Loading...
HomeMy WebLinkAbout20140383 Ver 1_401 Application_20140414I • P CC j verlJ ENGINEERS & ASSOCIATES, INC. PLANNERS SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL Date 4/9/2014 .rob No. 2013062 TO: Cherri Smith NC DWR, 401 & Buffer Permitting Unit ATTENTION: 1650 Mail Service Center Raleigh, NC 27699 -1650 SUBJECT Cherri Smith Sheetz - NC Hwy 42 / 50 Johnston Co. NWP 18 PCN / DWQ 401 WC 3890 GENTLEMEN: WE ARE SENDING YOU [X] Attached [ ] Under separate cover via [ J Shop Drawings [ ] Prints [ ] Plans [ ] Samples [ ] Specifications [ ] Copy of letter [ ] Change order [ ] Other the following items: COPIES DATE No. DESCRIPTION 5 Pre- Construction Notification Form 5 11x17 Plans 5 Agent Authorization 1 Check# 134&6 in the amount of $240 (fee) 5 NCDENR DWR Stream Determination i THESE ARE TRANSMITTED as checked below: [ ] For approval [ ] Approved [ xI For your use [ ] Approved as noted [ ] As requested [ J Disapproved [ ] For review and comment [ ] Other REMARKS. Ms. Smith, [ ] Resubmit copies for approval [ ] Submit copies for distribution [ ] Return corrected prints 20140383 Per our earlier conversations, please find enclosed the above items to be considered as the complete application package for a DWR 401 Water Quality General Ce D 3 APR 1 4 2014 Sincerely, , NR ' Wx AL TY COPY TO: Thomas Brown, USACOE StGNFD Rn—V- Williams, AICP CE-'P' Ifenclosures are not as noted. kindip notify its at once Project Planner N(dira.t8{r �;f� @ffvttf,`�`tr P��B�r��ii�h11�L� "S�"'i� �1 -4135 Fax: 252 - 752 -3974 NCBELS Lic. No. F -0334 www.riversandassociates.com NC60LA Lic. No. C -312 o�oF w a rFgO� 1 1 > 20140383 Id� r.. j R PR 1 4 2011 . X AuTy �. (1s �r A- Page 1 of 10 PCN Form — Version 1.4 January 2009 Office Use Only: A. Corps action ID no. 1. DWQ project no. 1 a. Form Version 1.4 January 2009 Id� r.. j R PR 1 4 2011 . X AuTy �. (1s �r A- Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): XD 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes X❑ No For the record only for Corps Permit: ❑ Yes X❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Sheetz Convenience Restaurant 2b. County: Johnston 2c. Nearest municipality / town: Garner 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Walter and Marie Williams 3b. Deed Book and Page No. DB: 2368 Pg: 77 (Johnston Co. Tax PIN 161700 -80 -5917) 3c. Responsible Party (for LLC if applicable). 3d. Street address: 3306 US Hwy 264 3e. City, state, zip: Greenville, NC 27834 3f. Telephone no.: 252 - 752 -4366 3g. Fax no.: 3h. Email address: Id� r.. j R PR 1 4 2011 . X AuTy �. (1s �r A- Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information'(if different from owner) 4a Applicant is ❑ Agent Q Other, specify, Purchaser 4b Name Tom Anastasi,'P E 4c Business name (if applicable) Sheetz, Inc. 4d , Street address 5700 Sixth,Avenue 4e City; state; zip Altoona, PA 1,6602 4f Telephone no 919 -437 -9859 4g Fax:no 4h Email address tanastas @sheetz.com 5. Agent/Consultant Information (if applicable) 5a Name Dwight Vernelson, P E 5b Business name (if applicable) Rivers and Associates, Inc 5c Street address 107 E 2nd Street 5d City, state, zip Greenville, NC 27834 5e. Telephone no 252- 752 -4135 5f Fax no 252 -752 -3974 5g Email address dvernelson @nversandassociates com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property`id'entification no (tax PIN or parcel ID) Johnston Co Tax PIN 161700 =80 -5917 1 b Site coordinates (in decimal degrees) Latitude 35 588b Longitude 48601 1c Property size 55 acres -2. Surface Waters 2a Name of nearest body of water to,proposed project Buffalo Branch (Id #27- 43- 15 -11) 2b. Water Quality, Classification of nearest