Loading...
HomeMy WebLinkAboutU-5317 (2)MOW U -5317 Summary Information Concurrence Point 2A NEPA/404 MERGER CONCURRENCE POINT 2A TIP PROJECT No. U -5317 WBS No. 45430.1.1 FEDERAL AID NUMBER STPDA- 0507(3) NORTHWEST JUDD PARKWAY FROM NC 55 To NC 42 FUQUAY- VARINA WAKE COUNTY SUMMARY INFORMATION Meeting Purpose March 20, 2014 The purpose of this meeting is to identify major drainage structure locations and approximate structure lengths, and review the preliminary alignment for each alternative (Concurrence Point 2A). Project Description The proposed project is to extend Judd Parkway on new location, which will be referred to as NW Judd Parkway. The project begins at the intersection of NC 42 /SW Judd Parkway and ends at the intersection of NC 55 /Wilbon Road /NE Judd Parkway. The proposed project is included in the North Carolina Department of Transportation's (NCDOT) Draft 2013 -2023 State Transportation Improvement Program (STIP) as Project U -5317. Funding is provided by the Town of Fuquay - Varina, partially through a grant from the Capital Area Metropolitan Planning Organization (CAMPO). Project Status /Schedule Planning: In progress • Environmental Assessment —Summer 2014 • Finding of No Significant Impact — Spring 2015 Right of Way Acquisition & Construction — Unfunded (Right of way and construction funding will be secured prior to approval of the FONSI.) Merger History of Project Concurrence Point 1— Met and achieved concurrence on May 15, 2013. The purpose of the project is to improve roadway linkage. Concurrence Point 2 — Met and achieved concurrence on May 15, 2013. Three detailed study alternatives were selected: Alternatives 2, 3, and 7. A description of each is in the appendix. U -5317 Summary Information Concurrence Point 2A Proposed Major Drainage Structures March 20, 2014 Depending on the alternative chosen, different pipes have been sized for each feature traversed by the proposed alternatives (features are labeled a -h in the Hydraulics Technical Memorandum). Table 1 summarizes the major drainage structures proposed for each alternative. More detail about each structure is in the appendix. Table 1: Proposed Major Hydraulic Structures * Stream and wetland impacts include a 25' buffer beyond slope stakes ** Refers to stream and wetland Map ID in the Natural Resources Technical Memorandum (August 2013) Notes: 1) No streams in the project study area are FEMA regulated streams. 2) All major drainage structures are on streams in the Cape Fear River Basin. Although the Cape Fear does not have buffer rules, the Town of Fuquay - Varina has adopted a local ordinance establishing 50' buffers on streams within town limits that are shown on the USGS 7.S minute topographic maps. However, the ordinance contains a provision allowing construction activities for "public projects such as road crossings... where no practical alternative exists." While the proposed roadway will fall within this provision, all activities associated with the project should attempt to minimize built upon area and maximize the use of stormwater best management practices. 2 Map Proposed Cost Best Proposed Proposed Perennial /_ Channel Alt. Usage Stream Wetland ID * *_ Structure Estimate, Class. Impacts (If)* Impacts (ac)* Intermittent Dimensions Feature "c" 12'x 8' RCBC Alt 2 SE, (buried 1') $355,000 C 230 1.42 Perennial 5' wide x (Site 2c) WB , <1 deep 140 LF 12'x 8' RCBC Alt 3 SE, (buried 1') $373,000 C 237 1.41 Perennial 5' wide x (Site 3cJ WB <1' deep 148 LF 12' x 8' RCBC Alt 7 SE, (buried 1') $355,000 C 232 1.45 Perennial 5' wide x (Site 7c) WB <1' deep 140 LF Feature "e" Alt 7 SA, 72" RCP 6' wide x (buried) $35,000 C 161 0.79 Perennial (Site 7e) WA 4' deep 124 LF * Stream and wetland impacts include a 25' buffer beyond slope stakes ** Refers to stream and wetland Map ID in the Natural Resources Technical Memorandum (August 2013) Notes: 1) No streams in the project study area are FEMA regulated streams. 