Loading...
HomeMy WebLinkAbout20211174 Ver 2_07a_PlanSheets_BL-0024_20220323AERIAL FO LINE 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS SHEET SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER LOCATION: DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 DEPARTMEN T O F TRA N S PORTATIONSTATE O F NORT H CAR O LI NA3/22/202210 10 20 ROADWAY DESIGN ENGINEER 2018 STANDARD SPECIFICATIONS K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_tsh.dgnC 2022 TYPE OF WORK: 5 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PHONE: (919) 677-2000 RALEIGH, NORTH CAROLINA 27601 421 FAYETTEVILLE STREET, SUITE 600 NC LICENSE #F-0102 VICINITY MAP CONTRACT: See Sheet 1B For Conventional Symbols See Sheet 1A For Index of Sheets PROJECT: BL-0024THE TOWN OF CARY BY: PLANS PREPARED FOR TOWN OF CARY CONTACT 40 802040 0 40 802040 BL-0024 1N.C. WAKE COUNTY 4 BLACK CREEK-L- Sta. 20+43.94 END PROJECT BL-0024 -L- Sta. 11+46.50 BEGIN BRIDGE -L- Sta. 14+31.50 END BRIDGE JEFFREY W. MOORE, P.E. = 0.139 MILES = 0.188 MILES LENGTH STRUCTURE PROJECT BL-0024 = 0.049 MILES TOTAL LENGTH PROJECT BL-0024 KYLE A. HUBERT, P.E. TO N HARR ISON AVE PROJECT BEGIN PROJECT END NW CARY PKWYNORWEL L BL VDLEE COURT HAMPTON MONTIBELLO DR CANBERRA CT LI VI NGSTON DR OAK ISLAND DR NANTUCKET DRC REE K BL A C K 49608.2.2 49608.2.3 NW CARY PARKWAY (SR 3112) SIDEWALK AT BLACK CREEK GRADING, DRAINAGE, PAVING, RETAINING WALLS, AND STRUCTURE CALEB D. LOWMAN, P.E. LENGTH SIDEWALK PROJECT BL-0024 -L- Sta. 9+75.00 BEGIN PROJECT BL-0024 PARK NORTH CARY TO EVANS ROAD (SR 3112) NW CARY PARKWAY -L-GREENWAY ACCESSBLACK CREEK-Y1--Y2-GREENWAY EXIST BLACK CREEK TO EVANS ROAD COURT HAMPTON LEEBE ISSUED IN ADVANCE OF THE CONSTRUCTION. SERVICES INSPECTOR WILL FORWARD THIS FORM TO PIO SO THAT A TRAFFIC ALERT CAN PRIOR TO CONSTRUCTION ACTIVITIES BEGINNING WITHIN THE RIGHT-OF-WAY. THE FIELD FORM AND SUBMIT IT TO THE FIELD SERVICES INSPECTOR AT LEAST FIVE (5) BUSINESS DAYS CONTRACTOR SHALL PROPERLY FILL OUT A TOWN OF CARY PUBLIC INFORMATION (PIO) ACTIVITIES THAT ARE GOING TO BE CONDUCTED WITHIN THE PUBLIC RIGHT-OF-WAY. THE A TRAFFIC ALERT ISSUED BY THE TOWN IS REQUIRED FOR THIS PROJECT FOR CONSTRUCTION ALL TRAFFIC SIGNAL MODIFICATION WORK SHALL BE COMPLETED PRIOR TO TRAIL OPENING. NOTES: NO MODIFICATIONS REQUESTED APPROVED IN ACCORDANCE WITH APPLICABLE SECTIONS OF THE LDO: THE FOLLOWING MODIFICATION(S) OF THE TOWN'S DEVELOPMENT STANDARDS HAVE BEEN APPROVED WITH THIS SITE PLAN. SIGN PERMITTING IS A SEPARATE APPROVAL PROCESS AND HAS NOT BEEN REVIEWED OR APPLICABLE REGULATION OR GUIDELINE SHALL APPLY. APPROVAL OF SUCH STATED ON THIS DEVELOPMENT OR OTHER RELATED APPROVAL, THE PLAN AND THE APPLICABLE REGULATIONS OR GUIDELINES, AND ABSENT CLARIFICATION OR GUIDELINES. IN THE EVENT OF A DISCREPANCY BETWEEN THIS APPROVED DEVELOPMENT DEVELOPMENT ORDINANCE (LDO) AND ALL OTHER APPLICABLE REGULATIONS AND INCLUDING ANY SUBSEQUENT DEVELOPMENT PLANS, SHALL COMPLY WITH THE CARY LAND UNLESS EXPLICITLY SPECIFIED IN THE NOTES ON THIS DEVELOPMENT PLAN, THIS PROJECT, TOWN OF CARY. MADE WITHOUT THE APPROVAL OF THE DEVELOPMENT REVIEW COMMITTEE OF THE LANDSCAPING, GRADING, ARCHITECTURAL DESIGN, LIGHTING, OR UTILITIES SHALL BE NO CHANGES TO ANY ASPECT OF THIS SITE PLAN, INCLUDING BUT NOT LIMITED TO, OWNER:SURVEYOR: ENGINEER: GEOTECHNICAL: KYLE.HUBERT@TOWNOFCARY.ORG (919) 462-3938 KYLE A. HUBERT, P.E. CARY, NC 27513 316 N. ACADEMY STREET TOWN OF CARY JEFF.MOORE@KIMLEY-HORN.COM 919.677.2000 JEFFREY W. MOORE, P.E. RALEIGH, NC 27601 SUITE 600 421 FAYETTEVILLE STREET KIMLEY-HORN AND ASSOCIATES, INC. SITE PLAN75% PLANS49608.2.1 3112001 3112001 3112001 ROW UTILITIES CONST. THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF CARY CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II TALFORD@WETHERILLENG.COM 919.851.8077 TONY ALFORD, PLS RALEIGH, NC 27606 1223 JONES FRANKLIN ROAD WETHERILL ENGINEERING, INC. JHAMM@FALCONENGINEERS.COM 919.302.9758 JEREMY HAMM, P.E. CARY, NC 27513 SUITE 110 1210 TRINITY ROAD FALCON ENGINEERING, INC.NAD 83/2011NC GRID SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_tsh.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER SHEET NUMBER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 1A BL-0024 WAKE COUNTY INDEX OF SHEETS SHEET TITLE SHEET INDEX OF SHEETS, GENERAL NOTES, LIST OF ROADWAY STANDARD DRAWINGS 1B CONVENTIONAL SYMBOLS SHEET PAVEMENT SCHEDULE, TYPICAL SECTIONS, AND MISCELLANEOUS DETAILS 1 PROFILE SHEET 1A-1 1A-2 CROSS SECTIONS RF-1 4 HORIZONTAL CURVE DATA L-101 THRU L-X S-1 THRU S-2 W-1 THRU W-X EXISTING SURVEY SHEET1C PROJECT NOTES AND STANDARD GREENWAY CONSTRUCTION PLAN NOTES (OMITTED) 2B-2 THRU 2B-3 2B-1 5 REFORESTATION PLAN (OMITTED) X-1 THRU X-14 2N-1 THRU 2N-2 2C-1 THRU 2C-3 TOWN OF CARY STANDARD DETAILS A-1 THRU A-X E-1 THRU E-X LIGHTING PLANS (OMITTED) 2A-1 SD-1 SIGN DESIGN SHEET TMP-1 THRU TMP-4 PS-1 TRANSPORTATION MANAGEMENT PLANS PAVEMENT MARKING AND SIGNING PLAN PLAN SHEET 3B-1 SUMMARY SHEET RETAINING WALL ENVELOPES STRUCTURE PLANS ROW-1 RIGHT-OF-WAY PLAN SHEET DETAIL SHEETS (OMITTED) AESTHETIC PLANS (OMITTED) LANDSCAPE PLANS (OMITTED) MODIFIED CONCRETE FLUME DETAIL2D-1 EROSION CONTROL PLANS RETAINING WALL PLANS (OMITTED) UBO-1 UTILITIES BY OTHERS PLANS EC-1 THRU EC-8 SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_tsh.dgnBL-0024 1B Existing Edge of Pavement Proposed Slope Stakes Cut Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal h C F Existing Easement Line HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ;zvW K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal R }Tp Q l ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower WATER: Water Manhole Water Meter Water Valve Water Hydrant 4 I H a TV: TV Pedestal TV Tower U/G TV Cable Hand Hole | I ] GAS: Gas Valve Gas Meter n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line d o A/G Water Above Ground Gas Line A/G Gas Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box CONC CONC WW vvDrainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW WLB EIPB ECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Abandoned According to Utility Records WLB EAB EPB R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland TUE DUE AUE CRProposed Curb Ramp CONVENTIONAL PLAN SHEET SYMBOLS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring HPBExisting Historic Property Boundary P T TC T FO W TV TV FO G FSS STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS Note: Not to Scale UST Contaminated Site: Known or Potential Known Contamination Area: Soil Potential Contamination Area: Soil Known Contamination Area: Water Potential Contamination Area: Water Primary Horiz Control Point Primary Horiz and Vert Control Point Secondary Horiz and Vert Control Point Vertical Benchmark Computed Property Corner RIGHT OF WAY & PROJECT CONTROL: Existing Right of Way Monument Proposed Right of Way Line Existing Right of Way Line (Rebar and Cap) Proposed Right of Way Monument Proposed C/A Monument (Rebar and Cap) Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Existing Curb Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Aerial Utility Easement Proposed Slope Stakes Fill Proposed Permanent Drainage/Utility Easement Existing Permanent Easement Monument (Rebar and Cap) Proposed Permanent Easement Monument Existing C/A Monument Proposed ROW and CA Line RW CA Existing Control of Access Line Proposed Control of Access Line U/G Telephone Cable Hand Hole U/G Power Line (SUE - LOS B)* U/G Power Cable Hand Hole U/G Power Line (SUE - LOS D)* U/G Power Line (SUE - LOS C)* U/G Telephone Cable (SUE - LOS B)* U/G Telephone Cable (SUE - LOS C)* U/G Telephone Cable (SUE - LOS D)* U/G Telephone Conduit (SUE - LOS B)* U/G Telephone Conduit (SUE - LOS C)* U/G Telephone Conduit (SUE - LOS D)* U/G Fiber Optics Cable (SUE - LOS B)* U/G Fiber Optics Cable (SUE - LOS C)* U/G Fiber Optics Cable (SUE - LOS D)* U/G Water Line (SUE - LOS B)* Above Ground Water Line U/G Water Line (SUE - LOS C)* U/G TV Cable (SUE - LOS B)* U/G Water Line (SUE - LOS D)* U/G TV Cable (SUE - LOS C)* U/G TV Cable (SUE - LOS D)* U/G Fiber Optic Cable (SUE - LOS B)* U/G Fiber Optic Cable (SUE - LOS C)* U/G Fiber Optic Cable (SUE - LOS D)* U/G Gas Line (SUE - LOS B)* U/G Gas Line (SUE - LOS C)* U/G Gas Line (SUE - LOS D)* SS Force Main Line (SUE - LOS B)* SS Force Main Line (SUE - LOS C)* SS Force Main Line (SUE - LOS D)* Utility Unknown U/G Line (SUE - LOS B)* ] Existing Iron Pin (EIP) Existing Concrete Monument (ECM) * SUE - Subsurface Utility Engineering LOS - Level of Service - A,B,C or D (Accuracy) U/G Power Line Test Hole (SUE - LOS A)* U/G Telephone Test Hole (SUE - LOS A)* SS Force Main Line Test Hole (SUE - LOS A)* U/G Gas Line Test Hole (SUE - LOS A)* U/G TV Test Hole (SUE - LOS A)* U/G Water Line Test Hole (SUE - LOS A)* (Concrete) Proposed Right of Way Monument Proposed C/A Monument (Concrete)9/10/2021 SHEET NO.PROJECT REFERENCE NO.K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_psh_1C.dgn3/22/2022421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 BL-0024 1C NAD 83/2011NC GRIDDATUM DESCRIPTION NORTHING: 753728.068(ft) EASTING: 2064266.873(ft) ELEVATION: 358.781(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "GPS-2" TO -L- STATION 9+20 IS S75°10'58"W 1037.2367' ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM IS NAVD88. THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY OTHERS FOR MONUMENT "GPS-2" (GROUND TO GRID) IS: 0.9999087011 P-102 P-103 P-104 P-105 P-106 LOW UTILITY=382.14' LOW POWER=397.46' P-102 LOW UTILITY=380.55' LOW POWER=389.33' P-103 LOW UTILITY=373.42' LOW POWER=382.60' P-104 LOW UTILITY=372.73' LOW POWER=382.67' P-105 LOW UTILITY=370.26' LOW POWER=386.92' P-106 S CONC SW CO N C SWSM T L GUARDRA IL LPEX IS T ING R /W E X IS T IN G R /W WOODS WOODSRIP RA P30" CONC C&G30" CONC C&GDB 11813 PG 765 20' GREENWAY EASEMENT EIP 0.47' EIP TO R/WINV=346.38' 12 " RCP INV=350.77'INV=351.14' 24" RCP 18" RCPFO U N D E N D N O T FOUND END NOT 12 " RCP(G IS)15" R C PC O N C 30" CONC C&GSD-106 107 SD- SD-108 WOODS PA V E D MTL GURADRAIL MTL GUARDRAIL WOODS WOODS WOODS WOODS CONC DITCH 30" CONC C&G 18" CMP 12 " CMP INV=347.45'N 89°30'00" W 311.62' HW 10" CONC SD-105 WOODS BLACK CREEK WOODS TOP=311.18' SSMH INV IN=300.78' INV OUT=300.58'BM 1982 PG 24440' UTI LI TY EASEM ENTN 01°05'19" EN 06°42'21" W559.84'TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 1000HL APTS, LLC BM 1994 PG 859 DB 18175 PG 1924 PIN 0765-53-4335 BM 1988 PG 1069 DB 12949 PG 1287 DB 7775 PG 470 PIN 0765-44-4056 MID AMERICA APARTMENTS, LLC 472.16' TOTALASSOCIATION, INC. BEECHTREE OF CARY HOME OWNERS BM 1988 PG 1069 DB 4326 PG 567 PIN 0765-64-1435 PAVEDWOODS DB 117 9 4 PG 6 9 6 2 0' GREENWAY EAS EMENTMTL GUARDRAIL CONC SW PAVEDEXISTING R/W CONC BRIDGE WOODS WOODS WOODS WOODS CONC DITCH BLACK CREEKEIP INV=303.26' 18" RCP 15" CMP 24" RCP15" RCPINV=302.84'SOILCAPBENT CAPBENT CAPBENT 12" CPP SEAT=345.95' GATE SD-102 SD-103 SD-104 PAVEDSS WOODS WOODS 30" CONC C&G18" RCP SOIL SD-101 TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 SSMH TOP=308.32' INV IN=299.54' INV OUT=299.41'PAVED30" PVCBM 1982 PG 24440' UTILITY EASEMENTN 00°33'39" E748.89'S 89°03'50" E1395.66' TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 EXISTING R/W CAPBENT WOODS LOW WIRE=378.88'LOW WIRE=370.12' LOW WIRE=367.69' LOW WIRE=370.17' G PS-2106.00'106.00'HW 10" CONC INV=343.97' HW 10" CONC LOW WIRE=363.57' INV=359.42'HH BL-101 GUARDRAIL MTL HW 8" CONC 345.94' INV= FOOT BRIDGE METAL & WOOD NW CARY PARKWAY (SR 3112) 24 ' PAVED ROADWAY C & G30" C O N C RAP RIP NW CARY PARKWAY (SR 3112) 24' PAVED ROADWAY SD-102 CB TOP=355.09' INV IN (W)=349.90' INV IN (S)=349.69' INV OUT (N)=349.55' SD-101 CB TOP=365.34' INV IN (W)=361.80' INV OUT (E)=361.75' SD-103 DI TOP=353.36' INV OUT=350.48' SD-104 DI TOP=306.80' INV OUT=303.75' SD-105 (2) DI TOP=345.81' INV IN (W)=342.51' INV OUT (SW)=342.24' SD-108 DI TOP=356.77' INV IN (N)=349.23' INV OUT (W)=349.11' SD-106 CB TOP=360.01' NO INVERTS FULL OF DEBRIS SD-107 CB TOP=360.39' INV OUT=356.82' BENCHLITE NAIL IN 14" PINE BM1 - ELEV=349.45' 10" CONC HW SEAT=350.94'SEAT=348.54' SEAT=348.95'SEAT=351.33'SEAT=347.00' SEAT=347.04'SEAT=345.89'SEAT=345.20' SEAT=344.57' SEAT=344.38' SEAT=345.53'HHHH4 ", PVC, TOWN OF CARYTOWN OF CARY 12 ", DIP, TOWN OF CARY 12 ", DIP, WATERLINE ATTACHED TO BRIDGE FUTURE 6" STUB 12 ", D IP, TO W N O F C A R Y AERIAL FO LINE 12 ", D IP, TO W N O F C A R Y AT&T Corp. C orp. A T & T W Charter RAP RIP 12" D I WATER L INE 12" DI WATER LINE SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_typ.