receiving water C,NSW 2c River'basin Neuse 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time, of this application Subject site,is 5 5 acres located on,the northwest comer of the intersection of Hwy 42 and Hwy 50 Approx 1 5 acres is woode&with the remaining 4 acres being recently`clear -cut Surrounding land use includesmgle -family residential to the west, agricultufe to themortti, commercial' businesses to the,east, and a commercial shopping center to the south Linear wetland (0 062 ac or 2;732,,sq ft ) bisects wooded,area;from north to =south 3b List the total estimated acreage of all existing wetlands on the property 0 062 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project Purpose is to install &constructed,wetland cellJor treatment,of,all stormwater,resulting from commercial development, build -out of the site 3e Describe the overall project in detail, including,the type,of equipment'to be used See Additional, Narrative 4. Jurisdictional Determinations 4a Have jurisdictional vifetland,or stream determinations by`the Corps or'State been requested,or obtained for'this property/ project (including all prior phases) in the past? ❑ Yes X❑ No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of'determination was made) Preliminary ❑ Final 46 If yes, who delineated thejurisdictional areas? Name (if known) Ben E Williams,AICP CEP Agency_ /Consultant,Company Rivers and Assoc Inc Other, 4d )f yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Corps determination meeting_ with Thomas Brown on 1 -14 -14 NCDENR Surface water determination (NBRRO #13 -322) Site visit 11 -6 -13 Letter 1.1 -7 -13 5. Project History_ 5a Have permits orcertifications been requested or,obtained for this project (including all prior phases) in the past El Yes 0 No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4,January,2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑X Wetlands ❑, Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete thisquestion for each wetland area impacted' 2a 'Wetland impact number Permanent (P) or Temporary T 2b Type,of impact 2c Type of wetland 2d Forested 2e Type,of,jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 P Excavation Unknown Yes Corps 0 062 N/2 Choose ore Choose one Yes /No - W3 Choose one Choose one Yes/No W4 Choose,one Choose one Yes/No W5 Choose one Choose one Yes /No N/6 Choose one Choose one Yes /No - -2g Total Wetland Impacts: 10 062` 2h Comments - The low - quality linear wetland bisect the wooded*ea;from north to south and receives drainage from the adjacent agricultural parcels °to the,north 3. Stream Impacts If there are' perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one - - S2 Choose one - S3 Choose,one - S4 Choose,one - S5 Choose one S6 - Choose one - 3h.'Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 14 January°2009 4. Open' Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the,U S then `individuall , list all open water impacts below 4a Open water impact number Permanent (P) or Tem ora ` T 4b Name,of waterbody (if applicable) 4c Type of'impact 4d' Watefbody type 4e Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f Total open water impacts 4g Comments 15. ;Pond or Like, Construction If pond or lake construction proposed, the complete the chart below 5a Pond,ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres), Flooded Filled Excavated Flooded Filled Excavated P1 Chooseone P2 Choose one 5f' Total: 5g Comments - 5h Is a dam high.