Loading...
HomeMy WebLinkAboutNCG551475_Correspondence (closure letter)_20220225P.O. Box 129 Morrisville, NC 27560 (919) 467-1239 February 24, 2022 MacCONNELL & Associates, P.C. "Engineering Today For Tomorrow's Future" Certification Letter Jane R. Bernard, Environmental Specialist Water Quality Regional Operations Section Division of Water Resources 3800 Barrett Drive, Raleigh, NC 27609 501 Cascade Pointe Lane Suite 103 Cary, NC 27513 www.macconnellandassoc.conm Re: Han -Dee Hugo's (Sampson Bladen Oil) - 6927 Buffaloe Rd, Raleigh, NC Final Inspection - NPDES Discharge System Closure- NC General Permit NCG550000 MacConnell & Associates, P.C. Project No.: A41418.00 Dear Ms. Jane Bernard: The above referenced project was inspected by Tyler MacConnell on three separate occasions under my supervision with the last visit being on February 23, 2022. 1 certify that the above referenced project was decommissioned with due care and to acceptable construction standards as per the attached closure plan. I trust that this letter meets your requirements for proper decommissioning under NC General Permit NCG550000. Thank you for your continued assistance, and if you have any questions, please do not hesitate to call me at (919) 467-1239. Sincerely, SEAL 17069 • • '•91NEEQ' ij G S. ��,a Pro ect ern" cc: Cory Brantley, Brantley & Sons, Inc. Jeremy Reason, Reason Construction Company, Inc. P.O. Box 129 Morrisville, NC 27560 (919) 467-1239 MacCONNELL & Associates, P.C. "Engineering Today For Tomorrow's Future" 501 Cascade Pointe Lane Suite 103 Cary, NC 27513 www.macconnellandassoc.com Closure Plan for NPDES Discharge System Covered Under NC General Permit NCG550000 Han -Dee Hugo's (Sampson Bladen Oil) 6927 Buffaloe Rd, Raleigh, NC 27616 Recommended On -Site Wastewater System Abandonment Procedures. 1. Have an approved hauler pump the liquid, sludge/septage and scum from all tanks in the system. Remove the tanks or crush them in place. If crushed in place, broadcast crushed tank with lime to disinfect. Backf ll the excavation to a natural grade and establish a vegetative cover. 2. Disconnect power at the source to all electrical controls and remove all controls and panels. 3. Disconnect all non -tankage equipment. Pressure wash and disinfect with bleach solution those surfaces which come in contact with wastewater, prior to removing from site. 4. Remove all parts of the discharge system (such as pipe, valves, valve boxes and risers) backfill the area to a natural grade and establish a vegetative cover. 5. Coat all surface areas exposed to wastewater/effluent with hydrated lime and establish a vegetative cover. 6. Wait at least 18 months before using the disposal area for gardening or construction. "nu" . ''T Gary S. MacConnell, P.E.