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER GRADE CL POINT S FINAL PAVEMENT DESIGN S -L- STA 15+95.00 TO STA 19+46.92 GROUND EXISTING 3:1 5' -L- 0.02 5'2'2' THIS LINE GRADE TO 1'1'5' CL -L- 5' TYPICAL SECTION NO. 3 6"6" 2A-1 TYPICAL SECTION NO. 1 GRADE POINTS -L- STA 9+75.00 TO STA 10+75.00 GROUND EXISTING GROUND EXISTING2:15' 0.02 5'2'2' 1'1' 6"6" VA R IE S 0.080.02 GRADE CL POINTS GROUND EXISTING 4 :1 5' -L- 0.02 5'2'2' 1'1' 6"6" GROUND EXISTING FENCE AESTHETIC 0.080.02 WALL MSE RETAINING VARIES 0.5' TYPICAL SECTION NO. 2 -L- STA 11+46.50 TO STA 14+31.50 GRADE CL POINTS -L- STA 14+75.69 TO STA 15+95.00 5' -L- 0.02 5'2'2' THIS LINE GRADE TO 1'1' 6"6" 0.080.02 WALL MSE RETAINING TYPICAL SECTION NO. 4 GROUND EXISTING CURB AND GUTTER RETAIN EXIST VARIES PROPOSED GUARDRAIL SAFETY RAIL STANDARD METAL GROUND EXISTING GROUND EXISTING 0.08 TYPICAL SECTION NO. 5 3:1 -L- STA 10+75.00 TO STA 11+46.50 (BEGIN BRIDGE) -L- STA 14+31.50 (END BRIDGE) TO STA 14+75.69 6" VARIES V A R IE S GRADE POINT THIS LINE GRADE TO THIS LINE GRADE TO PROPOSED 6" CONCRETE SIDEWALK RUBRAIL CONNECTION DETAIL NOT TO SCALE COMPOSITE WOOD RUBRAIL DETAIL 1 NUT WASHER HEAD BOLT BUTTON WOOD RUBRAIL 2"X6" COMPOSITE 2. REFER TO PLANS FOR RUBRAIL LOCATIONS. STANDARDS. REFER TO NCDOT STD DWG 862.02 FOR ADDITIONAL INFORMATION. 1. RUBRAIL CONNECTION TO EXISTING GUARDRAIL MUST CONFORM TO NCDOT NOTES: GUARDRAIL PROPOSED GROUND EXISTING SEE CONNECTION DETAIL WOOD RUBRAIL 2"X6" COMPOSITE SEE DETAIL 1 COMPOSITE WOOD RUBRAIL CL -L- SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_psh_2B-1.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER 2B-1 -L- PI Sta 56+52.25 L = 79.47' T = 40.76' R = 145.00' PI Sta 57+22.90 L = 63.65' T = 31.94' R = 310.00' PI Sta 59+00.26 L = 31.64' T = 15.95' R = 100.00' PI Sta 60+55.72 L = 26.43' T = 14.14' R = 30.00' PI Sta 61+15.16 L = 28.85' T = 16.28' R = 25.00' -Y1- PI Sta 14+14.67 L = 13.57' T = 6.79' R = 230.00' PI Sta 13+20.06 L = 35.97' T = 18.18' R = 100.00' PI Sta 12+31.55 L = 132.52' T = 68.16' R = 230.00' PI Sta 10+69.63 L = 67.87' T = 41.81' R = 46.00' -Y2- PI Sta 14+57.74 L = 9.48' T = 4.75' R = 100.00' PI Sta 10+63.53 L = 64.04' T = 32.52' R = 150.00' PI Sta 11+11.68 L = 32.72' T = 16.62' R = 75.00' PI Sta 14+84.85 L = 105.03' T = 52.91' R = 350.00' PI Sta 15+95.08 L = 115.95' T = 58.11' R = 700.00' PI Sta 18+26.79 L = 347.08' T = 173.87' R = 2,310.00' SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_typ.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER 1871 RCA NATN,RO H C AY IOLR 2C-1 1/8" RAD. 1/8" RADIUS 03100.01 DETAIL No. CONCRETE CURB AND GUTTER TYPES SIDE VIEW MEDIAN CURB & GUTTER 1871 RCA NATN,RO H C AY IOLR TRANSVERSE EXPANSION JOINT FRONT VIEW DET. 846.01 FOR CURB & GUTTER SUPERELEVATION RATES.NCDOT4. REFER TO 3. FINISH ALL CONCRETE WITH CURING COMPOUND. SPACING WILL BE ALLOWED WHEN A MACHINE IS USED) 2. CONTRACTION JOINTS SHALL BE SPACED AT 10 FOOT INTERVALS. (A 15 FOOT 1. CONCRETE SHALL BE 3,000 P.S.I. :NOTES JOINT FILLER: MAINTAIN 50-FT MAX. BETWEEN JOINTS OR AT ALL RIGID OBJECTS 1"1/2" 1-3/4" R 3/4" R 6"5"1'-0"7"2"7"3"12"9"9" 1'-6" 12"1:11/8" R SIDE VIEW STANDARD 30" CURB & GUTTER 1/8" RAD 1/2" RADIUS 3" RADIUS 3" RADIUS 6"2'-0" 2'-6"6"6"12"7"MIN. 4" EFFECTIVE: 05/15/20 2'-6" RADIUS 15" " 8 56 2'-6"1'-0"7"RADIUS 30" "/FT4 3 SLOPE= SIDE VIEW CONCRETE BORDER CURB SIDE VIEW ROLLED CURB18"SIDE VIEW 12 INCH CURB 1'-0" 2" R 7"7"6" PAVEMENT (TYPICAL) UNDER THE CURB & GUTTER AGGREGATE BASE COURSE (A.B.C.) STANDARD CURB TYPE ALTERNATE CURB TYPES TOP OF CURB 1'-0"GUTTER LINE STEP ONE STEP TWO 03100.12 DETAIL No. (FOR A DRIVEWAY APRON INSTALLATION) STANDARD METHOD OF REMOVING EXISTING CURB 1871 RCA NATN,RO H C AY IOLR 3. THIS METHOD IS NOT ALLOWED IN NEW SUBDIVISION CONSTRUCTION. CUT SHALL BE MADE TO THAT JOINT. 2. IF PERPENDICULAR CUT IS WITHIN 12 INCHES FROM A JOINT, THEN THE PARALLEL WIDTH APPROVED BY THE TOWN. 1. CURB AND GUTTER SECTION SHALL BE REMOVED IN ACCORDANCE WITH DRIVEWAY :NOTES GUTTER LINE TO BACK OF CURB AND THEN PARALLEL WITH " DEEP CUT SHALL BE MADE PERPENDICULAR 2 1A 1 WITHIN THREE (3) WORKING DAYS PORTION TO BE REMOVED AND REPLACED BE REMOVED PORTION TO " DEEP SCORE2 11 " DEEP SCORE2 11 EFFECTIVE: 05/15/20 09100.05 SHEET 1 OF 1 DETAIL No. STANDARD CONCRETE STREET-SIDE TRAIL 1871 RCA NATN,RO H C AY IOLR TRANSVERSE EXPANSION JOINT TYPICAL SECTION PLAN VIEW EXISTING SLOPES TO CREATE AN EVEN TRANSITION. 7. SIDE SLOPES SHALL NOT EXCEED 3:1. CUT & FILL SLOPES SHALL TIE INTO BACK OF CURB. 6. TRAILS WILL MEANDER BUT SHALL BE LOCATED MINIMUM 5 FEET FROM THE EDGE OF TRAIL. SHALL BE LOCATED WITHIN TRAIL AND SHALL BE MINIMUM 2 FEET FROM THE 5. NO ABOVE GROUND UTILITIES OR UTILITY SURFACE COVERS/PLATES/MANHOLES 4. SAW CUT JOINTS TO WIDTH OF TRAIL. 3. A 6 INCH DEPTH IS REQUIRED. 2. ALL CONCRETE TO BE FINISHED WITH CURING COMPOUND. 1. TRANSVERSE EXPANSION JOINTS TO BE A MAXIMUM OF 50 FEET. : NOTES (CONCRETE 3,000 P.S.I.) PROPOSED TRAIL OF NO LESS THAN 95% COMPACTED TO A DENSITY 0.02'/FT MAX.0.02'/FT 0.02'/FT SHOULDER GRASSED 2'-0" SHOULDER GRASSED 2'-0" TRAIL SURFACEJOINT FILLER 1/8" RADIUS 6" 1/4" 1/2"BACK OF CURBR/WSTREETSCAPE BUFFER40'-0" MAXIMUM 5'-0" MIN.10'-0" TRAILTRAIL SHEETS) LANDSCAPING NOTES ON (SEE ADDITIONAL AND PLANTINGS BETWEEN TRAIL MINIMUM 5'-0" ROADWAYPOLE LIGHT 2 0- F T TOC GREENWAY EASEMENTRADIUS MIN. 50-FT EFFECTIVE: 05/15/20 1 2 3 31 TYPE 1 TYPE 1A 1 2 3 1 2 3 2 TYPE 1B DETAIL No. ALTERNATIVE CURB RAMPS - DIRECTIONAL RAMPS 1871 RCA NATN,RO H C AY IOLR 03200.13 BUT ONLY IF THE BOTTOM OF THE CURB RAMP IS NO MORE THAN 5 FEET FROM THE BACK OF CURB. 2. DETECTABLE WARNINGS MAY BE PLACED PERPENDICULAR ACROSS THE BOTTOM OF THE CURB RAMP, BE ALIGNED WITH THE CENTERLINE OF THE RAMP. 1. ON LANDINGS AND FLUSH TRANSITIONS AT RADIUS RETURNS: ROWS OF DOMES ARE NOT REQUIRED TO :TYPE 1 NOTES 1 REFER TO STANDARD DETAIL 03200.07 FOR ALL RAMP NOTES :NOTE SURFACE DETECTABLE WARNING 6"x 12" CONCRETE CURB 5'-0" MINIMUM LANDING WIDTH 2'-6" CURB & GUTTER 5'-0" MINIMUM SIDEWALK WIDTH 5'-0" MINIMUM LANDING WIDTH NON-WALK SURFACE DETECTABLE WARNING SURFACE GUTTER 8.33% (12:1) MAX SLOPE DEPRESSED 2'-6" CURB AND MIN. 4'-0" DEPRESSED CURB CONCRETE 5'-0" MAX 8.33% (12:1) MAX RAMP SLOPE PAY LIMITS FOR 1 CURB RAMP CROSS SLOPE: 2.00% TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A 4 FOOT MINIMUM LANDING SURFACE DETECTABLE WARNING 2'-6" CURB & GUTTER 5'-0" MINIMUM SIDEWALK WIDTH 6"x 12" CONCRETE CURB 5'-0" MINIMUM SIDEWALK WIDTH 6"x 12" CONCRETE CURB GRADE BREAK NON-WALK SURFACE EFFECTIVE: 05/15/20 SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_typ.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER 2C-2 1871 RCA NATN,RO H C AY IOLR DETAIL MODIFIED BY KIMLEY-HORN REFER TO PLANS FOR SPECIFIC LOCATIONS NOTE: PLACE ONE BOLLARD IN CENTER AS DIRECTED BY THE TOWN : BLACKCOLOR : MAJESTIC 48", 3-RAIL x 8' NOMINAL PANELSTYLE : AEGIS PLUSTYPE : 1-888-333-3422PHONE OR EQUIVALENT www.ameristarfence.com TULSA, OK. 74116 1555 N. MINGO : AMERISTARMFG STEEL FENCE INFORMATION EFFECTIVE: 07/01/21 DETAIL No. STANDARD GREENWAY CURB RAMP 1871 RCA NATN,RO H C AY IOLR 09200.01 SHEET 1 OF 1 TRANSITION CURB 5'-0" TRANSITION CURB 5'-0" B GREENWAY10'-0" STRI P5'-0" GRASS WI TH MAX. 5 % SLOPEVAR. LENGTH TO 1 2'- 6"WI TH MAX. 5 % SLOPEVAR. LENGTH TO 1 2'- 6" DOMES WARNING GUTTER SHOWN) (EXISTING CURB & DROP CURB ELEVATION GREENWAY EXISTING WITH VARIABLE SLOPE VAR. LENGTH TO 12'-6" GRASS STRIP GRASS STRIP 1 0'- 0" MI N. WARNING DOMES DETECTABLE DROP CURB 10'-0" MINIMUM CURB RAMP ISOMETRIC VIEW SECTION A-A SECTION B-B12:1 MAX. RAMP 10'-0" GREENWAY 9" 10:1 2'- 0"10:110:110 :1 GUTTER DETECTABLE WARNING DOMES RAMP WIDTH AREA 2'-0" LENGTH0.90"R TO 1.40"R BASE DIAMETER BASE DIAMETER THAN 65% OF THE 50% TO NO MORE NO LESS THEN TOP DIAMETER OF 1.4" to 0.9" MIN. 0.65" 2.4" to 1.6" 0.20" THE TOP OF RAMPS, WILL BE CUT THROUGH LEVEL WITH THE SURFACE STREET. 4. SMALL CHANNELIZATION ISLANDS THAT CAN NOT PROVIDE A 5'x10' LANDING AT 3. ALLOWABLE CROSS SLOPE ON SIDEWALKS AND CURB RAMPS WILL BE 2% MAXIMUM. IN THE PAVEMENT MARKING PLANS. 2. LOCATE CURB RAMPS AND PLACE PEDESTRIAN CROSSWALK MARKINGS AS SHOWN 1. CONSTRUCT THE RAMP SURFACE TO BE STABLE, FIRM, AND SLIP RESISTANT. :NOTES A B A TOP OF CURBSTRIP5'-0" GRASS 2% MAXIMUM CROSS SLOPE DI RECTI ONSSLOPE ALL MAX. 2% ENTIRE RAMP. DARK-ON-LIGHT SEQUENCE COVERING THE SURFACE, EITHER LIGHT-ON-DARK, OR CONTRAST VISIBILITY WITH ADJOINING 2. DETECTABLE WARNING DOMES WILL RAMP FLOOR AS SHOWN ON THE DETAILS. FEET OF LENGTH AND FULL WIDTH OF THE 1. DETECTABLE WARNING DOMES WILL COVER 2 :NOTES DETECTABLE 2'-0" EXPANSION JOINT (TYP.) FALL WITHIN CROSSWALK LIMITS THIS PORTION OF RAMP MUST (40" MIN. FLOOR WIDTH) ANY RADII DUAL RAMPS BETWEEN RAMPS FULL HEIGHT CURB NOT LESS THAN 2'-0" EXISTING SIDEWALK THE RETURN. RAMPS MAY EXTEND OUTSIDE : A PORTION OF ONE OR BOTHNOTE STRIP GRASS 5'-0" PLAN VIEW CURB TRAIL GREENWAY 10'-0" STRIP GRASS 5'-0" CURB DETECTABLE WARNING DOMES HI-VISIBILTY CROSSWALKLENGTH2' -0" 1 0'- 0 "10'-0"HI-VISIBILTY CROSSWALK 10:1 10:1 EFFECTIVE: 05/15/20 09200.04 SHEET 1 OF 1 DETAIL No. 1871 RCA NATN,RO H C AY IOLR STANDARD REMOVABLE BOLLARD AND TWO COATS BENJAMIN MOORE HUNTER GREEN METAL ENAMEL. ALL METAL SHALL BE GALVANIZED PAINT, ONE COAT METAL PRIMER :NOTE BACK & FRONT OF BOLLARD, NOT STICKING OUT INTO TRAVEL WAY. ALIGN BOLLARD PIPE & GROUND INSERT SO EYES ARE LOCATED AT :REMOVABLE BOLLARD FRONT VIEW PLAN VIEW SIDEWALK TRAIL GREENWAY (TYPICAL) BOLLARD TO TOP OF BOLLARD STEEL DOME TOP, WELDED FOOTING CONCRETE 3,000 P.S.I. TO GROUND INSERT LOCKING EYE, WELDED WELDED TO BOLLARD LOCKING EYE, GROUND INSERT 5" DIAMETER FINISHED GRADE 4" 1'-6" OF BOLLARD ON FRONT & BACK 6" HANDLE, ALIGN (TYPICAL FOR ALL 3) REMOVABLE BOLLARD BOLLARD 6" FROM TOP OF TAPE, 3" WIDE AND YELLOW REFLECTIVE 3'-6" 6" 6" 1'-0" 10'-0" STAMPED CONCRETE 30'-0" WITHOUT STAMPED CONCRETE 50'-0" WITH 6'-0" 1'-0" BOLLARD CENTERED ON DIAMOND THERMOPLASTIC YELLOW 2" THICK EFFECTIVE: 05/15/20 09200.02 SHEET 1 OF 1 DETAIL No. STANDARD GREENWAY DRIVEWAY APRON 1871 RCA NATN,RO H C AY IOLR TYPICAL SECTION THICKNESS 3,000 P.S.I. WITH 6" MINIMUM CONCRETE TRAIL APRON EXPANSION JOINT COMPACTED BACKFILL PAVEMENT EXISTING 5'-5" 2% SIDEWALK 10.67% EXPANSION JOINT SLOPE OF 2.00% TO DRAIN TO CURB. MAXIMUM CROSS SLOPE AND LONGITUDINAL 8.33% (12:1) MAX RAMP SLOPE GREENWAY TRAIL STAMPED CONCRETE 6" CONCRETE CURB 2'-6" CURB & GUTTER CONCRETE CURB 6" x 12" AREA SIDEWALK .5-FT RADUIS (TYP.) NON-WALK SURFACE DETECTABLE WARNING SURFACE ISOMETRIC VIEW CROSS SLOPE: 2.00% 1 2 3 3FLUSH WITH SIDEWALK/TRAIL. CURB SHALL BE TAPERED TO FINISH :NOTE 10'-0" MIN. MIN. (TYPICAL) .5-FT RADIUS 1 2 1 AREA SIDEWALK 5'-0" MINIMUM SIDEWALK WIDTH 5'-0" MINIMUM UTILITY STRIP EXPANSION JOINT (TYPICAL) 10'-0" MIN. DETECTABLE WARNING DOMES RAMP WIDTH AREA 2'-0" LENGTH0.90"R TO 1.40"R BASE DIAMETER BASE DIAMETER THAN 65% OF THE 50% TO NO MORE NO LESS THEN TOP DIAMETER OF 1.4" to 0.9" MIN. 0.65" 2.4" to 1.6" 0.20" DARK-ON-LIGHT SEQUENCE COVERING THE ENTIRE RAMP. ADJOINING SURFACE, EITHER LIGHT-ON-DARK, OR 2. DETECTABLE WARNING DOMES WILL CONTRAST VISIBILITY WITH FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE DETAILS. 1. DETECTABLE WARNING DOMES WILL COVER 2 FEET OF LENGTH AND :DETECTABLE WARNING DOME NOTES 2 EFFECTIVE: 05/15/20 09400.01 SHEET 1 OF 1 DETAIL No. 1871 RCA NATN,RO H C AY IOLR STANDARD METAL SAFETY RAIL WITH VERTICAL PICKETS : BLACKCOLOR : CORONAS (RINGS)ACCESSORIES : MAJESTIC 48", 3-RAIL x 8' NOMINAL PANELSTYLE : AEGIS PLUSTYPE : 1-888-333-3422PHONE OR EQUIVALENT www.ameristarfence.com TULSA, OK. 74116 1555 N. MINGO : AMERISTARMFG STEEL FENCE INFORMATION FINISHED GROUND FOOTING DEPTH 36" MIN. MIN. 48" "4 15 MAX. " 4 31 "2 195 EDGE TO EDGE " SPACING, 4 33 MINIMUM 3" FORERUNNER RAIL "sq. 2 11 "sq. x 12ga. POST2 12 "sq. x 17ga. PICKET4 3 BOTTOM OF PICKETS RAIL FLUSH WITH "8 11 MINIMUM 2 FEET CLEAR BETWEEN RAIL & TRAIL EDGE. :NOTE SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_typ.