`hazard permit required? ❑ Yes ❑ No If yes,, permit ID no 51 Expected pond surfacejarea (acres) 5j Size of,pond watershed (acres) 5k Method of construction 6-Buffer Impacts (for DWQ) If project will, impact a protected riparian buffer, themcomplete the chart below If yes, then individually list all buffer impacts below Wany impacts require mite` ation, then vou MUST fill out Section D of this form 6a. Project is,m which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other ,6b Buffer Impact number - Permanent (P) or Temporary T 6c Reason for'impact 6d 'Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g `Zone 2 impact (square feet 61 Yes/No B2 Yes /No B3 - Yes /No B4 - Yes /No B5 - Yes %No B6 - - Yes /No - - 6h_ Total, Buffer Impacts: 61 Comments Page 5 of 10 D. Impact Justification and Mitigation - 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid,or minimize the proposed impacts in designing project Proposed commercial buildings and parking lots were located outside.of the wetland,areas Locating,the constructed "wetland within the wooded area containing,the, linear wetland feature, in addition to local vegetative, screening requirements, will provide a buffer from the existing residential area,and the proposed commercial development 1b Specifically,descnbe measures taken to avoid or minimize the proposed Impacts through, construction techniques The existing drainage from the adjacent, property located to,the north currently conveyed across the:subtect property by way of the linear wetland feature will be relocated fo,a ditch along the western boundary of the65 5 acrd parcel TF is ditch will be constructed with mvert7elevationsmatching existing, conditions, so as,to hot,impacts wetlands,on adjacent properties 2. Compensatory Mitigation foe Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for Impacts,to Watersrof the U,S or Waters of'the State? ❑ Yes ❑X No 2b If yes, mitigation Is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used'for this projects ❑'Mitigation bank El Payment,to In- Ileu'fee program D Permittee Responsible Mitigation 3. Complete if Usin ,a Mitigation Bank 3a Name of Mltigation'Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity, 3c Comments i 4. Complete if Makin ,a Payment-to Ih -lieu Fee Program 4a Approval letter from -In -lieu fee program Is attached' ❑ Yes 4b Stream mitigation requested linear'feet 4c If using, stream'mitigation,•stream temperature' Choose one 4d Buffer mitigation requested (DWQ only) z square feet 4e Rlpanan wetland mitigation requested acres 4f Non- riparian�wetland� mitigation requested - acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete'if Using a Permittee Responsible Mitigatiorr,Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation'plan 'Page 6 of 10 PCN Form— Version 1 4,January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes E] No 6b If yes, then identify,the square feet of impact to each zone of the,noarian buffer that requires mitigation Calculate the amount -of mitigation required, Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e =g , payment-to private mitigation bank, permittee, responsible riparian buffer restoration, payment'into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow.'Plan (required by DWQ) 1. Diffuse Ffow Plan 1 a Does the prolect,include or,is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection,Rules? lb If yes, then is a diffusd'flow plan included? If no, explain why ❑ Yes ❑ No 2. Stormwater Management Plan 2a What is the overall percent Imperviousness of this project? 60% 2b !Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d Ifthis project DOES,require a Stormwater Management Plan, then provide a brief, narrative description of the plan Stormwater management'plan,includes storm drainage, stormwater BMPtm the4orm +of a'constructed wetland serving the entire 5�5.acres Stormwatenimprovements include the construchomof anew ditch to handle off -site drainage Stormwater management plan,wilf be in accordance with Johnston County regulations, 2e Who will be,responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a In which local, overnment's jurisdiction is this ro ect? ❑ Phase II' ❑X NSW 3b Which of the following locally - Implemented stormwater management programs El USMP apply (cFieck all that apply) 0 Water Supply Watershed ❑ Other 3c Has,the,approved Stormwater Management Plan with proof ofapproval been E] Yes ❑X No attached? 4. DWQ Stormwater Program Review _ ❑ Coastal rcou nties [:IHQW 4a Which of following state - Implemented stormwater management programs -apply E]ORW (check,all that apply) ❑Session Law,2006 -246, ❑Other 4b, Has the approved Stormwater Management Plan,with proof,of approval been ❑ Yes ❑ iNo attached? 5., DWQ,401 Unit Stormwater Review 5a Does the,Stormwater Management-Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit,submittal requirements been met? ❑ Yes ❑ No Page 8 of 1A PCN Form — Version 1 4 Janua "ry 2009 F. Supplementary Information 1. Environmental Documentation,(DWQ Requirement) 1a_ Does the project Involve an expenditure of public - (federal /state /local) funds or the ❑ Yes ❑X No use °of public'(federal /state) land? 1b Ifyou answered "yes" to the above, does the project;require preparation of an environmental document pursuant to the requirements of�the'National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes "'to the above, has,the,document review been finalized by the State Clearing House? (If so, attach a copy'of the NEPA or SEPA final approval ❑Yes ❑ No letter) Comments 2. Violationsr(DWQ Requirement) 2a Is the4site in violation of DWQ�Wetland Rulb§,(15A NCAC,2H 0500), Isolated Wetland, Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A'NCAC 2B 0200)7 2b. Is this an after - the -fact permit application? El Yes ® No 1 2c If you answered "yes" to one or both -of the above questions, provide an explanation of -the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a, WIII this project (based on past and reasonably anticipated future Impacts) result in ❑Yes ❑X ,No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent'DWQ policy If you answered "no," provide a short narrative description. 4'. Sewage Disposal (DWQ'Requireinent) 4a Clearly detail the ultimate•tireatment methodsiand dispositiow(non- discharge ,,or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility The proposed,protect will connect to existing municipal wastewater collection and treatment infrastructure current available at property line Page 9 of 10 PCN Form — Version 1 4 January 2009 z5: EWdangered Species and DesignafedCq!'C cal;Haliifat (Corps;Requi�ement) =- — — —_ -- 5a: ;WIU`tfi s proiect-occur Wor, near�an °area with;federallyproiected, species or_ []'Yes X❑' No, „" habitat? o - b. 'M checkedgyvdh the +USFWS concerning Enda_ngered,Species %Acf ❑'Yes Q No nirnpacts ?' 5c� if yes; indicate' th&USFWS',Field -Okice,you'Ihavejcontacted: - '6& Whatdata souFCes'did you,usb,ib determine,whethei yoursite would, ir p'act;Endangered'Species;or' Designated,Critical, ' Habitat? Natu7al He�itagemebsite database and "on -sdd Gisits, 6: Essential`Fish Habitat'(Cdrps Requiiemen# t6a 'W this pfotectioccur in, or near an areaxdesignated as, essential fish hatidat? ❑`Yes `❑X No 6b ° What,data `sources didiyou iiseao detetmiiie'wtiether ' youtsita would'impact Essential Fi "sFi Habitat? Natural,`Hen'tage websde database ?arid,ons(evisits - 7: =Historiegr Orehiktoric Cultural Resourcew(Corps Rewilrt ient)s t `7a.'WillAkis project occur ih,or near an are thetstate ;Jederal orrfribal' ;:go`vemmentsrtiave designated as;havinglfilstoric qr cultufal'p�eseniatR n6 status.