HomeMy WebLinkAbout20211174 Ver 2_05_BL-0024_Permit Drawings_(2022-03-23)_20220323SHEET OF 3
PERMIT DRAWING
1
AERIAL FO LINE
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
SHEET
SIGNATURE:
SIGNATURE:
P.E.
P.E.
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
LOCATION:
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0 DEPARTMEN
T
O
F
TRA N S PORTATIONSTATE O F NORT
H CAR
O
LI
NA3/23/202210 10 20
ROADWAY DESIGN ENGINEER
2018 STANDARD SPECIFICATIONS
K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Hydraulics\PERMITS_Environmental\Drawings\BL-0024_prm_tsh.dgnC 2022
TYPE OF WORK:
5
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PHONE: (919) 677-2000
RALEIGH, NORTH CAROLINA 27601
421 FAYETTEVILLE STREET, SUITE 600
NC LICENSE #F-0102
VICINITY MAP
CONTRACT: See Sheet 1B For Conventional Symbols
See Sheet 1A For Index of Sheets
PROJECT: BL-0024THE TOWN OF CARY BY:
PLANS PREPARED FOR
TOWN OF CARY CONTACT
40 802040
0 40 802040
BL-0024 1N.C.
WAKE COUNTY
4
BLACK CREEK-L- Sta. 20+43.94
END PROJECT BL-0024
-L- Sta. 11+46.50
BEGIN BRIDGE
-L- Sta. 14+31.50
END BRIDGE
JEFFREY W. MOORE, P.E.
= 0.139 MILES
= 0.188 MILES
LENGTH STRUCTURE PROJECT BL-0024 = 0.049 MILES
TOTAL LENGTH PROJECT BL-0024
KYLE A. HUBERT, P.E.
TO
N
HARR
ISON
AVE
PROJECT
BEGIN
PROJECT
END
NW CARY PKWYNORWEL
L BL
VDLEE COURT
HAMPTON
MONTIBELLO DR
CANBERRA CT
LI
VI
NGSTON DR
OAK ISLAND DR
NANTUCKET DRC
REE
K
BL
A
C
K
49608.2.2
49608.2.3
NW CARY PARKWAY (SR 3112) SIDEWALK AT BLACK CREEK
GRADING, DRAINAGE, PAVING, RETAINING WALLS, AND STRUCTURE
CALEB D. LOWMAN, P.E.
LENGTH SIDEWALK PROJECT BL-0024
-L- Sta. 9+75.00
BEGIN PROJECT BL-0024
PARK
NORTH CARY
TO EVANS ROAD
(SR 3112)
NW CARY PARKWAY
-L-GREENWAY ACCESSBLACK CREEK-Y1--Y2-GREENWAY
EXIST BLACK CREEK
TO EVANS ROAD COURT HAMPTON LEEOWNER:SURVEYOR:
ENGINEER:
GEOTECHNICAL:
KYLE.HUBERT@TOWNOFCARY.ORG
(919) 462-3938
KYLE A. HUBERT, P.E.
CARY, NC 27513
316 N. ACADEMY STREET
TOWN OF CARY
JEFF.MOORE@KIMLEY-HORN.COM
919.677.2000
JEFFREY W. MOORE, P.E.
RALEIGH, NC 27601
SUITE 600
421 FAYETTEVILLE STREET
KIMLEY-HORN AND ASSOCIATES, INC.
SITE PLAN75% PLANS49608.2.1 3112001
3112001
3112001
ROW
UTILITIES
CONST.
TALFORD@WETHERILLENG.COM
919.851.8077
TONY ALFORD, PLS
RALEIGH, NC 27606
1223 JONES FRANKLIN ROAD
WETHERILL ENGINEERING, INC. NAD 83/2011NC GRIDJHAMM@FALCONENGINEERS.COM
919.302.9758
JEREMY HAMM, P.E.
CARY, NC 27513
SUITE 110
1210 TRINITY ROAD
FALCON ENGINEERING, INC.
BUFFER IMPACTS
SITE 1
4
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
ENGINEER
HYDRAULICS
ENGINEER
ROADWAY
$FILE$3/23/2022421 FAYETTEVILLE STREET, SUITE 600
C 2022
RALEIGH, NC 27601
BL-0024
EX
IS
T
ING
R
/W
E
X
IS
T
IN
G
R
/W
DB
11813
PG
765
20' GREENWAY
EASEMENT
EIP
0.47' EIP TO R/WN 89°30'00"
W
311.62'BM 1982 PG 24440' UTI
LI
TY EASEM
ENTN 01°05'19" EN 06°42'21" W559.84'TOWN OF CARY
BM 1994 PG 1888
DB 6394 PG 186
PIN 0765-23-7973
1000HL APTS, LLC
BM 1994 PG 859
DB 18175 PG 1924
PIN 0765-53-4335
BM 1988 PG 1069
DB 12949 PG 1287
DB 7775 PG 470
PIN 0765-44-4056
MID AMERICA APARTMENTS, LLC
472.16' TOTALASSOCIATION, INC.
