NETTING OVER - -- tO m
STRAW OR BY TACKING WITH *AEROSPRAY OR EQUAL WHERE ALLOWED" N o
BY THE DIRECTOR
ENGINEERING. NOTE: LESSER AMOUNTS OF STRAW MAY BE USED WITH MECHANICAL SPREADERS. DROP INLET
STRAW & ANCHORING MATERIAL SHALL NOT BE ALLOWED TO WASH TO CHANNELS OR INLET W/ GRATE
STRUCTURES.
MAINTENANCE
RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. MOW REGULARLY FENCE
IF GROUND COVERS SUCH AS EVERGREEN SHRUBS AND VINES ARE SPECIFIED, REFER TO THE
NOTATIONS ON THE CONSTRUCTION DRAWINGS AND ANY ITEMS IN THE SPECIAL CONDITIONS AS SECURE FENCE
TO SPACING, PLANTING RATES OR OTHER DIRECTIONS THAT ARE APPLICABLE TO THIS TYPE AS
sHowN
OF EROSION CONTROL.
CGRAVEL
RATE
FILTER z
O
J -
TEMP. STONE -_NOTES: CL
DITCH CHECKUSE SILT FENCING ON ALL U
STRUCTUSNS PP�ME ONTROLRCLASSO*B' SHALL HALL SBONE FOR EROSION SIDES BACKED WITH BE PAID FOR AT WIRE AS SHOWN IN HOG L,.1
THE CONTRACT UNIT PRICE PER TON 'STONE FOR DETAIL, 15-2.
EROSION CONTROL CLASS. *B"'
THE ENGINEER MAY DIRECT THE OPTION OF
CLASS A' STONE FOR SITES HAVING LESS THAN
-� ONE (1) ACRE DRAINAGE AREA AND A DITCH
EDGE OF PAVEMENT GRADE LESS THAN 39. PAYMENT SHALL BE UNIT
PRICE PER TON 'STONE FOR EROSION CONTROL
�C'. CLASS A".
O P SEDIMENT CONTROL STONE SHALL BE NO. 5 OR 57 >
STRUCTURAL STONE STONE AND SHALL BE PAID FOR AT THE CONTRACT
UNIT PRICE PER TON 'SEDIMENT CONTROL STONE-.
SCOPE SEDIMENT CONTROL STONE SHALL BE USED AS
DIRECTED BY THE ENGINEER.
LAY ONE BLOCK ON o D .D es -
SIDE --
IN EACH FACE (4) 80�Q
ISOMETRIC VIEW TOTAL FOR DEwATEwNa
op a ® ® a$
1' MIN. NATURAL GROUND o
CONCRETE BLOCK c
C%
o w
too
SASE of DITCH p DESIGNED BY: EAB
SEDIMENT 12" MIN.
CROSS SECTION - - - Tom? - - - - - 0 00(90 DRAWN BY: BCC
VEE DITCH FLOW CHECKED BY. EAB
21 SLOPE, GRAVEL FILTER
OPTIONAL TYPE 'B' 4'-6' SCALE: AS SHOWN
SILT BASIN L_ - - 12" THICK SEDIMENT
CO OL STONE INLET C PROTECTION DATE. 03/25/14
CHECK DAM ELEVATION VIEW BLOCK ; & GRAVEL PROJECT NUMBER: 2011-065
SHEET: 9 OF 9