(e,g National,Historic Trust�designation�or Yes ®,Noy properties sigriifcant`in, `NorthxCarolina fiis_tory4andjarchaeology) ?` '7b What,data'sources,did'youuse`to detefimine:whetheyour; site` would; impact` liistohc 'ora "rcheological:Fesour'ces? 8FlobdfZone Designat ioWn(Corps,Requiremerit)` 4a._Will ttifsprojectioccur in, a, FEMA- des'idnited,100- year`floodplainI ❑Yes ❑X ' No ,8b If,yes;, e)plain, hoW- projeci_meets'FEMAirequiremenis ' ,8e What,source(s) dld.you use'to,jmake,the'floodplain determination? wvaw ncfloodmaps com arid;DFgM Map ", #,3700161,7 - ✓r l�wiGAr .'A`p ApphcanVAgent's7, P „rinted_Name Date, Icant/Agent's.S,ignature t(E ant's, gnature is,vMii (only if an'au`thonzation letter frorOhe a licant m-, rovided ,A ageo10 bf 1 0, Pre - Construction Notification Additional Narrative PCN Item 3e: Describe the overall project in detail; including the type of,equipment to be used: Construction of a Sheetz gas station. Typical commercial development construction equipment will ,be utilized'. Grading and excavation equipment will be used during'installation of on -site utilities. Paving,equipment will be used during parking lot construction. Mobile cranes may be utilized during building construction. W \Private \Sheetz ;Convenience Restaurants \Garner - NC,42 & NC 50, \Env \CORPS \PCN - additiona1 narrative,docx - lsmrn /SYMrrr SI✓u orm �r wt) \ O •� aN =2 �U _0 2� 4 iU zp W 5 go N N O x is A 2 03 l j 9 ao I R � ` p of zz of � �� \ a � I • � 9 r •! I ®`� II I o e ra ,a ,>zs ° a I' I k m'< -an, m iC MMO31/LYd � N I W .d zt ot, N et s of of a .i, la 5 N e a a 3' t dEy' �V I , W ¢ r If m al 'jj 3• �° '"-� �P ��tl a b`C.a;..n ,I' '� lid _ ;<iti$8€ NMI � � It . ? . /c /c of v r \ \ a \ \.,:�` i 1• I' � 8@ ¢ � i �� � I I sH)trd � a rSOrSe -avu7 � � �R \'P✓- �\ r•� •'� \` \ \\`�\ � 1 f � �c � ?ya �aa py xon . s ia o""rwJ n\ f\ `\ .\: \\ VN \ 3 gg I { a7mo d y ,4 S �§ € �° a , e 8'= a � > `x is i \ I• \ �I mn aa�& a o° p i k H a z z U Z° J e 3 a - \ \I\\ \ i N 1 •I�, I I , m� yb is z O Wry � W � Ib o O a c b 29 � o Q Fee 8 �� �I• ., � ° W —70 of _ — — a„ ne o7drarrwrt — ea — — — — _____ �m 7 7 °t�nCC l,')4JpOGJO>]7Gp J°p'),..`C`GG�- 7�i.,GG Or�n�i „��p97^Oa;)i3 i. 7 24�% 7 3 KK P A a��C2 � �'�K - •'IlA't'C�']J'= fvf'OU7J "Gpn 20j-5�"GCn )`_GLppp �7•'. ?fn l= )tlf','p�t (FO /IZ /1) LLO `Jd BBfl iB0) Hl?bN o r "'ay9 I kk I C 3 h h^8 p rJv'r \ O •� aN =2 �U _0 2� 4 iU zp W 5 go N N O x is A 2 03 l j 9 ao I R � ` p of zz of � �� \ a � I • � 9 r •! I ®`� II I o e ra ,a ,>zs ° a I' I k m'< -an, m iC MMO31/LYd � N I W .d zt ot, N et s of of a .i, la 5 N e a a 3' t dEy' �V I , W ¢ r If m al 'jj 3• �° '"-� �P ��tl a b`C.a;..n ,I' '� lid _ ;<iti$8€ NMI � � It . ? . /c /c of v r \ \ a \ \.,:�` i 1• I' � 8@ ¢ � i �� � I I sH)trd � a rSOrSe -avu7 � � �R \'P✓- �\ r•� •'� \` \ \\`�\ � 1 f � �c � ?ya �aa py xon . s ia o""rwJ n\ f\ `\ .\: \\ VN \ 3 gg I { a7mo d y ,4 S �§ € �° a , e 8'= a � > `x is i \ I• \ �I mn aa�& a o° p i k H a z z U Z° J e 3 a - \ \I\\ \ i N 1 •I�, I I , m� yb is z O Wry � W � Ib o O a c b 29 � o Q Fee 8 �� �I• ., � ✓\`d�„�� �qq qil ", /'I'GJp7 �= `.Fj'Gpp ° ^O'r7� 3' Ol `�.'`)j OLt p6UJ�'LG Gtl °y.. t' 'i g b o NyljUr ]r`�c'`fSC,ia CGO II RUC 11�, fiJ�n J3gJ, p'ilI tl3GG°f°. Fla v.s ¢06 �i P„ TUlan a(O^G °J r5,70 Ct .GV W -'r t.U�OCG, pJC %'C q� °a °�'F <- cGa�'`='G, BG AMH ON �4c Cpu''^Cr)C°•7u `SjrJ'� -�, -),jam U %CCr�`iCt)C. }•r..' a' n. °� n )I�o Ia °.c o r c �o, "r ° -^ �_.