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER 2C-3 1871 RCA NATN,RO H C AY IOLR 316 NORTH ACADEMY ST. www.townofcary.org ARC NI 1871 ATNY,RO H CA OLRCARY, NC 27513 KIMLEY-HORN CONTRACTOR PRIME SUB CONTRACTORS MAJOR (3'-6") MAXIMUM SIGN HEIGHT 42" AS NECESSARY SUPPORT DEPTH GROUND 10000.02 DETAIL No. PROJECT IDENTIFICATION SIGN FOR TOWN OF CARY 1871 RCA NATN,RO H C AY IOLRTOTAL SIGN AREA = 32 SF/SIDE (MAXIMUM) : NOTE PARKS & TRANSPORTATION BOND PROJECTS EFFECTIVE: 05/15/20 TITLE OF PROJECT Town Caryof 09700.02 SHEET 1 OF 1 DETAIL No. STANDARD PUBLIC TRAIL SIGN: STEEP SLOPE 1871 RCA NATN,RO H C AY IOLR FRONT VIEW DETAIL POST MOUNTING TRAIL/GREENWAY DIA. 1'-0" 4" 2'-0"5'-0" MAXIMUM4'-0" MINIMUMFROM FINISHED GRADE OF TRAIL1'-6" 5'-0" MAX. 2'-0" MIN. UNLESS NOTED OTHERWISE " O.D. 8 3TUBULAR STEEL POST, 2 SIGN UNDISTURBED SUBGRADE COMPACTED OR COMPACTED AGGREGATE BASE 3,000 P.S.I. @ 28 DAYS CONCRETE FOOTING CAP. PAINT TO MATCH POST. USE FLAT POUND-IN POST (PUGET SOUND BLUE, SATIN FINISH) PAINT COLOR C-1: PMS 2955 " OUTER DIAMETER STEEL POST, 8 32 GRADE 6061 OR BETTER. 0.125 MINIMUM GAUGE ALUMINUM, SIGN: MUTCD W7-5. FINISHED GRADE AWAY FROM POST SLOPE TO DRAIN MOUNTING DETAIL (THIS SHEET). BOLT (TYPICAL). SEE POST SHALL BE MOUNTED DIRECTLY BELOW. HEIGHT SPECIFICATIONS AT RIGHT, AND CURVES AHEAD SIGN POLE, STEEP SLOPE SIGN FACE SHALL BE MOUNTED PER W1-5 SIGN FACE IS TO BE MOUNTED ON SAME MUTCD4. IF COLOR AND REFLECTION. REQUIREMENTS FOR MUTCD3. SIGN SHALL MEET CURRENT PROVIDE A SMOOTH SURFACE. 2. ALL VISIBLE WELDS TO BE CONTINUOUS AND GROUND TO 1. COLOR CODE REFERENCES THE PANTONE MATCHING SYSTEM. :NOTE "-18 GALVANIZED TRIDENT NUT16 5 GALVANIZED WASHER WASHER GALVANIZED WASHER NYLON VANDAL RESISTANT BOLT " GALVANIZED, ONE-WAY 2 1"x 316 5 SEE NOTE 4 EFFECTIVE: 05/15/20 SHEET NO.PROJECT REFERENCE NO.K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Hydraulics\CADD\PSH\BL-0024_hyd_psh_2D-1.dgn3/22/2022421 FAYETTEVILLE STREET, SUITE 600 C 2022 RALEIGH, NC 27601 BL-0024 ROADWAY DESIGN ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 2D-1 DIRECTED BY THE ENGINEER TRANSITION CURB DOWN AS CONCRETE FLUME END MODIFIED 8" X 4" LIP CURBCONCRETE FLUME BEGIN MODIFIED OPTIONAL SEE RDY. PLANS SHOULDER BERM GUTTER APPROACH SLAB BRIDGE 15'-0" MODIFIED CONCRETE FLUME PAY LIMITS - PER EACH A A OUTLET 2'-8" DEPRESSION 3" PAVED SHOULDER EDGE OF LANE 1'-0" R.2'-0"B B DOWEL BARS (4) 12" #6 CL STRUCTUREPLAN VIEW MIN. 2'-4" OPTIONAL SEE RDY. PLANS SHOULDER BERM GUTTER MODIFIED CONCRETE FLUME DETAIL SEE ROADWAY PLANS AT STRUCTURE 0406 END RIP-RAP DITCH - REFERENCE NCDOT SPECIAL DETAIL MODFLMDTCH AND NCDOT SPECIAL PROVISION SP8 R10. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN SHEET NO.PROJECT REFERENCE NO. ENGINEER 3/22/2022BL-0024 PRELIMINARY RETAINING WALL -WALL_1- PLAN PRELIMINARY RETAINING WALL -WALL_1- ELEVATION 316 314 312 318 320 322 324 326 328 356 330 332 334 336 338 340 342 344 346 348 350 352 354 310 368 358 360 362 364 366 370 372 374 376 378 380 382 384 386 388 2N-1 NAD 83/2011NC GRID0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 10 02040 10 5 20 40 80 GRAPHIC SCALES 80 1604080 TOP OF WALL EXISTING GROUND ELEV = 336.36' -L- Sta. 11+36.50' (XX' LT) -WALL_1- Sta. 10+40.64 = FACE OF RETAINING WALL BOTTOM OF WALL AT FRONT ELEV = 352.07' -L- Sta. 11+05.61 (7.50' LT) -WALL_1- Sta. 10+00.00 = ELEV = 358.75' -L- Sta. 11+05.61 (7.50' LT) -WALL_1- Sta. 10+00.00 = BEGIN RETAINING WALL ELEV = 357.78' -L- Sta. 11+42.23 (10.38' LT) -WALL_1- Sta. 10+49.96 = END RETAINING WALL ELEV = 337.65' -L- Sta. 11+42.23 (10.38' LT) -WALL_1- Sta. 10+49.96 =ABUTMENT111010+00-L- Sta. 11+05.61 (7.50' LT) -WALL_1- Sta. 10+00.00 = BEGIN RETAINING -WALL_1- -L- Sta. 11+42.23 (10.38' LT) -WALL_1- Sta. 10+49.96 = END RETAINING -WALL_1- DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN SHEET NO.PROJECT REFERENCE NO. ENGINEER 3/22/2022BL-0024 PRELIMINARY RETAINING WALL -WALL_1- PLAN 316 314 312 318 320 322 324 326 328 356 330 332 334 336 338 340 342 344 346 348 350 352 354 310 368 358 360 362 364 366 370 372 374 376 378 380 382 384 386 388 1110 12 139 2N-2 NAD 83/2011NC GRID0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 10 02040 10 5 20 40 80 GRAPHIC SCALES 80 1604080 PRELIMINARY RETAINING WALL -WALL_2- ELEVATION PRELIMINARY RETAINING WALL -WALL_2- PLAN EXISTING GROUND TOP OF WALL FACE OF RETAINING WALL BOTTOM OF WALL AT FRONT ELEV = 350.73' -L- Sta. 14+35.59 (10.15' LT) -WALL_2- Sta. 10+00.00 = BEGIN RETAINING WALL ELEV = 338.45' -L- Sta. 14+35.59 (10.15' LT) -WALL_2- Sta. 10+00.00 = ELEV = 350.05' -L- Sta. 14+75.00 (7.50' LT) -WALL_2- Sta. 10+46.94 = ELEV = 350.63' -L- Sta. 15+95.00 (7.50' LT) -WALL_2- Sta. 11+67.65 = END RETAINING WALL ELEV = 334.40' -L- Sta. 14+51.96 (18.54 LT) -WALL_2- Sta. 10+20.00 = ABUTMENTELEV = 350.11' -L- Sta. 15+25.00 (7.50' LT) -WALL_2- Sta. 10+98.0115+00-L- Sta. 15+95.00 (7.50' LT) -WALL_2- Sta. 11+67.65 = END RETAINING -WALL_2- -L- Sta. 14+35.59 (10.15' LT) -WALL_2- Sta. 10+00.00 = BEGIN RETAINING -WALL_2- SHEET NO.PROJECT REFERENCE NO.K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_sum.dgn3/22/2022421 FAYETTEVILLE STREET, SUITE 600 C 2022 RALEIGH, NC 27601 BL-0024 ROADWAY DESIGN ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED IN CUBIC YARDS SUMMARY OF EARTHWORK STATION STATION UNCLASSIFIED TOTAL EXCAVATION BORROW EMBANKMENT WASTE TOTALUNDERCUT +25% EMBANKMENT SUBTOTAL PROJECT TOTAL GRAND TOTAL SAY SHOULDER MATERIAL ENGINEERING UNIT. PART ON SUBSURFACE DATA PROVIDED BY THE GEOTECHNICAL DESIGN UNIT. THESE EARTHWORK QUANTITIES ARE BASED IN EARTHWORK QUANTITIES ARE CALCULATED BY THE ROADWAY FOR AT THE CONTRACT LUMP SUM PRICE FOR "GRADING." AND REMOVAL OF EXISTING ASPHALT PAVEMENT WILL BE PAID UNCLASSIFIED EXCAVATION, BORROW EXCAVATION, FINE GRADING, NOTE: APPROXIMATE QUANTITIES ONLY. CLEARING AND GRUBBING, TYPE III WARRANT POINT 81.25LT LESS ANCHOR DEDUCTIONS TL-3 ATTENUATOR IMPACT GREU TL-3 GUARDRAIL SUMMARY SURVEY -L- -L- SUBTOTAL TYPE III = = TOTAL SAY STRAIGHT LOCATIONEND STA.BEG. STA.LINE CURVED LENGTH FACED DOUBLESHOP APPROACH END END TRAILING ANCHORS NGGEA REMARKS E.O.L. FROM DIST. "N" WIDTH SHOUL. TOTAL FLARE LENGTH END APPROACH END TRAILING END APPROACH END TRAILING W GUARDRAIL FACED SINGLE GUARDRAIL EXISTING REMOVE GUARDRAIL EXISTING STOCKPILE AND REMOVE W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL. "N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL. TOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT. FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL. TL-3 GREU 1 150' 50'1 1 1 1 G = GATING IMPACT ATTENUATOR TYPE TL-3 NG = NON-GATING IMPACT ATTENUATOR TYPE TL-3 10+68.50 11+52.79 LT14+12.11 16+51.17 243.75 2 2 2 @ 50' 2 @ 18.75' 100 37.5 325 187.5 2 2 2 2 3B-1 200 287.5' 87.5' 9+75 11+46.50 14+31.50 567 259 0 0 08260 0 0 00 0 0 0 EST 5% FOR REPLACING TOPSOIL ON BORROW PITS 22000 0 0 0400460 164 227 391 391 391 404 435 457 ADDITIONAL GUARDRAIL POSTS = 5 EA 32 0 0 826 435 20+43.94 LOW UTILITY=382.14' LOW POWER=397.46' P-102 LOW UTILITY=380.55' LOW POWER=389.33' P-103 LOW UTILITY=373.42' LOW POWER=382.60' P-104 LOW UTILITY=372.73' LOW POWER=382.67' P-105 LOW UTILITY=370.26' LOW POWER=386.92' P-106 EIP 0.47' EIP TO R/WN 89°30'00" W 311.62'N 01°05'19" EN 06°42'21" W559.84'TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 1000HL APTS, LLC BM 1994 PG 859 DB 18175 PG 1924 PIN 0765-53-4335 BM 1988 PG 1069 DB 12949 PG 1287 DB 7775 PG 470 PIN 0765-44-4056 MID AMERICA APARTMENTS, LLC 472.16' TOTALASSOCIATION, INC. BEECHTREE OF CARY HOME OWNERS BM 1988 PG 1069 DB 4326 PG 567 PIN 0765-64-1435 EIP TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 N 00°33'39" E748.89'TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 HH SD-102 CB TOP=355.09' INV IN (W)=349.90' INV IN (S)=349.69' INV OUT (N)=349.55' SD-101 CB TOP=365.34' INV IN (W)=361.80' INV OUT (E)=361.75' SD-103 DI TOP=353.36' INV OUT=350.48' SD-104 DI TOP=306.80' INV OUT=303.75' SD-105 (2) DI TOP=345.81' INV IN (W)=342.51' INV OUT (SW)=342.24' SD-108 DI TOP=356.77' INV IN (N)=349.23' INV OUT (W)=349.11' SD-106 CB TOP=360.01' NO INVERTS FULL OF DEBRIS SD-107 CB TOP=360.39' INV OUT=356.82'HHHH FUTURE 6" STUB W 12" D I WATER L INE 12" DI WATER LINE EX IS T ING R /W E X IS T IN G R /W DB 11813 PG 765 20' GREENWAY EASEMENT BM 1982 PG 24440' UTI LI TY EASEM ENTDB 117 9 4 PG 6 9 6 2 0' GREENWAY EAS EMENTEXISTING R/W BM 1982 PG 24440' UTILITY EASEMENTEXISTING R/W 106.00'106.00'1 2 3 1 1 2 STAGING AREA 1 STAG ING AREA R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. ENGINEER HYDRAULICS ENGINEER ROADWAY K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_psh_4.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3/22/2022421 FAYETTEVILLE STREET, SUITE 600 C 2022 RALEIGH, NC 27601 BL-0024 1 CONSTRUCTION NOTES 2 4 TIE TO EXISTING CURB AND GUTTER 3 5 4 SEE SHEET 2B-1 FOR HORIZONTAL CURVE DATA CONCRETE JOINT TIE TO EXISTING SIDEWALK AT EXIST 6 7 (SEE DETAIL SHEET 2C-2) STANDARD METAL SAFETY RAIL NAD 83/2011NC GRIDCURB RAMP (SEE DETAIL SHEET 2C-2) AESTHETIC FENCE (SEE DETAILS SHEET A-X)LEE COURTHAMPTONSEE SHEET NO. 5 FOR -L- AND -Y1- PROFILES THRU W-2) MSE RETAINING WALL, (SEE DETAIL SHEET W-1 (SEE DETAIL SHEET 2C-2) PROPOSED REMOVABLE BOLLARDS 8 INCLUDING RIP RAP LINED SWALE. TO RETURN AREA TO EXISTING CONDITIONS. GRADING FOR CONSTRUCTION, CONTRACTOR IF SLOPE WORK REQUIRES BENCHING AND 0404 0403 0402 RETAIN DRAIN GRADE TO GRADE TO DRAIN 24" RCP-IV DETAIL 1 STANDARD 'V' DITCH EST 9 SY GFD EST 5 TONS CLASS 'B' RIP RAP SEE SHEET 2D-1 CONCRETE FLUME MODIFIED EX103 EX101 GREENWAY PROPOSED 3:13:1 D ( Not to Scale) STANDARD 'V' DITCH FROM STA. 14+40 TO STA. 15+75 -L- RT Min. D= 1 Ft. DETAIL 1 1.0% Ground Natural EST 45 SY GFD EST 20 TONS CL-B RIPRAP DETAIL 2 TOE PROTECTION 0401 0400 JB W/ MH COVER 2GI 24" RCP-IV 24" W/ ELBOWS ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM STA. 11+22 TO STA. 11+85 -L- LT DETAIL 2 Type of Liner= CL B Rip-Rap d= 1 Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE 0406 0407 2GI TO EXISTING DITCH TIE FILL SLOPE AND RIPRAP EST 15 SY GFD EST 7 TONS CLASS I RIP RAP AT OUTLET (STRUCTURES PAY ITEM) CLASS II RIP RAP (STRUCTURES PAY ITEM) CLASS II RIP RAP 1% ANNUAL CHANCE FLOODFLOODWAYCHANCE FLOOD1% ANNUAL CHANCE FLOOD0.2% ANNUAL F L O O DW A Y0.2% ANNUAL CHANCE FLOODEST 65 SY GFD EST 40 TONS CL-I RIPRAP PROP FILL SLOPE INSTALL RIPRAP ALONG 15" RCP-IV EST 82 SY GFD EST 40 TONS CLASS 'B' BRIDGE EMBANKMENT TIE RIP RAP TO EXISTING BASED ON EXISTING GROUND. RIP RAP AT A DEPTH 1.0' CONTRACTOR TO EMBED REMOVE 26 LF DRAIN GRADE TO 0405 RETAIN 6 LFREMOVE 29 LF O RETAIN RETAIN RETAINRETAIN RETA IN 2GI RETA IN R E T A IN RETA IN RETAINRETAIN RETAIN GREU TL-3 -Y1- PT Sta. 14+62.48 -Y1- PC Sta. 14+53.00 -Y1- PT Sta. 14+21.46 -Y1- PC Sta. 14+07.89 -Y1- PT Sta. 13+37.85 -Y1- PC Sta. 13+01.88 -Y1- PT Sta. 12+95.91 -Y1- PC Sta. 11+63.39 -Y1- PT Sta. 10+95.69 -L- PT Sta. 11+27.77 -L- PC Sta. 10+31.01 -L- POT Sta. 9+20.00 -L- PRC Sta. 10+95.05 -L- PC Sta. 14+31.94 -L- PRC Sta. 15+36.97 -L- PCC Sta. 16+52.92 030204-Y2- POC Sta. 56+76.72 -Y1- POT Sta. 15+15.40 =15+00-Y1- PC Sta. 10+27.82 -L- Sta. 11+36.50 BEGIN APPROACH SLAB -L- Sta. 11+46.50 BEGIN BRIDGE -L- Sta. 14+31.50 END BRIDGE -L- Sta. 14+41.50 END APPROACH SLAB (TYP) INC 25' TAPER 26.50' 043EXIST-L- PT Sta. 20+70.00 -Y1-15+00-L-+79.51+06.0130' REXISTING GUARDRAIL REMOVE AND REPLACE TYP. SEE L SHEETS PROPOSED LANDSCAPING TYP. SEE L SHEETS PROPOSED LANDSCAPING 6' R10+00+82.50+07.502 1 3 1 5 1 1 120+001 1 1 60+00 EXIST BLACK CREEK GREENWAY 4 3 PATH (TYP) 10' WIDE CONCRETE 4 GREENWAY PROPOSED BLACK CREEK 3 -L- POT Sta. 9+75.