BEECHTREE OF CARY HOME OWNERS
BM 1988 PG 1069
DB 4326 PG 567
PIN 0765-64-1435
DB
117
9
4 PG
6
9
6
2
0' GREENWAY EAS
EMENTEXISTING R/W
EIP
TOWN OF CARY
BM 1994 PG 1888
DB 6394 PG 186
PIN 0765-23-7973 BM 1982 PG 24440' UTILITY EASEMENTN 00°33'39" E748.89'TOWN OF CARY
BM 1994 PG 1888
DB 6394 PG 186
PIN 0765-23-7973
EXISTING R/W
106.00'106.00'HH
HHHH
FUTURE 6" STUB
W
12" D
I
WATER
L
INE
12" DI WATER LINE
1
2
3
1
1
2
STAGING
AREA
1
STAG
ING
AREA
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
15+0015+0010+0020+0060+00
C
C
F
FF C
C
C
C
C
F
F
F
F
C
C
C
F
F
F
60+00
(SR 3112) NW CARY PARKWAY
SEE SHEET 2B-1 FOR HORIZONTAL CURVE DATANAD 83/2011NC GRIDLEE COURTHAMPTONSEE SHEET NO. 5 FOR -L- AND -Y1- PROFILES
LEGEND
SITE 1
LIMITS OF DISTURBANCE
EASEMENT
PERMANENT UTILITY
EASEMENT
TEMPORARY CONSTRUCTION
EASEMENT
PERMANENT SIDEWALK
MINIMUM LENGTH 35 FT.
BANK TO TOB OF BANK.
BRIDGE TO SPAN TOP OF
TEMPORARY WORK BRIDGE.
RETAIN RETAIN
RETAINRETAIN
DRAIN
GRADE TO
GRADE TO DRAIN
24" RCP-IV
RETAIN
RETA
IN
2GI
DETAIL 1
STANDARD 'V' DITCH
RETA
IN
R
E
T
A
IN
RETA
IN
RETAINRETAIN
EST 9 SY GFD
EST 5 TONS
CLASS 'B' RIP RAP
SEE SHEET 2D-1
CONCRETE FLUME
MODIFIED
GREENWAY
PROPOSED 3:13:1
D
( Not to Scale)
STANDARD 'V' DITCH
FROM STA. 14+40 TO STA. 15+75 -L- RT
Min. D= 1 Ft.
DETAIL 1
1.0%
Ground
Natural
EST 45 SY GFD
EST 20 TONS CL-B RIPRAP
DETAIL 2
TOE PROTECTION
JB W/ MH COVER
2GI
24" RCP-IV
24" W/ ELBOWS
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 11+22 TO STA. 11+85 -L- LT
DETAIL 2
Type of Liner= CL B Rip-Rap
d= 1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
2GI
TO EXISTING DITCH
TIE FILL SLOPE AND RIPRAP
EST 15 SY GFD
EST 7 TONS CLASS I
RIP RAP AT OUTLET
(STRUCTURES PAY ITEM)
CLASS II RIP RAP
(STRUCTURES PAY ITEM)
CLASS II RIP RAP
EST 65 SY GFD
EST 40 TONS CL-I RIPRAP
PROP FILL SLOPE
INSTALL RIPRAP ALONG
15" RCP-IV
EST 82 SY GFD
EST 40 TONS CLASS 'B'
BRIDGE EMBANKMENT
TIE RIP RAP TO EXISTING
BASED ON EXISTING GROUND.
RIP RAP AT A DEPTH 1.0'
CONTRACTOR TO EMBED
REMOVE 26 LF
DRAIN
GRADE TO
RETAIN
RETAIN 6 LFREMOVE 29 LF
O
TEMPORARY IMPACTS BUFFER ZONE 1
TEMPORARY IMPACTS BUFFER ZONE 2
PERMANENT IMPACTS BUFFER ZONE 1
PERMANENT IMPACTS BUFFER ZONE 2
2SHEET OF 3
PERMIT DRAWING
3003003003053053053053053053053053
0
5305305305 305305305310310310310310310310310310310
310310310310310310310310310310315315
315315
315315
315315315315315315315315315
3
1
5
315315320320
320320320320320320320320320320320320
320
3
2
0
320320325325
325325325325325325325325325325325325325
325
325
325325325330330
330330330
330330330330330330330330330330
330
330
3
3
0
330330335335
335335335335335335335
3353353353353353353353
3
5
335
335335335335340340
340340340340
340340340
340340340340340340340340340
340
3403
4
0
340
340340340345345345345345
345345345
345345345345345345345345345
345
345
3
4
5
345345345345345350350350350350350350350350
3503503503503503503503503
5
0
350
350350350350
350350350350350350350350350350350355355355355355355355355355
3553553553
5
5
355
355355 355
355355355355355360360360360360360360
360
360
360360
3
60
360360360360360360360360365365365365
365
365365365
3653653
6
5
365365370
370370370370
370
370370370
370370370370375375375375
3753753753753803803 8 0
380 385385
4
EX
IS
T
ING
R
/W
E
X
IS
T
IN
G
R
/W
DB
11813
PG
765
20' GREENWAY
EASEMENT
EIP
0.47' EIP TO R/WN 89°30'00"
W
311.62'BM 1982 PG 24440' UTI
LI
TY EASEM
ENTN 01°05'19" EN 06°42'21" W559.84'TOWN OF CARY
BM 1994 PG 1888
DB 6394 PG 186
PIN 0765-23-7973
1000HL APTS, LLC
BM 1994 PG 859
DB 18175 PG 1924
PIN 0765-53-4335
BM 1988 PG 1069
DB 12949 PG 1287
DB 7775 PG 470
PIN 0765-44-4056
MID AMERICA APARTMENTS, LLC
472.16' TOTALASSOCIATION, INC.