` ] /,• c � o.,_ zo �t�InoI QC jQOJ,'';~F'LOJ^ -JOC�c �'o Qcoti�nOn p � GO Sj?I'CGC`J�tl�v Gb °iy iVJ°F3, a�, !A ` � a i� C� p� UCC UCC Q tT m �j U bt y U it 3 O 1C Q O O iq I I I aC[�ppC C�gFF�O`O `` E� mgie00 OSZ m7ti��UC mec .0 'rCO, rO. Al W W L-U _ O.�NhVtabi���f I W 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ,' 6 �\ •\ ' �� U U U U U U U U U U U U U U U U U U U 1l m m o m o o a m m m o otm m m o m m m o m I� zzzzzzzzzz'zzzzz2zzzzz 6i 6i L� L�6i 6i 6i 6i kis 6i 6i �AA AA AA AA \ \\ r f \ n `\ d fffi@ OOOI °F, i v.F.. I ' J I 6 �p5 I I�II4 Ir i I, IC ,I I a I A A � b vJ Iq N � I Py s m �;W�1$ �^ IXi eftu Ii ° c � Q fne °smmP�`ee s� G coil „°- a ^p ^VuC; °y <<'pe °�;OVJpp(] �e.o o.:.,c p•, °eC _o c'o O � �m 7 7 °t�nCC l,')4JpOGJO>]7Gp J°p'),..`C`GG�- 7�i.,GG Or�n�i „��p97^Oa;)i3 i. 7 24�% 7 3 KK P A a��C2 � �'�K - •'IlA't'C�']J'= fvf'OU7J "Gpn 20j-5�"GCn )`_GLppp �7•'. ?fn l= )tlf','p�t o r ` � a i� C� p� UCC UCC Q tT m �j U bt y U it 3 O 1C Q O O iq I I I aC[�ppC C�gFF�O`O `` E� mgie00 OSZ m7ti��UC mec .0 'rCO, rO. Al W W L-U _ O.�NhVtabi���f I W 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ,' 6 �\ •\ ' �� U U U U U U U U U U U U U U U U U U U 1l m m o m o o a m m m o otm m m o m m m o m I� zzzzzzzzzz'zzzzz2zzzzz 6i 6i L� L�6i 6i 6i 6i kis 6i 6i �AA AA AA AA \ \\ r f \ n `\ d fffi@ OOOI °F, i v.F.. I ' J I 6 �p5 I I�II4 Ir i I, IC ,I I a I A A � b vJ Iq N � I Py s m �;W�1$ �^ IXi eftu Ii ° c � Q fne °smmP�`ee s� \ \\ r f \ n `\ d fffi@ OOOI °F, i v.F.. I ' J I 6 �p5 I I�II4 Ir i I, IC ,I I a I A A � b vJ Iq N � I Py s m �;W�1$ �^ IXi eftu Ii ° c � Q fne °smmP�`ee s� v.F.. I ' J I 6 �p5 I I�II4 Ir i I, IC ,I I a I A A � b vJ Iq N � I Py s m �;W�1$ �^ IXi eftu Ii ° c � Q fne °smmP�`ee s� a I A A � b vJ Iq N � I Py s m �;W�1$ �^ IXi eftu Ii ° c � Q fne °smmP�`ee s� O_ c� W Z� O � 2 U o W 0'S Z m ^a b � ah Efi i_ LL Om YT u U � 02 IOC 2 i8 B 8 8 Ri A� R.,RR R:RO R: RR' m i �e ggoo ®O I II I I J 1 I � w z p` aim `� �� p EWaz�wzw>K ma 11,11, m mm a✓\3 00+08,`�� 2 w W 2 J ¢ 2 Z H W W 2 cWWi rt J � pp� gbl 4 WI'ytii Sa'A� $ g8INQ a st[Rw �"'� ��;RH ,� $ SAWSp2 p�o�Gm �WQ tLOW�Uy�,�2 � h2� ax�?R6i$? --h pap�i pZ yy�g�N�ti� ypy�1_���yyg��jj °�o a`$pai� GaQpo'a�i+ pp'm NV 6; C-0 13-914S 33S — 3NI71401 M � 1, 4 y L` �olt rI I ii P I elf— Lk i rte, rFY ai i x i �$: /d4t Q �c kk � / e gygy I Ilv p4i Ra INV $Yx t \! 0�111 $Y _ $Y xY AV _ RY x Ik $n > — _ — Y, ' $Y it S I II$5 i i 1la Laos AR //x by $Y Ii� III ath bo dYxti � ls' RYxI I � r �� I�Yx „ r AI it AY Iwo xY "a$ x 4vX/ �lIII I III AY xoi N� / t Ii lil i 11 ya x I I n rX PYxa AV AY 30 AV it ` L ♦ iFl AWi lilrl IL AYI I i R / �� f / /Y x Y� 5j �Y($I III Aa I t� Y I I v 1 x ��'� x� , x�Y $ i III I Q $°a $Y Aa i /ArR 3 ! � Y ._�! -L AY N 22 � xl '�Y, .,� 1'�/ l.t.Ux e 6 z x V rx x b� AYE"LY AY ° AY—I x `1 ml WI I r (eo /IZ /U,«o gd'e9CE e()'HuaoN O = M n O m y I U,O� �h3 1>k¢ b �2g1z i ¢ Pu ,2a i 2b y�6 Vo ippys" -pZ o a z g��t�2ew s p �W _ W� �W � O2W¢ OCiC �WL�.m rtm Ji 0p huh SpmpW¢�7 U O�O ��t2 U S`�N ��WJ �02 p'pq� i 20 -� x,16 pio 8 Q oLm�i�' w -ri jSZ� � J Pu p� Who O ORM loop it to WI2> Ott 2 W m W 22c�p 2W2pj WwW e WE � OC Ogf ��'PA ri 3 W Wz�N i 3W - 'iL ap hit �i� �y6c.m _TZS q tl ��U Qi m o _¢ I Q I UW Q °i 2QG p¢p b m also, ant? Q "a 'pWm�c�W 2i�T�op° -1 i am W k I// lu�Xd a U Wp� WoR?z c'I'^„W3 W a 00p >zU n show CW n ? IK�K¢ yd' �� ,p�i Q NN ���2020} =0 iQ1�Y p W� K8b 2� 2S2lU2 2N2 10 '161 Iga a I Ha wHO know, m a � pp� gbl 4 WI'ytii Sa'A� $ g8INQ a st[Rw �"'� ��;RH ,� $ SAWSp2 p�o�Gm �WQ tLOW�Uy�,�2 � h2� ax�?R6i$? --h pap�i pZ yy�g�N�ti� ypy�1_���yyg��jj °�o a`$pai� GaQpo'a�i+ pp'm NV 6; C-0 13-914S 33S — 3NI71401 M � 1, 4 y L` �olt rI I ii P I elf— Lk i rte, rFY ai i x i �$: /d4t Q �c kk � / e gygy I Ilv p4i Ra INV $Yx t \! 