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT BL-0024 TYPE III TYPE III02 (TYP)02 (TYP)6 66 7 -L- POC Sta. 17+82.69 -Y1- POT Sta. 10+00.00 = -L- POC Sta. 20+43.94 END CONSTRUCTION END TIP PROJECT BL-0024 6 7 3 REMOVE EXIST GATE 02 (TYP)TL-3 GREU 18' DRW 14' DRW CURB AND GUTTER OF MEDIAN 2'-6" REMOVE PORTION 25' R T Y PE 1PATH (TYP) 10' WIDE CONCRETE 2 1 1 FROM -L- 15+76.17 TO 16+51.17 PER DETAIL 1/SHEET 2A-1 INSTALL COMPOSITE WOOD RUBRAIL EXISTING GUARDRAIL REMOVE AND REPLACE BE INSTALLED PERMANENT SAFETY FENCE CAN UNTIL AESTHETIC FENCE AND FENCE DURING CONSTRUCTION INSTALL ORANGE SAFETY 8 -Y2- PT Sta. 61+27.74 -Y2- PC Sta. 60+41.58 -Y2- PC Sta. 60+98.89 -Y2- PT Sta. 60+68.01 -Y2- PC Sta. 58+84.31 -Y2- PT Sta. 57+54.61 -Y2- PCC Sta. 56+90.96 -Y2- PC Sta. 56+11.49 -Y2- POT Sta. 56+00.00 60+00 -Y2- PT Sta. 59+15.94 -Y2-TOP OF NUT =304.41' TH-3 TH-2 TH-1 TOP OF NUT =305.77' DIP = 345.15' TOP OF 12" VALVE = 347.12' TOP OF AIR =303.99' TOP OF NUT =305.09' TOP OF NUT TOP OF UTILITY = 323.89' 12" DUCTILE IRON WATER LINE TH-2 TOP OF UTILITY= 345.84' 12" DUCTILE IRON WATER LINE TH-1 TOP OF STORM DRAIN = 349.40' TOP OF UTILITY = 351.76' 12" DUCTILE IRON WATER LINE TH-3 TOP OF NUT =304.79' C C F FF C C C C C F F F F C C C F F F SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_pfl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 421 FAYETTEVILLE STREET, SUITE 600 C 2022 RALEIGH, NC 27601 BL-0024 310 320 330 340 350 360 370 380 10 11 12 13 14 15 16 17 18 19 20 300 310 320 330 340 350 360 300 SEE SHEET NO. 4 FOR L PLAN 11 12 13 14 1510 300 340 310 320 330 350 360 370 SEE SHEET NO. 4 FOR Y1 PLAN 5 -L- NW CARY PARKWAY (SR 3112) -Y1- 9+60 ELEV = 357.46' -L- STA 11+46.50 BEGIN BRIDGE ELEV = 350.62' -L- STA 14+31.50 END BRIDGE ELEV = 360.05' -L- STA 20+43.94 END CONSTRUCTION ELEV = 364.06' -L- STA 9+75.00 BEGIN PROFILE ELEV = 357.57' -L- STA 19+46.92 END PROFILE (CURB RAMP) ELEV = 307.73' -Y2- STA 58+98.46 -L- STA 13+27.88 = GREENWAY PROJECT BLACK CREEK SKEW = 0° CL ELEV = 354.04' PEDESTRIAN BRIDGE PREFABRICATED STEEL 1 @ 55', 1 @ 175', 1 @ 55' CL -L- STA 12+89.00 ELEV = 349.50' -L- STA 15+75 DITCH GRADE RT END SPECIAL ELEV = 348.00' -L- STA 14+40 DITCH GRADE RT BEGIN SPECIAL (+)1.20% PI = 10+55.00 EL = 359.66'(-)5 .5 0 0 0% (-)2.4000% VC = 80' PI = 14+75.00 EL = 349.58' (-)2.4000%(+)0.7500% PI = 16+60.00 EL = 350.97' (+)0.7500%(+)2.3000% VC = 80' VC = 80' PI = 14+75.00 ELEV = 349.81' -L- STA 14+95.95 LOW POINT ELEV = 353.79' -Y1- STA 10+00.00 -L- STA 17+82.69 ELEV = 353.79' -L- STA 17+82.69 -Y1- STA 10+00.00 = BEGIN PROFILE ELEV = 353.89' -L- STA 17+82.64 (5.0' LT) -Y1- STA 10+05.00 = (+)2.0000% ELEV = 307.26' -Y2- STA 56+76.72 -Y1- STA 15+15.40 = (-)4.8000% ELEV = 352.74' -Y1- STA 10+29.00 END PROFILE EIP 0.47' EIP TO R/WN 89°30'00" W 311.62'N 01°05'19" EN 06°42'21" W559.84'TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 1000HL APTS, LLC BM 1994 PG 859 DB 18175 PG 1924 PIN 0765-53-4335 BM 1988 PG 1069 DB 12949 PG 1287 DB 7775 PG 470 PIN 0765-44-4056 MID AMERICA APARTMENTS, LLC 472.16' TOTALASSOCIATION, INC. BEECHTREE OF CARY HOME OWNERS BM 1988 PG 1069 DB 4326 PG 567 PIN 0765-64-1435 EIP TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 N 00°33'39" E748.89'S 89°03'50" E1395.66' TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 4 ", PVC, TOWN OF CARYTOWN OF CARY 12 ", DIP, TOWN OF CARY 12 ", DIP, WATERLINE ATTACHED TO BRIDGE FUTURE 6" STUB 12 ", D IP, TO W N O F C A R Y AERIAL FO LINE 12 ", D IP, TO W N O F C A R Y AT&T Corp. C orp. A T & T W Charter 12" D I WATER L INE 12" DI WATER LINE EX IS T ING R /W E X IS T IN G R /W DB 11813 PG 765 20' GREENWAY EASEMENT BM 1982 PG 24440' UTI LI TY EASEM ENTDB 117 9 4 PG 6 9 6 2 0' GREENWAY EAS EMENTEXISTING R/W BM 1982 PG 24440' UTILITY EASEMENTEXISTING R/W 106.00'106.00'SHEET NO.PROJECT REFERENCE NO.K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_row_psh.dgn3/22/2022421 FAYETTEVILLE STREET, SUITE 600 C 2022 RALEIGH, NC 27601 BL-0024 ROADWAY DESIGN ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/2011NC GRIDROW-1 15+0015+0010+0020+0060+0060+00 1 2 3 1 1 15' LT +46 31.83' LT +50.14 27.91' LT +69.75 EX. R/W +94.80 EX. R/W +83.67 18.99' LT +39.52 35.16' LT +36.35 38.63' LT +56.84 22.41' LT +59.55 EASEMENT CONSTRUCTION TEMPORARY EX. R/W 10' LT 25' LT +46 2 STAGING AREA 1 30' LT 15' LT +22 STAG ING AREA 19.5' LT +95 30' LT +58.28 12.5' LT +08.51 10' LT +52.92 58.53' LT +70.64 53.32' LT +70.38 EASEMENT SIDEWALK PERMANENT 12.5' LT +95 25' LT +72 0.28' LT +30.54 10' LT +49.46 14' RT +77 (Y1) 14' RT +77 (Y1) 11' RT +21 (Y1) 11' RT +21 (Y1) 12' RT +49 (Y1) 11.56' LT +66.49 EX. R/W +43.76 EX. R/W +84.58 22.64' LT +85.99 30' LT +91.34 (L) 30' LT +71.17 (L) SHEET NO. WORK ZONE SAFETY & MOBILITY ONFOETATS DEPART MEN T OF TRANSPORTATIONANILORACHTR NFO ETATSDE P ART ME NTOFRATNSPOR TATIONANI L ORAC HTRO "from the MOUNTAINS to the COAST" DEPARTE N OF ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR APPROVED: DATE: SEAL PLANS PREPARED BY:NCDOT CONTACTS: VICINITY MAP STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS TRANSPORTATION MANAGEMENT PLAN INDEX OF SHEETS SHEET NO.TITLE TMP-1 TIP PROJECT:K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_tsh.dgn3/22/2022PROJECT ENGINEER PROJECT DESIGN ENGINEER WAKE COUNTY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED _ FINAL _ PRE-FINAL X MIDPOINT _ STAGING CONCEPT SUBMITTAL: 12/15/21 DATE SUBMITTED BL-0024JEFFREY W. MOORE, P.E. CALEB D. LOWMAN, P.E. RAYMOND HAYES, P.E. OAK ISLAND DR NANTUCKET DRPROJECT BEGIN PROJECT END MONTIBELLO DR LEE COURT HAMPTON CANBERRA CT LI VI NGSTON DR C REE K BL A C K NW CARY PKWY HEATHMOOR LNNORWELL BLVDSIGN DESIGNSD-1 TEMPORARY DETOUR ROUTESTMP-5 TEMPORARY PHASE 1 DETAILS TMP-4 TEMPORARY TRAFFIC CONTROL PHASINGTMP-3 N/ATMP-2 GENERAL NOTES, AND LOCAL NOTESTMP-1B AND LEGEND LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS, TMP-1A SHEETS TITLE SHEET, VINCINITY MAP AND INDEX OF TMP-1 SHEET NO.PROJ. REFERENCE NO. SEAL APPROVED:DATE: LEGEND ROADWAY STANDARD DRAWINGS TITLESTD. NO. PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., PAVEMENT MARKERS CRYSTAL/CRYSTAL CRYSTAL/RED YELLOW/YELLOW PAVEMENT MARKINGS PAVEMENT MARKING SYMBOLS EXISTING LINES TEMPORARY LINES PAVEMENT MARKING SYMBOLS GENERAL DIRECTION OF PEDESTRIAN TRAFFIC FLOW DEPARTE N O F ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" - PROPOSED PVMT. WORK AREA REMOVAL BARRICADE (TYPE III) TUBULAR MARKER TEMPORARY SIGNING SIGNALS E M P T EXISTING PROPOSED TEMPORARY 3/22/2022FLAGGER DIRECTION OF TRAFFIC FLOW TRUCK MOUNTED IMPACT ATTENUATOR (TMIA) FLASHING ARROW PANEL (TYPE C) NORTH ARROW TRAFFIC CONTROL DEVICES EXIST. PVMT. CONE DRUM STATIONARY SIGN PORTABLE SIGN CHANGEABLE MESSAGE SIGN 1101.02 TEMPORARY LANE CLOSURES 1101.03 TEMPORARY ROAD CLOSURES 1101.11 TRAFFIC CONTROL DESIGN TABLES 1110.01 STATIONARY WORK ZONE SIGNS 1110.02 PORTABLE WORK ZONE SIGNS 1135.01 CONES 1205.01 PAVEMENT MARKINGS - LINE TYPES & OFFSETS 1205.07 PAVEMENT MARKINGS - PEDESTRIAN CROSSWALKS STATIONARY OR PORTABLE SIGN SKINNY DRUM 1130.01 DRUMS 1150.01 FLAGGING DEVICES ARE CONSIDERED A PART OF THESE PLANS: TEMPORARY CRASH CUSHION LAW ENFORCEMENT DRAWINGS & LEGEND ROADWAY STANDARD 1101.01 WORK ZONE ADVANCE WARNING SIGNS TMP-1A DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_1A-C.dgn1101.05 WORK ZONE VEHICLE ACCESSES VARIABLE DEPTH MILLING AND WEDGING BL-0024 1145.01 BARRICADES - TYPE III 1180.01 SKINNY DRUM DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3/22/2022APPROVED:DATE: SHEET NO.PROJ. REFERENCE NO. DEPARTE N O F ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_1A-C.dgnBL-0024 TMP-1B TIME RESTRICTIONS LANE AND SHOULDER CLOSURE REQUIREMENTS GENERAL NOTES PAVEMENT EDGE DROP OFF REQUIREMENTS STRATEGIES MANAGEMENT TUESDAY AFTER THE WEEK OF CHRISTMAS. BEFORE THE WEEK OF CHRISTMAS DAY AND 7:00 P.M. THE FOLLOWING 8. FOR CHRISTMAS, BETWEEN THE HOURS OF 6:00 A.M. THE FRIDAY 7:00 P.M. MONDAY. 7. FOR THANKSGIVING DAY, BETWEEN THE HOURS OF 6:00 A.M. TUESDAY TO 7:00 P.M. TUESDAY. 6. FOR LABOR DAY, BETWEEN THE HOURS OF 6:00 A.M. FRIDAY AND INDEPENDENCE DAY. INDEPENDENCE DAY AND 7:00 P.M. THE TUESDAY AFTER THEN BETWEEN THE HOURS OF 6:00 A.M. THE THURSDAY BEFORE IF INDEPENDENCE DAY IS ON A FRIDAY, SATURDAY, SUNDAY OR MONDAY INDEPENDENCE DAY. DAY BEFORE INDEPENDENCE DAY AND 7:00 P.M. THE DAY AFTER 5. FOR INDEPENDENCE DAY, BETWEEN THE HOURS OF 6:00 A.M. THE 7:00 P.M. TUESDAY. 4. FOR MEMORIAL DAY, BETWEEN THE HOURS OF 6:00 A.M. FRIDAY TO 7:00 P.M. MONDAY. 3. FOR EASTER, BETWEEN THE HOURS OF 6:00 A.M. THURSDAY AND TUESDAY. SATURDAY, SUNDAY, OR MONDAY THEN UNTIL 7:00 P.M. THE FOLLOWING TO 7:00 P.M. JANUARY 2ND. IF NEW YEAR'S DAY IS ON A FRIDAY, 2. FOR NEW YEAR'S, BETWEEN THE HOURS OF 6:00 A.M. DECEMBER 31st VOLUMES, AS DIRECTED BY THE ENGINEER. 1. FOR ANY UNEXPECTED OCCURRENCE THAT CREATES UNUSUALLY HIGH TRAFFIC HOLIDAY NW CARY PARKWAY, FOR THE DURATION OF THE PROJECT. TIME RESTRICTIONS AS TRAFFIC DICTATES DUE TO HEAVY TRAFFIC ALONG NCDOT AND THE TOWN OF CARY HAVE THE AUTHORITY TO MODIFY DAY AND OR DIRECTED BY THE ENGINEER. THE CONSTRUCTION PROJECT, EXCEPT WHEN OTHERWISE NOTED IN THE PLANS, THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF ENGINEER. SUPPLEMENTING, COVERING OR REMOVAL OF DEVICES, AS DIRECTED BY THE OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING, TO MEET FIELD CONDITIONS, OR RESULT IN DUPLICATE, OR UNDESIRED DRAWINGS, STANDARD DETAILS AND ROADWAY DETAILS ARE NOT ATTAINABLE CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL TRAFFIC PATTERN ALTERATIONS SIGNING TRAFFIC CONTROL DEVICES PAVEMENT MARKINGS AND MARKERS MARKERS BY THE END OF EACH DAY'S OPERATION. Q) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND LINES. P) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING PLAN OPERATIONS TRANSPORTATION MISCELLANEOUS LOCAL NOTES HAMPTON LEE CT SR 3112 (NW CARY PARKWAY) ROAD NAME EVENTS AS FOLLOWS: B) DO NOT CLOSE OR NARROW TRAVEL LANES DURING HOLIDAYS AND SPECIAL HAMPTON LEE CT SR 3112 (NW CARY PARKWAY) DAY AND TIME RESTRICTIONS ROAD NAME A) DO NOT CLOSE OR NARROW TRAVEL LANES AS FOLLOWS: MINIMUM OF EVERY HALF MILE THROUGHOUT THE UNEVEN AREA. WARNING "UNEVEN LANES" SIGNS (W8-11) 500 FT IN ADVANCE AND A LANES OF TRAFFIC FOR NOMINAL LIFTS OF 1.5 INCHES. INSTALL ADVANCE G) DO NOT EXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BETWEEN OPEN ENGINEER, AT NO EXPENSE TO THE DEPARTMENT. BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE SPEED LIMITS LESS THAN 45 MPH. BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH POSTED SPEED LIMITS OF 45 MPH OR GREATER. BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH POSTED EDGE OF PAVEMENT DROP-OFF AS FOLLOWS: PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN F) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING TRAFFIC PATTERN ALTERATION. H) NOTIFY THE ENGINEER THIRTY (30) CALENDAR DAYS PRIOR TO ANY UNOPENED LANES ARE CLOSED TO TRAFFIC. PERPENDICULAR TO THE EDGE OF TRAVELWAY ON 500 FT CENTERS WHEN O) PLACE ADDITIONAL SETS OF THREE CHANNELIZING DEVICES ATTACHED, OF SUFFICIENT LENGTH TO CLOSE ENTIRE ROADWAY. N) PLACE TYPE III BARRICADES, WITH "ROAD CLOSED" SIGN R11-2 1130 (DRUMS) AND 1135 (CONES) FOR ADDITIONAL REQUIREMENTS. REFER TO STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES SECTIONS 10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN OPEN TRAVELWAY. AREAS NO GREATER IN FEET THAN TWICE THE POSTED SPEED LIMIT (25 MPH) EXCEPT, M) WHEN LANE CLOSURES ARE NOT IN EFFECT SPACE CHANNELIZING DEVICES IN WORK HAS BEEN REMOVED FOR CONSTRUCTION OPERATIONS (UTILITIES, DRAINAGE, ETC.). BY THE ENGINEER) AT ALL LOCATIONS WHERE THE OPEN PEDESTRIAN TRAVELWAY SIDEWALKS (CONCRETE, ASPHALT, OR OTHER SUITABLE MATERIAL AS APPROVED THE PHASING. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE TEMPORARY U) CONTRACTOR SHALL MAINTAIN SIDEWALK ACCESS AT ALL TIMES AS STATED IN COORDINATION WITH THE SIGNING AND DELINEATION UNIT. ON PAVEMENT MARKING PLANS OR AS DIRECTED BY THE ENGINEER IN T) ALL CURB RAMP LOCATIONS SHALL BE DERIVED FROM STATIONING SHOWN TO DELINEATE THE EDGE OF ROADWAY ALONG UNPAVED AREAS. RESPECTIVELY IN ADVANCE OF THE UNEVEN AREAS. USE DRUMS AND BLACK ON ORANGE ''PAVEMENT ENDS'' SIGNS (W8-3) AND THE ENGINEER. PLACE BLACK ON ORANGE "LOOSE GRAVEL" SIGNS (W8-7) TIE-IN AREA TO AN APPROPRIATE ROADWAY ELEVATION AS DETERMINED BY S) IN THE EVENT A TIE-IN CANNOT BE MADE IN ONE DAY'S TIME, BRING THE AREA AND/OR INTERSECTIONS, AS DIRECTED BY THE ENGINEER. R) LAW ENFORCEMENT MAY BE USED TO MAINTAIN TRAFFIC THROUGH THE WORK CONSTRUCTION. RESIDENTS AND BUSINESSES WILL BE MAINTAINED AT ALL POSSIBLE TIMES DURING PATTERNS, TEMPORARY LANE CLOSURES, AND ROAD CLOSURES. LOCAL ACCESS TO CONSTRUCTED WHILE MAINTAINING TRAFFIC AND USING TEMPORARY TRAFFIC PROPOSED IMPROVEMENTS ALONG SR-3112 (NW CARY PARKWAY) WILL BE AND ANYTIME (SUNDAY) MONDAY THRU FRIDAY 6:00-9:00 A.M. & 4:00-7:00 P.M. TRAVEL LANE. PERSONNEL AND/OR EQUIPMENT REMAIN WITHIN THE CLOSED DIRECTED BY THE ENGINEER. CONDUCT THE WORK SO THAT ALL THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD DRAWINGS OR AS OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE ACCORDING TO E) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY BARRIER OR GUARDRAIL. CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY STANDARD DRAWING ADJACENT TO A DIVIDED FACILITY AND WITHIN 10 FT OF AN OPEN TRAVEL LANE, WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER BARRIER OR GUARDRAIL. STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN D) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER LONGER NEEDED, OR AS DIRECTED BY THE ENGINEER. PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO C) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING ENGINEER. (W8-1) 500 FT IN ADVANCE OF THE UNEVEN AREA, OR AS DIRECTED BY THE L) INSTALL BLACK ON ORANGE ''DIP'' SIGNS (W8-2) AND/OR "BUMP" SIGNS TRAFFIC PATTERN. K) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY OPERATION. REQUIRED TO CLOSE THE ROAD WHEN ROAD CLOSURE IS NOT IN J) CONTRACTOR WILL COVER OR REMOVE ALL SIGNS AND DEVICES (3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION. 40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE I) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED TWO (2) WEEKS PRIOR TO IMPLEMENTING A ROAD CLOSURE AND OFFSITE DETOUR. Y) CONTRACTOR TO CONTACT THE CARY FIRE DEPARTMENT AND CARY AREA EMS FOR ANY DURATION ANY OPERATION THAT WILL REQUIRE BLACK CREEK GREENWAY TO BE CLOSED X) CONTRACTOR SHALL PROVIDE THE TOWN WITH TWO (2) WEEKS NOTICE PRIOR TO SIGNAGE ALONG BLACK CREEK GREENWAY. W) CONTRACTOR TO COORDINATE WITH TOWN OF CARY FOR ADVANCED WARNING SAFETY FENCE AS NEEDED TO KEEP PEDESTRIANS OUT OF THE WORK AREAS. TIMES, MAINTAIN EXISTING SIDEWALK UNTIL NEW SIDEWALK IS IN PLACE, USING V) MAINTAIN EXISTING PEDESTRIAN ROUTES DURING CONSTRUCTION. AT ALL POSSIBLE 3/22/2022APPROVED:DATE: SHEET NO.PROJ. REFERENCE NO. DEPARTE N O F ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_1A-C.dgnBL-0024 PHASING PLAN OPERATIONS TRANSPORTATION TMP-3 DAYS, UNLESSS OTHERWISE APPROVED BY THE TOWN AND ENGINEER. COMPLETE THE WORK ASSOSCIATED WITH STEP 3 UTILIZING ROAD CLOSURES SHOWN ON TMP-5 IN 6 CALENDAR INTERMEDIATE CONTRACT TIME #2: INSTALL FINAL MARKINGS, REMOVE ALL TRAFFIC CONTROL DEVICES, AND OPEN LANES TO TRAFFIC. STEP 6: ALONG THE SIDEWALK. WHILE MAINTAINING TRAFFIC AND UTILIZING LANE CLOSURE AS SHOWN ON RSD 1101.02 SHEET 14 OF 14, CONSTRUCT THE LIGNTING, AND LANDSCAPING STEP 5: MANOR REMOVE AND REPLACE SIDEWALK BETWEEN -L- STA. 17+70 AND 19+65 THAT MINIMIZES PEDESTRIAN ACCESS IMPACTS. WHILE MAINTAINING TRAFFIC AND UTILIZING ROAD CLOSURE AS SHOWN ON TMP-5, COMPLETE AND POUR CONCRETE DECKING. IN A CONTINUOUS STEP 4: OFFSITE DETOUR, AND SET THE THREE (3) PEDESTRIAN BRIDGE SPANS. INSTALL ROAD CLOSURE, DETOUR SIGNING, AND BARRICADES. CLOSE SR 3112 (NW CARY PARKWAY) AS SHOWN ON TMP-5. PLACE TRAFIC ONTO STEP 3: AND DRAINAGE FROM -L- STA. 9+75 TO 17+70. ONTO THE TEMPORARY PATTERN AND CONSTRUCT THE PEDESTRIAN BRIDGE, BENTS, END BENTS, RETAINING WALL, SIDEWALK, DRIVEWAYS, INSTALL LANE CLOSURE, SIGNING, DELINEATORS, AND TEMPORARY SIGNALS AS SHOWN ON RSD 1101.02 SHEET 14 OF 14. PLACE TRAFFIC STEP 2: PRIOR TO BEGINNING CONSTRUCTION INSTALL ADVANCE WARNING SIGNS ALONG SR 3112 (NW CARY PARKWAY) AS SHOWN ON RSD. 1101.01. STEP 1: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3/22/2022APPROVED:DATE: SHEET NO.PROJ. REFERENCE NO. DEPARTE N O F ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_4.dgnBL-0024 NAD 83/2011NC GRIDTMP-4 WORK AREA PHASE 1 TRAFFIC CONTROL PHASE 1 PRELIMINARY PLANS PRELIMINARY PLANS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CL TYPICAL SECTION B-B -L- STA. 17+00 EXIST EXIST NW CARY PKWY EXIST WORK ZONE B B CL EXIST EXIST NW CARY PKWY EXIST WORK ZONE TYPICAL SECTION A-A -L- STA. 14+75 A A POSSIBLE TIMES BLACK CREEK GREENWAY AT ALL MAINTAIN PEDESTRIAN ACCESS TO -L- (NW CARY PARKWAY) SR 3112 -Y2--Y 1-0400 0402 2GI 24" RCP-IV 24" W/ ELBOWS 15" RCP-IV 0406JB W/ MH COVER 0407 SEE SHEET 2D-1 CONCRETE FLUME MODIFIED 04042GI JB W/ MH COVER 0401 24" RCP-IV 24" RCP-IV 15" W/ ELBOWS R9-9 24'' X 12'' PEDESTRIAN BARRICADE CLOSED SIDEWALK 4' 5' MIN 2" MAX R9-9 24'' X 12''CLOSED SIDEWALK 4' 5' MIN 2" MAX R9-9 24'' X 12''CLOSED SIDEWALK 4' 5' MIN 2" MAX R9-9 24'' X 12''CLOSED SIDEWALK 4' 5' MIN 2" MAX R9-9 24'' X 12''CLOSED SIDEWALK 4' 5' MIN 2" MAX *MUST BE ADA COMPLIANT PEDESTRIAN BARRICADE *MUST BE ADA COMPLIANT PEDESTRIAN BARRICADE *MUST BE ADA COMPLIANT PEDESTRIAN BARRICADE *MUST BE ADA COMPLIANT PEDESTRIAN BARRICADE *MUST BE ADA COMPLIANT BARRICADE AND R9-9 MOUNTED SIGN AND NORWELL BLVD WITH PEDESTRIAN INTERSECTION OF NW CARY PARKWAY CLOSE SIDEWALK ACCESS AT TRAFFIC WILL IMPEDE PEDESTRIAN FOR OPERATIONS THAT MAY OR INSTALL PEDESTRIAN BARRICADE TRAFFIC WILL IMPEDE PEDESTRIAN FOR OPERATIONS THAT MAY OR INSTALL PEDESTRIAN BARRICADE BeechtreeHamptonHempstead Ct.Dr. W indchase Dr. Ludington W eston Pkwy N. Harrison Ave.NW Cary PkwyNorwell Blvd.O ak Isl and D r. Montibello Dr.Midenhall WayWinstead Dr.Research Dr.Harrison Oaks BlvdLee 3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_Detour_2.dgnRaleigh, North Carolina 27636 Post Office Box 33068 PE NO. F-0102C , 2016 SEAL APPROVED:DATE: DEPARTE N O F ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR SHEET NO.PROJ. REFERENCE NO. BL-0024 LEGEND DETOUR ROUTE ROAD CLOSED R11-2 48'' x 30'' TYPE III BARRICADE A B B A 48'' X 48'' AHEAD ROAD CLOSED W20-3A 48'' X 48'' W20-3C CLOSED ROAD 1000 FT 48'' X 48'' AHEAD DETOUR W20-2 D E G 48'' X 48'' F N L G J K L M I H K K J C M4-10L R11-2 48'' x 30'' ROAD CLOSED DETOUR48" x 18" TYPE III BARRICADE M4-10L R11-2 48'' x 30'' ROAD CLOSED DETOUR 48" x 18" TYPE III BARRICADE C D E G M PORTABLE SIGN TMP-5 CLOSED ROAD SCALE: 1" = 800' 500 FT W20-3B J II M I I 48'' X 48'' ROAD W20-3A 42" X 12" AHEAD CLOSED NEXT RIGHT SP-4R H L M H H H H H F E ROAD CLOSURE DETOUR END 24'' X 18'' M4-8 A M6-1 21'' X 15'' 21'' X 15'' M5-1 R M4-8 24'' X 12'' DETOUR SEE SHEET SD-1 301 K PARKWAY CARY M4-8 24'' X 12'' DETOUR SEE SHEET SD-1 301 L PARKWAY CARY M4-8 24'' X 12'' DETOUR SEE SHEET SD-1 301 M PARKWAY CARY N M6-1 21'' X 15'' M4-8 24'' X 12'' DETOUR M6-3 21'' X 15'' M4-8 24'' X 12'' DETOUR 21'' X 15'' M5-1 R SEE SHEET SD-1 301 I J PARKWAY CARY PARKWAY CARY SEE SHEET SD-1 301 O O N DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 48'' X 48'' ROAD W20-3A 42" X 12" AHEAD CLOSED SP-4R O O NEXT LEFT M4-10L R11-2 48'' x 30'' ROAD CLOSED DETOUR 48" x 18" TYPE III BARRICADE O 3/22/2022APPROVED:DATE: SHEET NO.PROJ. REFERENCE NO. DEPARTE N O F ANSPORTA TIONTAE OF NORT H ROL NA WORK Z ONE TRAFFIC CONTROLDIVISION OF HI GHW A YS T S CAI M TTR K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Traffic\TrafficControl\TCP\BL-0024_psh_TCP_SD-1.dgnBL-0024 SD-1 SIGN DESIGN retroflective sheeting. Background shall be NC Grade B fluoresent orange retroflective sheeting. Background shall be NC Grade B fluoresent orange panelStyle:Traffic Control.ssiconstructPanels:36|24|18levels:GSCOLORFILL|GSBWFILL|GSOUTLINEpanelBorderRadius:12.000chevronShoulderRadius:12.000 5.5"25"5.5" 3'-0" 5.1" 5"C 3.8" 5"C 5.1"2'-0"BORDER R=1.5" TH=0.63" IN=0.38" HTSYMBOLXWIDY HEIGHT: SIGN NUMBER: TYPE: QUANTITY: SIGN WIDTH: TOTAL AREA: BORDER TYPE: NO. Z BARS: RECESS: WIDTH: RADII: COPY COLOR: BACKG COLOR:CHECKED BY: CDLDESIGN BY: PROJECT ID: LENGTH: BL-0024 NORTH CAROLINA D.O.T. SIGN DETAIL LETTER POSITIONS STATIONARY 3'-0" 2'-0" 6.0 Sq.Ft. 0.38" 0.63" 1.5" Black Letter spacings are to start of next letter Text Length Series/Size Spacing Factor is 1 unless specified otherwise BL-0024_psh_TCP_GuidesignFILENAME: Oct 25, 2021 MAT'L:0.080" (2.0 mm) ALUMINUM 2. JRC 1. LOCATION: SEE PLANS 301 INSET Fluorescent Orange USE NOTES: 1, 2 non-reflective sheeting. Legend and border shall be direct applied black retroflective sheeting. Background shall be NC Grade B fluoresent orange SEE PLANS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED EX IS T ING R /W E X IS T IN G R /W EXISTING R/W EXISTING R/W SHEET NO.PROJECT REFERENCE NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Roadway\Proj\BL-0024_rdy_pmp_psh.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER THERMOPLASTIC: T46 T61 MARKING LEGEND SYMBOL AND PAVEMENT T46 WHITE STOPBAR (24") WHITE CROSSWALK LINE (8") PS-1 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 7. MINIMUM HEIGHT FROM GROUND TO BOTTOM OF LOWEST SIGN IS 7' 6. TRAIL CROSSING WARNING SIGNS SHALL HAVE A FLOURESCENT YELLOW-GREEN BACKGROUND COLOR. SIDEWALK AMENITIES DO NOT CONFLICT WITH POST OR VISIBILITY OF SIGN. 5. ADJUST SIGNS TO ENSURE NEW/EXISTING POLES, LIGHTS, TREES, AND DIRECTED BY TOWN. 4. RETAIN ALL OTHER EXISTING SIGNS NOT SHOWN ON SIGNING PLAN UNLESS OTHERWISE 3. CONTRACTOR TO COORDINATE CROSSWALK INSTALLATION WITH TOWN WITH PROPOSED. 2. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS AND/OR SYMBOLS IN CONFLICT 1. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC EXCEPT AS NOTED ON PLANS. SIGNING AND PAVEMENT MARKING NOTES:NAD 83/2011NC GRID15+0015+0010+0020+0060+00 STOPLIMITSPEEDCARYLIMITSPEEDBRIDGEICES BEFOREROADTRAILX-INGAHEADTRAILX-INGAHEADTRAILX-INGAHEAD"TITLE OF PROJECT"Town Cary316 NORTH ACADEMY ST.www.townofcary.orgARCNI 1871A TNY,ROHCAOL RCARY, NC 27513ofCONTRACTORPRIMESUB CONTRACTORSMAJOR 10' 5'"TITLE OF PROJECT"Town Cary316 NORTH ACADEMY ST.www.townofcary.orgA R C NI1871ATNY,ROHCAOLRCARY, NC 27513ofCONTRACTORPRIMESUB CONTRACTORSMAJOR HAMPTON LEE CTCARY PARKWAY45453T61 T46 RETAIN RETAIN RETAIN RETAIN (TYP) SEE DETAIL ON SHEET 2C-2 2" YELLOW THERMOPLASTIC (SEE DETAIL SHEET 2C-3) PROJECT IDENTIFICATION SIGN -L- STA 9+60 LT (SEE DETAIL SHEET 2C-3) PROJECT IDENTIFICATION SIGN -L- STA 19+23 RTLIMITSPEEDCARY453CURRENT LOCATION EXISTING SIGNS IN REMOVE AND RESET -L- STA 19+67 LT CURRENT LOCATION EXISTING SIGNS IN REMOVE AND RESET -L- STA 10+98 RT R1-1 (18" X 18") -Y1- STA 10+10 LT R1-1 (18" X 18") -Y1- STA 10+66 LT STOPSTOP(SEE DETAIL SHEET 2C-3) & W16-9P (24" X 12") W11-15P (18" X 12"), W11-15 (18" X 18"), -L- STA 18+17 LT (SEE DETAIL SHEET 2C-3) & W16-9P (24" X 12") W11-15P (18" X 12"), W11-15 (18" X 18"), -L- STA 17+48 LT (SEE DETAIL SHEET 2C-3) & W16-9P (24" X 12") W11-15P (18" X 12"), W11-15 (18" X 18"), -L- STA 10+25 LT 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS SHEET SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 3/23/202210 10 20 ROADWAY DESIGN ENGINEER 2018 STANDARD SPECIFICATIONS K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_tsh.dgnC 2022 5 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PHONE: (919) 677-2000 RALEIGH, NORTH CAROLINA 27601 421 FAYETTEVILLE STREET, SUITE 600 NC LICENSE #F-0102 CONTRACT: PROJECT: BL-0024THE TOWN OF CARY BY: PLANS PREPARED FOR TOWN OF CARY CONTACT 40 802040 0 40 802040 BL-0024N.C. -L- Sta. 11+46.50 BEGIN BRIDGE -L- Sta. 14+11.50 END BRIDGE JEFFREY W. MOORE, P.E. = 0.139 MILES = 0.188 MILES LENGTH STRUCTURE PROJECT BL-0024 = 0.049 MILES TOTAL LENGTH PROJECT BL-0024 KYLE A. HUBERT, P.E. CALEB D. LOWMAN, P.E. LENGTH GREENWAY PROJECT BL-0024 NARRATIVE BLACK CREEK-L- Sta. 20+43.94 END PROJECT BL-0024 TO N HARR ISON AVE -L- Sta. 9+75.00 BEGIN PROJECT BL-0024 PARK NORTH CARY TO EVANS ROAD (SR 3112) NW CARY PARKWAY -L-GREENWAY ACCESSBLACK CREEK-Y1--Y2-GREENWAY EXIST BLACK CREEK TO EVANS ROAD COURT HAMPTON LEEEC-2 SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME TIMEFRAME EXCEPTIONSSITE DESCRIPTION NPDES GENERAL STORMWATER PERMIT IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. NONE NONEPERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES SLOPES STEEPER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS 14 DAYS 7 DAYS 7 DAYS 7 DAYS GENERAL NOTES (TYPICAL ALL SHEETS): OF ENERGY, MINERAL, AND LAND RESOURCES. DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION APRIL 1, 2019 ISSUED BY THE NORTH CAROLINA NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE COMPLYWITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS DISTURBED AREAS CARY PARKWAY PEDESTRIAN BRIDGE IMPERVIOUS AND PERVIOUS SURFACES IN DIRECTION OF FLOW PROJECT DENUDED AREAS PROPOSED PERVIOUS SURFACE = 1.60 AC PROPOSED IMPERVIOUS SURFACE = 0.25 AC the bridge the sidwalk will continue until it reaches the intersection with Hampton Lee Ct. The trail then goes east with a pedestrian bridge on the side of NW Cary Parkway. After Cary, NC. The project site begins west of the NW Cary Parkway Bridge at Black Creek. The NW Cary Parkway Sidewalk and Pedestrian Bridge is location in Wake County, stabilized with grass and permanent plantings. during the construction of this project. Also, approximately 1.60 acres will be vegetatively a pedestrian bridge with a 10-foot wide path. Approximately 1.85 acres will be disturbed Parkway with connection to various adjacent locations. The multiuse trail includes The project is described as constructing a sidewalk to the north side of NW Cary The NW Cary Parkway is part of the Cary Comprehensive Pedestrian Plan. Project Description OF ROADS, DRIVEWAYS, OR PARKING LOTS. CLEANED OFF THE ROADWAY BY DRY SWEEPING METHODS ONLY. WATER MUST NOT BE USED TO WASH SEDIMENT OFF 13.) DO NOT ALLOW CONCRETE DUST/WASTE/WASTEWATER INTO STORM DRAIN OR OFF-SITE. ALL SEDIMENT MUST BE NECESSARY FOR STABILIZATION 12.) USE ROLLED EROSION CONTROL PRODUCTS ON ALL CUT/FILL SLOPES WITHOUT RIP RAPINCLUDING BASINS AS REPLACED BY WATTLES UPON PARTIAL STABILIZATION OF SOIL. DITCHES. CONTRACTOR TO COORDINATE WITH TOWN INSPECTOR TO DETERMINE WHEN ROCK CHECK DAMS MAY BE 11.) WATTLE DAMS TO BE INSTALLED AND MAINTAINED WHEN UNSTABLE AND SEDIMENT LADEN SOIL IS DRAINING IN METHOD TO USE AT A GIVEN TIME. URBAN NATURE OF THE SITE. CONTRACTOR TO COORDINATE WITH TOWN INSPECTOR TO DETERMINE THE BEST TO STRUCTURES. MANY VERSIONS OF INLET PROTECTION HAVE BEEN PROPOSED ON THIS PROJECT DUE TO THE 10.) INLET PROTECTION TO BE INSTALLED AND MAINTAINED WHEN UNSTABLE AND SEDIMENT LADEN SOIL IS DRAINING 9.) SEE SHEET SHEET EC-X FOR GENERAL CONSTRUCTION SCHEDULE/SEQUENCE 8.) NO BURNING WILL BE ALLOWED ON THE PROJECT. 