2) All major drainage structures are on streams in the Cape Fear River Basin. Although the Cape Fear does not have buffer rules, the Town of Fuquay - Varina has adopted a local ordinance establishing 50' buffers on streams within town limits that are shown on the USGS 7.S minute topographic maps. However, the ordinance contains a provision allowing construction activities for "public projects such as road crossings... where no practical alternative exists." While the proposed roadway will fall within this provision, all activities associated with the project should attempt to minimize built upon area and maximize the use of stormwater best management practices. 2 U -5317 Appendix Concurrence Point 2A APPENDIX Alternatives March 20, 2014 The proposed 1.8 -mile road will be partially on existing Wilbon Road and partially on new location. NW Judd Parkway will consist of a four -lane roadway with curb and gutter, a grassed median, and four -foot bicycle lanes and a sidewalk on both sides. Longfellow Street will be extended to intersect with the proposed NW Judd Parkway, Coley Farm Road will intersect with the proposed NW Judd Parkway, and Wilbon Road will have a new intersection with the proposed NW Judd Parkway. Bridge Street will be realigned to intersect with NW Judd Parkway at the same location as Three Meadows Road. As part of this project, the existing at -grade railroad crossing on Coley Farm Road will be closed, and an at -grade crossing will be added on the proposed NW Judd Parkway. The alternatives currently approved by the Merger Team as Detailed Study Alternatives are: • Alternative 2— Begins at NC 55 /NE Judd Parkway /Wilbon Road, follows Wilbon Road alignment for approximately 0.4 miles, arcs north of Wilbon Road on new location then continues on new location to the south, terminating at NC 42 /SW Judd Parkway. The new location portion is a total of approximately 1.4 miles long. Longfellow Street would be extended 520 feet to intersect with NW Judd Parkway. • Alternative 3— Begins at NC 55 /NE Judd Parkway /Wilbon Road, follows Wilbon Road alignment for approximately 0.6 miles, continues on new location to the south, terminating at NC 42 /SW Judd Parkway. The new location portion is a total of approximately 1.2 miles long. Longfellow Street would be extended 730 feet to intersect with NW Judd Parkway. • Alternative 7— Begins at NC 55 /NE Judd Parkway /Wilbon Road, follows Wilbon Road alignment for approximately 0.3 miles, arcs north of Wilbon Road on new location then continues on new location to the south, terminating at NC 42 /SW Judd Parkway. The new location portion is a total of approximately 1.5 miles long. Longfellow Street would be extended 70 feet to intersect with NW Judd Parkway. Public Comments Since the C.P. 1 & 2 Merger meeting, a public meeting was held in November 2013. A total of 42 people signed in during the public meeting. Written comments were received from 17 citizens and the U.S. Tobacco Cooperative /Tobacco Grower's Services. The following input was received for each alternative: Table 2: Public Comment Summary Alternative ` .