0�111 $Y _ $Y xY AV _ RY x Ik $n > — _ — Y, ' $Y it S I II$5 i i 1la Laos AR //x by $Y Ii� III ath bo dYxti � ls' RYxI I � r �� I�Yx „ r AI it AY Iwo xY "a$ x 4vX/ �lIII I III AY xoi N� / t Ii lil i 11 ya x I I n rX PYxa AV AY 30 AV it ` L ♦ iFl AWi lilrl IL AYI I i R / �� f / /Y x Y� 5j �Y($I III Aa I t� Y I I v 1 x ��'� x� , x�Y $ i III I Q $°a $Y Aa i /ArR 3 ! � Y ._�! -L AY N 22 � xl '�Y, .,� 1'�/ l.t.Ux e 6 z x V rx x b� AYE"LY AY ° AY—I x `1 ml WI I r (eo /IZ /U,«o gd'e9CE e()'HuaoN O = M n O m y I � I I I _ k I// lu�Xd I •�a�z�l IV � 1 " 1•i I � III I I I Aa It i, I II � 3 s La I �ro /,y / +� «o yd escy eo) waos 9-0 l39HS BNII H31VV4 .c ,$Yxl I I -5W�I4 w � ' •i�G' T\ x \ e$' x Yx y w f ! . Ii� IIt r , x -a�ti ° s n �os / I II x— A I "I i -1,� I xv, xi x A ray, RYx M As�3, 44 ds x x �I a� W� + I I\ x 2 + II �t I PI I I � I 1 %I i 128 �Yrt W a U ® i H 0 1.4 I I < it II II II II II II II II x b � ✓ 1KdJ�Y3 K#L3S MT FEx F: c+ ,r ©o�%,� - —Aa- o� w AHO AB 03TWJSM 1 r 3ddtd IAWWVa o ' F` 773319 „Dt - -47 08 0 vJ � N n • K W ,r ©o�%,� 5yx s +s� LlC— INS Rix hx 6x R3\1x� xi I yy 11 9Yx 1 11 xi L -0 ABHS BNI-1 Hoivn ft I d it ANI x y S�RI! CC R� �yG, ilyx) b \ \J ��, /.L� /N� ^b @ ol D x (rolwo LCO '9d 89CL 90)"U ON Ib x �R. 9 I p I I F 9n �I I i 14c I s�x� KIM V n ,V y E 6� a i aa 2 9 i E ggA o� G t7 N 0 vJ � N n • K W 5yx s +s� LlC— INS Rix hx 6x R3\1x� xi I yy 11 9Yx 1 11 xi L -0 ABHS BNI-1 Hoivn ft I d it ANI x y S�RI! CC R� �yG, ilyx) b \ \J ��, /.L� /N� ^b @ ol D x (rolwo LCO '9d 89CL 90)"U ON Ib x �R. 9 I p I I F 9n �I I i 14c I s�x� KIM V n ,V y E 6� a i aa 2 9 i E ggA G t7 N 0 ~ w $ x M 15 to pW� Win� MR24 .2 IVY. a%G' 'gg gg y b�, �@ d35 V QSyl�. 2UF �ing 3 g y m a o5a $ FAQ �k s $ q �� i�i �'���'!''' 3� S'$•• � � W� � � �Q����\ P J O � � jjEEgggg� th 1:11 oil i -K 2: g .1Fr I �K $ �g9� $k �BN� O y gt1 ,Z hg� '$� b�$�8 ,1�b q$td76���$�@ a PI AN -lid r$r� .�.�1, tl8�tl�n 3 0 c� y N (ro /IZ/I) «o Oe aura' a (7) ruaoN O O ti J t l \ Z A W O W 1, Il � p Q A 'acs •Yror00MOSOMM II !I ,� .•iSYYYYYYrYYYYYY.Y �.;r.iYi ©ieiriirii.rai I�iis�C�'jL��� \�prDl �ne>wauouirn/o. - r~a:�YYU.uuvnrr 711iiiYiiiYi ►.t► nnroioi�lia Invornirr� Now yL o _ I Y 4304 /+ / / of ' t I1 I I J III r i yo5 s � i E+ 3 P 3 ���-• 1 �I ��� I I a 3OOt,i X L / � �,.,, � X ❑ I 4, I - a s o nr_aii�• �iL'L]r'e 4 gYYYYYY \`r., .I�iiYirii \+ .ulriiiro�n ■nrnr +YYYiI pyyJyGiiYr' /1i �iiirrrr ■:Ibtl��t r ! ;fir „7 i _� O QN I ■ „ e z.2 �s. \CV O,°, � zl i O i k d m � 4304 /+ / / of ' t I1 I I J III r i yo5 s � i E+ 3 P 3 ���-• 1 �I ��� I I a 3OOt,i X L / � �,.,, � X ❑ I 4, I R c_ a i � m � � c ro r� C j h W V t iob W � m Y, gi WBtb / f l n Z R 3 ' U 'U U °i III --SA Iw YI I L ' i I .S 6 1 0 �e m OI U N e<g �e U Y a I a gla UI Ln • aj 1 a s o Ia, i dR, _� O QN a „ e z.2 ItE \CV O,°, � zl i O i k d m � �2 i/ Q R c_ a i � m � � c ro r� C j h W V t iob W � m Y, gi WBtb / f l n Z R 3 ' U 'U U °i III --SA Iw YI I L ' i I .S 6 1 0 �e m OI U N e<g �e U Y a I a gla UI Ln • aj 1 WETLANDS- I STREAMS AGENT AUTHOJZATION FORM All Blanks to Be Filled In By'The Ctirrent,Landowner Name: L� �li�r t� :'t °t. �•,.s Address: 3 So to Q s t L+JIy -- ZCO°y e- , Phone: t Sz - -75SL- v Project Name /`Descnption:� ee tZ Date: The Department of the Army NCDNR — DWQ U.S. -Army Corps,of Engineers, 512 N. Salisbury - Street Wilmington District Raleigh, NC 27504 P.O. Box 1890 Wilmington, NC 28402 Attn:: Sarah Knies Field Office: Raleigh Re: Streams Related Consulting and Pennitting To Whom It May Concern: I, the current rp opert X owner, hereby designate and,authorize Rivers and Associates, Inc. to act in my behalf as my agent in the evaluation of jurisdictional wetlands /streams