7.) INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO PREVENT SEDIMENT RUNOFF. NPDES PERMIT NO. NCG010000 AND NORTH CAROLINA GENERAL STATUE 113A-54.1(e) AND 15A NCAC 04B.0131. SELF-INSPECTIONS AND SELF-MONITORING SHALL BE CONDUCTED IN ACCORDANCE WITH THE CONDITIONS OF THE RAINFALL EVENT OF ONE INCH AND GREATER. SUBMIT SELF-INSPECTION REPORT WITHIN 15 DAYS OF THE INSPECTION. 6.) ALL EROSION CONTROL MEASURES MUST BE SELF-INSPECTED ONCE A WEEK OR WITHIN 24 HOURS OF ANY FENCE RUNS. 5.) SILT FENCE OUTLET MUST BE ADDED IN THE FIELD WHENEVER LOW POINTS ARE ENCOUNTERED ALONG SILT STORM DRAINS ARE INSTALLED SO THAT THE FENCES WILL PASS OVER THE PIPE OUTLETS. 4.) WHERE SILT FENCES ARE LOCATED BELOW STORM DRAIN OUTLETS, THEIR LOCATIONS MUST BE MODIFIED AS THE BE SUBMITTED FOR APPROVAL PRIOR TO CONSTRUCTION. SILT FROM PUMPED EFFLUENT DURING COSNTRUCTION. IF COFFER DAMS ARE UTILIZED, A COFFER DAM DETAIL MUST BLOACKAGE, REPLACE BAG WHEN ƒ FULL OF SEDIMENT, AND PROVIDE A SUFFICIENT QUANTITY OF BAGS TO CONTAIN COFFER DAM AND PUMP AROUND. IF SILT BAGS ARE UTILIZED, CONTRACTOR TO INSPECT BAG FOR DAMAGE AND OR CONTRACTOR SHALL PLAN TO ISOLATE AND DEWATER EXCAVATED AREAS AS NEEDED USING SILT BAGS AND/OR 3.) PIPES SHALL BE INSTALLED/REPLACED IN THE DRY (WITH A MIN. 3 DAYS OF DRY WEATHER DURING INSTALLATION) AT THE CONTRACTOR'S EXPENSE. DAMAGE TO EXISTING CURB AND GUTTER, ROADS, OR PARKING LOTS AT CONSTRUCTION ENTRANCES MUST BE REPAIRED FREE OF DEBRIS, DIRT, AND EQUIPMENT DURING THE PROJECT DURATION UNLESS DIRECTED BY TOWN ENGINEER. ANY 2.) CONTRACTOR TO ENSURE THAT ALL ROADWAYS, PARKING LOTS, AND CURB LINES ADJACENT TO THIS PROJECT ARE 1.) ALL EROSION CONTROL MEASURES TO BE WITHIN LIMITS OF DISTURBANCE. GREENWAY (BY OTHERS) PROPOSED BLACK CREEK Total Disturbed Area (shaded) = 1.85 acres EC-1 1871 RCA NATN,RO H C AY IOLR TOWN OF CARYNAD 83/2011NC GRID 47 LOW UTILITY=382.14' LOW POWER=397.46' P-102 LOW UTILITY=380.55' LOW POWER=389.33' P-103 LOW UTILITY=373.42' LOW POWER=382.60' P-104 LOW UTILITY=372.73' LOW POWER=382.67' P-105 LOW UTILITY=370.26' LOW POWER=386.92' P-106 EX IS T ING R /W E X IS T IN G R /W DB 11813 PG 765 20' GREENWAY EASEMENT EIP 0.47' EIP TO R/WN 89°30'00" W 311.62' BLACK CREEK BM 1982 PG 24440' UTI LI TY EASEM ENTN 01°05'19" EN 06°42'21" W559.84'472.16' TOTALDB 117 9 4 PG 6 9 6 2 0' GREENWAY EAS EMENTEXISTING R/W BLACK CREEKEIP BM 1982 PG 24440' UTILITY EASEMENTN 00°33'39" E748.89'EXISTING R/W 106.00'106.00'HH SD-102 CB TOP=355.09' INV IN (W)=349.90' INV IN (S)=349.69' INV OUT (N)=349.55' SD-101 CB TOP=365.34' INV IN (W)=361.80' INV OUT (E)=361.75' SD-103 DI TOP=353.36' INV OUT=350.48' SD-104 DI TOP=306.80' INV OUT=303.75' SD-105 (2) DI TOP=345.81' INV IN (W)=342.51' INV OUT (SW)=342.24' SD-108 DI TOP=356.77' INV IN (N)=349.23' INV OUT (W)=349.11' SD-106 CB TOP=360.01' NO INVERTS FULL OF DEBRIS SD-107 CB TOP=360.39' INV OUT=356.82'HHHH4 ", PVC, TOWN OF CARYTOWN OF CARY 12 ", DIP, TOWN OF CARY 12 ", DIP, WATERLINE ATTACHED TO BRIDGE FUTURE 6" STUB 12 ", D IP, TO W N O F C A R Y AERIAL FO LINE 12 ", D IP, TO W N O F C A R Y AT&T Corp. C orp. A T & T W Charter 12" D I WATER L INE 12" DI WATER LINE TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 1000HL APTS, LLC BM 1994 PG 859 DB 18175 PG 1924 PIN 0765-53-4335 BM 1988 PG 1069 DB 12949 PG 1287 DB 7775 PG 470 PIN 0765-44-4056 MID AMERICA APARTMENTS, LLC ASSOCIATION, INC. BEECHTREE OF CARY HOME OWNERS BM 1988 PG 1069 DB 4326 PG 567 PIN 0765-64-1435 TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 3003003003053053053053 05305305305305305310310310310310315315315315315320 320320320320325 325325325325325330 330330330330330 335 335335335335335 335335 340 340340340340340 340 340340340345345345345345345345 345 3 4 5 3 4 5 345345350350350350350350350 3503503503503 5 0 350350350350350350350350355355355 355355 355355355360360360 3 60360360365 365 365365365370 370 370370370 375 375380 380380 3853851 2 3 1 1 2 1 SHEET NO.PROJECT REFERENCE NO.K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_psh_4.dgn3/23/2022421 FAYETTEVILLE STREET, SUITE 600 C 2022 RALEIGH, NC 27601 BL-0024 ROADWAY DESIGN ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/2011NC GRIDLEE COURTHAMPTONEC-2 (APPLIES TO ALL SHEETS) LEGEND C F CONSTRUCTION LIMIT (SHADED ON PLANS) LIMITS OF DISTURBANCE STAGING AND STOCKPILE AREA (SEE DETAIL ON SHEET EC-5) TEMPORARY SILT FENCE (SEE DETAIL ON SHEET EC-5) SILT FENCE OUTLET SPECIAL SEDIMENT CONTROL FENCE/ EXISTING CONTOUR ON SHEET EC-6) ENTRANCE (SEE DETAIL TEMPORARY CONSTRUCTION SHEET EC-6) DAM, TYPE A (SEE DETAIL ON TEMPORARY ROCK SILT CHECK (SEE DETAIL ON SHEET EC-6) WATTLE CHECK & EC-6) (SEE DETAILS ON SHEETS EC-5 STORM DRAIN INLET PROTECTION (SEE DETAIL ON SHEET EC-5) ROCK INLET SEDIMENT TRAP GREENWAY PROPOSED 3:13:1 D ( Not to Scale) STANDARD 'V' DITCH FROM STA. 14+40 TO STA. 15+75 -L- RT Min. D= 1 Ft. DETAIL 1 1.0% Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM STA. 11+22 TO STA. 11+85 -L- LT DETAIL 2 Type of Liner= CL B Rip-Rap d= 1 Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE 1% ANNUAL CHANCE FLOODFLOODWAYCHANCE FLOOD1% ANNUAL CHANCE FLOOD0.2% ANNUAL F L O O DW A Y0.2% ANNUAL CHANCE FLOODO LIMITS OF DISTURBANCE (TYP) LIMITS (TYP) 2' FROM CONSTRUCTION INSTALL SILT FENCE ENTRANCE CONSTRUCTION INSTALL GRAVEL ENTRANCE CONSTRUCTION INSTALL GRAVEL ENTRANCE CONSTRUCTION INSTALL GRAVEL LIMITS OF DISTURBANCE (TYP) LIMITS (TYP) 2' FROM CONSTRUCTION INSTALL SILT FENCE 1' WEIR HEIGHT SILT CHECK, TYPE A INSTALL ROCK CONSTRUCTION SITE) NEAR ENTRANCE TO BOX HERE (OR LOCATION PLACE PERMITS RECORD (TYP) DISTURBANCE LIMITS OF STAG ING AREA STAG ING AREA TEMPORARY WORK BRIDGE TEMP LINING - JUTE NET INSTALL WATTLES 170' SPACING 1' WEIR HEIGHT SILT CHECK, TYPE A INSTALL ROCK BUFFER PLANTING PLAN SEE EC-3 FOR RIPARIAN 15+0015+0010+0020+0060+0060+00 (SR 3112) NW CARY PARKWAY C C F FF C C C C C F F F F C C C F F F SHEET NO.PROJECT REFERENCE NO.3/23/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_dtl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER EC-3 LT RIPRAP OUTLET PROTECTION below the riprap has taken place, or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. Inspect riprap outlet structures weekly and after significant (1/2 inch or greater) rainfall events to see if any erosion around or MAINTENANCE: ALIGNMENT STATION RT/LT RIP RAP CLASS RIP RAP (TONS)LENGTH OF APRON (FT) AT PIPE OUTLET (FT) WIDTH OF APRON FILTER FABRIC (SY) RIP RAP OUTLET PROTECTION CLASS I 87 10 15 Do La Do + La3Do -L-11+80 -L-14+03 RT CLASS B 3 106.255 SCIENTIFIC NAME COMMON NAME Red TopAgrostis alba Virginia Wild RyeElymus virginicus SwitchgrassPanicum virgatum Gamma GrassTripsicum dactyloides Pennsylvania SmartweedPolygonum pennsylvanicum Little BluestemSchizachyrium scoparium Soft RushJuncus effusus TickseedBidens aristosa Lance-leaved coreopsisCoreopsis lanceolata Deer TonguePanicim clandestinum Big BluestemAndropogon gerardii IndiangrassSorgastrum nutans 1: A SIMILAR MIXTURE CAN BE USED WITH APPROVAL BY ENGINEER. RIPARIAN BUFFER SEEDING PLAN 1 PER CENT COMPOSITION 10 15 15 5 5 5 5 10 10 5 5 10 HERBACEOUS, PERMANENT SEED MIXTURE LABELED "RIPARIAN SEED MIX" PER ACRE SHALL BE USED FOR SEEDING. THE FOLLOWING TABLE LISTS A RIPARIAN SEED MIX AT THE RATE OF ¼ LB PER 1,000 SQ FT OR 10 LBS SCIENTIFIC NAME COMMON NAME Beauty Berry Red Chokeberry BUFFER ZONE 1 PLANTING PLAN PER CENT COMPOSITION 25 25 15 10 10 FEET ON CENTER OR 250 PER 1,000 SF. BANKFULL OUTWARD AND THE TOP OF BANK. PLANT SPACING WILL BE 3-4 BUFFER ZONE 1 PLANTINGS TO BE INSTALLED IN AREAS BETWEEN THE Viburnum dentatum Southern Arrowwood Cornus amomum Silky Dogwood Llex glabra Cephalanthus occidentalis Button Bush Photinia pyrifolia Alnus serrulata Tag Alder 15 RIPARIAN BUFFER PLANTING PLAN SHEET NO.PROJECT REFERENCE NO.3/23/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_dtl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER EC-4 Shoulders, Side Ditches, Slopes (3:1) Date Type Planting Rate Jun. 15-Aug. 15 (Nov. 1-Mar. 1) combinations are possible. those which do well under local conditions: other seeding rate vegetation of denuded areas. The above vegetation rates are for additional information concerning other alternatives for Consult Conservation Engineer or Soil Conservation Service or Add Weeping Lovegrass or Add Hulled Common Bermudagrass Tall Fescue *** & Browntop Millet *** or Sorghum-Sudan Hybrids *** (unhulled-unscarified) & Tall Fescue Add Abruzzi Rye Sericea Lespedeza may be shaded out. grow over 12 inches in height before mowing, otherwise, fescue desired permanent vegetation. Do not allow temporary cover to *** Temporary - Reseed according to optimum season for SEEDING SCHEDULE Date Type Aug. 15-Nov. 1 Nov. 1-Mar. 1 Mar. 1-Apr. 15 Mar. 1-Jun. 1 (Mar. 1-Jun. 30) (Mar. 1-Apr. 15) (Mar. 1-Jun. 30) Jun. 1-Sep. 1 Sep. 1-Mar. 1 Tall Fescue Tall Fescue Tall Fescue Tall Fescue Slopes (3;1 to 2:1) & Abruzzi Rye Hulled Common Bermudagrass & Browntop Millet *** or Sorghum-Sudan Hybrids *** Sericea Lespedeza (scarified) and Add Tall Fescue 25 lbs./acre 25 lbs./acre 12 lbs./acre 35 lbs./acre 30 lbs./acre 50 lbs./acre 5 lbs./acre 8 lbs./acre 35 lbs./acre 30 lbs./acre 70 lbs./acre Apr. 15-Jun. 15 1) 2) 3) 4) 5) 6) 7) seeded and planted to a depth of six inches. After rough grading is completed, till soil in areas to be disturbed areas to be vegetated. Apply agricultural lime, fertilizer, and superphosphate to 40 lbs. 50% superphosphate/1000 sq. ft. (1750 lbs/acre) 35 lbs. 10-10-10 fertilizer/1000 sq. ft. (1500 lbs/acre) 90 lbs. limestone/1000 sq. ft. (2 tons/acre) Seeding permanent grass. November 15. February 15 through May 15 or August 15 through 3.0 lbs. KY-31 tall fescue/1000 sq. ft. (130 lbs./acre) during -OR- sq. ft. during November 15 through February 15. 3.0 lbs. KY-31 tall fescue and 2.0 lbs. annual ryegrass/1000 of 3 inches. Mulch around shubbery and trees with pine straw to depth Temporary cover -OR- 1.0 lbs. brown top millet/1000 sq. ft. May through August 25. 