Loading...
HomeMy WebLinkAbout2021 Divisions 9-14 Meeting Minutes Draft2021 NCDOT MITIGATION MONITORING REPORT REVIEW MEETING DIVISIONS 9-14 Agenda March 16, 2022 1pm-3pm DOT CCA Technical Services Conf. Room Col. C11 (CAP 30) and Online (Go To Meeting) Opening Remarks: Dave Johnson-NCDOT Monitoring Reports: Division 9 U-2579B UT to Fisher Branch (Forsyth) - Year 4 • ACOE- Agrees continue monitoring; site looks good to date. • DWR- Asked for clarification/update re: slight bank erosion around PP#1. o DOT states there has been no further change since the 2020 site visit. Supplemental live stakes were planted Jan. 2021. Surviving at time of inspection. • DOT to continue monitoring in 2022 U-2707 UT to Muddy Creek (Forsyth) - Year 4 • ACOE- Site looks good to date. • DWR-questioned Rosgen C5 design. Was this achieved? o DOT -Yes. Designed and constructed per mitigation plan. There have been several bankfull events throughout the monitoring period. Channel monitoring throughout year 4 has revealed little change since construction. • DOT to continue monitoring in 2022 Division 12 1-3819A UT to Fourth Creek (Iredell) - Year 5 • DOT reposted report 3/14/2022 to correct the impacts noted in introduction section of report. • Silt loss from B section March 2021, Lane Construction removed sediment and returned stream to original channel. • Adjacent Development- sediment loss Jan. 2022. o Site visit with agencies Feb. 14, 2022 to review offsite sediment loss within mitigation area. • DOT to continue monitoring in 2022 • EPA -Questioned if report would be updated. o DOT updated the report to include intention to continue monitoring on site. Revision was posted to EAU website 3/XX/2022 • DWR- Monitoring should be open ended until B section is stabilized. Also report on adjacent development site. • ACOE-good with comments. Ilivieinn 12 R-2518A Middle Fork Creek Site I (Madison) • Remediation underway. Update on schedule: o Pre -bid — March 10 o Bid opening — March 16 o Availability —April 2022 • DOT will keep everyone in loop as construction progresses. R-2519B Fox Hollow Creek Site 25 (Mitchell) - Year 2 • Head -cut discovered in 2020 not getting any worse to date. • ACOE-no comments. • DWR- Noted some new growth on multi -flora and Japanese knotweed. • DOT - Continue to treat with herbicide. • DOT to continue monitoring in 2022 R-2519B Long Branch Site 5A (Yancey) - Year 2 • DWR- Noted Multi -flora rose on site. • DOT to continue monitoring in 2022 R-2519B Long Branch Site 6 (Yancey) - Year 2 • No comments • DOT to continue monitoring in 2022 R-2519B Long Branch Site 8 (Yancey) - Year 2 • DOT- Herbicide treatment continues. Lespedeza will be mowed, sprayed and seedlings replanted in 2022/2023. • ACOE-No comments • DWR-upper section treated? o DOT -Yes. TOB to CA fence. • DOT to continue monitoring in 2022 R-2519B Long Branch Site 9 (Yancey) - Year 2 • No comments • DOT to continue monitoring in 2022 R-2519B Parsnip Branch Site 18 (Yancey) - Year 2 • DWR- Noted multi -flora rose on the site • DOT- Herbicide treatment will continue, and DOT will investigate invasives this growing season. • DOT to continue monitoring in 2022 R-2519B UT to Big Crabtree Creek Site 21 (Yancey) - Year 2 • DWR- Replanting looks good. Noted multi -flora rose on the site • DOT to continue monitoring in 2022 R-2519B UT to Brushy Creek Site 30 (Mitchell) - Year 2 • DWR-upper section 120'. Inquired about repair work. o DOT -Profile remains similar since initial downcutting after construction that was noted during first year monitoring. DOT will consider placing boulder toe along 50'-60' of the left bank that eroded early after construction. • DOT will investigate and coordinate with agencies. • ACOE-Reinforced that bank erosion needs to be fixed, if still exists. Complete this summer, if possible. • DWR-CA fence fell in creek upstream. o DOT -This is above mitigation area per permit drawings. • DOT to continue monitoring in 2022 R-2519B UT to Brushv Creek Site 33 (Mitchell) - Year 2 • No comments • DOT to continue monitoring in 2022 R-2519B UT to Brushy Creek Site 35 (Mitchell) - Year 2 • DOT abandoned site after previous monitoring due to heavy infestation of kudzu. • ACOE-Questioned timing of permit modification. DOT to request permit modification after completion of monitoring of remaining on -site mitigation sites along the R-2519B project. nivicinn 1 A 1-4729A Horse Creek - Year 3 Report • DWR- Notified DOT of beaver presence on the site prior to today's meeting. • DOT- APHIS has removed beaver and dam first week of March 2022. • DOT to continue monitoring in 2022 Closing Comments Red Text denotes NCDOT proposed close out in 2021