and processing of permit applications; to furnish-upon request supplemental information in support of applications, etc. from this day`forward. The tc. day of c`c_io�s� , 20 13. This notice supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional.courtesy reasons,. is valid only for government officials to enter the property when.accompanied by Rivers and Associates, Inc. You should call Rivers and Associates, Inc. to arrange a site meeting prior to visiting the site. Print Property Owner'&Name V Property Owner's Signature ,Cc: Ben E. Williams, AICP CEP Rivers and Associates, Inc. ir5EEN 1 North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary November 7, 2013 Walter and Marie Williams 3306 US Hwy 264 Greenville, NC 27834 Subject: Surface Water Determination Letter NBRRO# 13 -322 Johnston County Determination Type: Buffer Call Isolated or EIP Call ® Neuse (15A NCAC 2B.0233) Start@ ❑ Tar - Pamlico (15A NCAC 2B .0259) ❑ Ephemeral /IntermittenUPerennial Determination USGS To o ❑ Isolated Wetland Determination ❑ Jordan (15A NCAC 2B .0267) X Project Name: Location/Directions: Subject Stream NW intersection of NC Hwy 50 and Hwv 42. Tax Pin # 161700 -80 -5917 Subject property is a private undeveloped lot at project address; UT to Buffalo Creek Determination Date: November 6, 2013 Staff: Sara Knies Feature E /t /P* Not Subject Subject Start@ Stop@ Soil Survey USGS To o A E X X E✓I /P = Ephemera lllntermittent /Perennial Explanation: The feature(s) listed above has or have been located on the Soil Survey of Johnston County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). No`r hCarolina N17tu,6911Y North Carolina Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699 -1628 Phone (919) 791 -4200 Internet: www.ncwaterguality.org Location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788 -7159 An Equal Opportunity /AfFrmabve Action Employer - 50% Recycled /10% Post Consumer Paper Taxt in' 4- 1'61700- 80=591:7 _ - Joffrif ori;County .Novehibef 7, 20,13 Pagej,of 2 ;' Th s,on- site•d`etermination•sf all`expire,five (5) years from,tfie`date o6his Wteil tindowners or affected,iparties that dis'pute`a determiaationtmadesby the DWR,or Del`egated:Local Authority' may",, requesf�a,determina}tionitiy�fhe Director: =An`appeal request;must'lie'made'within sixty (60)'days'of,date of,thfs'leiteror from•thev'da4:ihe,af&eted- !pairtyt(includirig downstream and/ or,adjacei owners) is`notified,of this letter:. A request for a,d'eterm natidifjby the .. 1)r rector. ii ll be referred•to tfie Directoi- in w "riling c% Karen'Higgin "s, DWR'WeBSCaPe Unit; 1GSO.Mail;Service ,Ceniir;;Raleigh, NC 27699:, SThis,determination is,final and bindmg'unless, as, detailed'above, you ask fora hearing oraappeal wiihin sixty (60) days:. The --owner /futpre'owners should notify theDivision,of Water Resources (including.Ady other Local,:State;;aI(4 Federal:Agencies) of this decision concerning,any- future cofrespondences `regarding,the- sutijecfprope�rty (stated abo•ve).. This' project may require a Section 404 /401 Permit,for the proposedfactH, Any inquiries,ihould,be 'directed;tojhe,Division of Water. Resources (Ceritral'Office) at (919)- 807- 6300;rand;'the.US Army Corp of Engineer`s (Raleighll egulatory Field Office) at_,(919 }554 -4884: If you hi a questions regaiding -this determination, please,feel free`to contact Sara Knie-s'at (919) - 791.4200. F V tfully,,Smltll Regional Sup rvisoi 'r cc: ;.__RRO /SW_ P °File�;Copy' n` •.. r ' 1 r 7 0 I r I I t r S6eetz Convenience Restaurant Johnston County — NC Hwy 50-and NC Hwy 42 I� , 'i t 7 a M c Sheetz Convenience Restaurant Johnston County — NC Hwy 50 and NC Hwy 42 it 6 to 6 L? TIA