1.0 lbs. annual ryegrass/1000 sq. ft. August 25 through April. Date surface is uniform and free of large dirt clods. Disk nutrients into soil to a depth of six inches until 1) 2) 3) 4) 5) 6) 7) SEEDING SPECIFICATIONS CONSTRUCTION SEQUENCE MAINTENANCE PLAN fine gravel or sand may be needed to protect the filter cloth. Where large stones are used or machine placement is difficult, a 4-inch layer of If extensive damage is suspected, remove and replace the entire sheet. of filter material with a minimum overlap of 12 inches around the damaged area. If damage occurs remove the riprap and repair the sheet by adding another layer next section as required. Take care not to damage the cloth when placing riprap. ground and where necessary, bury the lower end of the cloth or overlap with the the overlap. Bury the upstream end of the cloth a minimum of 12 inches below Overlap the edges by at least 12 inches, and space anchor pins every 3 ft along Synthetic filter fabric - Place the cloth filter directly on the prepared foundation. layers with minimal mixing. specified depth. Where more than one layer of filter material is used, spread the foundation is prepared. For gravel, spread filter stone in a uniform layer to the Sand and gravel filter blanket - Place the filter blanket immediately after the ground inside dimensions and grade of the riprap meet design specifications. sufficiently to allow placement of the riprap in a manner such that the finished will be at the elevation of the surrounding area. Channels should be excavated material. Cut the subgrade sufficiently deep that the finished grade of the riprap depressions with riprap. Remove brush, trees, stumps and other objectional to a density approximating that of the surrounding undisturbed material or overfill lines and grades shown on the plans. Compact any fill required in the subgrade Subgrade Preparation - Prepare the subgrade for riprap and filter to the required CONSTRUCTION SPECIFICATIONS flow. Control of weed and brush growth may be needed in some locations. vigorous condition to protect the area from erosion and scour during out-of-bank immediately. Maintain all vegetation adjacent to the channel in a healthy, look for indications of piping, scour holes, or bank failures. Make repairs where concentrated flow enters. Carefully check stability at road crossings and promptly. Give special attention to the outlet and inlet sections and other points Inspect channels at regular intervals as well as after major rains, and make repairs MAINTENANCE riprap should be apparent. of the riprap should blend with the surrounding area. No overfall or protrusion of stone sizes to produce a relatively smooth, uniform surface. The finished grade stones. Hand placing may be necessary to achieve the proper distribution of The finished slope should be free of pockets of small stone or clusters of large the stones. stone sizes. Take care not to dislodge the underlying base or filter when placing riprap by dumping through chutes or other methods that cause segregation of final placement. Place riprap to its full thickness in one operation. Do not place be obtained by selective loading at the quarry and controlled dumping during a minimum of voids. The desired disbribution of stones throughout the mass may of the filter. Place riprap so that if forms a dense, well-graded mass of stone with Stone Placement - Placement of riprap should follow immediately after placement RIP RAP (6.15) LAND GRADING (6.02) TOPSOILING (6.04) GRASS-LINED CHANNELS (6.30) VEGETATIVE PLAN (NCDENR 6.11) retain sediment. Sediment barriers - Use sediment fences or other barriers where necessary to All stockpile areas used shall be stabilized with silt fence and seeded. topsoil is stockpiled in small piles located near areas where they will be used. traffic routes. On large sites, respreading is easier and more economical when Select stockpile location to avoid slopes and natural drainageways, avoiding STOCKPILING basins, diversions, and other controls into place before stripping. generally varies along a gradient from hilltop to toe of the slope. Put sediment soil cores at several locations within each area to be stripped. Topsoil depth but depth varies depending on the site. Determine depth of stripping by taking roadbuilding, or compaction by equipment. A 4 to 6-inch stripping depth is common, Strip topsoil only from those areas that will be disturbed by excavation, filling, STRIPPING identified by their extremely light weight when dry. Organic soils such as mucks and peats do not make good topsoil. They can be if it meets the other criteria listed above. desirable; however, material excavated from deeper layers may be worth storing Generally, the upper part of the soil, which is richest in organic matter, is most thickness affect the ease of excavation and spreading of topsoil. Soil factors such as rock fragments, slope, depth to water table, and layer The depth of material meeting the above qualifications should be at least 2 inches. Sodium - sodium adsorption ratio should be less than 12. Soluble salts - should be less than 500 ppm. it is less than 6.0. Acidity - pH should be greater than 3.6 before liming, and liming is required if greater than 1.5% by weight. Organic matter content - (sometimes referred to as "humic matter") should be soils such as peat or muck as topsoil. loam, clay loam, and loamy sand are fair. Do not use heavy clay and organic Texture - loam, sandy loam, and silt loam are best; sandy clay loam, silty clay handling. Quality topsoil has the following characteristics: Determine whether the quality and quantity of available topsoil justifies selective MATERIALS CONSTRUCTION SPECIFICATIONS to avoid excessive mixing of topsoil into the subsoil. After topsoil application, follow procedure for seedbed preparation, taking care between topsoil and subsoil. after spreading topsoil. A disk may be used to promote bonding at the interface On slopes and areas that will not be mowed, the surface may be left rough high-maintenance turf is to be established. germination. Light packing with a roller is recommended where but avoid excessive compaction, as it increases runoff and inhibits seed Compact the topsoil enough to ensure good contact with the underlying soil, water pockets. topsoiling or other operations to prevent the formation of depressions or wet or frozen. Correct any irregularities in the surface that result from Do not spread topsoil while it is frozen or muddy or when subgrade is SPREADING TOPSOIL the soil to a depth of at least 6 inches before spreading topsoil. the topsoil and subsoil. If no amendments have been incorporated, loosen by disking or scarifying to a depth of at least 4 inches, to ensure bonding of Roughening - Immediately prior to spreading the topsoil. loosen the subgrade Incorporate lime to a depth of at least 2 inches by disking. recommended by soil tests or specified for the seeding mixture to be used. soil is composed of heavy clays, incorporate agricultural limestone in amounts Liming of subsoil - Where the pH of the existing subsoil is 6.0 or less, or the approved plan and do not alter them by adding topsoil. Grading - Maintain grades on the areas to be topsoiled according to the such as diversions, berms, dikes, waterways, and sediment basins. Before spreading topsoil, establish erosion and sedimentation control practices SITE PREPARATION growth. must be stabilized with permanent vegetation to control erosion and weed Permanent vegetation - If stockpiles will not be used within 12 months they formation of the stockpile. as possible, no more than 30 working days or 120 calendar days after the Temporary seeding - Protect topsoil stockpiles by temporarily seeding as soon 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre at a rate of 450 gallons emulsion per acre of straw. of all drainage swales, tack mulch with asphalt emulsion surface equals or exceeds a 3:1 slope, and in the inverts sunlight to seedlings. On areas where the ground of ground surface should be visible to avoid blocking sq. ft. (2 tons/acre). Spread uniformly. Approximately• Mulch seeded area with small grain straw at 90 lbs/1000 6. The City of Greenville contact is Lynn Raynor, (252) 329-4620 within 7 to 14 days or sooner following completion of construction or development. requirements. Permanent ground cover is to be provided for all disturbed areas latest NPDES Rules dated August 2011 for more information on ground stabilization within 7 to 14 days or sooner of completion of any phase of grading. Refer to the 5. The Contractor shall provide ground cover on exposed slopes or other areas vegetative cover. according to specifications in the vegetative plan to maintain a vigorous, dense 4. The Contractor shall fertilize, reseed as necessary, and mulch all seeded areas barrier. feet deep at the fence. Silt fence will be repaired as necessary to maintain a 3. The Contractor shall remove sediment from behind silt fence when it becomes 0.5 the sediment pools no longer drains properly. capacity has been approximately 50% filled. Gravel will be cleaned or replaced when 2. The Contractor shall remove sediment from erosion control devices when storage and logged after every one inch of rainfall and once a week. The rain gauge must be kept onsite and inspections by the Contractor must be made System (NPDES) general stormwater permit, a rain gauge must be installed on site. maintain all practices as designed. Also per National Pollutant Discharge Elimination once every week. Any needed repairs will be made immediately by the Contractor to and operation following every runoff producing rainfall but in no case less than 1. The Contractor shall check all erosion and sediment control practices for stability is an essential part of an effective erosion and sedimentation control plan. maintenance of small eroded areas before they become significant gullies washouts or breaks occur, repair them immediately. Prompt remove all sediment from diversion and other water-disposal practices. If sedimentation control practices, especially after heavy rainfalls. Promptly Periodically check all graded areas and the supporting erosion and MAINTENANCE stabilization of these areas in the plan. make sure they are adequately protected from erosion. Include final 12. Show topsoil stockpiles, borrow areas, and spoil areas on the plans, and 15 working days or longer. measures on all graded areas when work is to be interrupted or delayed for completed on each area in the grading plan. Apply temporary stabilization 11. Permanently stabilize all graded areas immediately after final grading is with approved methods. 10. Handle seeps or springs encountered during construction in accordance during all phases of development. 9. Keep diversions and other water conveyance measures free of sediment slippage. 8. Do not place fill on a frozen foundation, due to possible subsidence and materials into fill slopes. 7. Do not incorporate frozen material or soft or highly compressible related problems. the layers as required to reduce erosion, slippage, settlement, or other 6. Place all fill in layers not to exceed 9 inches in thickness, and compact building debris, and other materials inappropriate for constructing stable fills. 5. Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, other objectionable material that would affect the planned stability of the fill. 4. Clear and grub areas to be filled to remove trees, vegetation, roots, or placing topsoil. 3. Scarify areas to be topsoiled to a minimum depth of 2 inches before it for use in finishing the grading of all critical areas. 2. Remove good topsoil from areas to be graded and filled, and preserve construction schedule. measures in accordance with the approved sedimentation control plan and 1. Construct and maintain all erosion and sedimentation control practices and CONSTRUCTION SPECIFICATIONS GRASS-LINED CHANNELS (6.30) the channel freely. 3. Remove and properly dispose of all excess soil so that surface water may enter preparations and sod buildup. during seedbed plans plus a 0.2-ft overcut around the channel perimeter to allow for bulking 2. Excavate the channel and shape it to neat lines and dimensions shown on the foundation area and dispose of properly. 