Loading...
HomeMy WebLinkAbout20141053 Ver 1_401 Application_201408271 71/3 L Scoping Meeting Minutes for 17BP.8.R.61 (Bridge 439) held 08/16/13 1. Let Date September 23, 2014. 2. SEPI responsible for Roadway Design, Bid Documents, Right of Way acquisition Hydraulic Design, Erosion Control, Permit Drawings, Traffic Control Plans and an environmental Pre - Construction Notification (PCN). 3. DOT will be responsible for Structure Design, Structure General drawings, Geotechnical Investigations, Speed Study, Surveying /Base Map Preparation, Utility Coordination and Permit Application 4. Per field review a 2 barrel 10'x9', cast in place RCBC is proposed at a 450 skew. Sills are anticipated in both barrels. A low flow channel to match the existing stream width will be maintained to the greatest extent practicable. 5. A PCN will be required for this option due to stream impacts. 6. Overhead and buried utilities crossing the creek were observed 7. Not on a bike route 8. Not High Quality Water; no state stormwater permit required. 9. Speed limit posted at 40 mph 10. Existing bridge is on a horizontal curve; roadway will need to be superelevated. 11. Bridge 440 and 439 in Randolph County will be put under the same contract.