Loading...
HomeMy WebLinkAbout20211174 Ver 2_Riparian Buffer Authorization Request_20220323 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 3/23/2022 6:21:11 PM(Start) Approve by Carpenter,Kristi Lynn 3/24/2022 3:50:44 PM(DOT-Initial Review) • The task was assigned to Carpenter,Kristi Lynn 3/23/2022 6:22 PM • • Application • Water Resources Buffer 1 1 1 .0250 1 1 1.1 -)(2)Buffer Authorization Online } Update 10/23/2018 Original Submittal 3/23/2022 A. Owner/Applicant Information General Information Primary Contact Email:* emma.radford@kimley-horn.com Please list the contact person's email for questions or payment on this project if needed. Who is submitting the application?* Owner Applicant other than Owner Agent 1. Property Owner Information: 1a.Name on Recorded Deed:* Town of Cary 1b.Responsible Party: Mr.Kyle Hubert (for Corporations) 1c.Mailing Address:* Street Address 316 North Academy Street Address Line 2 City State/Province/Region Cary NC Postal/Zip Code Country 27513 us 1d.Telephone:* 9194623938 1e.Email Address:* Kyle.Hubert@townofcary.org 3. Agent Information: 3a.Name: 3b.Company Affiliation: 3c.Mailing Address: Street Address Address Line 2 City State/Province/Region Postal/Zip Code Country 3d.Telephone: 3e.Email Address: 3f.Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document authorization form. POF only ..................... ........................................................................................................................................................................................................................................................................................................ B. Project Information and Prior Project History 1. Project Information h ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................f....... 1a.Name of Project:* NW Cary Parkway Sidewalk at Black Creek(BL-0024) (Subdivision,facility,or establishment name) 1b.Is this a publicly-funded transportation project?* • Yes No 1c.TIP# BL-0024 1d.Subdivision Name: le.Nearest Municipality: Town of Cary 1f.Property Size: 4.90 acres 1g.County(or Counties)where the project is located: Wake 1h.Property ID# Date of Purchase Tax PIN or Parcel id 1 i. Deed Information Type of Book Book# Page# Deed IF Map -IF 1 j.Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF only 1k.How would you like to provide the Latitude and Longitude information?* Address Lookup • Manually Latitude* 35.820433 Longitude* :-78.784944 11.Is the project located in any of North Carolina's twenty coastal counties?* Yes No 2. Surface Waters 2a.Name of the nearest body of water to proposed project: Black Creek 2b.Water Quality Classification of nearest receiving water: C; NSW 2c.List the total estimated linear feet of all existing streams(intermittent and perennial)on the property: 201 (linear feet only) 3. Project Description: ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 3a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The approximately 4.9-acre project study area is situated along the NW Cary Parkway roadway corridor and is located within the municipal boundaries of the Town of Cary in Wake County,North Carolina.The Town of Cary's proposed NW Cary Parkway pedestrian bridge project runs perpendicular to Black Creek.Black Creek flows south to north through the project study area with an existing greenway network parallel to the right bank.The project study area and its vicinity primarily consist of forested riparian corridors and greenways within North Cary Park,single-family and multi-family residential developments,and institutional and recreational facilities. 3b.Attach an 8%x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document Fig2_CaryPedBridge_USGS.pdf 975.94KB PDF only 3c.Attach an 8'/z x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document Fig4_CaryPedBridge_NRCS.pdf 1003.45KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: The project proposes to construct additional sidewalk and a pedestrian bridge over Black Creek along the northern side of NW Cary Parkway to connect the 650-foot gap in the existing pedestrian infrastructure along the project corridor and improve pedestrian access in the Town of Cary.Currently,the sidewalk connects to the park trails but does not continue along Cary Parkway across the bridge.The sidewalk completion would improve connectivity between numerous residential developments, areas of employment,parks,and greenways.The bridge would improve safety by allowing pedestrians and bicyclists to cross over Black Creek separately from North Cary Parkway.Equipment typical of greenway and bridge projects will be utilized, including but not limited to excavators,bull dozers,and cranes. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document 07b_BL-0024_XSC.pdf 994.96KB 07a_PlanSheets_BL-0024.pdf 15.28MB PDF only 5. Jurisdictional Determinations 5a.Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases)in the past?* 5b.Who did the determination on the jurisdictional areas? .................................................................................................................. Who did the determination? IF List name if known Date IF Attach Corps James Lastinger 11/05/2021 (Name if known) 06a_JD_Lett... 1.71... pdf only State Rob Ridings 07/29/2021 06b BufferD... 331.... (Name if known) — pdf only * Please include the date of the determination and upload a copy of the determination. Comments: Kimley-Horn staff conducted a delineation of the project study area on July 21,2021. One perennial stream(Black Creek)was identified within the project study area and one intermittent stream(Stream S3)was identified within 50 feet of the project study area.James Lastinger of the USACE issued a Preliminary Jurisdictional Determination dated November 5,2021 (SAW-2021-01634).Rob Ridings of the NCDWR issued a buffer determination letter(DWR#20211174)on July 29,2021. 6. Project History .............................................................................. 6a.Have permits or certifications been requested or obtained for this project(including all prior phases)in the past?* Yes O No 7. Future Project Plans A ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ....... 7a.Is this project a phased project?* Yes • No C. Proposed Impacts Inventory Buffer Impacts A ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ....... Project is in which protected Basin?* Neuse River Basin(15A NCAC 02B.0233) Catawba River Basin(15A NCAC 02B.0243) Randleman Lake Watershed(15A NCAC 02B.0250) Tar-Pamlico River Basin(15A NCAC 02B.0259) Jordan Lake Watershed(15A NCAC 02B.0267) Goose Creek Watershed(15A NCAC 02B.0606&15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation,then you MUST fill out Section D of this form. .................................. Site#-Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 Site 1 -Temporary Black Creek Temporary Allowable 994.00 794.00 Construction (T) Square Square Access(Left Bank) Perm or Temp Feet Feet Map label(e.g.Road Crossing 1) Site 1 -Temporary Black Creek Temporary Allowable 1,107. 898.00 Construction (T) 00 Square Access(Right Perm or Temp Square Feet Bank) Feet Map label(e.g.Road Crossing 1) Site 1 -Powerline Black Creek Permanent Exempt 514.00 761.00 Reloaction (P) Square Square Map label(e.g.Road Perm or Temp Feet Feet Crossing 1) Site 1 -Riprap Black Creek Permanent Allowable 0.00 158.00 placement (P) Square Square Map label(e.g.Road Perm or Temp Feet Feet Crossing 1) Total Zone 1 Impacts: 2,615.00 Total Zone 2 Impacts: 2,611.00 Total Buffer Impacts: 5,226.00 Comments: Unavoidable permanent impacts to the riparian buffer zones associated with Black Creek will result from the proposed project.At Impact Site 1,permanent impacts to riparian buffer zone 2 will result from the placement of riprap along a newly constructed stormwater ditch.Riprap will be placed underneath and between NW Cary Parkway and the proposed pedestrian bridge to protect the steep slope that ties into the existing greenway from erosion.This impact is"Allowable Upon Authorization"under the Neuse River Riparian Basin Buffer Rules Table of Uses [Section(11)(cc)]for stormwater control measures.Additionally,Duke Energy is permitting a powerline relocation within the existing NCDOT right-of-way easement south of NW Cary Parkway.This will result in permanent impacts that are"Deemed Allowable"under the Neuse River Riparian Basin Buffer Rules Table of Uses[Section (11)(pp)]for Utilities—Non sewer aerial line Perpendicular crossings. Additionally,temporary impacts to the riparian buffer zones 1 and 2 at Impact Site 1 will result from temporary construction access along the left and right bank of Black Creek.This will allow crane access underneath the existing NW Cary Parkway roadway bridge to construct the proposed pedestrian bridge.Temporary construction access disturbing greater than 2,500 sqft of the riparian buffer is"Allowable Upon Authorization"under the Neuse River Riparian Basin Buffer Rules Table of Uses [Section(11)(ee)].A riparian buffer replanting/seeding plan is included in the erosion control plans. D. Impact Justification and Mitigation .................................................................................................................................................................................... 