-,,_ r I Number oftomments in. . Supp'ortof Alternative; - Alternative 2 1 Alternative 3 3 Alternative 7 8 No preference 5 U -5317 Appendix Concurrence Point 2A Major Drainage Structure Detail March 20, 2014 Depending on the alternative chosen, different pipes have been sized for each feature (labeled a -h in the Hydraulics Technical Memorandum) traversed by the proposed alternatives. Table 1 summarizes the major drainage structures proposed for each alternative. Table 3: Proposed Major Drainage Structure Detail Site Drainage Area.(ac) Method Used QSO* (cfs) Q100* _ (cfs) Existing .. Structure, Approx. Proposed Structure - 2c 196 Chart 8B 500 600 N/A 12'x 8' RCBC (buried 1') 3c 195 Chart 8B 500 600 N/A 12'x 8' RCBC (buried 1') 7c 196 Chart 8B 500 600 N/A 12'x 8' RCBC (buried 1') 7e 46 Chart C 200.3 110 120 N/A 72" RCP (buried) * Peak flowrate (cubic feet per second). Q50: 50 -year storm event, Q100: 100 -year storm event Each alternative crosses Feature c at the same location (Sites 2c, 3c, 7c). Feature c conveys a large drainage area through a wetland system and is the largest drainage crossing in each alternative. It is recommended that a 1 @ 12' x 8' RCBC (buried 1') be used at the crossing of Feature c for all three alternatives. An 8' x 8' RCBC (buried 1') satisfies the general requirement of an HW /D (headwater divided by culvert depth) ;z� 1.2 for the 50 year event. However, recent NCDOT guidance suggests new location RCBC's should be sized to minimize backwater, flowing full in the 100 -yr storm event. Site a is crossed at different locations by Alternatives 2 and 7 (Sites 2e and 7e), and is not crossed by Alternative 3. Alternative 2 only requires a minor drainage structure. Alternative 7 is located downstream from the confluence of Features e and f. Therefore if Alternative 7 is selected, it is recommended that a 72" RCP (buried) be installed in the crossing over Feature e. 4 Figure 1: Hydraulic Features Delineated Resources Ponds TIP# U -5317 - Northwest Judd Parkway Ell ® Wetlands Wake County � Fuquay - Varina, North Carolina Figure 2: Hydraulic Features Delineated Resources �, Ponds TIP# U -5317 - Northwest Judd Parkway Streams ® Wetlands Wake County - Fuquay- Varina, North Carolina k• A N_ �II Pte'• I F E �PD lk Vl 4 PRO X 8' RCBC -*T 7 + 6.54 __ ll. F E off, , p LFR,ai to ,TH y + _-, ' E ' 4- ° AL _ FIGURE 3 100 50 0 100 200 NORTHWEST JUDD PARKWAY EXTENSION - SITE 2C PROPOSED STRUCTURE 12'X 18' RCBC TOTAL LENGTH 140' SCALE 1" = 100' - PRELIMINARY DESIGN _ PROJECT 45430./.7 (U-5317) ❑ _ ❑ Kimley -Horn WAKE COUNTY and Associates, Inc. NORTHWEST JUDD PARKWAY (SR 2768) Iil v 88 Z:;� 4- 4- 4- 1pr CAI -I 300, ELF - NGT 12'X 8' RCBC sT�RA STA. 2 +93.02 4 71A6 V, FIG URE 4 NORTHWEST JUDD PARKWAY EXTENSION - SITE 3C 100 50 0 100 200 PROPOSED STRUCTURE 12' X 18' RCBC TOTAL LENGTH 148' SCALE 1" = 100' PRELIMINARY DESIGN PROJECT 45430]./ (U -5317) ❑ _ " Kimley -Horn n WAKE COUNTY and Associates, Inc. 4� NORTHWEST JUDD PARKWAY (SR 2768) 7j .s I� I� l6 If, I PRO X 8' RCBC -*T 7 f 6.54 �. All - j� R/r , _ & 3S0 F NORTHWEST JUDD PARKWAY EXTENSION - SITE 7C loo so o too 200 PROPOSED STRUCTURE 12'X 18' RCBC TOTAL LENGTH 140' SCALE 1" = 100' PRELIMINARY DESIGN PROJECT 45430.1.1 (U -5317) r_" Kimley -Horn WAKE COUNTY and Associates, Inc. f NORTHWEST JUDD PARKWAY (SR 2768) lv�r Facing upstream on Feature c looking west of Sites 2c, 3c, 7c Facing downstream on Feature c looking east of Sites 2c, 3c, 7c 1� 'ROP 72" RCP I / TA 52+92.83 • •1 ice• � / / �' J � , e F N F ell FIGURE 6 NORTHWEST JUDD PARKWAY EXTENSION - SITE 7E 100 50 0 loo 200 PROPOSED STRUCTURE 72" RCP TOTAL LENGTH 124' SCALE 1" = 100' PRELIMINARY DESIGN PROJECT 45430./J(U -5317) Kimley -Horn WAKE COUNTY ❑ ❑ and Associates, Inc. NORTHWEST JUDD PARKWAY (SR 1768) Facing upstream on Feature e looking west of Site 7e Facing downstream on Feature e looking east of Site 7e