Loading...
HomeMy WebLinkAboutWI0100639_Geothermal Well Construction Record (GW1)_20220324r—illlt I V/g•e WELL CONSTRUCTION RECORD (GW-1) 1. Well Contractor Information: Clint J Babbitt Well Contractor Name N C-3556-A NC Well Contractor Certification Number AAA Sweetwater Well & Pump, Inc. Company Name �y /� ,q Construction Permit #; V00t` 2. WellV y '�S` List all applicable ut'll construction permits (i.e, WC, Countv, State, Variance, etc) 3. Well Use (check well use): Water Supply Well: kg ' iltural othermal (Heating/Cooling Supply) Industrial/Commercial Irrigation Non -Water Supply Well: Monitoring Injection Well: Aquifer Recharge Aquifer Storage and Recovery Aquifer Test Ex. mental Technology othermal (Closed Loop) Geothermal (Heating/Cooling Return) 4. Date Well(s) Completed: Well Loca a i li ty Owner Name 1; vsicai Address, Cit1;and Zip p tarirrlit, Zi1�-iev� 1¼$avJ 3A,/ JMunicipal/Public ❑iRcsidential Water Supply (single) DResidcntial Water Supply (shared) °Recovery LJGroundwater Remcdiation DSalinity Barrier EJStormwater Drainage IJSubsidcnec Control UJTracer rOthcr (explain under #21 Remarks) Well II3# v\wt Facility ID# (if applicable) `,t' ( Li S/C4 91 a ip alutti-) Parcel Identification No. (PIN) 5b. Latitude and longitude in degrees/minutes/seconds or decimal degrees: tifwcli field. one la1JIong is sufficient) • 6. Is(are) the well(s) 4j,'I'crmanent or EiTemporary 7. Is this a repair to an existing well: Yes or If this is a repair, fill out known well construction information and explain the nature of the repair under r21 remarks section or on the hack of this form. 8. For Geoprobe/DPT or Closed -Loop Geothermal Wells having the same construction. lion. only 1 GW-1 ceded. Indicate TOTAL NUMBER of wells drilled: 9. Total well depth below land surface: for multiply' wells list all depths if different (example- 3@200' and 2@1O0') 10. Static water level below top of casing: 1J water level is above casing, use " - " 11. Borehole diameter: 6 (in.) 12. Well construction method: Drilled X 4ugc, rotery, cable, (1uce( push, ctc.) FOR WATER SUPPLY WELLS ONLY: 132. Yield (gpm) 13h. Disinfection type: CCH Meth d of iebt: Timed A iounl: Form GW-1 For Internal Use Only: 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING (for multi -cased wells) OR LINER if a 1 , licable THICKNESS MATERIAL FROM TO DIAMETER ft. 1 ft. closed-loo I 16. INNER CASING OR TUIIIN . ,.,` ermal MATERIAL ' SS FROM TO DIAMETER .` ft' 7,5O, GOP I In. SDR-ti PVC ft. in_ Soy I i ?we., gstft. 17. SCREEN SLOT SiZE THICKNESS MATERIAL FROM TO DIAMETER ft. ft. in. ft, ft. in. 18. GROUT FROM TO MATERiAI, EMPi.ACENIENT METHOD & AMOUNT p ft' %in ft. Bentonite S� d -VV( ft. cD rt. 1 l' vukylAfwer e /r . 4. ft. ft. 19. SAND/GRAVEL PACK (if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ft. ft. ft. ft. 20. DRILLING LOG (attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soil/rock type,;rain size, etc.) ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. 21. REMARKS Grouted On:;4)1)-0--- 22. Certification: ,-/Ve Sature of Cjftified Welt Contractor 131' signing this form, I hereby certfr that the well(s) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A 1s'CAC 02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTRUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Resources, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 241r. For Infection Wells: In addition to sending the form to the address in 24a above, also submit one copy of this form within 30 days of completion of well construction to the lbllowing: Division of Water Resources, Underground injection Control Program, 1636 Muil Service Center, Raleigh, NC 27699-1636 24c. For Water Supply & Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this lone within 30 days of completion of well construction to the county health ► epart ment of the county where constructed, North Carolina Department u1 Environmental Quality - Division oil Water Resources Revised 2-22-2016