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. Impacts to streams and riparian buffers have been avoided and minimized to the extent practical. Impacts to streams in the project corridor were entirely avoided by intentionally locating the pedestrian bridge alignment outside of stream and riparian zones throughout the project corridor.To minimize impacts to riparian areas,the stream crossing location was intentionally located where a perpendicular crossing was feasible.Temporary construction access is proposed along both banks of Black Creek within the project corridor,allowing the pedestrian bridge to be constructed without impacting the stream itself.The proposed temporary work bridge will span the stream from top of bank to top of bank,therefore no stream impacts will result from the placement of this bridge.Additionally,the powerline relocation is located entirely within existing NCDOT right-of-way,therefore Duke Energy will be able to relocate their lines without the need of an additional easement. 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Impacts to streams and protected riparian buffers within the project study area will be minimized to the extent practical throughout the construction process by avoiding these features with equipment,materials,and access corridors where practicable. Where feasible,staging and construction access routes will be located in upland areas throughout the corridor.Silt fencing will be installed around the limits of disturbance to help ensure that all construction equipment will remain within the permitted areas throughout the construction process.Temporary sediment control measures will be used to reduce stormwater impacts to receiving waters and minimize runoff from the construction sites. E. Diffuse Flow Plan ........ ......... ......... 1a.What type of SCM are you providing?* Level Spreader Vegetated Conveyance(lower SHWT) Wetland Swale(higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30%nitrogen 1 c.Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document 08_Erosion Control Pages from BL-0024.pdf 9.82MB PDF only F. Supplementary Information ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land? 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)Environmental Policy Act(NEPA/SEPA)? Yes N( 1c.If you answered"yes"to the above,has the document been finalized by the State Clearing House? Yes • No 1d.Attach a copy of the NEPA or SEPA final approval letter. Click the upload button or drag and drop files here to attach document PDF only Violations ............................................... 2a.Is the site in violation of DWR Wetland Rules(15A NCAC 02H .0500),Isolated Wetland Rules(15A NCAC 02H.1300),DWR Surface Water or Wetland Standards,or Riparian Buffer Rules(15A NCAC 02B.0200)? 2b.Is this an after-the-fact buffer authorization application? Yes No G.Additional Information ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................--........... Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document Fig 1_CaryPed Bridge_Vicinity.pdf 895.24KB Fig 3_CaryPed Bridge_JD Features.pdf 1.76MB 04_CaryParkway_S1_NCDWR-Stream Form.pdf 120.79KB 05_BL-0024_Permit Drawings_(2022-03-23).pdf 1.82MB 01_CaryPed Bridge_CoverLetter_2021.pdf 619.56KB PDF only Additional Comments: On behalf of our client,the Town of Cary,Kimley-Horn is submitting the attached buffer authorization request for the above referenced linear transportation project located in the Neuse River Basin.The project proposes to construct additional sidewalk and a pedestrian bridge over Black Creek along NW Cary Parkway to connect the 650-foot gap in the existing pedestrian infrastructure in Cary,Wake County,North Carolina. In total,the project proposes 2,101 square feet of temporary Buffer Zone 1 impacts, 1,692 square feet of temporary Buffer Zone 2 impacts,514 square feet of permanent Buffer Zone 1 impacts,and 919 square feet of permanent Buffer Zone 2 impacts. To assist with the processing of this application,the following information is included: •Buffer Authorization Form •Signed Agent Authorization Form •Figures •NCDWR Stream Data Form •Buffer Determination Letter(DWR#20211174) •USACE Preliminary Jurisdictional Determination(SAW-2021-01634) •Buffer Impact Drawings •Plan Sheets •Erosion Control Sheets If there is any additional information you need to assist in the processing of this buffer authorization,please do not hesitate to contact me at(919)677-2215 or Emma.Radford@kimley-horn.com. H. Sign and Submit .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... By digitally signing below,I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the application form." Print Name:* Emma Radford,WPIT Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Yes No Is this project a public transportation project?* Yes No ID#* 20211174 Version:* 2 Select Reviewer:* Rob Ridings:eads\rgridings Select Reviewing Office* Central Office-(919)707-9000 Has payment been received?* No Payment Needed Fee Received Need Fee-send electronic notification