BEECHTREE OF CARY HOME OWNERS
BM 1988 PG 1069
DB 4326 PG 567
PIN 0765-64-1435
DB
117
9
4 PG
6
9
6
2
0' GREENWAY EAS
EMENTEXISTING R/W
EIP
TOWN OF CARY
BM 1994 PG 1888
DB 6394 PG 186
PIN 0765-23-7973 BM 1982 PG 24440' UTILITY EASEMENTN 00°33'39" E748.89'TOWN OF CARY
BM 1994 PG 1888
DB 6394 PG 186
PIN 0765-23-7973
EXISTING R/W
106.00'106.00'HH
HHHH
FUTURE 6" STUB
W
12" D
I
WATER
L
INE
12" DI WATER LINE
1
2
3
1
1
2
STAGING
AREA
1
STAG
ING
AREA
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
15+0015+0010+0020+0060+00
C
C
F
FF C
C
C
C
C
F
F
F
F
C
C
C
F
F
F
60+00
(SR 3112) NW CARY PARKWAY
SEE SHEET 2B-1 FOR HORIZONTAL CURVE DATANAD 83/2011NC GRIDLEE COURTHAMPTONSEE SHEET NO. 5 FOR -L- AND -Y1- PROFILES
LEGEND
SITE 1
LIMITS OF DISTURBANCE
EASEMENT
PERMANENT UTILITY
MINIMUM LENGTH 35 FT.
BANK TO TOB OF BANK.
BRIDGE TO SPAN TOP OF
TEMPORARY WORK BRIDGE.
EASEMENT
PERMANENT SIDEWALK
EASEMENT
TEMPORARY CONSTRUCTION
RETAIN RETAIN
RETAINRETAIN
DRAIN
GRADE TO
GRADE TO DRAIN
24" RCP-IV
RETAIN
RETA
IN
2GI
DETAIL 1
STANDARD 'V' DITCH
RETA
IN
R
E
T
A
IN
RETA
IN
RETAINRETAIN
EST 9 SY GFD
EST 5 TONS
CLASS 'B' RIP RAP
SEE SHEET 2D-1
CONCRETE FLUME
MODIFIED
GREENWAY
PROPOSED 3:13:1
D
( Not to Scale)
STANDARD 'V' DITCH
FROM STA. 14+40 TO STA. 15+75 -L- RT
Min. D= 1 Ft.
DETAIL 1
1.0%
Ground
Natural
EST 45 SY GFD
EST 20 TONS CL-B RIPRAP
DETAIL 2
TOE PROTECTION
JB W/ MH COVER
2GI
24" RCP-IV
24" W/ ELBOWS
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 11+22 TO STA. 11+85 -L- LT
DETAIL 2
Type of Liner= CL B Rip-Rap
d= 1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
2GI
TO EXISTING DITCH
TIE FILL SLOPE AND RIPRAP
EST 15 SY GFD
EST 7 TONS CLASS I
RIP RAP AT OUTLET
(STRUCTURES PAY ITEM)
CLASS II RIP RAP
(STRUCTURES PAY ITEM)
CLASS II RIP RAP
EST 65 SY GFD
EST 40 TONS CL-I RIPRAP
PROP FILL SLOPE
INSTALL RIPRAP ALONG
15" RCP-IV
EST 82 SY GFD
EST 40 TONS CLASS 'B'
BRIDGE EMBANKMENT
TIE RIP RAP TO EXISTING
BASED ON EXISTING GROUND.
RIP RAP AT A DEPTH 1.0'
CONTRACTOR TO EMBED
REMOVE 26 LF
DRAIN
GRADE TO
RETAIN
RETAIN 6 LFREMOVE 29 LF
O
TEMPORARY IMPACTS BUFFER ZONE 1
TEMPORARY IMPACTS BUFFER ZONE 2
PERMANENT IMPACTS BUFFER ZONE 1
PERMANENT IMPACTS BUFFER ZONE 2
3SHEET OF 3
PERMIT DRAWING
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
ENGINEER
HYDRAULICS
ENGINEER
ROADWAY
$FILE$3/23/2022421 FAYETTEVILLE STREET, SUITE 600
C 2022
RALEIGH, NC 27601
BL-0024