1. Remove all trees, brush, stumps, and other objectionable material from the CONSTRUCTION SPECIFICATIONS channel. since it is the primary erosion protection for the grass in a healthy, vigorous condition at all times, maintain the designed carrying capacity. Keep the Remove all significant sediment accumulations to stability and evidence of piping or scour holes. channel outlet and all road crossings for bank repairs. It is particularly important to check the after every heavy rainfall event. Immediately make established, periodically check the channel; check it channels after every rainfall. After grass is During the establishment period, check grass-lined MAINTENANCE anticipated velocities during the establishment period. mulch or a temporary liner sufficient to withstand and selection of species. Protect the channel with channelwill depend upon the severity of the conditions 4. The procedure used to establish grass in the CONSTRUCTION SPECIFICATIONS new NCGO1 permit regardless of when they are approved. Notice of Intent (e-NOI) form. All construction activities are required to follow the approved on or after April 1, 2019 are required to fill out and submit an electronic this plan set. Please note that any construction activities that have an ES&C Plan 3. The Inspection, Recordkeeping, and Reporting Plan sheet is on sheet EC-10 of until the e-NOT has been filled out. Notice of Termination (e-NOT). A $100 annual general permit fee will be charged inspection report, the permittee shall visit deq.nc.gov/ NCG01 to submit an electronic the E&SC Plan. After DEMLR informs the permittee of the project close out, via 2. When the project is complete, the permittees shall contact DEMLR to close out be kept on site, preferably in a permits box, and accessible during inspection. approved. A copy of the E&SC permit, the COC, and a hard copy of the plan must Please note, the e-NOI form may be only be filled out once the plans have been filling out the electronic Notice of Intent (e-NOI) form at deq.nc.gov/ NCG01. be obtained before any land disturbing activities occur. The COC can be obtained by 1. Erosion and Sediment Control (E&SC) permit and a certificate of coverage must to the construction sequence: The NCG01 permit became effective on April 1, 2019 and added the following notes cannot access the form, please contact NCDEQ Land Quality Section at (919) 791-4200. and PDF from at http://portal.ncdenr.org/web/lr/erosion. If you have questions or 15A NCAC 4B.0131. The Self-Inspection Report form is available as a Word Document permanent ground cover is established in accordance with NCGS 113A-54.1 and inspections must be conducted after each phase of the project, and continue until and sedimentation control measures according to the approved plan. The The focus of the self-inspection report is the installation/maintenance of erosion for Construction Activities. from the weekly self-monitoring program of the NPDES Stormwater Permit inspections took effect October 1, 2010. The self-inspection program is separate control plan is being followed. Rules detailing the documentation of these phase of the project to make sure that the approved erosion and sedimentation persons responsible for land-disturbing activities inspect a project after each The Sedimentation Pollution Control Act was amended in 2006 to require that Notification of Land Resources Sediment and Erosion Control Self-Inspection Program: maintain management control. construction activities are needed, amend the sequence schedule in advance to of and until permanent vegetation on the project is established. When changes in during the demolition or clearing and grubbing phases as well as throughout the life and sediment control measures must be installed, maintained and adjusted as needed Follow the construction sequence throughout project development. Adequate erosion MAINTENANCE until the e-NOT has been filled out. Notice of Termination (e-NOT). A $100 annual general permit fee will be charged inspection report, the permittee shall visit deq.nc.gov/NCGOI to submit an electronic E&SC Plan. After DEMLR informs the permittee of the project close out, via 13. When the project is complete, the permittee shall contact DEMLR to close out the removed. Contractor must receive permission by project inspector before any measures are maintenance and vegetative plan. removed, restored as existing, and permanently vegetated as described in the and material area stockpile areas, and all other erosion control devices shall be 12. AFTER SITE IS STABILIZED, construction entrances, and construction staging 11. Site includes approximately 1.60 acres of permanent vegetation area. 10. Estimated time before final stabilization is 12 months. after rainfall events. Needed repairs will be made immediately. 9. All erosion and sediment control practices will be inspected weekly and devices maintained. shall have temporary vegetative ground cover established and erosion control ceases for more than the above mentioned length of time, all disturbed areas areas and slopes shall be stabilized within 14 days. If work on the project 3:1, and high quality (HQW) zones should be stabilized within 7 days. All other requirements. In summary, perimeter dikes, swales, ditches, slopes steeper than Rules dated August 2011 for more information on ground stabilization or sooner of completion of any phase of grading. Refer to the latest NPDES specifications to maintain a vigorous, dense, vegetative cover within 7 to 14 days 8. All graded areas will be seeded, fertilized and mulched according to NCDOT and mulch. 7. Finish grading of slopes, topsoil critical areas and permanently vegetate, seed 6. Complete final grading for trail. indicated. Modify silt fence placement around trail and outlets as necessary. construction. Place additional erosion control matting and stabilize 2:1 slopes as pedestrian bride and retaining wall, and place reinforced silt fence as needed during 5. In accordance with the erosion control plans, grade trail, install crosspipes, construct erosion control devices. protection fence, construction entrance, temporary stream crossings, and all other 4. Prior to any land disturbing (including demolition) activities, install silt/tree 3. Flag the work limits for protection. beginning or entrance of project. inspection. It is recommended that these items be placed in a permits box at the Coverage, and S&E plan are required to be maintained on site and accessible during 2. Per NPDES requirement, a rain gauge, self-inspections, records, permit, Certificate of and invite NCDEQ Regional LQS contact number is (919) 791-4200. 1. Hold preconstruction conference at least one week prior to starting construction CONSTRUCTION SPECIFICATIONS SHEET NO.PROJECT REFERENCE NO.3/23/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_dtl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER EC-5 after the contributing drainage area has been properly stabilized. unstable sediment deposits and bring the area to grade and stabilize it undermining the fence during cleanout.Remove all fencing materials and rain and to reduce pressure on the fence. Take care to avoid deposits as necessary to provide adequate storage volume for the next it promptly. Replace hardware cloth every 60 days. Remove sediment a sediment fence collapse, tear, decompose or become ineffective, replace each rainfall. Make any required repairs immediately. Should the fabric of Inspect sediment fences and fence outlets at least once a week and after MAINTENANCE: FENCE DETAIL SHOWN TO THE LEFT. FOLLOW MAINTENANCE REQUIREMENTS FROM STANDARD TEMPORARY SILT MAINTENANCE: removal. the next rain. Take care not to damage or undercut the fabric during sediment sediment from the pool area as necessary to provide adequate storage volume for Inspect the fabric barrier after each rain and make repairs as needed. Remove MAINTENANCE: effluent during construction. sediment. Provide a sufficient quantity of bags to contain silt form pumped Inspect inlet pipe and bag for damage and blockage. Replace bag when ƒ full of MAINTENANCE: SHEET NO.PROJECT REFERENCE NO.3/23/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_dtl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER EC-6 roadways. Immediately remove all objectionable materials spilled, washed, or tracked onto public rainfall, inspect any structure used to trap sediment and clean it out as necessary. construction site. This may require periodic topdressing with 2-inch stone. After each Maintain the stone pad in a condition to prevent mud or sediment from leaving the MAINTENANCE: SECTION. STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE SILT CHECK, DAROCK SILT CHECKS AS NEEDED TO PREVENT DAMAGE TO CHANNEL PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE BETWEEN SILT CHECKS, INSTALL A PROTECTIVE RIPRAP LINER IN THAT DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS SILT CHECK AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE RUNOFF EVENT. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE ROCK INSPECT ROCK SILT CHECKS AND CHANNELS FOR DAMAGE AFTER EACH MAINTENANCE: the next rain. Take care not tp damage the inlet protection device during sediment removal. Remove sediment from the pool area as necessary to procide adequate storage volume for MAINTENANCE: OVER THE WATTLE. THROUGH THE WATTLE, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN REMOVE SEDIMENT ACCUMULATED BEHIND THE WATTLES AS NEEDED TO PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN WATTLES, INSTALL A FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE WATTLE AND EROSION INSPECT WATTLES AND CHANNELS FORAMAGE AFTER EACH RUNOFF EVENT. MAINTENANCE: SHEET NO.PROJECT REFERENCE NO.3/23/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_dtl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER EC-7 SHEET NO.PROJECT REFERENCE NO.3/23/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Erosion Control\PSH\BL-0024_ero_dtl.dgnDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BL-0024 421 FAYETTEVILLE STREET, SUITE 600 C 2021 RALEIGH, NC 27601 ROADWAY DESIGN ENGINEER EC-8 BLACK CREEK-L- Sta. 20+43.94 END PROJECT BL-0024 -L- Sta. 11+46.50 BEGIN BRIDGE -L- Sta. 14+31.50 END BRIDGE TO N HARR ISON AVE PROJECT BEGIN PROJECT END NW CARY PKWYNORWEL L BL VDLEE COURT HAMPTON MONTIBELLO DR CANBERRA CT LI VI NGSTON DR OAK ISLAND DR NANTUCKET DRC REE K BL A C K -L- Sta. 9+75.00 BEGIN PROJECT BL-0024 PARK NORTH CARY TO EVANS ROAD (SR 3112) NW CARY PARKWAY -L-GREENWAY ACCESSBLACK CREEK-Y1--Y2-GREENWAY EXIST BLACK CREEK TO EVANS ROAD COURT HAMPTON LEEUO-2 (919) 462-3938 TOWN OF CARY, PROJECT TEAM LEAD TOWN OF CARY CONTACT: KYLE HUBERT AERIAL FO LINE VICINITY MAP09/08/990 PLANS UTILITY OWNERS ON PROJECT INDEX OF SHEETS XX DEPART ME NT OF TRANSPORTATION STATE OF NORTH CARO LI NASHEET NO. UO-1 T.I.P. NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS CONTRACT:3/22/2022UTILITIES BY OTHERS PLANS GRAPHIC SCALE PREPARED FOR OFFICE OF: FAX (919) 250-4151 PHONE (919) 707-6690 RALEIGH NC 27699-1555 1555 MAIL SERVICES CENTER DIVISION OF HIGHWAYS UTILITIES ENGINEERING UTILITIES UNIT UTILITIES COORDINATOR SHEET NO. DESCRIPTION UO-1 TITLE SHEET DIVISIONS OF HIGHWAYS STATE OF NORTH CAROLINA WAKE COUNTY 40 20 40 80 BL-0024 TIP PROJECT: BL-0024UO-2 UTILITY BY OTHERS PLAN SHEETS (E) SIGNALS - TOWN OF CARY: MATT FARABAUGH 919-612-8005 (D) CATV - CHARTER-SPECTRUM: ROBERT DABROWSKI 919-288-4867 (C) TELECOMMUNICATIONS - AT&T: DOCK POTTER 919-239-5813 (B) POWER - DUKE ENERGY PROGRESS: GEORGE COX 252-269-8848 (A) POWER - DUKE ENERGY PROGRESS: JESSICA WESTERVELT 919-810-6258 AMY D. YORK MONROE BROWN CENTRAL UTILITIES ENGINEER LOCATION: TYPE OF WORK: UTILITY RELOCATIONS BY OTHERS NW CARY PARKWAY (SR 3112) SIDEWALK AT BLACK CREEK TOP OF NUT =304.41' TH-3 TH-2 TH-1 TOP OF NUT =305.77' DIP = 345.15' TOP OF 12" VALVE = 347.12' TOP OF AIR =303.99' TOP OF NUT =305.09' TOP OF NUT TOP OF UTILITY = 323.89' 12" DUCTILE IRON WATER LINE TH-2 TOP OF UTILITY= 345.84' 12" DUCTILE IRON WATER LINE TH-1 TOP OF STORM DRAIN = 349.40' TOP OF UTILITY = 351.76' 12" DUCTILE IRON WATER LINE TH-3 TOP OF NUT =304.79' S SEX IS T ING R /W E X IS T IN G R /W DB 11813 PG 765 20' GREENWAY EASEMENT EIP 0.47' EIP TO R/W18" CMP N 89°30'00" W 311.62' BLACK CREEK BM 1982 PG 24440' UTI LI TY EASEM ENTN 01°05'19" EN 06°42'21" W559.84'TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 1000HL APTS, LLC BM 1994 PG 859 DB 18175 PG 1924 PIN 0765-53-4335 BM 1988 PG 1069 DB 12949 PG 1287 DB 7775 PG 470 PIN 0765-44-4056 MID AMERICA APARTMENTS, LLC 472.16' TOTALASSOCIATION, INC. BEECHTREE OF CARY HOME OWNERS BM 1988 PG 1069 DB 4326 PG 567 PIN 0765-64-1435 DB 117 9 4 PG 6 9 6 2 0' GREENWAY EAS EMENTEXISTING R/W BLACK CREEKEIP SOILSS SOIL TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 BM 1982 PG 24440' UTILITY EASEMENTN 00°33'39" E748.89'S 89°03'50" E1395.66' TOWN OF CARY BM 1994 PG 1888 DB 6394 PG 186 PIN 0765-23-7973 EXISTING R/W G PS-2106.00'106.00'30" PVCHH HHHH4 ", PVC, TOWN OF CARYTOWN OF CARY 12 ", DIP, TOWN OF CARY 12 ", DIP, WATERLINE ATTACHED TO BRIDGE FUTURE 6" STUB 12 ", D IP, TO W N O F C A R Y AERIAL FO LINE 12 ", D IP, TO W N O F C A R Y AT&T Corp. C orp. A T & T W Charter 12" D I WATER L INE 12" DI WATER LINE 1 2 3 1 1 2 1 UTILITIES BY OTHERS SHEET. FOR PROPOSED UTILITY WORK SHOWN ON THIS PAYMENT WILL BE MADE TO THE CONTRACTOR SHEET WILL BE DONE BY OTHERS. NO ALL PROPOSED UTILITY WORK SHOWN ON THIS NOTE: PROJECT REFERENCE NO.SHEET NO.3/22/2022K:\RAL_Roadway\011775062 - Cary Parkway Bridge\Utilities\UBO\BL-0024_rdy_UBO_2.dgnBP1.R004.0 UO-2 O 15+0015+0010+0020+0060+00 RETAIN RETAIN RETAIN AT&T TO REMOVE POLE AND INSTALL GUY WIRE DUKE TO RETAIN POLE (SR 3112) NW CARY PARKWAY GUY WIRES AND OH LINES DUKE TO INSTALL NEW POLE GUY WIRES AND OH LINES DUKE TO INSTALL NEW POLE REM REM REMOVE POLE AT&T TO REMOVE POLE DUKE TO REM GUY WIRE AND OH LINES DUKE TO INSTALL NEW POLE HAND HOLE AT&T TO ADJUST HAND HOLE SEGRA TO RETAIN EXIST UG LINES CHARTER TO RETAIN EXIST UG LINE AT&T TO RETAIN EXIST UG LINE AT&T TO RETAIN TO TRANSFER OH LINES TO NEW DUKE POLES AT&T, DUKE LIGHTING, CROWN CASTLE, AND CARY FIBER TO TRANSFER OH LINES TO NEW DUKE POLES AT&T, DUKE LIGHTING, CROWN CASTLE, AND CARY FIBER